US Army Corps of Engineers
BUILDING STRONG®
Gary Hinkle, PE
June 10, 2014
Mid-West Electric Consumers AssociationBoard of Directors MeetingSylvan Lake, SD
U.S. Army Corps of EngineersOmaha District Update
US Army Corps of Engineers
BUILDING STRONG®
Customer Funded Projects
• Since 2004, 51 Projects • Over $105M• Past, Present & Future
BUILDING STRONG®3
Generators
Big Bend Generator Rewinds - $24M
Future: Preparation of Rewind Specifications; GP, FR, OA, FP
BUILDING STRONG®4
Garrison Rewind Autotransformer $1M
Oahe Rehab GSU’s, Spare GSU, Containment $3.4M
Oahe Parallel Autotransformer $3M
Big Bend Rehab GSUs, Oil Containment $2.4M
Gavins Point Replace GSUs $5.3M
Future: Fort Randall Replace GSU Transformers $15M
Transformers
BUILDING STRONG®5
Relay Replacements
Line Relays $1M
Big Bend Generator Relays $500K
Fort Randall Generator Relays $500K
Future: Fort Peck $400K, Misc Requests
BUILDING STRONG®6
Switchyards
Gavins Point Breaker Replacement $1.5M
Fort Randall – Switchyard Upgrades $15MOahe – Switchyard Breaker Replacement - $4MOahe – Switchyard Upgrades - $7.6M
BUILDING STRONG®7
Exciters
Fort Randall Exciters, $5.5M
Big Bend Exciters, $6.5M
Oahe & Gavins Point Exciters; $6.5M
BUILDING STRONG®8
Gavins Point Vacuum Breakers $1M
Oahe – SF6 Breakers - $3.5M
Big Bend Unit Breakers - $4M
Unit Breakers
BUILDING STRONG®9
Station Service Equipment
Completed Station Service Rehabs at GA, BB, FP
Requesting Station Service Rehabs at FR & GP
Future Requests for Oahe
BUILDING STRONG®
Governors
10
Design Governor Upgrades $250KGovernor Upgrades Supply Contract $2MGovernor Installation $3M / Plant
BUILDING STRONG®
Mechanical Repairs
11
Oahe Generator Air Coolers $1.3M
Big Bend Bearing Oil Coolers / Shaft Sleeves / HP Oil Lift $800K
Fort Randall Penstock Packing; $525K
Gavins Point Trash Racks $80K
Unwatering Valves / Station Drainage, Big Bend & Fort Randall
BUILDING STRONG®12
TurbinesGarrison Major Rehab
Fort Peck Unit 2
Future: Fort Randall, Big Bend, Fort Peck, Gavins Point, Oahe
BUILDING STRONG®
2015 Request - $16.3M
Station Service Breakers & Dry Type Transformers; (Gavins Point & Fort Randall)
Unwatering Valves, Raw Water Header, Drainage Piping (Big Bend & Fort Randall)
Replace Excitation Systems (Oahe & Gavins Point
Upgrade Governor Controls (GP, BB, OA) New Designs (Fort Randall GSU Transformers,
Generator Rewinds @ 3 projects)