US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 1 Slides for the US Si Tracker...
-
date post
19-Dec-2015 -
Category
Documents
-
view
214 -
download
2
Transcript of US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 1 Slides for the US Si Tracker...
![Page 1: US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 1 Slides for the US Si Tracker Institutional Group Leaders Meeting J. Incandela March.](https://reader030.fdocuments.in/reader030/viewer/2022032800/56649d3e5503460f94a1770d/html5/thumbnails/1.jpg)
US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 1
Slides for the US Si Tracker Institutional Group Leaders Meeting
J. Incandela
March 1, 2005
![Page 2: US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 1 Slides for the US Si Tracker Institutional Group Leaders Meeting J. Incandela March.](https://reader030.fdocuments.in/reader030/viewer/2022032800/56649d3e5503460f94a1770d/html5/thumbnails/2.jpg)
US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 2
US CMS Tracker Group
• Brown University• R. Hooper, G. Landsberg, C. Nguyen, H. Nguyen
• University of California, Riverside (UCR)• P. Gartung, G. Hanson, G.Y. Jeng, G. Pasztor
• University of California, Santa Barbara (UCSB)• A. Affolder, S. Burke, C. Campagnari, F. Garberson, D. Hale, J. Incandela, • P. Kalavase, S. Kyre, J. Lamb, R. Taylor, D. Stuart, D. White + technicians
• University of Illinois, Chicago (UIC)• E. Chabalina, C. Gerber, L. Nigra, T. Ten
• Fermilab (FNAL)• M. Demarteau, A. Ronzhin, K. Sogut, L. Spiegel, S. Tkaczyk + technicians
• University of Kansas (KU)• P. Baringer, A. Bean, L. Christofek, D. Coppage
• Mexican Consortium: • Cinvestav: H. Castilla, R. Perez, A. Sanchez• Puebla: E. Medel, H. Salazar• San Luis Potosi: A. Morelos
• University of Rochester (UR)• R.Demina, R. Eusebi, E. Halkiadakis, A. Hocker, S. Korjenevski, P. Tipton
20 joined group this past year – few more needed at both sites10 left the group (includes KSU)
20 joined group this past year – few more needed at both sites10 left the group (includes KSU)
![Page 3: US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 1 Slides for the US Si Tracker Institutional Group Leaders Meeting J. Incandela March.](https://reader030.fdocuments.in/reader030/viewer/2022032800/56649d3e5503460f94a1770d/html5/thumbnails/3.jpg)
US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 3
US Group Activity
• US Group Leaders Meeting – monthly or as needed• Discuss resources, planning, etc.
• US Production Meeting – Weekly• Keep track of quality, schedule, problems
• All major tasks report.
• Experts understood to be meeting regularly.
• One expert representative for each task will make summary report in the Production meeting.
• Will start next week.
![Page 4: US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 1 Slides for the US Si Tracker Institutional Group Leaders Meeting J. Incandela March.](https://reader030.fdocuments.in/reader030/viewer/2022032800/56649d3e5503460f94a1770d/html5/thumbnails/4.jpg)
US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 4
SST Schedule
Completion: Jan. 2006
An aggressive schedule
![Page 5: US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 1 Slides for the US Si Tracker Institutional Group Leaders Meeting J. Incandela March.](https://reader030.fdocuments.in/reader030/viewer/2022032800/56649d3e5503460f94a1770d/html5/thumbnails/5.jpg)
US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 5
Schedule Outlook
• Parts• Sensor: HPK – yields very high – quality excellent
• Fairly confident all Sensors will arrive by November – even if we increase order from 16400 to ~18000
• Hybrids: Cicorel – quality good – yields rising• Recent batches were very good
• Went from slightly behind the original schedule to slightly ahead• The exceptionally good new batches included TOB
• Looks like all TOB hybrids could be in hand before Europe closes for August
• Module Production• Open issues: Approval of Ag epoxy fix, Encapsulation• Start now: 6-9 per day (30 per site this week) • Following 4 weeks: ~50/w/site• Following 4 weeks: ~75/w/site• Steady state after that: ~100/w/site
• Cannot exceed ~ 60-70/w/site until multi-rod burn-in is going. • Without rods, need overnight cycling in Wien box for thermal check. • Gives us 5 to 8 weeks to get the rod production up to snuff.
![Page 6: US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 1 Slides for the US Si Tracker Institutional Group Leaders Meeting J. Incandela March.](https://reader030.fdocuments.in/reader030/viewer/2022032800/56649d3e5503460f94a1770d/html5/thumbnails/6.jpg)
US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 6
Planning
• We will focus heavily on TOB initially, with the possibility of completing all rods by early Autumn being considered.
• Then, UCSB will be full time TEC module production.
• Meanwhile, we build a team up at CERN for I&C
![Page 7: US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 1 Slides for the US Si Tracker Institutional Group Leaders Meeting J. Incandela March.](https://reader030.fdocuments.in/reader030/viewer/2022032800/56649d3e5503460f94a1770d/html5/thumbnails/7.jpg)
US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 7
UCSB Assembly Plate/Capacity
Total of 24 plates(#) = plates added in 2004
Module type Completed Plates
Plates In Process Total Daily Capacity
(# modules)
TOB r-phi 7 (2) 7 21
TOB stereo 3 (1) 3 9
TEC R5P 2 (2) 1 3 9
TEC R5S 2 (2) 1 3 9
TEC R6 5 (4) 5 15
TEC R7 2 (2) 1 3 9
![Page 8: US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 1 Slides for the US Si Tracker Institutional Group Leaders Meeting J. Incandela March.](https://reader030.fdocuments.in/reader030/viewer/2022032800/56649d3e5503460f94a1770d/html5/thumbnails/8.jpg)
US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 8
TEC R7
TEC R6 TEC R5P TEC R5S
TOB r-phi TOB stereo
Module Types Built in US
![Page 9: US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 1 Slides for the US Si Tracker Institutional Group Leaders Meeting J. Incandela March.](https://reader030.fdocuments.in/reader030/viewer/2022032800/56649d3e5503460f94a1770d/html5/thumbnails/9.jpg)
US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 9
Tracker Management Structure
Proposed Solution to Management Structure• Must involve all Talented People in the Success of the Project
• Propose to Manage the Project with a Management Board
• Each Member with assigned Specific Responsibility
• Propose the Management Board meets ~ once each Month
• Management Board meets at different Tracker Institutions :• Visit labs, Meets people doing the work, understands Problems/Common
Solutions
• Receive Reports, Technical Status, Financial Status, Anticipate Future Problems
• Manage the Project to meet Schedule and Budget
• Develop the CMS Tracker Management Team
Slide taken from Peter Sharp’s presentation
![Page 10: US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 1 Slides for the US Si Tracker Institutional Group Leaders Meeting J. Incandela March.](https://reader030.fdocuments.in/reader030/viewer/2022032800/56649d3e5503460f94a1770d/html5/thumbnails/10.jpg)
US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 10
Tracker Management Structure
Tracker Management Board
1 Peter Sharp Project Manager
2 Didier Contardo TEC - France
3 Geoff Hall Head of the Project Office UK
4 Roland Horisberger Pixels Switzerland
5 Joe Incandela TOB USA
6 Marcello Mannelli QA and Schedules
7 Stefan Schael TEC + Germany
8 Roberto Tenchini Resources (Finance & People)
9 Guido Tonelli TIB / TID Italy
10 Guenter Flugge Tracker Institution Board
Slide taken from Peter Sharp’s presentation
![Page 11: US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 1 Slides for the US Si Tracker Institutional Group Leaders Meeting J. Incandela March.](https://reader030.fdocuments.in/reader030/viewer/2022032800/56649d3e5503460f94a1770d/html5/thumbnails/11.jpg)
US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 11
Tracker Management Structure
Proposed Project Structure
Slide taken from Peter Sharp’s presentation
![Page 12: US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 1 Slides for the US Si Tracker Institutional Group Leaders Meeting J. Incandela March.](https://reader030.fdocuments.in/reader030/viewer/2022032800/56649d3e5503460f94a1770d/html5/thumbnails/12.jpg)
US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 12
Tracker Management Structure
0
10
20
30
40
50
60
70
80
90
100
Slide taken from Peter Sharp’s presentation
![Page 13: US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 1 Slides for the US Si Tracker Institutional Group Leaders Meeting J. Incandela March.](https://reader030.fdocuments.in/reader030/viewer/2022032800/56649d3e5503460f94a1770d/html5/thumbnails/13.jpg)
US Tracker Institutional Leaders Meeting, March 1, 2005 J. Incandela 13
Management
• Tracker Construction Board• Currently 2D
• Columns: TIB/TOB/TEC/PIXELS
• Rows: Module Production, Integration: Tracker/Electronics/Software
• May add more technical rows