TDP AWG meeting, Los Angeles, 2009-05-07 Matt Fleming slide ‹#› of 27 Major Points to Consider In order to compare reflectors the support has to be included. Hydroformed reflector cost is mostly material. Tooling cost gets lost in this project. An offset is 16% more area. 12m has not been done before. Previous 6m reflectors were 4.8mm thick, 12m will be 3.0mm
  • date post

    19-Dec-2015
  • Category

    Documents

  • view

    215
  • download

    2

Transcript of US SKA TDP Hydroforming Production Cost Rev B 12m Primary & Support Structure US SKA Antenna Working...

TDP AWG meeting, Los Angeles, 2009-05-07 Matt Fleming slide ‹#› of 27

Major Points to Consider

In order to compare reflectors the support has to be included.

Hydroformed reflector cost is mostly material.

Tooling cost gets lost in this project.

An offset is 16% more area.

12m has not been done before.

Previous 6m reflectors were 4.8mm thick, 12m will be 3.0mm

Hat Creek Assy

TDP AWG meeting, Los Angeles, 2009-05-07 Matt Fleming slide 3 of 27

SKA Assy

TDP AWG meeting, Los Angeles, 2009-05-07 Matt Fleming slide 4 of 27

Direct Unit PriceEasiest to Estimate

TDP AWG meeting, Los Angeles, 2009-05-07 Matt Fleming slide 5 of 27

Direct VariablePer Unit

Direct Fixed

Total Units

TotalUnit Cost

DirectUnit Cost

Unit Price

Raw materialIncoming freightDirect LaborConsumablesPackaging

EngineeringToolingProcess development

Total Unit CostBest for comparison

TDP AWG meeting, Los Angeles, 2009-05-07 Matt Fleming slide 6 of 27

TotalUnit Cost

DirectUnit Cost

Indirect Fixed

Total Units

DirectUnit Cost

Unit Price

Facilities, Utilities,Rent, Insurance,Management, Purchasing, Training,Repairs, replacement.

Unit PriceHard to Estimate

TDP AWG meeting, Los Angeles, 2009-05-07 Matt Fleming slide 7 of 27

Margin

TotalUnit Cost

DirectUnit Cost

Unit PriceTotal

Unit Cost

ProfitsProject ProposalsMarketingInvestmentsShareholder dividends

Okay Assumptions First

TDP AWG meeting, Los Angeles, 2009-05-07 Matt Fleming slide 8 of 27

A Peak at Final Results

TDP AWG meeting, Los Angeles, 2009-05-07 Matt Fleming slide ‹#› of 27

Direct Variable CostsSummarize by Stations

TDP AWG meeting, Los Angeles, 2009-05-07 Matt Fleming slide 10 of 27

Step 1 Detail by Station

TDP AWG meeting, Los Angeles, 2009-05-07 Matt Fleming slide 11 of 27

More Detail by Station

TDP AWG meeting, Los Angeles, 2009-05-07 Matt Fleming slide 12 of 27

More Detail by Station

TDP AWG meeting, Los Angeles, 2009-05-07 Matt Fleming slide 13 of 27

Summary Direct Variable Costs

TDP AWG meeting, Los Angeles, 2009-05-07 Matt Fleming slide 14 of 27

Step 2, Production Rate Needed

TDP AWG meeting, Los Angeles, 2009-05-07 Matt Fleming slide ‹#› of 27

Step 3, Direct Fixed Costs

TDP AWG meeting, Los Angeles, 2009-05-07 Matt Fleming slide 16 of 27

Final Results Again

TDP AWG meeting, Los Angeles, 2009-05-07 Matt Fleming slide ‹#› of 27

Reflector & Support

TDP AWG meeting, Los Angeles, 2009-05-07 Matt Fleming slide 18 of 27

Dedicated Facilitymatched to production rate

TDP AWG meeting, Los Angeles, 2009-05-07 Matt Fleming slide 19 of 27

6 m ATA Primary

TDP AWG meeting, Los Angeles, 2009-05-07 Matt Fleming slide 20 of 27

6m JPL Symmetric

TDP AWG meeting, Los Angeles, 2009-05-07 Matt Fleming slide 21 of 27

Inspection ATA Secondary

TDP AWG meeting, Los Angeles, 2009-05-07 Matt Fleming slide 22 of 27

Test of Flash Projected Targets

TDP AWG meeting, Los Angeles, 2009-05-07 Matt Fleming slide 23 of 27

John Andersen & First Shipment

TDP AWG meeting, Los Angeles, 2009-05-07 Matt Fleming slide 24 of 27

Surface RMS at 12m ?

Project Diameter Mfg rms Grav rms Wt lbs

ATA 6.1m 29.2m² 0.25mm 0.70mm 1,400

JPL 6.0m 28.3m² 0.20mm 0.27mm

TDP 12.0m 113.1m² 1.50mm 5,814

CART Mk 1 10.0m 78.5m² 1.20mm

CART Mk 2 10.0m 78.5m² 0.54mm 0.86mm

XDM 15.0m 176.7m² 1.80mm

KAT 7 12.0m 113.1m² 1.00mm

ASKAP 12.0m 113.1m² 1.00mm

Mounted with gravity

paint

1/20

Previous 6m reflectors were 4.8mm thick, 12m will be 3.0mmOffsets have less curvature

0.36mm

6m ATA Early

TDP AWG meeting, Los Angeles, 2009-05-07 Matt Fleming slide 26 of 27

Primary 12

TDP AWG meeting, Los Angeles, 2009-05-07 Matt Fleming slide 27 of 27

2.4m ATA Early

TDP AWG meeting, Los Angeles, 2009-05-07 Matt Fleming slide 28 of 27

Secondary 12

TDP AWG meeting, Los Angeles, 2009-05-07 Matt Fleming slide 29 of 27

Primary Reflector CostsJust Beginning to Learn

Project Diameter $ / dish Wt lbs $ / m² $ / lb

ATA -42 6.1m 29.2m² 24,600 1,400 842 17.57

ATA -350 6.1m 29.2m² 13,700 1,400 469 9.79

TDP 12m 113.1m² 29,451 5,814 260 5.07

CART Mk 2 10.0m 78.5m² 50,416 642

ASKAP 12m 113.1m²

KAT7 12m 113.1m²

TDP AWG meeting, Los Angeles, 2009-05-07 Matt Fleming slide 30 of 27

ATA -350 reflector original bid $8,300 at 12% total cost.ATA-42 Most recent price is $19,200 at 25% total cost

These are not final confirmed figures.Some of these numbers are guesses.

Antenna CostsJust Beginning to Learn

Project Diameter $ / ant Wt lbs $ / m² $ / lb

ATA-42 6.1m 29.2m² 78,000 4,500 2,671 17.33

ATA-350 6.1m 29.2m² 66,000 4,500 2,260 14.67

ASCAP-36 12m 113.1m² 200,000 66,140 1,768 3.02

KAT7-80 12m 113.1m² 300,000 42,000 2,653 7.14

TDP AWG meeting, Los Angeles, 2009-05-07 Matt Fleming slide 31 of 27

ATA -350 reflector original bid $8,300 at 12% total cost.ATA-42 Most recent price is $19,200 at 25% total cost

These are not final confirmed figures.Some of these numbers are guesses.