Transcript of USCG R&D Center’s Analysis of Standard Boat Asset Project Office (APO’s) Metrics
USCG R&D Center’s Analysis of Standard
Boat Asset Project Office
(APO’s)Metrics
LT Sam Edwards
CG Measurement Summit ‘07
28 Nov 2007
04/09/23 23:48UNCLAS |Analysis of APO's metrics | LT Sam Edwards 2
R&D Center Analyses, Modeling & Simulation
Force Structure and Availability
Sector Operations (Multi-Unit and Missions)
Radar Detection Range
Cutter Chasing Go-Fast
04/09/23 23:48UNCLAS |Analysis of APO's metrics | LT Sam Edwards 3
Primary Standard Boat APO Goals
(1) Increase the Operational Availability for Assigned Classes of Standard Boats (i.e. RBS)
(2) Reduce the Annual Maintenance Cost for Assigned Classes of Standard Boats (i.e. RBS).
04/09/23 23:48UNCLAS |Analysis of APO's metrics | LT Sam Edwards 4
AnnualInvestment
Personnel System Ops& Upgrades
EngineeringSystem Ops& Upgrades
LogisticsSystem Ops& Upgrades
RBS APO “System Model” (Simplified)
BudgetRequest
MaintenanceCommunity - Sector - Depot
Actual Annual Availability
Annual Availability Gap
Desired Annual Availability
AnnualMaint’ Cost Gap
Desired Annual Maint’ Cost
Actual AnnualMaint’ Cost
04/09/23 23:48UNCLAS |Analysis of APO's metrics | LT Sam Edwards 5
AnnualInvestment
Personnel System Ops& Upgrades
EngineeringSystem Ops& Upgrades
LogisticsSystem Ops& Upgrades
Critical APO Measurement Points
BudgetRequest
MaintenanceCommunity - Sector - Depot
Actual Annual Availability
Annual Availability Gap
Desired Annual Availability
AnnualMaint’ Cost Gap
Desired Annual Maint’ Cost
Actual AnnualMaint’ Cost
(A)
(B)
04/09/23 23:48UNCLAS |Analysis of APO's metrics | LT Sam Edwards 6
Filtering Candidate Metrics Pool
Candidate APO Metrics
“Right” APO Metrics
Filters
Criticality / “So What” Test (Capability to ID Critical Problem(s) and/or Provide Insight into Corrective Action)
Implementation Cost (to set up APO Metric Data Collection Infrastructure)
Additional Recurring Labor Cost (to enter Selected APO Metric Data)
04/09/23 23:48UNCLAS |Analysis of APO's metrics | LT Sam Edwards 7
ALMIS Metrics Pass These Filters
Criticality / “So What” Test (Capability to ID Critical Problem(s) and/or Provide Insight into Corrective Action)
Implementation Cost (to set up APO Metric Data Collection Infrastructure)
Additional Recurring Labor Cost (to enter Selected APO Metric Data)
Filters ALMIS Attributes
ALMIS Is Being ImplementedFor standard boat APO. Therefore, these costs are already being incurred /accepted.
• Aviation and standard boat have Operational Similarities….• ALMIS metrics have evolved within aviation community.
04/09/23 23:48UNCLAS |Analysis of APO's metrics | LT Sam Edwards 8
Critical Questions
(1) What are the Available ALMIS Metrics?
(3) Do they need to be supplemented or modified for Standard Boat APO use?
(2) Which Metrics are Most Promising for Standard Boat APO use?
04/09/23 23:48UNCLAS |Analysis of APO's metrics | LT Sam Edwards 9
Metrics available in ALMIS
WebReport
Power PlayCube
•Created on demand•Can have long run-time•Fixed format
•Generated every 24 hours•Quickly accessible•Allow calculations•Allow drill-through•Configurable formatting
04/09/23 23:48UNCLAS |Analysis of APO's metrics | LT Sam Edwards 10
Promising ALMIS-Available Metrics
Overall (As monitored by the APO IT Cell for APO Command Staff)
• Actual RBS % Fleet Available = ____% for FY 08
• Actual RBS Fleet Annual Maintenance Cost = $_______ for FY08 (Note: Aviation APO uses ALMIS Labor to calculate Maintenance Costs Quarterly and Annually)
Overall Diagnostic
• Dispatch Reliability Index (DRI)
• Percent Planned Monthly Hours Flown
• Not Mission Capable due to Unit-Level Maintenance (NMCM)
• Not Mission Capable Due to Supply (NMCS)
• Not Mission Cable Due to Depot-Level Maintenance (NMCD)
04/09/23 23:48UNCLAS |Analysis of APO's metrics | LT Sam Edwards 11
Promising ALMIS- Available Metrics
Logistics Support System ( As monitored by the APO Logistics Cell)
• Not Mission Capable due to Supply (NMCS)
• Total Stock Position (SP)…..Value of Inventory on Hand and On Order
• First Time Fill Rate…………..All Parts
• Cannibalization Hours...Number of Labor Hours to Obtain parts from other A/C
• Cost Drivers……Status of Parts that are most costly to keep asset operational
• Availability Degraders……Parts most likely to keep asset OOC
04/09/23 23:48UNCLAS |Analysis of APO's metrics | LT Sam Edwards 12
Promising ALMIS-Available Metrics
Personnel Support System ( As monitored by the APO IT Cell)
• Unit-Level Maintenance Loading Index (UMLI) = (Unit MLH total) PCS Assigned x 1378 where MLH = Maintenance Labor Hours 1378 = Labor Hours per person per year
• Unit-Level Experience Index (ULEI) = (time in aviation + time in AC type) # of Billets
• Overall Maintenance Effort Index (OMEI) = Depot + Unit Labor Hours Total Flight Hours (Note: Aviation APO is working to calculate this in ALMIS; presently problems with getting Depot-level contracting costs into ALMIS)
• Unit-level Maintenance Effort Index (UMEI) = Unit Labor Hours Total Flight Hours
The Below Metrics are Approved but Not yet Implemented in ALMIS
04/09/23 23:49UNCLAS |Analysis of APO's metrics | LT Sam Edwards 13
Promising ALMIS- Available Metrics
Engineering Support System ( As monitored by the APO Engineering Cell)
• Number of Priority 2 Requisitions per QTR or Per FY
• MTBF…….Note: Aviation APO calculates from ACMS; Performance & Reliability Summary (reported by part)
• Not Mission Capable due to Depot-Level Maintenance (NMCD)
• Not Mission Capable due to Maintenance (NMCM)
• Costs Drivers……Status of Parts that are most costly to keep asset operational
• Availability Degraders……Status of Parts that keep asset OOC
• Maintenance Time Reports……for Specific Types of Maintenance
04/09/23 23:49UNCLAS |Analysis of APO's metrics | LT Sam Edwards 14
Unit-LevelMaintenanceEffortIndex
Total Stock Position
04/09/23 23:49UNCLAS |Analysis of APO's metrics | LT Sam Edwards 15
0%
1%
2%
3%
4%
5%
6%
7%
8%
9%
10%
FY00 FY01 FY02 FY03 FY04 FY05 FY 06
HH-60J USCG Target
SUPPLYH60 NMCS FY00-06
04/09/23 23:49UNCLAS |Analysis of APO's metrics | LT Sam Edwards 16
SUPPLY H60 NMCS (12-Month Tracking)
0%
2%
4%
6%
8%
10%
12%
14%
16%
18%
20%
Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec
HH-60J Target
04/09/23 23:49UNCLAS |Analysis of APO's metrics | LT Sam Edwards 17
SUPPLYAir Station First Time Fill Rate
60%
65%
70%
75%
80%
85%
90%
95%
FY01 FY02 FY03 FY04 FY05 FY06
HC-130 HH-60 HH-65 HU-25
04/09/23 23:49UNCLAS |Analysis of APO's metrics | LT Sam Edwards 18
1%
6%
11%
16%
21%
26%
31%
07 Q3 06 Q4 07 Q1 07 Q2
C130 H60 H65 HU25
PERFORMANCEFLEET NMCM (Quarterly)
04/09/23 23:49UNCLAS |Analysis of APO's metrics | LT Sam Edwards 19
PERFORMANCE10-YEAR H60 NMCM
…And it is continuing to grow and grow
04/09/23 23:49UNCLAS |Analysis of APO's metrics | LT Sam Edwards 20
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
FY01 FY02 FY03 FY04 FY05 FY06
HH-60J USCG Target
PERFORMANCEH60 7-YEAR AVAILABILTY
04/09/23 23:49UNCLAS |Analysis of APO's metrics | LT Sam Edwards 21
40%
50%
60%
70%
80%
90%
100%
07 Q3 06 Q4 07 Q1 07 Q2
C130 H60 H65 HU25 Target
PERFORMANCEH60 AVAILABILTY FY06
04/09/23 23:49UNCLAS |Analysis of APO's metrics | LT Sam Edwards 22
2 7 8 8 7 9 7 6 7 6 7 5 90
1
2
3
4
5
6
7
8
9
10
94 95 96 97 98 99 00 01 02 03 04 05 06
Fiscal Year
PD
M C
ompl
etio
ns
0
10
20
30
40
50
60
70
80
Avg
Mon
ths
in S
ervi
ce
(yel
low
line
)
PDMPRODUCTION RATE
04/09/23 23:49UNCLAS |Analysis of APO's metrics | LT Sam Edwards 23
Shore Facilty
C4ISR
Cutter
Patrol Boat
Standard Boat
Aviation
Aviation Metrics Relevancy
Maintenance Performance Metrics
Supply Performance Metrics
Asset Mission Performance Metrics
Independent APO Metrics Assessment
APO Types
100%0%Anticipate HighDegree of Similarity forMaintenance & Supply MetricsAcross APO’s
04/09/23 23:49UNCLAS |Analysis of APO's metrics | LT Sam Edwards 24
RDC Analysis Findings
(1) The aviation APO has evolved over the past decade an impressive set of APO Metrics, using ALMIS, that work for them.
(3) The decision to implement ALMIS for the standard boat APO provides an initial set of metrics that pass thru the Criticality, Implementation Cost, and Recurring Labor Cost Filters, which would be required for any new set of metrics.
(2) The majority of aviation APO Metrics appear to be directly applicable to the standard boat APO.
(4) It will be a significant amount of time before the standard boat APO Metrics will have stabilized such that they can be used with confidence.
(5) The ALMIS Database must be continually reviewed and cleansed by by APO staff, which are knowledgeable in the maintenance of the APO’s assets, even after the transition period.
04/09/23 23:49UNCLAS |Analysis of APO's metrics | LT Sam Edwards 25
RDC Analysis Recommendations
(1) The standard boat APO should initially use the aviation APO’s metrics as a point-of-departure for its own metrics.
(2) The standard boat APO should adequately staff (probably its Engineering Division) to review and cleanse its ALMIS database in a manner similar to the aviation APO.
(3) Even as the standard boat APO evolves the metrics that work best for it, the CG should use one IT system across the standard boat and aviation APOs in order to realize economics-of-scale.