Use of GIS/GPS for supporting field enumeration · GPS/GIS) •A new EA map resulted with EA's...
Transcript of Use of GIS/GPS for supporting field enumeration · GPS/GIS) •A new EA map resulted with EA's...
Regional Workshop on the Use of Technology in Population and Housing Censuses in Arab countries,
Cairo - Egypt, 29-31 January 2018
Palestine
January 2018
Use of GIS/GPS for supporting field enumeration
Regional Workshop on the Use of Technology in Population and Housing Censuses in Arab countries, Cairo - Egypt, 29-31 January 2018
Old censuses
• In census 1997 and 2007, paper questionnaire were used
• Paper maps were used for locations and addressing
• Traditional data processing, data entry, coding and cleaning
• Takes long time period to finish data processing after fieldwork
• No complex ICT infrastructure needed
26-Jan-18Use of GIS/GPS for supporting field enumeration2
Regional Workshop on the Use of Technology in Population and Housing Censuses in Arab countries, Cairo - Egypt, 29-31 January 2018
Census 2017
• In census 2017, PCBS adopted using the new technology inimplementing the census fieldwork activities
• New technology means mobile applications supported withGPS/GIS
• A special set of mobile applications were produced to tacklethis issue
• GPS/GIS was used in all census 2017 stages as an embeddedmodule in the applications
• Different usages of GPS/GIS in all census stages
• Using tablets supported by GPS/GIS technology enhanceddata quality
26-Jan-18Use of GIS/GPS for supporting field enumeration3
Regional Workshop on the Use of Technology in Population and Housing Censuses in Arab countries, Cairo - Egypt, 29-31 January 2018
Census 2017
GPS/GIS heavily used in:
• Correcting and updating of basemap
• Fieldwork management andmonitoring
• A Guiding map for locationsused by fieldwork staff
26-Jan-18Use of GIS/GPS for supporting field enumeration4
Regional Workshop on the Use of Technology in Population and Housing Censuses in Arab countries, Cairo - Egypt, 29-31 January 2018
Correcting and updating of base map
• Before census 2017 PCBS implemented a projectto digitize a base map
• Aerial photo map was used and last map versionwas 2014
• The project of digitizing implemented during theperiod 2008-2014
• Different geographical layers were digitized(localities borders, enumeration area, streets,buildings, landmarks, etc.)
• An integrated GIS database was established toserve future surveys and sampling frames
26-Jan-18Use of GIS/GPS for supporting field enumeration5
Regional Workshop on the Use of Technology in Population and Housing Censuses in Arab countries, Cairo - Egypt, 29-31 January 2018
Correcting and updating of base mapUsing new technology (Tablets supported byGPS/GIS)
• The first stage of census 2017 dedicated forupdating the existing base map dependingon aerial photo 2015
• New aerial photo was obtained (2016)
• In the office, all geographical layers werereflected on the new aerial photo then thebase map layers were reviewed andcorrected.
• A special mobile application (one of thecensus applications) was produced for thefieldwork
26-Jan-18Use of GIS/GPS for supporting field enumeration6
Regional Workshop on the Use of Technology in Population and Housing Censuses in Arab countries, Cairo - Egypt, 29-31 January 2018
Correcting and updating of base map…Using new technology (Tablets supported by GPS/GIS)
• Tablets supported with GPS receivers used to update thelocations and collect the data
• The period assigned for the updating stage was three months(October-December 2016)
• Approximately 300 persons were assigned to perform thefieldwork
• Then 20 days of office work spent to extend the 2007 EA’s tocover all areas in Palestine and to be match with 2017localities borders
• Fourteen employees worked in the office after finishing thefieldwork to re-divide the EA's
26-Jan-18Use of GIS/GPS for supporting field enumeration7
Regional Workshop on the Use of Technology in Population and Housing Censuses in Arab countries, Cairo - Egypt, 29-31 January 2018
Correcting and updating of base map…Using new technology (Tablets supported byGPS/GIS)
• The ICT infrastructure for the GIS departmentwork was renewed and supported
• A final GIS database was produced and allnext census stages depended on this GISdatabase
• EA's re-divided upon the results of this stageand control data collected
• Each EA contains in average 150-180households
26-Jan-18Use of GIS/GPS for supporting field enumeration8
Regional Workshop on the Use of Technology in Population and Housing Censuses in Arab countries, Cairo - Egypt, 29-31 January 2018
Correcting and updating of base map
…Using new technology (Tablets supported byGPS/GIS)
• A new EA map resulted with EA's boundariesand information demonstrated
• Next stages, needs and details, were designeddepending on the results of this stage
• In all next census 2017 stages, GPS modulewas embedded in the applications and one ofits uses was, if existed, correcting andupdating the base map and the GIS database
26-Jan-18Use of GIS/GPS for supporting field enumeration9
Regional Workshop on the Use of Technology in Population and Housing Censuses in Arab countries, Cairo - Egypt, 29-31 January 2018
Fieldwork management and monitoring
• A central web application“Fieldwork Management System”designed based on the GISdatabase used to manage andmonitor the fieldwork
• Can be opened usingPC/Laptop/Tablet/Mobile
• The GIS database provided aclear vision of the work thatshould be accomplished in allcensus stages
26-Jan-18Use of GIS/GPS for supporting field enumeration10
Regional Workshop on the Use of Technology in Population and Housing Censuses in Arab countries, Cairo - Egypt, 29-31 January 2018
Fieldwork management and monitoring
The use of the “Fieldwork Management System” helped to design allcensus stages as:
• Identification of required staff for the fieldwork
• The skills and training needs of the fieldwork staff
• Determining the timetable of the project
• Optimized workload distribution among different types of fieldworkstaff
• The number and distribution of required regional offices
• Equipment and ICT infrastructure in the regional offices
26-Jan-18Use of GIS/GPS for supporting field enumeration11
Regional Workshop on the Use of Technology in Population and Housing Censuses in Arab countries, Cairo - Egypt, 29-31 January 2018
Fieldwork management and monitoring
Monitoring and control:
• GPS module was embedded in all census applications
• Each fieldworker (supervisor, crew leader, enumerator) assigned oneor more EA according to the work hierarchy
• All fieldwork activities were controlled and monitored by “FieldworkManagement System”
26-Jan-18Use of GIS/GPS for supporting field enumeration12
Regional Workshop on the Use of Technology in Population and Housing Censuses in Arab countries, Cairo - Egypt, 29-31 January 2018
Fieldwork management and monitoring
Monitoring and control:
In the field:
• The information of all buildings and households inthe EA was uploaded on the tablet from the GISdatabase
• Each fieldworker can't work outside his assignedEA's (restricted by the EA uploaded)
• The questionnaire will not open unless thefieldworker stands in the allowed distance read byGPS receiver
26-Jan-18Use of GIS/GPS for supporting field enumeration13
Regional Workshop on the Use of Technology in Population and Housing Censuses in Arab countries, Cairo - Egypt, 29-31 January 2018
Fieldwork management and monitoring
Monitoring and control:
…In the field:
• The application automatically recorded thefieldworker route (tracking system)
• Instructions sent to all fieldworkers tosynchronize the tables and send the data everytwo hours
• Supervisor/Crew leader/Local Director/HQ canmonitor the work progress
• They can also monitor data transmissions anddevices synchronization
26-Jan-18Use of GIS/GPS for supporting field enumeration14
Regional Workshop on the Use of Technology in Population and Housing Censuses in Arab countries, Cairo - Egypt, 29-31 January 2018
Fieldwork management and monitoring
Monitoring and control:
…In the field:
• GIS database offer several types of workprogress tables/charts/maps
• Visual EA's maps with colored flags oneach building or EA to monitor thecompleteness of the EA's
• Direct intervention from any level of administration to perform amendments
26-Jan-18Use of GIS/GPS for supporting field enumeration15
Regional Workshop on the Use of Technology in Population and Housing Censuses in Arab countries, Cairo - Egypt, 29-31 January 2018
A Guiding map for locations used by fieldwork staff
• The base map of each district (depends on theworking EA's) loaded on the tablets
• The GIS database for the district and the assignedEA's geo information loaded on the tablets as well
• The map used as a guiding map where trackingtool embedded in the application register theactual route of the fieldworker
• Using digital maps and GIS information enhancethe data quality and accuracy. Also saves time andefforts.
26-Jan-18Use of GIS/GPS for supporting field enumeration16
Regional Workshop on the Use of Technology in Population and Housing Censuses in Arab countries, Cairo - Egypt, 29-31 January 2018
Thank you
17 26-Jan-18Use of GIS/GPS for supporting field enumeration