U.S. DOT T3 Webinar Mobile Device Technology TCRP Synthesis 91 April 10, 2012

24
U.S. DOT T3 Webinar U.S. DOT T3 Webinar Mobile Device Mobile Device Technology Technology TCRP Synthesis 91 TCRP Synthesis 91 April 10, 2012 April 10, 2012 Case Study Case Study LeeTran – Lee County, FL LeeTran – Lee County, FL Mike Horsting, AICP Mike Horsting, AICP 1

description

U.S. DOT T3 Webinar Mobile Device Technology TCRP Synthesis 91 April 10, 2012. Case Study LeeTran – Lee County, FL Mike Horsting, AICP. Presentation Outline. Lee County Background Situation and Need Identified Solution Technology Procurement and Installation Trouble-shooting - PowerPoint PPT Presentation

Transcript of U.S. DOT T3 Webinar Mobile Device Technology TCRP Synthesis 91 April 10, 2012

Page 1: U.S. DOT T3 Webinar Mobile Device Technology  TCRP Synthesis 91 April 10, 2012

U.S. DOT T3 WebinarU.S. DOT T3 WebinarMobile Device Mobile Device Technology Technology

TCRP Synthesis 91TCRP Synthesis 91April 10, 2012April 10, 2012

Case StudyCase StudyLeeTran – Lee County, FLLeeTran – Lee County, FL

Mike Horsting, AICPMike Horsting, AICP

11

Page 2: U.S. DOT T3 Webinar Mobile Device Technology  TCRP Synthesis 91 April 10, 2012

Presentation OutlinePresentation Outline►Lee County BackgroundLee County Background►Situation and NeedSituation and Need► Identified SolutionIdentified Solution►Technology Procurement and Technology Procurement and

InstallationInstallation►Trouble-shootingTrouble-shooting►Results and BenefitsResults and Benefits

2

Page 3: U.S. DOT T3 Webinar Mobile Device Technology  TCRP Synthesis 91 April 10, 2012

Who is LeeTran?Who is LeeTran?►Lee County Transit – Fort Myers, FLLee County Transit – Fort Myers, FL►County-wide bus route networkCounty-wide bus route network►18 bus routes18 bus routes►Bus fleet of 61Bus fleet of 61►3.1 million annual passenger trips3.1 million annual passenger trips►Traditional transit rider and touristsTraditional transit rider and tourists

3

Page 4: U.S. DOT T3 Webinar Mobile Device Technology  TCRP Synthesis 91 April 10, 2012

Where is Lee County?Where is Lee County?

4

Page 5: U.S. DOT T3 Webinar Mobile Device Technology  TCRP Synthesis 91 April 10, 2012

Fort Myers Beach Fort Myers Beach Dreaming…Dreaming…

5

Page 6: U.S. DOT T3 Webinar Mobile Device Technology  TCRP Synthesis 91 April 10, 2012

Fort Myers Beach Reality…Fort Myers Beach Reality…

6

Page 7: U.S. DOT T3 Webinar Mobile Device Technology  TCRP Synthesis 91 April 10, 2012

StakeholdersStakeholders► Town of Fort Myers BeachTown of Fort Myers Beach

► Lee County TransitLee County Transit

► Lee County Department of Lee County Department of TransportationTransportation

► State of Florida Department State of Florida Department of Transportationof Transportation

7

Page 8: U.S. DOT T3 Webinar Mobile Device Technology  TCRP Synthesis 91 April 10, 2012

Identifying the ProblemIdentifying the Problem►Tourism DestinationTourism Destination

Great beaches and warm, sunny wintersGreat beaches and warm, sunny winters► Island Community with Limited AccessIsland Community with Limited Access►Significant to Severe CongestionSignificant to Severe Congestion►Limited Parking Limited Parking ►Driver BehaviorDriver Behavior►Limited TransitLimited Transit

8

Page 9: U.S. DOT T3 Webinar Mobile Device Technology  TCRP Synthesis 91 April 10, 2012

Identifying the NeedsIdentifying the Needs►Additional Passenger InformationAdditional Passenger Information

Number one passenger requestNumber one passenger request Reduce the guessing Reduce the guessing (When will the trolley be here?)(When will the trolley be here?)

►Manage CongestionManage Congestion►Give Transit the AdvantageGive Transit the Advantage►Reduce Road-RageReduce Road-Rage

9

Page 10: U.S. DOT T3 Webinar Mobile Device Technology  TCRP Synthesis 91 April 10, 2012

Packaging a SolutionPackaging a Solution► Intelligent Transportation SystemsIntelligent Transportation Systems

Real-Time Passenger InformationReal-Time Passenger Information First at stops, then mobile devicesFirst at stops, then mobile devices

► Increase Capacity by Reducing Increase Capacity by Reducing HeadwaysHeadways

►Dedicated Transit Lane over BridgeDedicated Transit Lane over Bridge►Free ParkingFree Parking►Marketing CampaignMarketing Campaign►Luggage / Gear RacksLuggage / Gear Racks

10

Page 11: U.S. DOT T3 Webinar Mobile Device Technology  TCRP Synthesis 91 April 10, 2012

ITS RequirementsITS Requirements►Web-based and Cost effective solutionWeb-based and Cost effective solution►Real-Time Information must be:Real-Time Information must be:

80% accuracy for 10 minute predictions80% accuracy for 10 minute predictions 90% accuracy for 5 minute predictions90% accuracy for 5 minute predictions

►Vendor support for changes and upgradesVendor support for changes and upgrades►LED displays at four key stop locationsLED displays at four key stop locations►Expandable to other routes, vehicles and Expandable to other routes, vehicles and

information mediumsinformation mediums11

Page 12: U.S. DOT T3 Webinar Mobile Device Technology  TCRP Synthesis 91 April 10, 2012

Solution Procurement Solution Procurement ►Solicitation - RFPSolicitation - RFP►Evaluation Criteria:Evaluation Criteria:

StabilityStability Recent ExperienceRecent Experience ReferencesReferences Technical ProposalTechnical Proposal Software RequirementsSoftware Requirements PricePrice

► Initial 5 year contract with vendorInitial 5 year contract with vendor12

Page 13: U.S. DOT T3 Webinar Mobile Device Technology  TCRP Synthesis 91 April 10, 2012

Functional DiagramFunctional Diagram

13

Page 14: U.S. DOT T3 Webinar Mobile Device Technology  TCRP Synthesis 91 April 10, 2012

Installation and TestingInstallation and Testing► Vehicle InstallationVehicle Installation► LED Displays at StationsLED Displays at Stations

Power SourcesPower Sources► Initial learning period 1-2 monthsInitial learning period 1-2 months

Off-season time periodOff-season time period Quick accuracyQuick accuracy One routeOne route

► Test Launch and Test Launch and MonitorMonitor

14

Page 15: U.S. DOT T3 Webinar Mobile Device Technology  TCRP Synthesis 91 April 10, 2012

Initial Information SourcesInitial Information Sources►LED DisplaysLED Displays

Arrivals and Current TimeArrivals and Current Time

► InternetInternet Arrivals and Interactive MapArrivals and Interactive Map

►SMS (phase II)SMS (phase II) Text Text

15

Page 16: U.S. DOT T3 Webinar Mobile Device Technology  TCRP Synthesis 91 April 10, 2012

DeploymentDeployment►TrainingTraining

Dispatchers and SupervisorsDispatchers and Supervisors OperatorsOperators

►Marketing and AdvertisingMarketing and Advertising Brochures Brochures Variable Message BoardsVariable Message Boards

►Monitoring into Winter SeasonMonitoring into Winter Season Field ObservationsField Observations

16

Page 17: U.S. DOT T3 Webinar Mobile Device Technology  TCRP Synthesis 91 April 10, 2012

RealityReality►Seasonal Congestion too SevereSeasonal Congestion too Severe►Software MiscalculationsSoftware Miscalculations►Vehicles “Dropping-out”Vehicles “Dropping-out”► Inaccurate PredictionsInaccurate Predictions►Operational FrustrationsOperational Frustrations►Solar-powered SignsSolar-powered Signs

17

Page 18: U.S. DOT T3 Webinar Mobile Device Technology  TCRP Synthesis 91 April 10, 2012

Fixing RealityFixing Reality►Schedule-based PredictionsSchedule-based Predictions

►Headway-based PredictionsHeadway-based Predictions ““Loop Jobs”Loop Jobs”

►Accuracy AchievedAccuracy Achieved

18

Page 19: U.S. DOT T3 Webinar Mobile Device Technology  TCRP Synthesis 91 April 10, 2012

ExpansionExpansion►Added Information via Mobile DeviceAdded Information via Mobile Device►Two additional routesTwo additional routes

Entire beach zoneEntire beach zone►Entire dedicated fleet installationEntire dedicated fleet installation►All stopsAll stops

Stop ID numbersStop ID numbers

19

Page 20: U.S. DOT T3 Webinar Mobile Device Technology  TCRP Synthesis 91 April 10, 2012

Pushback/ResultsPushback/Results►““Our customers don’t use smart Our customers don’t use smart

phones”phones”

►SMS Text messagingSMS Text messaging►WebsiteWebsite►SmartphoneSmartphone►AlertsAlerts

20

Page 21: U.S. DOT T3 Webinar Mobile Device Technology  TCRP Synthesis 91 April 10, 2012

Overall ImprovementsOverall Improvements► Improved Customer SatisfactionImproved Customer Satisfaction

No more guessing at 4 major stopsNo more guessing at 4 major stops►Business Owner SatisfactionBusiness Owner Satisfaction

Customer informationCustomer information Extra businessExtra business

►Accurate Real-time Information Accurate Real-time Information ►Positive customer feedbackPositive customer feedback►Ridership increase of 32%Ridership increase of 32%

21

Page 22: U.S. DOT T3 Webinar Mobile Device Technology  TCRP Synthesis 91 April 10, 2012

Additional BenefitsAdditional Benefits►DispatchDispatch

Vehicle location monitoringVehicle location monitoring On-time performanceOn-time performance

►Additional Customer InformationAdditional Customer Information Service Advisories and DelaysService Advisories and Delays Planned service changesPlanned service changes

22

Page 23: U.S. DOT T3 Webinar Mobile Device Technology  TCRP Synthesis 91 April 10, 2012

Cost, Time, Staffing, Cost, Time, Staffing, BudgetingBudgeting

► Initial procurement of $60,000Initial procurement of $60,000 HardwareHardware InstallationInstallation First year operating costsFirst year operating costs

►Annual operating costs of $12,000Annual operating costs of $12,000►Lowered wireless costs after 5 yearsLowered wireless costs after 5 years►TIME! TIME!

23

Page 24: U.S. DOT T3 Webinar Mobile Device Technology  TCRP Synthesis 91 April 10, 2012

Thank You!Thank You!Mike Horsting, AICPMike Horsting, AICP

[email protected]@rtachicago.org

2424