ABSTRACT Remote Controlled Orbiter Capability The Remote Control Orbiter (RCO) capability allows a Space Shuttle Orbiter to perform an unmanned re-entry and landing. This low-cost capability employs existing and newly added functions to perform key activities typically performed by flight crews and controllers during manned re-entries. During an RCO landing attempt, these functions are triggered by automation resident in the on-board computers or uplinked commands from flight controllers on the ground. In order to properly route certain commands to the appropriate hardware, an In-Flight Maintenance (IFM) cable was developed. Currently, the RCO capability is reserved for the scenario where a safe return of the crew from orbit may not be possible. The flight crew would remain in orbit and await a rescue mission. After the crew is rescued, the RCO capability would be used on the unmanned Orbiter in an attempt to salvage this national asset. https://ntrs.nasa.gov/search.jsp?R=20070019347 2020-06-27T22:03:03+00:00Z

Transcript of USA Master Template - Revised...SPACE SHUTTLE PROGRAM Orbiter Project Office NASA Johnson Space...

Page 1: USA Master Template - Revised...SPACE SHUTTLE PROGRAM Orbiter Project Office NASA Johnson Space Center, Houston, Texas Author Bio’s Michael T. Garske – NASA, Space Shut tle Program,

ABSTRACT Remote Controlled Orbiter Capability The Remote Control Orbiter (RCO) capability allows a Space Shuttle Orbiter to perform an unmanned re-entry and landing. This low-cost capability employs existing and newly added functions to perform key activities typically performed by flight crews and controllers during manned re-entries. During an RCO landing attempt, these functions are triggered by automation resident in the on-board computers or uplinked commands from flight controllers on the ground. In order to properly route certain commands to the appropriate hardware, an In-Flight Maintenance (IFM) cable was developed. Currently, the RCO capability is reserved for the scenario where a safe return of the crew from orbit may not be possible. The flight crew would remain in orbit and await a rescue mission. After the crew is rescued, the RCO capability would be used on the unmanned Orbiter in an attempt to salvage this national asset.

https://ntrs.nasa.gov/search.jsp?R=20070019347 2020-06-27T22:03:03+00:00Z

Page 2: USA Master Template - Revised...SPACE SHUTTLE PROGRAM Orbiter Project Office NASA Johnson Space Center, Houston, Texas Author Bio’s Michael T. Garske – NASA, Space Shut tle Program,

Page

0

SPA

CE

SHU

TTLE

PR

OG

RA

MO

rbite

r Pro

ject

Offi

ceN

ASA

Joh

nson

Spa

ce C

ente

r, H

oust

on, T

exas

Rem

ote

Con

trol O

rbite

r Cap

abilit

y

AIA

A B

riefin

g05

/11/

07

M. G

arsk

e/N

ASA

RC

O P

roje

ct M

anag

er a

nd D

esig

n En

gine

erR

. de

la T

orre

/ Boe

ing

IDS

GN

C E

ntry

Eng

inee

r

Page 3: USA Master Template - Revised...SPACE SHUTTLE PROGRAM Orbiter Project Office NASA Johnson Space Center, Houston, Texas Author Bio’s Michael T. Garske – NASA, Space Shut tle Program,

Page

1

SPA

CE

SHU

TTLE

PR

OG

RA

MO

rbite

r Pro

ject

Offi

ceN

ASA

Joh

nson

Spa

ce C

ente

r, H

oust

on, T

exas

RC

O A

bstr

act

The

Rem

ote

Con

trol O

rbite

r (R

CO

) cap

abili

ty a

llow

s a

Spa

ce S

huttl

e O

rbite

r to

perfo

rm a

n un

man

ned

re-e

ntry

and

land

ing.

Thi

s lo

w-c

ost c

apab

ility

empl

oys

exis

ting

and

new

ly a

dded

func

tions

to p

erfo

rm k

ey a

ctiv

ities

typi

cally

per

form

ed

by fl

ight

cre

ws

and

cont

rolle

rs d

urin

g m

anne

d re

-ent

ries.

Dur

ing

an R

CO

la

ndin

g at

tem

pt, t

hese

func

tions

are

trig

gere

d by

aut

omat

ion

resi

dent

in th

e on

-bo

ard

com

pute

rs o

r upl

inke

dco

mm

ands

from

flig

ht c

ontro

llers

on

the

grou

nd.

In o

rder

to p

rope

rly ro

ute

certa

in c

omm

ands

to th

e ap

prop

riate

har

dwar

e, a

n In

-Flig

ht M

aint

enan

ce (I

FM) c

able

was

dev

elop

ed. C

urre

ntly

, the

RC

Oca

pabi

lity

is re

serv

ed fo

r the

sce

nario

whe

re a

saf

e re

turn

of t

he c

rew

from

orb

it m

ay n

ot b

e po

ssib

le. T

he fl

ight

cre

w w

ould

rem

ain

in o

rbit

and

awai

t a re

scue

m

issi

on. A

fter t

he c

rew

is re

scue

d, th

e R

CO

cap

abili

ty w

ould

be

used

on

the

unm

anne

d O

rbite

r in

an a

ttem

pt to

sal

vage

this

nat

iona

l ass

et.

Page 4: USA Master Template - Revised...SPACE SHUTTLE PROGRAM Orbiter Project Office NASA Johnson Space Center, Houston, Texas Author Bio’s Michael T. Garske – NASA, Space Shut tle Program,

Page

2

SPA

CE

SHU

TTLE

PR

OG

RA

MO

rbite

r Pro

ject

Offi

ceN

ASA

Joh

nson

Spa

ce C

ente

r, H

oust

on, T

exas

Aut

hor B

io’s

Mic

hael

T. G

arsk

e –

NA

SA

, Spa

ce S

huttl

e P

rogr

am, O

rbite

r Pro

ject

Offi

ce

281-

483-

0790

mic

hael

.t.ga

rske

@na

sa.g

ov

Mr.

Gar

ske

has

alm

ost 2

3 ye

ars

of c

ombi

ned

expe

rienc

e in

NA

SA

wor

king

for t

he S

pace

Shu

ttle

Pro

gram

in

eng

inee

ring,

ope

ratio

ns, a

nd m

anag

emen

t fro

m tw

o N

AS

A c

ente

rs-K

enne

dy a

nd J

ohns

on S

pace

C

ente

rs.

He

earn

ed h

is B

.S. i

n Te

chni

cal P

hysi

cs a

nd A

.A. i

n A

stro

nom

y fro

m S

outh

wes

t Mis

sour

i S

tate

Uni

vers

ity in

198

3 an

d a

M.S

. in

Eng

inee

ring

Man

agem

ent f

rom

Uni

vers

ity o

f Cen

tral F

lorid

a in

19

90.

He

is th

e S

enio

r Pro

ject

Man

ager

for t

he O

rbite

r Pro

ject

Offi

ce a

nd is

the

Pro

ject

Man

ager

for

RC

O.

He'

s ea

rned

man

y N

AS

A a

war

ds in

clud

ing

the

NA

SA

Exc

eptio

nal S

ervi

ce M

edal

and

the

NA

SA

Spa

ce F

light

Aw

aren

ess

Aw

ard.

Raf

ael d

e la

Tor

re –

Boei

ng ID

S, S

pace

Exp

lora

tion

Div

isio

n

Mr.

de la

Tor

re h

as o

ver 9

yea

rs e

xper

ienc

e in

the

Spa

ce S

huttl

ePr

ogra

m a

s a

cont

ract

or a

t the

Ken

nedy

an

d Jo

hnso

n S

pace

Cen

ters

. He

has

been

ana

lyzi

ng th

e S

pace

Shu

ttle

Orb

iter E

ntry

GN

&C

sys

tem

an

d O

rbite

r ent

ry a

nd la

ndin

g pe

rform

ance

for t

he la

st 7

yea

rs. I

n ad

ditio

n to

his

ana

lysi

s ac

tiviti

es, h

is

curre

nt re

spon

sibi

litie

s in

clud

e ow

ners

hip

of s

ever

al fl

ight

sof

twar

e fu

nctio

ns re

late

d to

the

entry

G

N&

C s

yste

m, i

nclu

ding

app

roac

h an

d la

ndin

g gu

idan

ce a

nd th

e he

ad-u

p di

spla

y. H

e ea

rned

his

B.S

. in

Aer

ospa

ce E

ngin

eerin

g fro

m E

mbr

y-R

iddl

e A

eron

autic

al U

nive

rsity

in 2

000

and

M.S

. in

Phy

sics

fro

m T

he U

nive

rsity

of H

oust

on -

Cle

ar L

ake

in 2

007.

He

has

been

a k

ey c

ontri

buto

r to

deve

lopi

ng,

impl

emen

ting

and

test

ing

GN

&C

-rela

ted

softw

are

mod

ifica

tions

in s

uppo

rt of

RC

O.

Page 5: USA Master Template - Revised...SPACE SHUTTLE PROGRAM Orbiter Project Office NASA Johnson Space Center, Houston, Texas Author Bio’s Michael T. Garske – NASA, Space Shut tle Program,

SPA

CE

SHU

TTLE

PR

OG

RA

MO

rbite

r Pro

gram

Offi

ceN

ASA

Joh

nson

Spa

ce C

ente

r, H

oust

on, T

exas

Page 6: USA Master Template - Revised...SPACE SHUTTLE PROGRAM Orbiter Project Office NASA Johnson Space Center, Houston, Texas Author Bio’s Michael T. Garske – NASA, Space Shut tle Program,

Page

4

SPA

CE

SHU

TTLE

PR

OG

RA

MO

rbite

r Pro

ject

Offi

ceN

ASA

Joh

nson

Spa

ce C

ente

r, H

oust

on, T

exas

Intr

oduc

tion

•In

itial

ass

umpt

ion

or ri

sk is

that

the

Orb

iter T

ile P

rote

ctio

n Sy

stem

(TPS

) co

uld

suffe

r dam

age

such

that

re-e

ntry

with

flig

ht c

rew

wou

ld b

e to

o ris

ky,

even

if re

paire

d•

The

Spac

e Sh

uttle

Pro

gram

(SSP

) Mis

sion

Man

agem

ent T

eam

(MM

T) w

ould

de

clar

e a

Safe

Hav

en a

nd b

egin

cre

w re

scue

ope

ratio

ns v

ia a

noth

er s

huttl

e la

unch

•M

eanw

hile

, the

“co

mpr

omis

ed”

Orb

iter w

ould

be

a su

rrog

ate

to th

est

rand

ed

crew

and

ISS

crew

and

its

reso

urce

s de

plet

ed to

min

imum

requ

ired

to

supp

ort a

re-e

ntry

/bre

akup

for a

n oc

ean

ditc

h•

Spac

e Sh

uttle

Pro

gram

was

sea

rchi

ng fo

r eas

y co

ncep

t to

retr

ieve

/reco

ver a

co

mpr

omis

ed O

rbite

r and

not

dis

card

a v

alua

ble

asse

t•

The

Rem

ote

Con

trol

Orb

iter (

RC

O) c

apab

ility

was

dev

elop

ed a

nd

impl

emen

ted

to p

rovi

de th

e SS

P th

e ca

pabi

lity

to la

nd th

e O

rbite

r with

out a

fli

ght c

rew

in a

n em

erge

ncy

situ

atio

n –

Use

s th

e A

utol

and

func

tiona

lity

•Th

e Sp

ace

Shut

tle P

rogr

am h

as re

ques

ted

a ca

pabi

lity

to re

cove

r the

veh

icle

in

lieu

of a

n oc

ean

ditc

h w

hen

a Sa

fe H

aven

has

bee

n de

clar

ed –

Salv

age

oper

atio

n

Page 7: USA Master Template - Revised...SPACE SHUTTLE PROGRAM Orbiter Project Office NASA Johnson Space Center, Houston, Texas Author Bio’s Michael T. Garske – NASA, Space Shut tle Program,

Page

5

SPA

CE

SHU

TTLE

PR

OG

RA

MO

rbite

r Pro

ject

Offi

ceN

ASA

Joh

nson

Spa

ce C

ente

r, H

oust

on, T

exas

Ove

rvie

w

•Th

e O

rbite

r flig

ht d

eck

pane

ls th

at a

re u

sed

to m

anua

lly c

ontr

olth

e fo

llow

ing

func

tions

wer

e ta

rget

ed to

be

reco

nfig

ured

:–

APU

sta

rt/ru

n–

Air

Dat

a Pr

obe

(AD

P) d

eplo

y–

Mai

n La

ndin

g G

ear (

MLG

) arm

/dow

n–

Dra

g C

hute

arm

/dep

loy

–Fu

el C

ell r

eact

ant v

alve

clo

sure

•Th

e re

conf

igur

atio

n is

acc

ompl

ishe

d by

the

fligh

t cre

w p

erfo

rmin

g an

In-F

light

M

aint

enan

ce (I

FM) p

roce

dure

to in

stal

l a p

re-fa

bric

ated

cab

le a

nd lo

adin

g sp

ecia

l so

ftwar

e de

sign

ed to

sup

port

cap

abili

ty•

RC

O IF

M in

stal

ls a

cab

le to

pro

vide

ele

ctric

al c

onne

ctiv

ity fr

omG

roun

d C

ontr

ol

Inte

rfac

e Lo

gic

(GC

IL) a

vion

ics

box

up to

the

fligh

t dec

k pa

nel s

witc

hes

–En

able

s gr

ound

con

trol

lers

to c

ontr

ol th

e ta

rget

ed fu

nctio

ns v

iaco

mm

and

uplin

k–

Allo

ws

fligh

t sof

twar

e to

con

trol

cer

tain

targ

eted

func

tions

•Th

e ca

ble

is 2

8 fe

et lo

ng, w

eigh

s 5.

4 lb

s, a

nd is

sto

wed

on

the

ISS

for e

mer

genc

y us

e•

RC

O IF

M C

able

with

its

supp

ortin

g fli

ght s

oftw

are

chan

ge w

ill p

rovi

de th

e SS

P th

e ca

pabi

lity

to la

nd th

e O

rbite

r with

out a

flig

ht c

rew

in a

n em

erge

ncy

situ

atio

n

Page 8: USA Master Template - Revised...SPACE SHUTTLE PROGRAM Orbiter Project Office NASA Johnson Space Center, Houston, Texas Author Bio’s Michael T. Garske – NASA, Space Shut tle Program,

Page

6

SPA

CE

SHU

TTLE

PR

OG

RA

MO

rbite

r Pro

ject

Offi

ceN

ASA

Joh

nson

Spa

ce C

ente

r, H

oust

on, T

exas

Prog

ram

Des

ign

Gro

undr

ules

•R

CO

IFM

Cab

le s

uppo

rts a

n em

erge

ncy

cont

inge

ncy

oper

atio

n

•R

CO

IFM

Cab

le m

ust b

e si

ngle

faul

t tol

eran

t for

func

tions

that

:

–A

ffect

cre

w s

afet

y (w

hile

doc

ked

or d

urin

g un

dock

ing

oper

atio

ns)

–A

ffect

the

safe

ty o

f peo

ple

on th

e gr

ound

•Ze

ro fa

ult t

oler

ance

for R

CO

IFM

Cab

le fu

nctio

ns th

at p

rote

ct fr

om lo

ss o

f V

ehic

le

•Th

e la

ndin

g si

te s

hall

be V

ande

nber

g.

•S

yste

ms

certi

ficat

ion

is n

ot p

erfo

rmed

.

•Th

e R

CO

Cab

le s

hall

be in

stal

led

as a

n In

Flig

ht M

aint

enan

ce (I

FM).

•S

AIL

func

tiona

l ver

ifica

tion

test

ing

shal

l be

perfo

rmed

•B

uild

one

cab

le fo

r flig

ht a

nd o

ne fo

r SA

IL.

–S

tow

one

flig

ht c

able

onb

oard

ISS

.

Page 9: USA Master Template - Revised...SPACE SHUTTLE PROGRAM Orbiter Project Office NASA Johnson Space Center, Houston, Texas Author Bio’s Michael T. Garske – NASA, Space Shut tle Program,

Page

7

SPA

CE

SHU

TTLE

PR

OG

RA

MO

rbite

r Pro

ject

Offi

ceN

ASA

Joh

nson

Spa

ce C

ente

r, H

oust

on, T

exas

RC

O C

able

Page 10: USA Master Template - Revised...SPACE SHUTTLE PROGRAM Orbiter Project Office NASA Johnson Space Center, Houston, Texas Author Bio’s Michael T. Garske – NASA, Space Shut tle Program,

Page

8

SPA

CE

SHU

TTLE

PR

OG

RA

MO

rbite

r Pro

ject

Offi

ceN

ASA

Joh

nson

Spa

ce C

ente

r, H

oust

on, T

exas

RC

O IF

M C

once

pt

•One

RC

O IF

M c

able

for S

AIL

to s

uppo

rt in

tegr

atio

n of

har

dwar

e/so

ftwar

e av

ioni

cs

test

ing,

IFM

ver

ifica

tion

and

one

cabl

e fo

r flig

ht

BAY

1

BAY

2

BAY

3A

PI-1

&2Pa

nel C

3A5

(not

all

2 co

nnec

tors

de

pict

ed)

Pane

l F6A

3(n

ot a

ll 3

conn

ecto

rs

depi

cted

)Pa

nel F

2

Rec

omm

ende

d Fe

edth

ru(p

ort

side

) for

SA

ILR

oute

and

sec

ure

with

tie

wra

ps, v

elcr

ost

raps

, and

duc

t ta

pe.

Pane

l R2

GC

IL

Rec

omm

ende

d fe

edth

ru(s

tarb

oard

) for

Flig

htR

oute

and

sec

ure

with

tie

wra

ps, v

elcr

ost

raps

, and

duc

t ta

pe.

Page 11: USA Master Template - Revised...SPACE SHUTTLE PROGRAM Orbiter Project Office NASA Johnson Space Center, Houston, Texas Author Bio’s Michael T. Garske – NASA, Space Shut tle Program,

Page

9

SPA

CE

SHU

TTLE

PR

OG

RA

MO

rbite

r Pro

ject

Offi

ceN

ASA

Joh

nson

Spa

ce C

ente

r, H

oust

on, T

exas

RC

O C

able

Rou

ting

PN

L F6

A3

(Lan

ding

Gea

r Con

trols

)M

idde

ckA

vion

ics

Bay

3A

GC

IL h

ooku

p

Page 12: USA Master Template - Revised...SPACE SHUTTLE PROGRAM Orbiter Project Office NASA Johnson Space Center, Houston, Texas Author Bio’s Michael T. Garske – NASA, Space Shut tle Program,

Page

10

SPA

CE

SHU

TTLE

PR

OG

RA

MO

rbite

r Pro

ject

Offi

ceN

ASA

Joh

nson

Spa

ce C

ente

r, H

oust

on, T

exas

RC

O F

light

Sof

twar

e

•SW

cha

nges

targ

eted

onl

y ne

cess

ary

item

s–

Crit

ical

and

cou

ld n

ot b

e up

linke

d–

Tim

e-cr

itica

l com

man

ds•

Cha

nges

impl

emen

ted

via

phas

ed a

ppro

ach

–O

I-30

STS

-117

•S

peci

al F

light

Sof

twar

e pa

tch

•O

MS

Bur

n en

able

win

dow

exp

ansi

on fo

r Deo

rbit

burn

(15

sec

–3

min

)•

Sta

te V

ecto

r inf

o tra

nsfe

r fro

m G

3 to

S2

durin

g en

try o

ps fo

r ant

enna

m

anag

emen

t–

OI-3

2 S

TS-1

20•

OI-3

0 ch

ange

s ba

selin

edin

FS

W•

RC

O In

hibi

t/Ena

ble

ITE

M e

ntry

add

ed to

dis

play

for a

ctiv

atio

n of

FSW

fu

nctio

ns–

OI-3

3 TB

D•

Aut

omat

es la

ndin

g ge

ar a

nd d

rag

chut

e ar

m &

dep

loy

•In

corp

orat

es G

PS

dur

ing

rollo

ut fo

r lat

eral

trac

king

Page 13: USA Master Template - Revised...SPACE SHUTTLE PROGRAM Orbiter Project Office NASA Johnson Space Center, Houston, Texas Author Bio’s Michael T. Garske – NASA, Space Shut tle Program,

Page

11

SPA

CE

SHU

TTLE

PR

OG

RA

MO

rbite

r Pro

ject

Offi

ceN

ASA

Joh

nson

Spa

ce C

ente

r, H

oust

on, T

exas

SAIL

Tes

ting

(OV-

095)

•H

isto

ry m

akin

g ev

ent…

Firs

t tim

e G

3 an

d S

2 G

PC

mem

ory

conf

igur

atio

n co

mbi

natio

n w

as u

sed

for e

ntry

and

land

ing

•V

erifi

ed F

light

Sof

twar

e m

ods

are

read

y to

sup

port

STS

-117

with

OI-3

0

•V

erifi

ed F

light

Sof

twar

e m

ods

are

read

y to

sup

port

STS

-120

with

OI-3

2

•V

erifi

ed h

ardw

are

inte

rface

s (v

olta

ge a

nd c

urre

nt le

vels

)

•Te

st ru

n of

IFM

inst

alla

tion

and

proc

edur

e w

ith S

TS-1

21 C

rew

•A

lso,

und

ock

and

back

aw

ay s

teps

, inc

ludi

ng P

LBD

clo

sure

via

man

ual

uplin

k co

mm

ands

wer

e ru

n an

d va

lidat

ed

Page 14: USA Master Template - Revised...SPACE SHUTTLE PROGRAM Orbiter Project Office NASA Johnson Space Center, Houston, Texas Author Bio’s Michael T. Garske – NASA, Space Shut tle Program,

Page

12

SPA

CE

SHU

TTLE

PR

OG

RA

MO

rbite

r Pro

ject

Offi

ceN

ASA

Joh

nson

Spa

ce C

ente

r, H

oust

on, T

exas

Uni

que

Ops

Gui

delin

es

•O

rbit

SM c

ontr

ollin

g PL

MD

Ms

thro

ugh

land

ing

(No

BFS

load

ed/ru

nnin

g)–

Supp

orts

Ant

enna

Man

agem

ent f

or c

omm

unic

atio

ns–

Supp

orts

PLB

D c

losu

re–

Har

dwar

e co

nfig

urat

ion

cons

trai

nts

prev

ent u

se o

f BFS

–SM

is m

ore

robu

st o

pera

ting

syst

em•

Vand

enbe

rg s

elec

ted

as la

ndin

g si

te–

Low

est r

isk

to th

e pu

blic

or g

roun

d re

sour

ces

due

to w

ater

app

roac

h–

Nee

ds M

LS e

quip

men

t ins

talle

d to

sup

port

aut

olan

dso

ftwar

e–

Orb

iter F

SW m

ods

(OI-3

3) e

nabl

e G

PS d

urin

g la

ndin

g ro

llout

•A

utol

and

GN

C c

apab

ility

will

be

utili

zed

–A

ppro

ach

& L

andi

ng p

itch

and

roll

guid

ance

–A

utom

ated

land

ing

gear

and

dra

g ch

ute

depl

oy (O

I-33)

–A

uto

dero

tatio

nan

d no

se-w

heel

ste

erin

g du

ring

rollo

ut

Page 15: USA Master Template - Revised...SPACE SHUTTLE PROGRAM Orbiter Project Office NASA Johnson Space Center, Houston, Texas Author Bio’s Michael T. Garske – NASA, Space Shut tle Program,

Page

13

SPA

CE

SHU

TTLE

PR

OG

RA

MO

rbite

r Pro

ject

Offi

ceN

ASA

Joh

nson

Spa

ce C

ente

r, H

oust

on, T

exas

Ops

Ove

rvie

w

•O

n O

rbit

-Saf

e H

aven

Dec

lare

d, S

alva

ge th

e O

rbite

r

–D

ocke

d w

ith IS

S

–S

ome

leve

l of T

PS

repa

irs c

ould

be

perfo

rmed

–P

repa

re O

rbite

r for

rem

ote

cont

rolle

d ca

pabi

lity

•P

erfo

rm IF

M’s

(und

ock

and

RC

O) a

nd c

ockp

it sw

itchl

ist(

entry

)•

Ena

ble

RC

O F

light

Sof

twar

e

–C

rew

Egr

ess

to IS

S, c

lose

and

sec

ure

hatc

h•

Han

dove

r Orb

iter c

ontro

l to

MC

C g

roun

d fli

ght c

ontro

llers

–U

ndoc

k &

Sep

arat

e O

rbite

r fro

m IS

S•

Gro

und

uplin

ks D

EU

’sno

rmal

ly p

erfo

rmed

by

crew

key

boar

d en

tries

Page 16: USA Master Template - Revised...SPACE SHUTTLE PROGRAM Orbiter Project Office NASA Johnson Space Center, Houston, Texas Author Bio’s Michael T. Garske – NASA, Space Shut tle Program,

Page

14

SPA

CE

SHU

TTLE

PR

OG

RA

MO

rbite

r Pro

ject

Offi

ceN

ASA

Joh

nson

Spa

ce C

ente

r, H

oust

on, T

exas

Ops

Ove

rvie

w C

ontin

ued

•P

re-D

eOrb

itB

urn

setu

ps

–C

onfig

ure

GP

C’s

to G

3/S

2 m

emor

y co

nfig

urat

ion

(Not

e: n

o B

FS)

•Lo

ad a

nd a

ctiv

ate

TFL

172

dow

nlin

k te

lem

etry

form

at (n

orm

ally

164

)

–U

plin

k an

d lo

ad D

eOrb

itta

rget

s

–U

plin

k S

tore

d P

rogr

amm

ed C

omm

ands

•S

PC

’sar

e up

linke

dan

d st

ored

onb

oard

for t

imed

ex

ecut

ion…

grou

nd u

ses

traje

ctor

y pr

edic

tion

tool

s to

pre

dict

the

time

for e

xecu

tion

of th

e fo

llow

ing

RC

O fu

nctio

ns:

–A

ir D

ata

Pro

bes

Dep

loym

ent

–La

ndin

g G

ear D

eplo

ymen

t (O

I-30,

OI-3

2)–

Dra

g C

hute

Dep

loym

ent (

OI-3

0, O

I-32)

–Fu

el C

ell S

hutd

own

–C

lose

Pay

load

Bay

Doo

rs

–S

tart

thre

e A

PU

’svi

a R

eal T

ime

Com

man

d up

link

Page 17: USA Master Template - Revised...SPACE SHUTTLE PROGRAM Orbiter Project Office NASA Johnson Space Center, Houston, Texas Author Bio’s Michael T. Garske – NASA, Space Shut tle Program,

Page

15

SPA

CE

SHU

TTLE

PR

OG

RA

MO

rbite

r Pro

ject

Offi

ceN

ASA

Joh

nson

Spa

ce C

ente

r, H

oust

on, T

exas

Ops

Ove

rvie

w C

ontin

ued

•P

erfo

rm D

e-O

rbit

Bur

n

–C

omm

and

GP

C’s

to G

NC

Maj

or M

ode

303

and

to S

M M

ajor

Mod

e 20

1

–A

PU

’sto

nor

m P

ress

(HY

D P

ress

ure

to n

orm

al) v

ia u

plin

k R

TC

–C

omm

and

GP

C’s

to G

NC

Maj

or M

ode

304

•E

ntry

Inte

rface

, 400

,000

ft.

•A

t Mac

h 5,

the

Air

Dat

a P

robe

s de

ploy

via

onb

oard

SP

C

•A

t Mac

h 2.

5 en

ter t

he T

AEM

inte

rface

•A

ppro

ach

and

Land

ing

inte

rface

at T

ouch

dow

n m

inus

~80

sec

onds

•A

t 200

0 ft.

, the

Lan

ding

Gea

r is

arm

ed a

nd d

eplo

yed

*

•To

uchd

own

–A

rm a

nd d

eplo

y dr

ag c

hute

*

–A

uto

dero

tatio

nan

d st

eerin

g (u

sing

GP

S in

OI-3

3)

•La

ndin

g R

ollo

ut c

ompl

ete

–O

rbite

r Pow

er d

own

via

onbo

ard

SP

C to

clo

se F

uel C

ell R

eact

ant v

alve

s

*via

onb

oard

SP

C th

roug

h O

I-32,

Aut

omat

ed fo

r OI-3

3

Page 18: USA Master Template - Revised...SPACE SHUTTLE PROGRAM Orbiter Project Office NASA Johnson Space Center, Houston, Texas Author Bio’s Michael T. Garske – NASA, Space Shut tle Program,

Page

16

SPA

CE

SHU

TTLE

PR

OG

RA

MO

rbite

r Pro

ject

Offi

ceN

ASA

Joh

nson

Spa

ce C

ente

r, H

oust

on, T

exas

Ris

ks/c

once

rns

•N

one

at th

e C

able

leve

l

•O

nly

parti

al c

heck

out c

apab

ility

prio

r to

use

can

be a

ccom

mod

ated

on-

orbi

t

•O

verfl

ight

risk

NO

T an

issu

e fo

r MM

T an

d A

genc

y w

ith w

ater

app

roac

h to

Van

denb

erg

•V

ande

nber

g su

ppor

t fac

ilitie

s ne

ar ru

nway

cou

ld s

usta

in d

amag

e

•R

CO

IFM

Cab

le lo

ss o

f fun

ctio

n/re

sult

tabl

e:

Func

tion

Loss

Of F

unct

ion/

Act

ion

Res

ult

Sta

rt A

PU

sAc

tivat

e 3

prio

r to

de-o

rbit

burn

. If

2 o

f 2

AP

U s

tring

s do

not

act

ivat

e, e

xecu

te o

cean

di

tch

If ai

r dat

a pr

obes

fails

to d

eplo

y, ta

ke

Nav

igat

ion

Der

ived

Air

Dat

a S

houl

d ge

ar fa

il, th

en la

ndin

g w

ill be

with

ge

ar u

p

If D

rag

chut

e fa

ils to

dep

loy,

then

runw

ay

rol lo

ut w

ill be

long

Fuel

cel

l(s) e

xpec

ted

to o

verh

eat,

if he

at

reje

ctio

n lo

st, p

rior t

o ru

nnin

g ou

t of c

ryo

whi

le s

till p

rodu

cing

pow

er.

Loss

of O

rbite

r in

ocea

n

Dep

loy

Air

Dat

a P

robe

Pote

ntia

l los

s of

Orb

iter

with

in la

ndin

g si

teA

rm, D

eplo

y La

ndin

g G

ear

Loss

of O

rbite

r on

runw

ay

and

pote

ntia

l fac

ilitie

s da

mag

eD

eplo

y D

rag

Chu

teEx

ceed

ing

runw

ay le

ngth

m

ay c

ause

dam

age

to

Orb

iter

Em

erge

ncy

Pow

er D

own

Pot

entia

l los

s of

Orb

iter o

n ru

nway

due

to F

uel C

ell

over

tem

p.

Page 19: USA Master Template - Revised...SPACE SHUTTLE PROGRAM Orbiter Project Office NASA Johnson Space Center, Houston, Texas Author Bio’s Michael T. Garske – NASA, Space Shut tle Program,

Page

17

SPA

CE

SHU

TTLE

PR

OG

RA

MO

rbite

r Pro

ject

Offi

ceN

ASA

Joh

nson

Spa

ce C

ente

r, H

oust

on, T

exas

Sum

mar

y

•Th

e R

CO

IFM

Cab

le w

ith it

s su

ppor

ting

fligh

t sof

twar

e ch

ange

will

pro

vide

th

e SS

P th

e ca

pabi

lity

to la

nd th

e O

rbite

r with

out a

flig

ht c

rew

in a

n em

erge

ncy

situ

atio

n•

The

RC

O IF

M C

able

and

con

cept

pro

vide

s th

e be

nefit

of r

ecov

erin

ga

high

va

lued

ass

et in

lieu

of d

isca

rdin

g in

the

ocea

n

Page 20: USA Master Template - Revised...SPACE SHUTTLE PROGRAM Orbiter Project Office NASA Johnson Space Center, Houston, Texas Author Bio’s Michael T. Garske – NASA, Space Shut tle Program,

Bac

kup

SPA

CE

SHU

TTLE

PR

OG

RA

MO

rbite

r Pro

gram

Offi

ceN

ASA

Joh

nson

Spa

ce C

ente

r, H

oust

on, T

exas

Page 21: USA Master Template - Revised...SPACE SHUTTLE PROGRAM Orbiter Project Office NASA Johnson Space Center, Houston, Texas Author Bio’s Michael T. Garske – NASA, Space Shut tle Program,

SPA

CE

SHU

TTLE

PR

OG

RA

MO

rbite

r Pro

gram

Offi

ceN

ASA

Joh

nson

Spa

ce C

ente

r, H

oust

on, T

exas

TPS

Re-

enfo

rced

Car

bon-

Car

bon

(RC

C)

TPS

Tile

Page 22: USA Master Template - Revised...SPACE SHUTTLE PROGRAM Orbiter Project Office NASA Johnson Space Center, Houston, Texas Author Bio’s Michael T. Garske – NASA, Space Shut tle Program,

Page

20

SPA

CE

SHU

TTLE

PR

OG

RA

MO

rbite

r Pro

ject

Offi

ceN

ASA

Joh

nson

Spa

ce C

ente

r, H

oust

on, T

exas

Pane

ls A

cces

sed

F7F6

F8

F1W

3W

4W

5

W6

W2

W1

F2F4

F3

A2

F5

L1

L4

L2L3

A2A1

A2

A1C

1C

4C

5

B1

B2

C2

C3

A1

A2

A3

A1

A6

A7

A3

A5

C6

C7

S2S1

A2

A1

F9

R1

R2R3

R5

R4

A2

R7

R6

R8

R9

L6

L5

L7

L8

O1

O2

O3

O6

O7

O8

O5

O9

O13

O14

O15

O16

O17

O18

O19

O20

A8

A2

A6

A9

A10

A12

A11

A9

A12

A13

A3

A4

A9

A12

A13

A3

A4

Pane

l R2

APU

Ope

rate

APU

Hyd

Mai

n Pu

mp

Pres

sure

Pane

l C3A

5Fu

el C

ell R

eact

ant V

alve

Dep

loy

Left

Air

Dat

a Pr

obe

Pane

l F6A

3La

ndin

g G

ear A

RM

Land

ing

Gea

r DO

WN

Pane

l F2

Dra

g-C

hute

AR

MD

rag-

Chu

te D

EPLO

Y

Page 23: USA Master Template - Revised...SPACE SHUTTLE PROGRAM Orbiter Project Office NASA Johnson Space Center, Houston, Texas Author Bio’s Michael T. Garske – NASA, Space Shut tle Program,

Page

21

SPA

CE

SHU

TTLE

PR

OG

RA

MO

rbite

r Pro

ject

Offi

ceN

ASA

Joh

nson

Spa

ce C

ente

r, H

oust

on, T

exas

Com

man

d/dr

iver

Ove

rvie

w

Upl

ink

Com

man

ds/

Dow

nlin

k

Com

mG

PC

NS

P/

MD

M

PC

MM

U

PL M

DM

GC

ILD

river

s

PSP-

1LC

Adr

iver

Gea

r Arm

APU

1, 2

, 3St

art/r

un(lo

w p

ress

/nor

m)

L&R

AD

Pde

ploy

Dra

g C

hute

Arm

/dep

loy

Fuel

Cel

l1

and

3Sh

utdo

wn*

*

** N

ote

Fuel

Cel

l 2 is

alre

ady

dow

nM

N A

to M

N B

bus

s tie

Orb

iter G

CIL

/LC

A D

river

sO

rbite

r Flig

ht D

eck

Pan

el F

unct

ions

RC

O IF

M

Cab

le

PSP-

2LC

Adr

iver

PI-1

LCA

Driv

er*

PI-2

LCA

driv

er

Gea

r Dow

n

* Not

e PI

-1 L

CA

driv

er w

ill be

dio

de la

tche

d O

N w

hen

activ

ated

.

L&R

AD

PA

RM

Page 24: USA Master Template - Revised...SPACE SHUTTLE PROGRAM Orbiter Project Office NASA Johnson Space Center, Houston, Texas Author Bio’s Michael T. Garske – NASA, Space Shut tle Program,

Page

22

SPA

CE

SHU

TTLE

PR

OG

RA

MO

rbite

r Pro

ject

Offi

ceN

ASA

Joh

nson

Spa

ce C

ente

r, H

oust

on, T

exas

RC

O C

able

Des

ign

Ana

lysi

s

•FM

EA b

ent p

in a

naly

sis

perf

orm

ed•

Orb

iter s

yste

m c

ircui

t ana

lysi

s pe

rfor

med

•H

azar

d an

alys

is p

erfo

rmed

•M

ater

ials

cer

tific

atio

n co

mpl

eted

•Pa

rts

dera

ting

anal

ysis

per

form

ed•

EMI a

naly

sis

perf

orm

ed

Page 25: USA Master Template - Revised...SPACE SHUTTLE PROGRAM Orbiter Project Office NASA Johnson Space Center, Houston, Texas Author Bio’s Michael T. Garske – NASA, Space Shut tle Program,

Page

23

SPA

CE

SHU

TTLE

PR

OG

RA

MO

rbite

r Pro

ject

Offi

ceN

ASA

Joh

nson

Spa

ce C

ente

r, H

oust

on, T

exas

RC

O C

able

Har

dwar

e

•R

CO

IFM

Cab

le p

arts

list

(one

cab

le)

–16

con

nect

ors

with

pin

s, b

acks

hells

, and

cap

s–

~800

ft 2

2AW

G N

icke

l coa

ted

wire

(MIL

-W-2

2759

/12-

22-9

)–

5 di

odes

(JA

NTX

1N49

42)

–sp

lices

–G

orte

xou

ter j

acke

t for

cab

le p

rote

ctio

n–

Velc

ro s

trap

s–

Oth

er s

mal

l har

dwar

e m

isc…

Page 26: USA Master Template - Revised...SPACE SHUTTLE PROGRAM Orbiter Project Office NASA Johnson Space Center, Houston, Texas Author Bio’s Michael T. Garske – NASA, Space Shut tle Program,

Page

24

SPA

CE

SHU

TTLE

PR

OG

RA

MO

rbite

r Pro

ject

Offi

ceN

ASA

Joh

nson

Spa

ce C

ente

r, H

oust

on, T

exas

RC

O O

pera

tiona

l Gui

delin

es

•O

ther

than

the

initi

al o

rbite

r TP

S d

amag

e ca

usin

g S

afe

Hav

en, a

ll ot

her o

rbite

r sy

stem

s ar

e fu

lly fu

nctio

nal

–A

vion

ics

and

Flig

ht C

ontro

l Sys

tem

s re

dund

ancy

not

cha

nged

exc

ept:

•P

L1 M

DM

J6

dem

ated

due

to C

ontin

genc

y S

huttl

e C

rew

Sup

port

(CS

CS

) IF

M

•R

isk

asse

ssm

ent f

or V

ehic

le s

urvi

vabi

lity

durin

g re

-ent

ry is

som

ewhe

re b

etw

een

re-e

ntry

with

cre

w o

nboa

rd a

nd o

cean

ditc

h•

Use

Saf

e H

aven

IFM

und

ocki

ng a

ppro

ach

•Ta

sks

hist

oric

ally

per

form

ed b

y th

e C

rew

acc

omm

odat

ed b

y;–

Gro

und

uplin

k (R

TC’s

and

DE

U E

quiv

alen

ts)

–G

roun

d up

link

Sto

red

Pro

gram

Com

man

ds (S

PC

’s) t

o ac

com

mod

ate

time

criti

cal e

vent

s•

Cre

w w

ill in

stal

l IFM

har

dwar

e an

d pr

e-co

nfig

ure

nece

ssar

y sw

itche

s•

The

Orb

iter i

s re

ady

to b

e co

mm

ande

d, re

-ent

er, a

nd la

nd re

mot

ely,

via

gro

und

cont

rol o

nce

the

RC

O IF

M is

inst

alle

d•

Aut

olan

dfu

nctio

nalit

y is

NO

T af

fect

ed

Page 27: USA Master Template - Revised...SPACE SHUTTLE PROGRAM Orbiter Project Office NASA Johnson Space Center, Houston, Texas Author Bio’s Michael T. Garske – NASA, Space Shut tle Program,

Page

25

SPA

CE

SHU

TTLE

PR

OG

RA

MO

rbite

r Pro

ject

Offi

ceN

ASA

Joh

nson

Spa

ce C

ente

r, H

oust

on, T

exas

RC

O T

imel

ine

Even

tTi

me

Task

Pre-

Und

ock

Prep

arat

ion

Pre-

Und

ock

IFM

Inst

alla

tion

Con

figur

e D

PS, G

PC 5

to S

M O

PS 2

(SM

MM

201

)

Ku-B

and

Ante

nna

Stow

APU

Con

fig

Dea

ctiv

ate

Star

Tra

cker

s an

d cl

ose

door

s

H2O

Loo

p C

onfig

FES

Che

ckou

t

OM

S/R

CSC

onfig

NW

S E

nabl

e

FES/

NH

3 C

onfig

Con

figur

e fo

r Pay

load

Bay

Doo

r clo

sing

Con

figur

e TC

S

Hyd

raul

ic S

ys C

onfig

Clo

se H

atch

es

Sepa

ratio

n M

aneu

ver

Und

ock

Fire

Aft

Pitc

h R

CS

jets

bur

st -

atta

in 0

.22

fps

vel

Und

ock

+ 9

sec

Uni

vers

al P

oint

ing

Item

21

at 2

ft s

epar

atio

n

Und

ock

+ 2

min

Ope

n D

AP d

eadb

ands

to c

onfig

ure

for f

ree

drift

Und

ock

+ 32

min

Clo

se D

AP d

eadb

ands

Reb

oost

Man

euve

rM

aneu

ver t

o re

boos

tbur

n at

titud

e

Und

ock

+ 42

min

Perfo

rm p

osig

rade

+X re

boos

tbur

n

Man

euve

r to

com

mat

titud

eTI

G -

80 m

inM

aneu

ver t

o co

mm

unic

atio

ns a

ttitu

de

Con

figur

e D

PS fo

r Ent

ryTI

G -

70 m

inG

NC

GPC

sto

MM

301

Page 28: USA Master Template - Revised...SPACE SHUTTLE PROGRAM Orbiter Project Office NASA Johnson Space Center, Houston, Texas Author Bio’s Michael T. Garske – NASA, Space Shut tle Program,

Page

26

SPA

CE

SHU

TTLE

PR

OG

RA

MO

rbite

r Pro

ject

Offi

ceN

ASA

Joh

nson

Spa

ce C

ente

r, H

oust

on, T

exas

RC

O T

imel

ine

Con

t’dU

plin

k D

eorb

itTa

rget

sTI

G -

30 m

inU

plin

k de

orbi

ttar

gets

Upl

ink

SPC

sU

plin

k SM

Sto

red

Prog

ram

Com

man

ds

Tran

sitio

n to

GN

C M

M 3

02TI

G -

25 m

inU

plin

k C

md

GN

C G

PCs

to M

M 3

02

Tran

sitio

n to

SM

MM

202

TIG

-24

min

Upl

ink

Cm

dSM

GPC

to M

M 2

02

Load

Deo

rbit

Targ

ets

TIG

-20

min

Upl

ink

Load

deo

rbit

targ

ets

Man

euve

r to

Deo

rbit

Attit

ude

Man

euve

r to

deor

bita

ttitu

de

Clo

se P

aylo

ad B

ay D

oors

TIG

-15

min

Upl

ink

SM O

PS 2

02 C

md

to c

lose

Pay

load

Bay

doo

rs

Star

t APU

1, 2

and

3TI

G -

5 m

inC

md

APU

1, 2

, and

3 S

tart

–U

plin

k R

TC

Deo

rbit

Burn

Exe

cTI

G -

60 s

ecU

plin

k de

orbi

tbur

n E

xec

Cm

d

TIG

Perfo

rm d

eorb

itbu

rn

Tran

sitio

n to

GN

C M

M 3

03EI

-15

min

Upl

ink

Cm

dG

NC

GPC

sto

MM

303

Upl

ink

Cm

dG

PS to

Nav

Auto

Tran

sitio

n to

SM

MM

201

EI -

14 m

inU

plin

k C

md

SM G

PC to

MM

201

APU

sPr

ess

EI -

13 m

inAP

Us

to N

orm

Pre

ss –

uplin

k R

TC

Man

euve

r to

EI -

5 At

titud

eEI

-10

min

Upl

ink

Cm

dto

man

euve

r to

EI -

5 at

titud

e

Cm

dG

NC

GPC

sto

MM

304

EI -

5 m

inU

plin

k C

md

GN

C G

PCs

to M

M 3

04

Entry

Inte

rface

EIEn

try In

terfa

ce, h

= 4

00,0

00 ft

Dep

loy

Air D

ata

Prob

eM

= 5

Arm

and

Dep

loy

Air D

ata

Prob

e -S

M S

PC

TAEM

Inte

rface

M =

2.5

TAEM

Inte

rface

Appr

oach

and

Lan

ding

Inte

rface

TD -

80 s

ecAp

proa

ch a

nd L

andi

ng In

terfa

ce

Arm

/Dep

loy

Land

ing

Gea

rh

= 20

00 ft

Arm

and

Dep

loy

Land

ing

Gea

r -SM

SPC

Touc

hdow

nTD

Touc

hdow

n

Arm

/Dep

loy

Dra

g C

hute

TD +

7 s

ecAr

m/D

eplo

y D

rag

Chu

te -

SM S

PC

Orb

iter P

ower

dow

nR

ollo

ut c

ompl

ete

Cm

dFu

el C

ell R

eact

ant V

alve

s C

lose

d -S

M S

PC