U.S. Coast Guard Notice of Proposed Rulemaking Inspection of Towing Vessels Articulated tug-barge...

32
U.S. Coast Guard U.S. Coast Guard Notice of Proposed Notice of Proposed Rulemaking Rulemaking Inspection of Towing Inspection of Towing Vessels Vessels Articulated tug-barge Sept 2011 1

Transcript of U.S. Coast Guard Notice of Proposed Rulemaking Inspection of Towing Vessels Articulated tug-barge...

Page 1: U.S. Coast Guard Notice of Proposed Rulemaking Inspection of Towing Vessels Articulated tug-barge Sept 2011 1.

U.S. Coast GuardU.S. Coast GuardNotice of Proposed RulemakingNotice of Proposed Rulemaking

Inspection of Towing VesselsInspection of Towing Vessels

Articulated tug-barge

Sept 20111

Page 2: U.S. Coast Guard Notice of Proposed Rulemaking Inspection of Towing Vessels Articulated tug-barge Sept 2011 1.

Inspection of Towing VesselsInspection of Towing Vessels

Reason for Proposed Rule

The CG & Maritime Transportation Act of 2004:

• Added towing vessels as a class of inspected vessels.

• Authorized the establishment of a safety management system for towing vessels.

• Authorized the USCG to prescribe maximum hours of service for individuals on towing vessels at least 26 feet in length.

Line-Haul Towboat 2

Page 3: U.S. Coast Guard Notice of Proposed Rulemaking Inspection of Towing Vessels Articulated tug-barge Sept 2011 1.

Inspection of Towing VesselsInspection of Towing Vessels

Current Regulatory Status:

Towing vessels are regulated but most are not inspected.

• The USCG does not issue Certificates of Inspection (COI) to towing vessels unless they are over 300 GT and in oceans service.

• Certain tow vessel components/operationsare only subject to USCG regulations that are:

• Specific to towing vessels

• Applicable to all uninspected vessels

• Applicable to all vessels

• The USCG may board towing vessels for safetyand security checks at any time.

3

Ocean-going Tugboat

Page 4: U.S. Coast Guard Notice of Proposed Rulemaking Inspection of Towing Vessels Articulated tug-barge Sept 2011 1.

Inspection of Towing VesselsInspection of Towing Vessels

Historical Background of the Rule

• Dec 2004:

• The USCG published a notice with request for

comments, as well as a notice of public meetings.

• Four public meetings were held.

• American Bureau of Shipping Group (ABSG) Report:• 1-year contractor-supported study:

• Categorized the industry• Analyzed casualty data• Provided economic data

• The USCG visited companies and vessels and internally reviewed accident histories.

4

Page 5: U.S. Coast Guard Notice of Proposed Rulemaking Inspection of Towing Vessels Articulated tug-barge Sept 2011 1.

Inspection of Towing VesselsInspection of Towing Vessels

• Regulation sought by the American Waterways Operators (AWO).

• Creates single agency (Coast Guard (USCG)) oversight.

• Levels the playing field across the industry by establishing base standards.

• Therefore, the USCG established a joint working group with the AWO to improve safety.

5

Page 6: U.S. Coast Guard Notice of Proposed Rulemaking Inspection of Towing Vessels Articulated tug-barge Sept 2011 1.

Inspection of Towing VesselsInspection of Towing Vessels

Building the Rule

• TSAC involvement:

• TSAC/USCG began working together in the fall of 2004.

• Interactive project.

• Nearly 200 industry representatives

participated.

• Added time to the project but produced

dividends at the end.

• Incorporated TSAC recommendations

into the rule.

Line-Haul Towboat6

Page 7: U.S. Coast Guard Notice of Proposed Rulemaking Inspection of Towing Vessels Articulated tug-barge Sept 2011 1.

Inspection of Towing VesselsInspection of Towing Vessels

Notice of Proposed Rulemaking

• Adds new subchapter (M) to 46 CFR.

• Establishes baseline regulations forinspected towing vessels.

• Defines the Towing Safety ManagementSystem (TSMS) .

• Prescribes qualifications for third-party auditors and related procedures.

• Prescribes procedures for vessel compliance and obtaining a certificate of inspection (COI).

• Reflects cooperation with TSAC.

7

Operations in fleeting area

Page 8: U.S. Coast Guard Notice of Proposed Rulemaking Inspection of Towing Vessels Articulated tug-barge Sept 2011 1.

Inspection of Towing VesselsInspection of Towing Vessels

Key Elements

Standards (lifesaving, fire protection, machinery, etc.):• Developed specifically for towing vessels.

Applicability:• Limited to “traditional” towing vessels—for now.• Focused on risk.

Safety Management System: • The core of operations and compliance.• Addresses the human element.• Ties management to vessels.• Used throughout manufacturing, financing, transportation (ISM mandated, RCP proprietary).• Facilitates audited compliance activities.

Third-party auditors and surveyors: • Allows for flexibility—service when/where needed.• Allows the CG to focus on the areas of greatest risk.

Coast Guard Option 8

Page 9: U.S. Coast Guard Notice of Proposed Rulemaking Inspection of Towing Vessels Articulated tug-barge Sept 2011 1.

Inspection of Towing VesselsInspection of Towing Vessels

• 46 CFR subchapter M:• Part 136—CERTIFICATION• Part 137–VESSEL COMPLIANCE• Part 138—TOWING SAFETY

MANAGEMENT SYSTEMS (TSMS)• Part 139—THIRD-PARTY

ORGANIZATIONS• Part 140—OPERATIONS• Part 141—LIFESAVING• Part 142—FIRE PROTECTION• Part 143—MACHINERY AND

ELECTRICAL SYSTEMS AND EQUIPMENT

• PART 144—CONSTRUCTION AND ARRANGEMENT

9

Line Haul

Page 10: U.S. Coast Guard Notice of Proposed Rulemaking Inspection of Towing Vessels Articulated tug-barge Sept 2011 1.

Inspection of Towing VesselsInspection of Towing Vessels

Applicability

• In general, this regulation would apply totowing vessels ≥ 26 ft., as well as any towing vessels pushing, pulling, or hauling a barge carrying dangerous or hazardous materials.

10

Towboat pushing two covered hoppers, likely carrying grain, and one tank barge.

Page 11: U.S. Coast Guard Notice of Proposed Rulemaking Inspection of Towing Vessels Articulated tug-barge Sept 2011 1.

Inspection of Towing VesselsInspection of Towing Vessels

Towing Safety Management System

• Risk-based: Analysis of accident data and experts’ inputs.

• Human factors: training, safety drills, crew endurance management program, restrictions on hours of service.

• Equipment: lifesaving, fire protection, electrical and machinery,vessel operational requirements.

• Recordkeeping.

• TSMS + audits, surveys, andCG oversight = a dynamic system. 11

View from the pilothouse

Page 12: U.S. Coast Guard Notice of Proposed Rulemaking Inspection of Towing Vessels Articulated tug-barge Sept 2011 1.

Inspection of Towing VesselsInspection of Towing Vessels

Proposed Third Party Concept

The USCG approves third-party auditors and surveyors.+

Companies implement TSMS and ensure vessels meet standards.+

Third parties verify compliance(Audit TSMS / Survey vessels).

+The USCG boards vessels

(Initial / 5yrs / Risk).

+The USCG reviews reports.

=Certificate of Inspection issued to vessels in compliance. Workboat Harbor Tugboat

12

Page 13: U.S. Coast Guard Notice of Proposed Rulemaking Inspection of Towing Vessels Articulated tug-barge Sept 2011 1.

Inspection of Towing VesselsInspection of Towing Vessels

Towing Company Responsibilities

• Develop and implement TSMS on vessels and shore side operations.

• Operate under TSMS.

• Maintain vessels in compliance with regulations and TSMS.

Tugboat backing bow around

13

Page 14: U.S. Coast Guard Notice of Proposed Rulemaking Inspection of Towing Vessels Articulated tug-barge Sept 2011 1.

Inspection of Towing VesselsInspection of Towing Vessels

Third Party – Auditor and Surveyor Responsibilities

• Review TSMS and approve TSMS if it complies with the proposed requirements.

• Audit TSMS and vessels.

• Survey towing vessels.

Articulated tug-barge in open waters

14

Page 15: U.S. Coast Guard Notice of Proposed Rulemaking Inspection of Towing Vessels Articulated tug-barge Sept 2011 1.

Inspection of Towing VesselsInspection of Towing Vessels

Coast Guard Responsibilities

• Approve and oversee third-party auditors and surveyors.

• Ensure CG inspection of every towing vessel at least once every 5 years.

• Additional risk-based boarding of towing vessels.

• Issue Certificate of Inspection (COI).

Tow transiting lock

15

Page 16: U.S. Coast Guard Notice of Proposed Rulemaking Inspection of Towing Vessels Articulated tug-barge Sept 2011 1.

Inspection of Towing VesselsInspection of Towing Vessels

Affected Vessels

• 5,208 Towing Vessels (including towboats and tugboats).• Vessels operating in inland rivers, Great Lakes, coasts, and

oceans.• Perform line-haul, fleeting, and harbor assist operations.

Affected Companies

• 1,059 owner/operator companies.• 327 companies, with either a full safety management system or

similar program, control 2,941 vessels.• 827 companies, without safety management systems or similar

programs, control 2,267 vessels.16

Page 17: U.S. Coast Guard Notice of Proposed Rulemaking Inspection of Towing Vessels Articulated tug-barge Sept 2011 1.

Inspection of Towing VesselsInspection of Towing VesselsCompliance Phase-in for a

Towing Company

Final Rule

TSMS2yrs fm FR

YR11

YR0

YR6

YR2

COI4yrs fm TSMS25% p/yr

Deferred Machinery & Electrical (M&E)5yrs fm COI

Deferred redundancy M&E5yrs from COI

Complianc

e

17

Page 18: U.S. Coast Guard Notice of Proposed Rulemaking Inspection of Towing Vessels Articulated tug-barge Sept 2011 1.

18

A Bridge to Inspection…A Bridge to Inspection…

04/21/23

Mr. Patrick LeeTowing Vessel National Program CoordinatorOffice of Vessel Activities (CG-5431)202-372-1135

Page 19: U.S. Coast Guard Notice of Proposed Rulemaking Inspection of Towing Vessels Articulated tug-barge Sept 2011 1.

19

Towing Vessel Bridging Program

Why do we need a bridge?

04/21/23

Page 20: U.S. Coast Guard Notice of Proposed Rulemaking Inspection of Towing Vessels Articulated tug-barge Sept 2011 1.

04/21/23 20

A Phased Approach…

Phase 1Outreach & EducationIIEsTesting of Risk ToolQualification/PQSId of FORs

Phase 2Prioritized ExamsCourse DevelopmentComments on NPRM100% FORs examined

Phase 3COI IssuanceFormal Training

Summer 2009Subchapter “M”

Published

Law Enforcement Boardings & Surge Operations

Page 21: U.S. Coast Guard Notice of Proposed Rulemaking Inspection of Towing Vessels Articulated tug-barge Sept 2011 1.

Enclosure (1)

Phase 2 Prioritization Matrix

04/21/23

Page 22: U.S. Coast Guard Notice of Proposed Rulemaking Inspection of Towing Vessels Articulated tug-barge Sept 2011 1.

22 04/21/23

Page 23: U.S. Coast Guard Notice of Proposed Rulemaking Inspection of Towing Vessels Articulated tug-barge Sept 2011 1.

UTV Fleet of Responsibility

Page 24: U.S. Coast Guard Notice of Proposed Rulemaking Inspection of Towing Vessels Articulated tug-barge Sept 2011 1.

What is it? Who is it? What can it do for me?

04/21/23 24

Page 25: U.S. Coast Guard Notice of Proposed Rulemaking Inspection of Towing Vessels Articulated tug-barge Sept 2011 1.

United States Coast GuardTowing Vessel National Center of Expertise

04/21/23 25

Towing Vessel National Center of Expertise

Page 26: U.S. Coast Guard Notice of Proposed Rulemaking Inspection of Towing Vessels Articulated tug-barge Sept 2011 1.

United States Coast GuardTowing Vessel National Center of Expertise

Why is the Center of Expertise in Paducah?

Hub of the inland waterways

Tow Boat City USA

Seamen’s Church Institute

04/21/23 26

Page 27: U.S. Coast Guard Notice of Proposed Rulemaking Inspection of Towing Vessels Articulated tug-barge Sept 2011 1.

United States Coast GuardTowing Vessel National Center of Expertise

The TVNCOE Team

Active Military:

LCDR Russell LCDR Bethke LCDR KeoghSupervisor Asst. Supervisor InspectorCOE Manager Asst. Manager InvestigatorInspector InspectorCivilians:

Roy Murphy Steven Douglass Bill Perkins Mike Kelly Industry Industry USCG retiredUSCG retiredLicensed Master Licensed Master Inspector Inspector Training Chief Engineer InvestigatorInvestigator

Page 28: U.S. Coast Guard Notice of Proposed Rulemaking Inspection of Towing Vessels Articulated tug-barge Sept 2011 1.

United States Coast GuardTowing Vessel National Center of Expertise

04/21/23 28

Page 29: U.S. Coast Guard Notice of Proposed Rulemaking Inspection of Towing Vessels Articulated tug-barge Sept 2011 1.

United States Coast GuardTowing Vessel National Center of Expertise

CG’s Experts on Towing Vessels

TrainingAssist in the development of curriculumImprove consistency of exams, inspections

Information brokersGather, organize, distribute important data

Subject Matter ExpertiseIdentify issues and help shape policyBring the industry and Coast Guard together

04/21/23 29

Page 30: U.S. Coast Guard Notice of Proposed Rulemaking Inspection of Towing Vessels Articulated tug-barge Sept 2011 1.

United States Coast GuardTowing Vessel National Center of Expertise

Training UTV Examiner Course

Total = 8 (FY10 & FY 11)CG Students trained = 152Industry reps participated = 52Companies represented = 33

Other OutreachFirefighting Pressure vessel

04/21/23 30

Page 31: U.S. Coast Guard Notice of Proposed Rulemaking Inspection of Towing Vessels Articulated tug-barge Sept 2011 1.

United States Coast GuardTowing Vessel National Center of Expertise

TVNCOE Website

Quick access to towing vessel information

Centralized location for current CG policies, guidebooks, PQS manual, job aids, etc

Links to other resources

News & Eventswww.uscg.mil/tvncoe

04/21/23 31

Page 32: U.S. Coast Guard Notice of Proposed Rulemaking Inspection of Towing Vessels Articulated tug-barge Sept 2011 1.

United States Coast GuardTowing Vessel National Center of Expertise

04/21/23 32