![Page 1: US Army Corps of Engineers BUILDING STRONG ® STEP FOUR: EVALUATE EFFECTS OF ALTERNATIVE PLANS Planning Principles & Procedures – FY11.](https://reader035.fdocuments.in/reader035/viewer/2022070407/56649e455503460f94b3a2dd/html5/thumbnails/1.jpg)
US Army Corps of Engineers
BUILDING STRONG®
STEP FOUR: EVALUATE EFFECTS OF ALTERNATIVE PLANS
Planning Principles & Procedures – FY11
![Page 2: US Army Corps of Engineers BUILDING STRONG ® STEP FOUR: EVALUATE EFFECTS OF ALTERNATIVE PLANS Planning Principles & Procedures – FY11.](https://reader035.fdocuments.in/reader035/viewer/2022070407/56649e455503460f94b3a2dd/html5/thumbnails/2.jpg)
BUILDING STRONG®
OBJECTIVE
DEFINE EVALUATION
DESCRIBE STEPS IN EVALUATION PROCESS
![Page 3: US Army Corps of Engineers BUILDING STRONG ® STEP FOUR: EVALUATE EFFECTS OF ALTERNATIVE PLANS Planning Principles & Procedures – FY11.](https://reader035.fdocuments.in/reader035/viewer/2022070407/56649e455503460f94b3a2dd/html5/thumbnails/3.jpg)
BUILDING STRONG®
EVALUATION
QUANTIFY AND JUDGE CONTRIBUTIONS OF PLANS
ASSESSMENT: Measure/ quantify differences
APPRAISAL: Judge/ weight differences
FIND VALUE OR WORTH OF PLANS
IDENTIFY PLANS to carry through to COMPARISON
RE-FORMULATE & RE-EVALUATE as necessary
![Page 4: US Army Corps of Engineers BUILDING STRONG ® STEP FOUR: EVALUATE EFFECTS OF ALTERNATIVE PLANS Planning Principles & Procedures – FY11.](https://reader035.fdocuments.in/reader035/viewer/2022070407/56649e455503460f94b3a2dd/html5/thumbnails/4.jpg)
BUILDING STRONG®
EVALUATION AND COMPARISON
EVALUATION - LOOK AT PLAN ON ITS OWN MERITS (With project vs. Without project conditions)
COMPARISON - CONTRAST THE MERITS AMONG PLANS (Plan vs. Plan)
![Page 5: US Army Corps of Engineers BUILDING STRONG ® STEP FOUR: EVALUATE EFFECTS OF ALTERNATIVE PLANS Planning Principles & Procedures – FY11.](https://reader035.fdocuments.in/reader035/viewer/2022070407/56649e455503460f94b3a2dd/html5/thumbnails/5.jpg)
BUILDING STRONG®
EVALUATION STEPS
FORECAST WITH PROJECT CONDITION COMPARE WITH PLAN TO WITHOUT ASSESS EFFECTS APPRAISE EFFECTS QUALIFY PLANS – for further consideration, or drop them
![Page 6: US Army Corps of Engineers BUILDING STRONG ® STEP FOUR: EVALUATE EFFECTS OF ALTERNATIVE PLANS Planning Principles & Procedures – FY11.](https://reader035.fdocuments.in/reader035/viewer/2022070407/56649e455503460f94b3a2dd/html5/thumbnails/6.jpg)
BUILDING STRONG®
FORECAST “WITH PROJECT” CONDITION
EFFECT WITHOUT CONDITION
PLAN A CONDITION
POPULATION 147,000 147,000
ANNUAL DAMAGES
$2.1 Million
$0.7 Million
WETLAND ACRES
412
458
HABITAT UNITS 206 246
RECREATION (USER DAYS)
5,000 25,000
![Page 7: US Army Corps of Engineers BUILDING STRONG ® STEP FOUR: EVALUATE EFFECTS OF ALTERNATIVE PLANS Planning Principles & Procedures – FY11.](https://reader035.fdocuments.in/reader035/viewer/2022070407/56649e455503460f94b3a2dd/html5/thumbnails/7.jpg)
BUILDING STRONG®
EVALUATION STEPS
FORECAST WITH PROJECT CONDITION COMPARE WITH PLAN TO WITHOUT ASSESS EFFECTS APPRAISE EFFECTS QUALIFY PLANS
![Page 8: US Army Corps of Engineers BUILDING STRONG ® STEP FOUR: EVALUATE EFFECTS OF ALTERNATIVE PLANS Planning Principles & Procedures – FY11.](https://reader035.fdocuments.in/reader035/viewer/2022070407/56649e455503460f94b3a2dd/html5/thumbnails/8.jpg)
BUILDING STRONG®
ASSESS EFFECTS
DESCRIBE AND MEASURE ► Resources (ex: wetlands)► Plan outputs (ex: flood damages)► Plan effects (ex: community cohesion)
IN TERMS OF:► Magnitude► Timing & duration► Location► Other characteristics
![Page 9: US Army Corps of Engineers BUILDING STRONG ® STEP FOUR: EVALUATE EFFECTS OF ALTERNATIVE PLANS Planning Principles & Procedures – FY11.](https://reader035.fdocuments.in/reader035/viewer/2022070407/56649e455503460f94b3a2dd/html5/thumbnails/9.jpg)
BUILDING STRONG®
WITH VS WITHOUTEFFECT WITHOUT
CONDITION PLAN A
CONDITION DIFFERENCE
POPULATION 147,000 147,000 0
ANNUAL DAMAGES
$2.1 Million
$0.7 Million
$1.4 million decrease downtown
WETLAND ACRES
412
458
46 acres increase along the river
HABITAT UNITS 206 246 40 HU increase in nature preserve
RECREATION (USER DAYS)
5,000 25,000 20,000 user-days increase in riverfront
park
![Page 10: US Army Corps of Engineers BUILDING STRONG ® STEP FOUR: EVALUATE EFFECTS OF ALTERNATIVE PLANS Planning Principles & Procedures – FY11.](https://reader035.fdocuments.in/reader035/viewer/2022070407/56649e455503460f94b3a2dd/html5/thumbnails/10.jpg)
BUILDING STRONG®
SIGNIFICANT EFFECTS
INSTITUTIONAL
PUBLIC
TECHNICAL
![Page 11: US Army Corps of Engineers BUILDING STRONG ® STEP FOUR: EVALUATE EFFECTS OF ALTERNATIVE PLANS Planning Principles & Procedures – FY11.](https://reader035.fdocuments.in/reader035/viewer/2022070407/56649e455503460f94b3a2dd/html5/thumbnails/11.jpg)
BUILDING STRONG®
INSTITUTIONAL SIGNIFICANCE
The importance of an impact (effect) is recognized in laws, programs and policies:
Federal: ► Principles and Guidelines – NED & EQ impacts► ER 1105-2-100 – primary, secondary, incidental benefits► Endangered Species Act; Clean Water Act► Annual Budget EC 11-2-xxx (ex: for 2010 -193): provides ranking criteria
(scarcity, connectivity, special status species, plan recognition, self-sustaining, cost/acre)
State/Regional: ► Laws creating non-Federal entities (Port Authorities, Flood Control
Districts, etc.)► Ex: Chesapeake Bay Agreement
Local/Tribal: ► Budgets allocated for funds to restore, preserve, etc.
![Page 12: US Army Corps of Engineers BUILDING STRONG ® STEP FOUR: EVALUATE EFFECTS OF ALTERNATIVE PLANS Planning Principles & Procedures – FY11.](https://reader035.fdocuments.in/reader035/viewer/2022070407/56649e455503460f94b3a2dd/html5/thumbnails/12.jpg)
BUILDING STRONG®
INSTITUTIONAL SIGNIFICANCE (LAWS)
Water Resources Development Act Annual Appropriations Acts Clean Water Act of 1972 (section 404 permits) Wetlands Reserve Program Coastal Barrier Resources Act 1990 Chesapeake Bay Agreement State Natural Heritage Programs Zoning Ordinances/Land Trusts
![Page 13: US Army Corps of Engineers BUILDING STRONG ® STEP FOUR: EVALUATE EFFECTS OF ALTERNATIVE PLANS Planning Principles & Procedures – FY11.](https://reader035.fdocuments.in/reader035/viewer/2022070407/56649e455503460f94b3a2dd/html5/thumbnails/13.jpg)
BUILDING STRONG®
PUBLIC SIGNIFICANCE
Non-profit organizations► Navigation users groups► Community organizations
Grass roots support groups► Save the Bay, Save the Whales, Historic Preservation -
Volunteer groups working to identify and preserve a resource
Controversy over the use of resources Opposition to the destruction of a resource Public health & safety
![Page 14: US Army Corps of Engineers BUILDING STRONG ® STEP FOUR: EVALUATE EFFECTS OF ALTERNATIVE PLANS Planning Principles & Procedures – FY11.](https://reader035.fdocuments.in/reader035/viewer/2022070407/56649e455503460f94b3a2dd/html5/thumbnails/14.jpg)
BUILDING STRONG®
TECHNICAL SIGNIFICANCE
Engineering & Economic Sciences► Residual flooding in urban areas► Maintain existing levels of flood protection► Commercial transport► Net benefits, cost effectiveness/incremental cost
Ecological and environmental sciences Human and animal health sciences Biological and life sciences
![Page 15: US Army Corps of Engineers BUILDING STRONG ® STEP FOUR: EVALUATE EFFECTS OF ALTERNATIVE PLANS Planning Principles & Procedures – FY11.](https://reader035.fdocuments.in/reader035/viewer/2022070407/56649e455503460f94b3a2dd/html5/thumbnails/15.jpg)
BUILDING STRONG®
SIGNIFICANCE ATTRIBUTES
Scarcity: relative abundance, rareness Representativeness: exemplifies natural, undisturbed habitat Status and trends: occurrence and extent over time, how and
why changed Connectivity: habitat corridors, fragmentation, barriers Limiting habitat: essential to species survival Biodiversity: species richness, genetic variability
![Page 16: US Army Corps of Engineers BUILDING STRONG ® STEP FOUR: EVALUATE EFFECTS OF ALTERNATIVE PLANS Planning Principles & Procedures – FY11.](https://reader035.fdocuments.in/reader035/viewer/2022070407/56649e455503460f94b3a2dd/html5/thumbnails/16.jpg)
BUILDING STRONG®
SIGNIFICANCE
Can sources of significance overlap? YES! Ex: Wetlands
► Institutional – protected by law► Technical – ecosystem functions► Public – public support
![Page 17: US Army Corps of Engineers BUILDING STRONG ® STEP FOUR: EVALUATE EFFECTS OF ALTERNATIVE PLANS Planning Principles & Procedures – FY11.](https://reader035.fdocuments.in/reader035/viewer/2022070407/56649e455503460f94b3a2dd/html5/thumbnails/17.jpg)
BUILDING STRONG®
MAGNITUDE
NED – benefits & costs
EQ - habitat units, acres of wetlands, protected species, WQ (loads, concentrations), cultural resource sites & properties, etc.
RED - regional sales & income ($), employment, local tax receipts, etc.
OSE - community cohesion - people displaced; prevention of loss of life & public safety; environmental justice, etc.
![Page 18: US Army Corps of Engineers BUILDING STRONG ® STEP FOUR: EVALUATE EFFECTS OF ALTERNATIVE PLANS Planning Principles & Procedures – FY11.](https://reader035.fdocuments.in/reader035/viewer/2022070407/56649e455503460f94b3a2dd/html5/thumbnails/18.jpg)
BUILDING STRONG®
Examples of Effects Evaluated for the Indian River Lagoon Project (P&G Accounts)
NED• Water supply benefits for irrigation• Flood protection (maintain existing levels of service)• Recreation, commercial fishing (qualitative)
RED• Construction, real estate, and O&M: employment, earnings, & output
EQ• Fish & wildlife resources• Protected species• Vegetation: terrestrial & marine• Essential fish habitat• Historic properties• Aesthetics
OSE• Potential community disruption from conversion of agric land
![Page 19: US Army Corps of Engineers BUILDING STRONG ® STEP FOUR: EVALUATE EFFECTS OF ALTERNATIVE PLANS Planning Principles & Procedures – FY11.](https://reader035.fdocuments.in/reader035/viewer/2022070407/56649e455503460f94b3a2dd/html5/thumbnails/19.jpg)
BUILDING STRONG®
Examples of Effects Evaluated for the Indian River Lagoon Project
Hydrologic & Ecological Criteria
• Avg annual nitrogen load to estuary (metric tons/ year) • Avg annual phosphorus load to estuary (metric tons/ year) • Avg annual phosphorus load to Lake Okeechobee (metric tons/
year) • Existing wetlands restored (acres)• Former wetlands restored -hydric soils (acres) • Focal species habitat (acres) • Flows to estuary to meet required salinity envelope (cfs)
![Page 20: US Army Corps of Engineers BUILDING STRONG ® STEP FOUR: EVALUATE EFFECTS OF ALTERNATIVE PLANS Planning Principles & Procedures – FY11.](https://reader035.fdocuments.in/reader035/viewer/2022070407/56649e455503460f94b3a2dd/html5/thumbnails/20.jpg)
BUILDING STRONG®
Examples of Effects to be Evaluated inLake Okeechobee Watershed Study
Lake O Performance Measures - quantitative indicator of how well alternative meets planning objectives – alternatives are formulated to meet them
• Phosphorus load reduction to Lake O
• Exceedances of P load reduction target to Lake O
• Storage (% of runoff stored when Lake O water levels high)
• Increased Lake O inflows during dry conditions
• Wetland restoration (total acres gained)
![Page 21: US Army Corps of Engineers BUILDING STRONG ® STEP FOUR: EVALUATE EFFECTS OF ALTERNATIVE PLANS Planning Principles & Procedures – FY11.](https://reader035.fdocuments.in/reader035/viewer/2022070407/56649e455503460f94b3a2dd/html5/thumbnails/21.jpg)
BUILDING STRONG®
Lake O Evaluation Criteria► Additional effects determined to be potentially important by the project
delivery team, or required by laws, policies, regulations Agricultural water supply Flood damage potential to existing development Net change in recreational potential Ecologic value (eco values of sites to assess impacts) Cultural resources impacts (# resources, spatial
extent) Socio-economic impacts (e.g., ag income, #
residences) Real Estate (# owners, # parcels) Environ & Econ Equity (minority or low income pop.
jobs) Operational flexibility
Examples of Effects to be Evaluated inLake Okeechobee Watershed Study
![Page 22: US Army Corps of Engineers BUILDING STRONG ® STEP FOUR: EVALUATE EFFECTS OF ALTERNATIVE PLANS Planning Principles & Procedures – FY11.](https://reader035.fdocuments.in/reader035/viewer/2022070407/56649e455503460f94b3a2dd/html5/thumbnails/22.jpg)
BUILDING STRONG®
MAGNITUDE - TECHNIQUES
PRINCIPLES AND GUIDELINES – NED, EQ ER 1105-2-100: Appendix D: Economic & Social
Considerations; Appendix E: Civil Works Missions National Economic Development Manuals (IWR) Evaluation of Environmental Investments Research Program
(IWR & ERDC) RED & OSE Handbooks under development (IWR)
![Page 23: US Army Corps of Engineers BUILDING STRONG ® STEP FOUR: EVALUATE EFFECTS OF ALTERNATIVE PLANS Planning Principles & Procedures – FY11.](https://reader035.fdocuments.in/reader035/viewer/2022070407/56649e455503460f94b3a2dd/html5/thumbnails/23.jpg)
BUILDING STRONG®
PRODUCT OF ASSESSMENT
EFFECT WITHOUT CONDITION
PLAN A CONDITION
DIFFERENCE
POPULATION 147,000 147,000 0
ANNUAL DAMAGES
$2.1 Million
$0.7 Million
$1.4 million decrease downtown
WETLAND ACRES
412
458
46 acres increase along the river
HABITAT UNITS 206 246 40 HU increase in nature preserve
RECREATION (USER DAYS)
5,000 25,000 20,000 user-days increase in riverfront
park
![Page 24: US Army Corps of Engineers BUILDING STRONG ® STEP FOUR: EVALUATE EFFECTS OF ALTERNATIVE PLANS Planning Principles & Procedures – FY11.](https://reader035.fdocuments.in/reader035/viewer/2022070407/56649e455503460f94b3a2dd/html5/thumbnails/24.jpg)
BUILDING STRONG®
Assessment Example from Indian River Lagoon Feasibility Study
EFFECT
Without Cond
ALT 2 ALT 3 ALT 4 ALT 5 ALT 6
Cost ($1000) $0 $22,089 $47,965 $53,629 $51,702 $50,689
Flow Reduction (ac-ft)
0 +151,200 +140,600 +137,340 +152,670 +160,546
Phosphorus Removed (Kg/yr)
0 +10,140 +69,066 +94,781 +87,228 +83,067
Wetlands Restored (acres)
0 0 +39,614 +54,827 +53,665 +53,665
Watershed Habitat (HU’s)
23,352 0 (-23,352)
70,709 (+47,357)
86,301 (+62,949)
66,608 (+43,256)
66,608 (+43,256)
Estuarine Habitat (HU’s)
27 290 (+263)
2,204 (+2,177)
3,542 (+3,515)
3,988 (+3,961)
4,435 (+4,408)
Etc…
![Page 25: US Army Corps of Engineers BUILDING STRONG ® STEP FOUR: EVALUATE EFFECTS OF ALTERNATIVE PLANS Planning Principles & Procedures – FY11.](https://reader035.fdocuments.in/reader035/viewer/2022070407/56649e455503460f94b3a2dd/html5/thumbnails/25.jpg)
BUILDING STRONG®
EVALUATION STEPS
FORECAST WITH PROJECT CONDITION COMPARE WITH PLAN TO WITHOUT ASSESS EFFECTS APPRAISE EFFECTS QUALIFY PLANS
![Page 26: US Army Corps of Engineers BUILDING STRONG ® STEP FOUR: EVALUATE EFFECTS OF ALTERNATIVE PLANS Planning Principles & Procedures – FY11.](https://reader035.fdocuments.in/reader035/viewer/2022070407/56649e455503460f94b3a2dd/html5/thumbnails/26.jpg)
BUILDING STRONG®
APPRAISE EFFECTS
What is important?
JUDGE IMPACTS► Positive, Negative, or Neutral?► How positive/ negative?► MOSTLY SUBJECTIVE
• Project Delivery Team► P&G - EQ, RED, OSE► NED -
WEIGHT SIGNIFICANCE
USE P&G CRITERIA
![Page 27: US Army Corps of Engineers BUILDING STRONG ® STEP FOUR: EVALUATE EFFECTS OF ALTERNATIVE PLANS Planning Principles & Procedures – FY11.](https://reader035.fdocuments.in/reader035/viewer/2022070407/56649e455503460f94b3a2dd/html5/thumbnails/27.jpg)
BUILDING STRONG®
Appraisal Example from Indian River Lagoon Feasibility Study
EFFECT
Without Cond
ALT 2 ALT 3 ALT 4 ALT 5 ALT 6
Air Quality H 0 0 0 0 0
Threatened & Endangered Species
L + ++ ++ ++ ++
Coastal Zone L + + ++ ++ ++
Aesthetic Values
M 0 + + ++ ++
Cultural Properties
M - - - - -
Employment M + + + ++ ++
Etc…
Notes: Without cond relative resource values: H=High, M=Moderate L=Low. Notes: Without cond relative resource values: H=High, M=Moderate L=Low. Net overall change from without plan: ++=very beneficial change; +=beneficial;Net overall change from without plan: ++=very beneficial change; +=beneficial;0=no change; -=adverse change; --=very adverse change0=no change; -=adverse change; --=very adverse change
![Page 28: US Army Corps of Engineers BUILDING STRONG ® STEP FOUR: EVALUATE EFFECTS OF ALTERNATIVE PLANS Planning Principles & Procedures – FY11.](https://reader035.fdocuments.in/reader035/viewer/2022070407/56649e455503460f94b3a2dd/html5/thumbnails/28.jpg)
BUILDING STRONG®
EVALUATION STEPS
FORECAST WITH PROJECT CONDITION COMPARE WITH PLAN TO WITHOUT ASSESS EFFECTS APPRAISE EFFECTS QUALIFY PLANS
![Page 29: US Army Corps of Engineers BUILDING STRONG ® STEP FOUR: EVALUATE EFFECTS OF ALTERNATIVE PLANS Planning Principles & Procedures – FY11.](https://reader035.fdocuments.in/reader035/viewer/2022070407/56649e455503460f94b3a2dd/html5/thumbnails/29.jpg)
BUILDING STRONG®
QUALIFY PLANS
IDENTIFY PLANS THAT DESERVE TO BE CARRIED FORWARD & COMPARED AGAINST EACH OTHER
![Page 30: US Army Corps of Engineers BUILDING STRONG ® STEP FOUR: EVALUATE EFFECTS OF ALTERNATIVE PLANS Planning Principles & Procedures – FY11.](https://reader035.fdocuments.in/reader035/viewer/2022070407/56649e455503460f94b3a2dd/html5/thumbnails/30.jpg)
BUILDING STRONG®
EVALUATION STANDARDS
MUST MEET MINIMUM STANDARDS
CRITERIA TO DEFINE STANDARDS:► Planning objectives & constraints► Federal objective► Environmental compliance, consultation and
coordination requirements► P&G criteria► Requirements specific to authorization
• e.g., “Savings Clause” in WRDA 2000 ► Key stakeholders’ concerns
![Page 31: US Army Corps of Engineers BUILDING STRONG ® STEP FOUR: EVALUATE EFFECTS OF ALTERNATIVE PLANS Planning Principles & Procedures – FY11.](https://reader035.fdocuments.in/reader035/viewer/2022070407/56649e455503460f94b3a2dd/html5/thumbnails/31.jpg)
BUILDING STRONG®
PLANNING OBJECTIVES
Objective - Reduce current risk of damage due to flooding.► Does the plan achieve the objective?► To what extent is the objective met?
Constraint – Maintain at least existing level of flood protection► Does the plan avoid/meet the constraint?
![Page 32: US Army Corps of Engineers BUILDING STRONG ® STEP FOUR: EVALUATE EFFECTS OF ALTERNATIVE PLANS Planning Principles & Procedures – FY11.](https://reader035.fdocuments.in/reader035/viewer/2022070407/56649e455503460f94b3a2dd/html5/thumbnails/32.jpg)
BUILDING STRONG®
FEDERAL OBJECTIVE
Contribution of plan to NED benefits.
Ecosystem restoration - contribution of plan to NER benefits (Corps objective)
![Page 33: US Army Corps of Engineers BUILDING STRONG ® STEP FOUR: EVALUATE EFFECTS OF ALTERNATIVE PLANS Planning Principles & Procedures – FY11.](https://reader035.fdocuments.in/reader035/viewer/2022070407/56649e455503460f94b3a2dd/html5/thumbnails/33.jpg)
BUILDING STRONG®
ENVIRONMENTAL CONSULTATION AND COORDINATION REQUIREMENTS
Endangered Species
Cultural Resources
Fish and Wildlife CAR
National Environmental Policy Act (NEPA)
Others
![Page 34: US Army Corps of Engineers BUILDING STRONG ® STEP FOUR: EVALUATE EFFECTS OF ALTERNATIVE PLANS Planning Principles & Procedures – FY11.](https://reader035.fdocuments.in/reader035/viewer/2022070407/56649e455503460f94b3a2dd/html5/thumbnails/34.jpg)
BUILDING STRONG®
PRINCIPLES AND GUIDELINES
FOUR SUBJECTIVE CRITERIA:
► COMPLETENESS► EFFECTIVENESS► EFFICIENCY► ACCEPTABILITY
![Page 35: US Army Corps of Engineers BUILDING STRONG ® STEP FOUR: EVALUATE EFFECTS OF ALTERNATIVE PLANS Planning Principles & Procedures – FY11.](https://reader035.fdocuments.in/reader035/viewer/2022070407/56649e455503460f94b3a2dd/html5/thumbnails/35.jpg)
BUILDING STRONG®
A Note Regarding Iteration…
Will re-formulation & re-evaluation occur? ► Most likely!
Why?► PDT learns from evaluations► More information becomes available► Our understanding improves
Ex:► Initial science indicates correcting salinity levels will restore
estuarine biota (PROBLEMS & OPPORTUNITIES)► So… alternatives are FORMULATED to deliver appropriate
freshwater flows to estuary► Subsequent modeling (EVALUATION) indicates that correcting
salinity & flows are insufficient to restore estuarine biota► So… alternatives are RE-FORMULATED to include measures to
address additional WQ nutrient requirements► Subsequent modeling (RE-EVALUATION) quantifies improvements
to biota resulting from re-formulated alternatives► And so on…
![Page 36: US Army Corps of Engineers BUILDING STRONG ® STEP FOUR: EVALUATE EFFECTS OF ALTERNATIVE PLANS Planning Principles & Procedures – FY11.](https://reader035.fdocuments.in/reader035/viewer/2022070407/56649e455503460f94b3a2dd/html5/thumbnails/36.jpg)
BUILDING STRONG®
Review
Evaluation comprises objective Assessment & subjective Appraisal
Effects measured as the difference between with & without project conditions
Many procedures developed to quantify NED, NER, EQ, & physical effects of alternative plans
4 accounts provide flexible framework for identifying & summarizing plan effects
Plans qualified for further consideration Re-evaluation (& re-formulation) often part of iterative
planning process
![Page 37: US Army Corps of Engineers BUILDING STRONG ® STEP FOUR: EVALUATE EFFECTS OF ALTERNATIVE PLANS Planning Principles & Procedures – FY11.](https://reader035.fdocuments.in/reader035/viewer/2022070407/56649e455503460f94b3a2dd/html5/thumbnails/37.jpg)
BUILDING STRONG®
Cleveland Harbor
![Page 38: US Army Corps of Engineers BUILDING STRONG ® STEP FOUR: EVALUATE EFFECTS OF ALTERNATIVE PLANS Planning Principles & Procedures – FY11.](https://reader035.fdocuments.in/reader035/viewer/2022070407/56649e455503460f94b3a2dd/html5/thumbnails/38.jpg)
BUILDING STRONG®
Cleveland Harbor
![Page 39: US Army Corps of Engineers BUILDING STRONG ® STEP FOUR: EVALUATE EFFECTS OF ALTERNATIVE PLANS Planning Principles & Procedures – FY11.](https://reader035.fdocuments.in/reader035/viewer/2022070407/56649e455503460f94b3a2dd/html5/thumbnails/39.jpg)
BUILDING STRONG®
PLANS ACHIEVEMENT OF OBJECTIVE
OTHER EVALUATION
![Page 40: US Army Corps of Engineers BUILDING STRONG ® STEP FOUR: EVALUATE EFFECTS OF ALTERNATIVE PLANS Planning Principles & Procedures – FY11.](https://reader035.fdocuments.in/reader035/viewer/2022070407/56649e455503460f94b3a2dd/html5/thumbnails/40.jpg)
BUILDING STRONG®
EVALUATION METRICS
+ / 0 / -
Ranking: #1 thru #N
% of planning objective achieved
Make up a metric