U.S. DOT T3 Webinar Mobile Device Technology TCRP Synthesis 91 April 10, 2012
description
Transcript of U.S. DOT T3 Webinar Mobile Device Technology TCRP Synthesis 91 April 10, 2012
U.S. DOT T3 WebinarU.S. DOT T3 WebinarMobile Device Mobile Device Technology Technology
TCRP Synthesis 91TCRP Synthesis 91April 10, 2012April 10, 2012
Case StudyCase StudyLeeTran – Lee County, FLLeeTran – Lee County, FL
Mike Horsting, AICPMike Horsting, AICP
11
Presentation OutlinePresentation Outline►Lee County BackgroundLee County Background►Situation and NeedSituation and Need► Identified SolutionIdentified Solution►Technology Procurement and Technology Procurement and
InstallationInstallation►Trouble-shootingTrouble-shooting►Results and BenefitsResults and Benefits
2
Who is LeeTran?Who is LeeTran?►Lee County Transit – Fort Myers, FLLee County Transit – Fort Myers, FL►County-wide bus route networkCounty-wide bus route network►18 bus routes18 bus routes►Bus fleet of 61Bus fleet of 61►3.1 million annual passenger trips3.1 million annual passenger trips►Traditional transit rider and touristsTraditional transit rider and tourists
3
Where is Lee County?Where is Lee County?
4
Fort Myers Beach Fort Myers Beach Dreaming…Dreaming…
5
Fort Myers Beach Reality…Fort Myers Beach Reality…
6
StakeholdersStakeholders► Town of Fort Myers BeachTown of Fort Myers Beach
► Lee County TransitLee County Transit
► Lee County Department of Lee County Department of TransportationTransportation
► State of Florida Department State of Florida Department of Transportationof Transportation
7
Identifying the ProblemIdentifying the Problem►Tourism DestinationTourism Destination
Great beaches and warm, sunny wintersGreat beaches and warm, sunny winters► Island Community with Limited AccessIsland Community with Limited Access►Significant to Severe CongestionSignificant to Severe Congestion►Limited Parking Limited Parking ►Driver BehaviorDriver Behavior►Limited TransitLimited Transit
8
Identifying the NeedsIdentifying the Needs►Additional Passenger InformationAdditional Passenger Information
Number one passenger requestNumber one passenger request Reduce the guessing Reduce the guessing (When will the trolley be here?)(When will the trolley be here?)
►Manage CongestionManage Congestion►Give Transit the AdvantageGive Transit the Advantage►Reduce Road-RageReduce Road-Rage
9
Packaging a SolutionPackaging a Solution► Intelligent Transportation SystemsIntelligent Transportation Systems
Real-Time Passenger InformationReal-Time Passenger Information First at stops, then mobile devicesFirst at stops, then mobile devices
► Increase Capacity by Reducing Increase Capacity by Reducing HeadwaysHeadways
►Dedicated Transit Lane over BridgeDedicated Transit Lane over Bridge►Free ParkingFree Parking►Marketing CampaignMarketing Campaign►Luggage / Gear RacksLuggage / Gear Racks
10
ITS RequirementsITS Requirements►Web-based and Cost effective solutionWeb-based and Cost effective solution►Real-Time Information must be:Real-Time Information must be:
80% accuracy for 10 minute predictions80% accuracy for 10 minute predictions 90% accuracy for 5 minute predictions90% accuracy for 5 minute predictions
►Vendor support for changes and upgradesVendor support for changes and upgrades►LED displays at four key stop locationsLED displays at four key stop locations►Expandable to other routes, vehicles and Expandable to other routes, vehicles and
information mediumsinformation mediums11
Solution Procurement Solution Procurement ►Solicitation - RFPSolicitation - RFP►Evaluation Criteria:Evaluation Criteria:
StabilityStability Recent ExperienceRecent Experience ReferencesReferences Technical ProposalTechnical Proposal Software RequirementsSoftware Requirements PricePrice
► Initial 5 year contract with vendorInitial 5 year contract with vendor12
Functional DiagramFunctional Diagram
13
Installation and TestingInstallation and Testing► Vehicle InstallationVehicle Installation► LED Displays at StationsLED Displays at Stations
Power SourcesPower Sources► Initial learning period 1-2 monthsInitial learning period 1-2 months
Off-season time periodOff-season time period Quick accuracyQuick accuracy One routeOne route
► Test Launch and Test Launch and MonitorMonitor
14
Initial Information SourcesInitial Information Sources►LED DisplaysLED Displays
Arrivals and Current TimeArrivals and Current Time
► InternetInternet Arrivals and Interactive MapArrivals and Interactive Map
►SMS (phase II)SMS (phase II) Text Text
15
DeploymentDeployment►TrainingTraining
Dispatchers and SupervisorsDispatchers and Supervisors OperatorsOperators
►Marketing and AdvertisingMarketing and Advertising Brochures Brochures Variable Message BoardsVariable Message Boards
►Monitoring into Winter SeasonMonitoring into Winter Season Field ObservationsField Observations
16
RealityReality►Seasonal Congestion too SevereSeasonal Congestion too Severe►Software MiscalculationsSoftware Miscalculations►Vehicles “Dropping-out”Vehicles “Dropping-out”► Inaccurate PredictionsInaccurate Predictions►Operational FrustrationsOperational Frustrations►Solar-powered SignsSolar-powered Signs
17
Fixing RealityFixing Reality►Schedule-based PredictionsSchedule-based Predictions
►Headway-based PredictionsHeadway-based Predictions ““Loop Jobs”Loop Jobs”
►Accuracy AchievedAccuracy Achieved
18
ExpansionExpansion►Added Information via Mobile DeviceAdded Information via Mobile Device►Two additional routesTwo additional routes
Entire beach zoneEntire beach zone►Entire dedicated fleet installationEntire dedicated fleet installation►All stopsAll stops
Stop ID numbersStop ID numbers
19
Pushback/ResultsPushback/Results►““Our customers don’t use smart Our customers don’t use smart
phones”phones”
►SMS Text messagingSMS Text messaging►WebsiteWebsite►SmartphoneSmartphone►AlertsAlerts
20
Overall ImprovementsOverall Improvements► Improved Customer SatisfactionImproved Customer Satisfaction
No more guessing at 4 major stopsNo more guessing at 4 major stops►Business Owner SatisfactionBusiness Owner Satisfaction
Customer informationCustomer information Extra businessExtra business
►Accurate Real-time Information Accurate Real-time Information ►Positive customer feedbackPositive customer feedback►Ridership increase of 32%Ridership increase of 32%
21
Additional BenefitsAdditional Benefits►DispatchDispatch
Vehicle location monitoringVehicle location monitoring On-time performanceOn-time performance
►Additional Customer InformationAdditional Customer Information Service Advisories and DelaysService Advisories and Delays Planned service changesPlanned service changes
22
Cost, Time, Staffing, Cost, Time, Staffing, BudgetingBudgeting
► Initial procurement of $60,000Initial procurement of $60,000 HardwareHardware InstallationInstallation First year operating costsFirst year operating costs
►Annual operating costs of $12,000Annual operating costs of $12,000►Lowered wireless costs after 5 yearsLowered wireless costs after 5 years►TIME! TIME!
23