US 29/PINE RIDGE RD. (S-77) - SCDOT SharePoint …info2.scdot.org/projects/ViewerFiles/FINAL PIM...

1
E. WADE HAMPTON BLVD. (US 29) DICK BROOKS USPS GAS STATION CHURCH LIFESONG CAROLINA FRESH FARMS 0 SCALE IN FEET (36" x 60") 50 50 100 - N - PI N E RI DGE RD. ( S - 77 ) INTERSECTION IMPROVEMENTS US 29/PINE RIDGE RD. (S-77) E. WADE HAMPTON BLVD. (US 29) RECONFIGURATION / RELOCATION PROPOSED ROADWAY WIDENING / NEW CONCRETE MEDIAN REMOVAL EXISTING DRIVEWAY/MEDIAN NEW RIGHT-OF-WAY NEW SIDEWALK/SHARED USE PATH LIMITS OF CONSTRUCTION PROPOSED PAVEMENT MARKING PROPERTY LINE EXISTING RIGHT-OF-WAY

Transcript of US 29/PINE RIDGE RD. (S-77) - SCDOT SharePoint …info2.scdot.org/projects/ViewerFiles/FINAL PIM...

Page 1: US 29/PINE RIDGE RD. (S-77) - SCDOT SharePoint …info2.scdot.org/projects/ViewerFiles/FINAL PIM US29 and...LIFESONG CAROLINA FRESH FARMS 0 SCALE IN FEET (36" x 60") 50 50 100-N-P

E. WADE HAMPTON BLVD. (US 29)

DICK

BROOKS

USPS

GAS

STATION

CHURCH

LIFESONG

CAROLINA

FRESH FARMS

0

SCALE IN FEET

(36" x 60")

50 50 100

-N-

PIN

E

RID

GE

RD. (S-

77)

INTERSECTION IMPROVEMENTS

US 29/PINE RIDGE RD. (S-77)

E. WADE HAMPTON BLVD. (US 29)

RECONFIGURATION / RELOCATIONPROPOSED ROADWAY WIDENING /

NEW CONCRETE MEDIAN

REMOVALEXISTING DRIVEWAY/MEDIAN

NEW RIGHT-OF-WAY

NEW SIDEWALK/SHARED USE PATH

LIMITS OF CONSTRUCTION

PROPOSED PAVEMENT MARKING

PROPERTY LINE

EXISTING RIGHT-OF-WAY