UPPER ARLINGTON SCHOOLS · building team meeting #3 greensview elementary school january 12, 2016...
Transcript of UPPER ARLINGTON SCHOOLS · building team meeting #3 greensview elementary school january 12, 2016...
![Page 1: UPPER ARLINGTON SCHOOLS · building team meeting #3 greensview elementary school january 12, 2016 your voice matters moody nolan perkins+will hilliard jeane korda emh&t mksk turner.](https://reader034.fdocuments.in/reader034/viewer/2022042410/5f280bd12fb7ee5c16201fe5/html5/thumbnails/1.jpg)
MOODY NOLAN | PERKINS+WILL
UPPER ARLINGTON SCHOOLSBUILDING TEAM MEETING #3
GREENSVIEW ELEMENTARY SCHOOLJANUARY 12, 2016
YOURVOICE MATTERS
MOODY NOLAN PERKINS+WILL HILLIARD JEANE KORDA EMH&T MKSK TURNER
![Page 2: UPPER ARLINGTON SCHOOLS · building team meeting #3 greensview elementary school january 12, 2016 your voice matters moody nolan perkins+will hilliard jeane korda emh&t mksk turner.](https://reader034.fdocuments.in/reader034/viewer/2022042410/5f280bd12fb7ee5c16201fe5/html5/thumbnails/2.jpg)
Affirm
Guiding
Principles
Present
Facilities
Analysis
Findings
Evaluate
Master
Plan
Options
Evaluate
Revised
Master
Plan
Options
CES 1 CES 2 CES 3 CES 4
SEPT 9+10 NOV 18+19 FEB 23+24 APR 19+20
Review
Financials
CES 5
TBD 2017
BTM 1
BTM 2
BT SUMMIT
BTM 3
SEP 29–OCT 1
NOV 10-12
DEC 3
JAN 12-14
BTM 4MAR 15-17
OUR PROGRESS
![Page 3: UPPER ARLINGTON SCHOOLS · building team meeting #3 greensview elementary school january 12, 2016 your voice matters moody nolan perkins+will hilliard jeane korda emh&t mksk turner.](https://reader034.fdocuments.in/reader034/viewer/2022042410/5f280bd12fb7ee5c16201fe5/html5/thumbnails/3.jpg)
••
••
••
••
••
••
![Page 4: UPPER ARLINGTON SCHOOLS · building team meeting #3 greensview elementary school january 12, 2016 your voice matters moody nolan perkins+will hilliard jeane korda emh&t mksk turner.](https://reader034.fdocuments.in/reader034/viewer/2022042410/5f280bd12fb7ee5c16201fe5/html5/thumbnails/4.jpg)
••••••••
•••••••••••
![Page 5: UPPER ARLINGTON SCHOOLS · building team meeting #3 greensview elementary school january 12, 2016 your voice matters moody nolan perkins+will hilliard jeane korda emh&t mksk turner.](https://reader034.fdocuments.in/reader034/viewer/2022042410/5f280bd12fb7ee5c16201fe5/html5/thumbnails/5.jpg)
••••••••••••
••••••
![Page 6: UPPER ARLINGTON SCHOOLS · building team meeting #3 greensview elementary school january 12, 2016 your voice matters moody nolan perkins+will hilliard jeane korda emh&t mksk turner.](https://reader034.fdocuments.in/reader034/viewer/2022042410/5f280bd12fb7ee5c16201fe5/html5/thumbnails/6.jpg)
•
•
•
•
•
•
•
•
•
•
![Page 7: UPPER ARLINGTON SCHOOLS · building team meeting #3 greensview elementary school january 12, 2016 your voice matters moody nolan perkins+will hilliard jeane korda emh&t mksk turner.](https://reader034.fdocuments.in/reader034/viewer/2022042410/5f280bd12fb7ee5c16201fe5/html5/thumbnails/7.jpg)
•
•
•
•
•
•
![Page 8: UPPER ARLINGTON SCHOOLS · building team meeting #3 greensview elementary school january 12, 2016 your voice matters moody nolan perkins+will hilliard jeane korda emh&t mksk turner.](https://reader034.fdocuments.in/reader034/viewer/2022042410/5f280bd12fb7ee5c16201fe5/html5/thumbnails/8.jpg)
215
758
418
598
508
407
CURRENT ENROLLMENT
BURBANK
BARRINGTON
GREENSVIEW
TREMONT
WICKLIFFE
WINDERMERE
1 Source: Upper Arlington Enrollment Projections-(November 2015)
CURRENTSF/STUDENT
177 SF
112 SF
115 SF
133 SF*
100 SF
135 SF
* With planned additions
10 YEARSF/STUDENT
N/A
96 SF
91 SF
106 SF
86 SF
111 SF
10 YEAR PROJECTION
N/A
887
526
749
589
494
1
SQUARE FEET PER STUDENT
![Page 9: UPPER ARLINGTON SCHOOLS · building team meeting #3 greensview elementary school january 12, 2016 your voice matters moody nolan perkins+will hilliard jeane korda emh&t mksk turner.](https://reader034.fdocuments.in/reader034/viewer/2022042410/5f280bd12fb7ee5c16201fe5/html5/thumbnails/9.jpg)
701
705
1,816
SQUARE FEET PER STUDENT
HASTINGS
JONES
UAHS
1 Source: Upper Arlington Enrollment Projections-(November 2015)
717
806
1,947
191 SF
186 SF
162 SF
187 SF
162 SF
151 SF
CURRENT ENROLLMENT
CURRENTSF/STUDENT
10 YEARSF/STUDENT
10 YEAR PROJECTION
1
![Page 10: UPPER ARLINGTON SCHOOLS · building team meeting #3 greensview elementary school january 12, 2016 your voice matters moody nolan perkins+will hilliard jeane korda emh&t mksk turner.](https://reader034.fdocuments.in/reader034/viewer/2022042410/5f280bd12fb7ee5c16201fe5/html5/thumbnails/10.jpg)
GREENSVIEW ELEMENTARY SCHOOLMAJOR CHALLENGES
BUILDING:
• LACK OF SECURE ENTRY VESTIBULE
• SIZE OF CLASSROOMS
• LIBRARY SIZE AND CONFIGURATION DOES NOT
SUPPORT COLLABORATION
• LACK OF COLLABORATIVE SPACE
• FOOD SERVICE CONFIGURATION INCREASES TIME TO
GET FOOD
• SOME DISJOINTED SUPPORT OFFICE LOCATIONS
• SP ED - MD ROOM IS NOT CENTRALLY LOCATED
• LIMITED ADJACENT STORAGE FOR MPR
• NOT ENOUGH STUDENT STORAGE, CONDITION OF
STUDENT STORAGE
• NO ROOM FOR SEATING IN THE GYM
SITE:
• LACK OF CLEAR MAIN ENTRY
• NO SECURE OUTDOOR LEARNING SPACE
![Page 11: UPPER ARLINGTON SCHOOLS · building team meeting #3 greensview elementary school january 12, 2016 your voice matters moody nolan perkins+will hilliard jeane korda emh&t mksk turner.](https://reader034.fdocuments.in/reader034/viewer/2022042410/5f280bd12fb7ee5c16201fe5/html5/thumbnails/11.jpg)
CHRONOLOGY DIAGRAMGREENSVIEW ELEMENTARY SCHOOL
![Page 12: UPPER ARLINGTON SCHOOLS · building team meeting #3 greensview elementary school january 12, 2016 your voice matters moody nolan perkins+will hilliard jeane korda emh&t mksk turner.](https://reader034.fdocuments.in/reader034/viewer/2022042410/5f280bd12fb7ee5c16201fe5/html5/thumbnails/12.jpg)
CIRCULATION ANALYSISGREENSVIEW ELEMENTARY SCHOOL
LENGTH FROM ONE END OF THE BUILDING TO THE OTHER: 640 LINEAR FEET
AVERAGE WIDTH OF CORRIDOR:8 FEET
![Page 13: UPPER ARLINGTON SCHOOLS · building team meeting #3 greensview elementary school january 12, 2016 your voice matters moody nolan perkins+will hilliard jeane korda emh&t mksk turner.](https://reader034.fdocuments.in/reader034/viewer/2022042410/5f280bd12fb7ee5c16201fe5/html5/thumbnails/13.jpg)
CLASSROOM SIZE ANALYSISGREENSVIEW ELEMENTARY SCHOOL
![Page 14: UPPER ARLINGTON SCHOOLS · building team meeting #3 greensview elementary school january 12, 2016 your voice matters moody nolan perkins+will hilliard jeane korda emh&t mksk turner.](https://reader034.fdocuments.in/reader034/viewer/2022042410/5f280bd12fb7ee5c16201fe5/html5/thumbnails/14.jpg)
![Page 15: UPPER ARLINGTON SCHOOLS · building team meeting #3 greensview elementary school january 12, 2016 your voice matters moody nolan perkins+will hilliard jeane korda emh&t mksk turner.](https://reader034.fdocuments.in/reader034/viewer/2022042410/5f280bd12fb7ee5c16201fe5/html5/thumbnails/15.jpg)
SECURITY ANALYSISGREENSVIEW ELEMENTARY SCHOOL
Main Entry
![Page 16: UPPER ARLINGTON SCHOOLS · building team meeting #3 greensview elementary school january 12, 2016 your voice matters moody nolan perkins+will hilliard jeane korda emh&t mksk turner.](https://reader034.fdocuments.in/reader034/viewer/2022042410/5f280bd12fb7ee5c16201fe5/html5/thumbnails/16.jpg)
![Page 17: UPPER ARLINGTON SCHOOLS · building team meeting #3 greensview elementary school january 12, 2016 your voice matters moody nolan perkins+will hilliard jeane korda emh&t mksk turner.](https://reader034.fdocuments.in/reader034/viewer/2022042410/5f280bd12fb7ee5c16201fe5/html5/thumbnails/17.jpg)
![Page 18: UPPER ARLINGTON SCHOOLS · building team meeting #3 greensview elementary school january 12, 2016 your voice matters moody nolan perkins+will hilliard jeane korda emh&t mksk turner.](https://reader034.fdocuments.in/reader034/viewer/2022042410/5f280bd12fb7ee5c16201fe5/html5/thumbnails/18.jpg)
REPAIR +
RENOVATE +
REBUILD
Infrastructure: Maintain/upgrade to working order # of Teaching Spaces: Added spaces right-sized to accommodate year 6 enrollment projection, assumes 25 students per classroom
Program: Limited or no change Core Spaces: (Cafeteria/MPR): Sized to year 10 enrollment projection w/minimum time for lunch (max: three lunches)
Physical Appearance: No significant change Kindergarten: Assumes full-day (20 students per classroom)
Infrastructure: Change uses of existing structure or expand to allow better use
# of Teaching Spaces: Right-sized spaces added to accommodate year 6 enrollment projection, assumes 25 students per classroom
Program: Some alteration possible Core Spaces: (Cafeteria/MPR): Sized to year 10 enrollment projection (two lunches), gym sized to elementary school standard (HS court size)
Physical Appearance: Change mostly limited to interiors and/or expansion
Kindergarten: Assumes full-day (20 students per classroom)
Infrastructure: New and optimized # of Teaching Spaces: Right-sized spaces included to accommodate year 6 enrollment projection, assumes 25 students per room
Program: Addresses deficiencies Core Spaces: (Cafeteria/MPR): Sized to year 10 enrollment projection (two lunches), gym sized to elementary school standard (HS court size)
Physical Appearance: Completely new Kindergarten: Assumes full-day (20 students per classroom)
NOTE: Two or more strategies can be combined
![Page 19: UPPER ARLINGTON SCHOOLS · building team meeting #3 greensview elementary school january 12, 2016 your voice matters moody nolan perkins+will hilliard jeane korda emh&t mksk turner.](https://reader034.fdocuments.in/reader034/viewer/2022042410/5f280bd12fb7ee5c16201fe5/html5/thumbnails/19.jpg)
NORTH
![Page 20: UPPER ARLINGTON SCHOOLS · building team meeting #3 greensview elementary school january 12, 2016 your voice matters moody nolan perkins+will hilliard jeane korda emh&t mksk turner.](https://reader034.fdocuments.in/reader034/viewer/2022042410/5f280bd12fb7ee5c16201fe5/html5/thumbnails/20.jpg)
REPAIR• REPAIRED CLASSROOMS• REPAIR EXISTING PER
PHYSICAL ASSESSMENT REPORT
RENOVATE• ADMIN AND SECURE
VESTIBULE AT ENTRY• MEDIA CENTER
REBUILD• SOME NEW, LARGER
CLASSROOMS
NOT MODIFIED:• EXISTING TO REMAIN• MOST CLASSROOM SIZES• MULTIPURPOSE ROOM
AND KITCHEN SIZES
NORTH
EXISTING TO REMAIN
DEMOLISH
REPAIR
RENOVATE
REBUILD DRAFT PRELIMINARY CONCEPT MASTER PLAN – JANUARY 12, 2016
![Page 21: UPPER ARLINGTON SCHOOLS · building team meeting #3 greensview elementary school january 12, 2016 your voice matters moody nolan perkins+will hilliard jeane korda emh&t mksk turner.](https://reader034.fdocuments.in/reader034/viewer/2022042410/5f280bd12fb7ee5c16201fe5/html5/thumbnails/21.jpg)
NORTH
•
•
DRAFT PRELIMINARY CONCEPT MASTER PLAN – JANUARY 12, 2016
![Page 22: UPPER ARLINGTON SCHOOLS · building team meeting #3 greensview elementary school january 12, 2016 your voice matters moody nolan perkins+will hilliard jeane korda emh&t mksk turner.](https://reader034.fdocuments.in/reader034/viewer/2022042410/5f280bd12fb7ee5c16201fe5/html5/thumbnails/22.jpg)
REPAIR• REPAIRED CLASSROOMS• REPAIR EXISTING PER
PHYSICAL ASSESSMENT REPORT
RENOVATE• ADMIN AND SECURE
VESTIBULE AT ENTRY• MEDIA CENTER
REBUILD• SOME NEW, LARGER
CLASSROOMS
NOT MODIFIED:• EXISTING TO REMAIN• MOST CLASSROOM SIZES• MULTIPURPOSE ROOM AND
KITCHEN SIZES
NORTH
EXISTING TO REMAIN
DEMOLISH
REPAIR
RENOVATE
REBUILD DRAFT PRELIMINARY CONCEPT MASTER PLAN – JANUARY 12, 2016
![Page 23: UPPER ARLINGTON SCHOOLS · building team meeting #3 greensview elementary school january 12, 2016 your voice matters moody nolan perkins+will hilliard jeane korda emh&t mksk turner.](https://reader034.fdocuments.in/reader034/viewer/2022042410/5f280bd12fb7ee5c16201fe5/html5/thumbnails/23.jpg)
NORTH
•
•
DRAFT PRELIMINARY CONCEPT MASTER PLAN – JANUARY 12, 2016
![Page 24: UPPER ARLINGTON SCHOOLS · building team meeting #3 greensview elementary school january 12, 2016 your voice matters moody nolan perkins+will hilliard jeane korda emh&t mksk turner.](https://reader034.fdocuments.in/reader034/viewer/2022042410/5f280bd12fb7ee5c16201fe5/html5/thumbnails/24.jpg)
NORTH
RENOVATE• LARGER CLASSROOMS• LARGER MEDIA CENTER• LARGER ADMINISTRATION• LARGER MULTIPURPOSE
ROOM AND KITCHEN/ RECEIVING
• SECURE VESTIBULE AT ENTRY
• NEW COLLABORATION SPACE• NEW LOBBY SPACE
REBUILD• NEW, LARGER CLASSROOMS
AND COLLABORATION SPACE• NEW, LARGER GYMNASIUM
NOT MODIFIED:• EXISTING TO REMAIN
EXISTING TO REMAIN
DEMOLISH
REPAIR
RENOVATE
REBUILD DRAFT PRELIMINARY CONCEPT MASTER PLAN – JANUARY 12, 2016
![Page 25: UPPER ARLINGTON SCHOOLS · building team meeting #3 greensview elementary school january 12, 2016 your voice matters moody nolan perkins+will hilliard jeane korda emh&t mksk turner.](https://reader034.fdocuments.in/reader034/viewer/2022042410/5f280bd12fb7ee5c16201fe5/html5/thumbnails/25.jpg)
NORTH
•
•
DRAFT PRELIMINARY CONCEPT MASTER PLAN – JANUARY 12, 2016
![Page 26: UPPER ARLINGTON SCHOOLS · building team meeting #3 greensview elementary school january 12, 2016 your voice matters moody nolan perkins+will hilliard jeane korda emh&t mksk turner.](https://reader034.fdocuments.in/reader034/viewer/2022042410/5f280bd12fb7ee5c16201fe5/html5/thumbnails/26.jpg)
NORTH
RENOVATE• LARGER CLASSROOMS• LARGER MEDIA CENTER• LARGER ADMINISTRATION
SECURE VESTIBULE AT ENTRY
• NEW COLLABORATION SPACE
• NEW LOBBY SPACE
REBUILD• NEW, LARGER
CLASSROOMS • NEW, LARGER MULTI-
PURPOSE ROOM AND KITCHEN/ RECEIVING
• NEW GYMNASIUM
NOT MODIFIED:• EXISTING TO REMAIN
EXISTING TO REMAIN
DEMOLISH
REPAIR
RENOVATE
REBUILD DRAFT PRELIMINARY CONCEPT MASTER PLAN – JANUARY 12, 2016
![Page 27: UPPER ARLINGTON SCHOOLS · building team meeting #3 greensview elementary school january 12, 2016 your voice matters moody nolan perkins+will hilliard jeane korda emh&t mksk turner.](https://reader034.fdocuments.in/reader034/viewer/2022042410/5f280bd12fb7ee5c16201fe5/html5/thumbnails/27.jpg)
NORTH
EXISTING TO REMAIN
DEMOLISH
REPAIR
RENOVATE
REBUILD
RENOVATE• LARGER CLASSROOMS• LARGER MEDIA CENTER• LARGER ADMINISTRATION
SECURE VESTIBULE AT ENTRY
• NEW COLLABORATION SPACE
• NEW LOBBY SPACE
REBUILD• NEW, LARGER
CLASSROOMS • NEW, LARGER MULTI-
PURPOSE ROOM AND KITCHEN/ RECEIVING
• NEW GYMNASIUM
NOT MODIFIED:• EXISTING TO REMAIN
DRAFT PRELIMINARY CONCEPT MASTER PLAN – JANUARY 12, 2016
![Page 28: UPPER ARLINGTON SCHOOLS · building team meeting #3 greensview elementary school january 12, 2016 your voice matters moody nolan perkins+will hilliard jeane korda emh&t mksk turner.](https://reader034.fdocuments.in/reader034/viewer/2022042410/5f280bd12fb7ee5c16201fe5/html5/thumbnails/28.jpg)
NORTH
•
•
DRAFT PRELIMINARY CONCEPT MASTER PLAN – JANUARY 12, 2016
![Page 29: UPPER ARLINGTON SCHOOLS · building team meeting #3 greensview elementary school january 12, 2016 your voice matters moody nolan perkins+will hilliard jeane korda emh&t mksk turner.](https://reader034.fdocuments.in/reader034/viewer/2022042410/5f280bd12fb7ee5c16201fe5/html5/thumbnails/29.jpg)
NORTH
EXISTING TO REMAIN
DEMOLISH
REPAIR
RENOVATE
REBUILD
RENOVATE• LARGER CLASSROOMS• LARGER MEDIA CENTER• LARGER ADMINISTRATION
SECURE VESTIBULE AT ENTRY
• NEW COLLABORATION SPACE
• NEW LOBBY SPACE
REBUILD• NEW, LARGER
CLASSROOMS • NEW, LARGER MULTI-
PURPOSE ROOM AND KITCHEN/ RECEIVING
• NEW GYMNASIUM
NOT MODIFIED:• EXISTING TO REMAIN
DRAFT PRELIMINARY CONCEPT MASTER PLAN – JANUARY 12, 2016
![Page 30: UPPER ARLINGTON SCHOOLS · building team meeting #3 greensview elementary school january 12, 2016 your voice matters moody nolan perkins+will hilliard jeane korda emh&t mksk turner.](https://reader034.fdocuments.in/reader034/viewer/2022042410/5f280bd12fb7ee5c16201fe5/html5/thumbnails/30.jpg)
NORTH
EXISTING TO REMAIN
DEMOLISH
REPAIR
RENOVATE
REBUILD
RENOVATE• LARGER CLASSROOMS• LARGER MEDIA CENTER• LARGER ADMINISTRATION
SECURE VESTIBULE AT ENTRY
• NEW COLLABORATION SPACE
• NEW LOBBY SPACE
REBUILD• NEW, LARGER
CLASSROOMS • NEW, LARGER MULTI-
PURPOSE ROOM AND KITCHEN/ RECEIVING
• NEW GYMNASIUM
NOT MODIFIED:• EXISTING TO REMAIN
DRAFT PRELIMINARY CONCEPT MASTER PLAN – JANUARY 12, 2016
![Page 31: UPPER ARLINGTON SCHOOLS · building team meeting #3 greensview elementary school january 12, 2016 your voice matters moody nolan perkins+will hilliard jeane korda emh&t mksk turner.](https://reader034.fdocuments.in/reader034/viewer/2022042410/5f280bd12fb7ee5c16201fe5/html5/thumbnails/31.jpg)
NORTH
•
•
DRAFT PRELIMINARY CONCEPT MASTER PLAN – JANUARY 12, 2016
![Page 32: UPPER ARLINGTON SCHOOLS · building team meeting #3 greensview elementary school january 12, 2016 your voice matters moody nolan perkins+will hilliard jeane korda emh&t mksk turner.](https://reader034.fdocuments.in/reader034/viewer/2022042410/5f280bd12fb7ee5c16201fe5/html5/thumbnails/32.jpg)
65
NORTH
NEW BUILDING ZONE
DRAFT PRELIMINARY CONCEPT MASTER PLAN – JANUARY 12, 2016
![Page 33: UPPER ARLINGTON SCHOOLS · building team meeting #3 greensview elementary school january 12, 2016 your voice matters moody nolan perkins+will hilliard jeane korda emh&t mksk turner.](https://reader034.fdocuments.in/reader034/viewer/2022042410/5f280bd12fb7ee5c16201fe5/html5/thumbnails/33.jpg)
65
RENOVATE• LARGER MEDIA CENTER• LARGER ADMINISTRATION
SUITE
REBUILDNEW AND LARGER: • CLASSROOMS• COLLABORATION SPACE• ART AND MUSIC
CLASSROOMS• MEDIA CENTER• GYMNASIUM• MULTIPURPOSE ROOM
AND KITCHEN• ADMINISTRATION SUITE
NORTH
EXISTING TO REMAIN
DEMOLISH
REPAIR
RENOVATE
REBUILD DRAFT PRELIMINARY CONCEPT MASTER PLAN – JANUARY 12, 2016
![Page 34: UPPER ARLINGTON SCHOOLS · building team meeting #3 greensview elementary school january 12, 2016 your voice matters moody nolan perkins+will hilliard jeane korda emh&t mksk turner.](https://reader034.fdocuments.in/reader034/viewer/2022042410/5f280bd12fb7ee5c16201fe5/html5/thumbnails/34.jpg)
NORTH
EXISTING TO REMAIN
DEMOLISH
REPAIR
RENOVATE
REBUILD
RENOVATE• LARGER MEDIA CENTER• LARGER ADMINISTRATION
SUITE
REBUILDNEW AND LARGER: • CLASSROOMS• COLLABORATION SPACE• ART AND MUSIC
CLASSROOMS• MEDIA CENTER• GYMNASIUM• MULTIPURPOSE ROOM
AND KITCHEN• ADMINISTRATION SUITE
DRAFT PRELIMINARY CONCEPT MASTER PLAN – JANUARY 12, 2016
![Page 35: UPPER ARLINGTON SCHOOLS · building team meeting #3 greensview elementary school january 12, 2016 your voice matters moody nolan perkins+will hilliard jeane korda emh&t mksk turner.](https://reader034.fdocuments.in/reader034/viewer/2022042410/5f280bd12fb7ee5c16201fe5/html5/thumbnails/35.jpg)
NORTH
•
•
DRAFT PRELIMINARY CONCEPT MASTER PLAN – JANUARY 12, 2016
![Page 36: UPPER ARLINGTON SCHOOLS · building team meeting #3 greensview elementary school january 12, 2016 your voice matters moody nolan perkins+will hilliard jeane korda emh&t mksk turner.](https://reader034.fdocuments.in/reader034/viewer/2022042410/5f280bd12fb7ee5c16201fe5/html5/thumbnails/36.jpg)
NORTH
NEW BUILDING ZONE
DRAFT PRELIMINARY CONCEPT MASTER PLAN – JANUARY 12, 2016
![Page 37: UPPER ARLINGTON SCHOOLS · building team meeting #3 greensview elementary school january 12, 2016 your voice matters moody nolan perkins+will hilliard jeane korda emh&t mksk turner.](https://reader034.fdocuments.in/reader034/viewer/2022042410/5f280bd12fb7ee5c16201fe5/html5/thumbnails/37.jpg)
REBUILDNEW AND LARGER:• CLASSROOMS• COLLABORATION SPACE• ART AND MUSIC
CLASSROOMS• MEDIA CENTER• GYMNASIUM• MULTIPURPOSE ROOM
AND KITCHEN• ADMINISTRATION SUITE
NORTH
EXISTING TO REMAIN
DEMOLISH
REPAIR
RENOVATE
REBUILD DRAFT PRELIMINARY CONCEPT MASTER PLAN – JANUARY 12, 2016
![Page 38: UPPER ARLINGTON SCHOOLS · building team meeting #3 greensview elementary school january 12, 2016 your voice matters moody nolan perkins+will hilliard jeane korda emh&t mksk turner.](https://reader034.fdocuments.in/reader034/viewer/2022042410/5f280bd12fb7ee5c16201fe5/html5/thumbnails/38.jpg)
REBUILDNEW AND LARGER:• CLASSROOMS• COLLABORATION SPACE• ART AND MUSIC
CLASSROOMS• MEDIA CENTER• GYMNASIUM• MULTIPURPOSE ROOM
AND KITCHEN• ADMINISTRATION SUITE
NORTH
EXISTING TO REMAIN
DEMOLISH
REPAIR
RENOVATE
REBUILD DRAFT PRELIMINARY CONCEPT MASTER PLAN – JANUARY 12, 2016
![Page 39: UPPER ARLINGTON SCHOOLS · building team meeting #3 greensview elementary school january 12, 2016 your voice matters moody nolan perkins+will hilliard jeane korda emh&t mksk turner.](https://reader034.fdocuments.in/reader034/viewer/2022042410/5f280bd12fb7ee5c16201fe5/html5/thumbnails/39.jpg)
NORTH
•
•
DRAFT PRELIMINARY CONCEPT MASTER PLAN – JANUARY 12, 2016
![Page 40: UPPER ARLINGTON SCHOOLS · building team meeting #3 greensview elementary school january 12, 2016 your voice matters moody nolan perkins+will hilliard jeane korda emh&t mksk turner.](https://reader034.fdocuments.in/reader034/viewer/2022042410/5f280bd12fb7ee5c16201fe5/html5/thumbnails/40.jpg)
NORTH
NEW BUILDING ZONE
DRAFT PRELIMINARY CONCEPT MASTER PLAN – JANUARY 12, 2016
![Page 41: UPPER ARLINGTON SCHOOLS · building team meeting #3 greensview elementary school january 12, 2016 your voice matters moody nolan perkins+will hilliard jeane korda emh&t mksk turner.](https://reader034.fdocuments.in/reader034/viewer/2022042410/5f280bd12fb7ee5c16201fe5/html5/thumbnails/41.jpg)
REBUILDNEW AND LARGER:• CLASSROOMS• COLLABORATION SPACE• ART AND MUSIC
CLASSROOMS• MEDIA CENTER• GYMNASIUM• MULTIPURPOSE ROOM
AND KITCHEN• ADMINISTRATION SUITE
NORTH
EXISTING TO REMAIN
DEMOLISH
REPAIR
RENOVATE
REBUILD DRAFT PRELIMINARY CONCEPT MASTER PLAN – JANUARY 12, 2016
![Page 42: UPPER ARLINGTON SCHOOLS · building team meeting #3 greensview elementary school january 12, 2016 your voice matters moody nolan perkins+will hilliard jeane korda emh&t mksk turner.](https://reader034.fdocuments.in/reader034/viewer/2022042410/5f280bd12fb7ee5c16201fe5/html5/thumbnails/42.jpg)
REBUILDNEW AND LARGER:• CLASSROOMS• COLLABORATION SPACE• ART AND MUSIC
CLASSROOMS• MEDIA CENTER• GYMNASIUM• MULTIPURPOSE ROOM
AND KITCHEN• ADMINISTRATION SUITE
NORTH
EXISTING TO REMAIN
DEMOLISH
REPAIR
RENOVATE
REBUILD DRAFT PRELIMINARY CONCEPT MASTER PLAN – JANUARY 12, 2016
![Page 43: UPPER ARLINGTON SCHOOLS · building team meeting #3 greensview elementary school january 12, 2016 your voice matters moody nolan perkins+will hilliard jeane korda emh&t mksk turner.](https://reader034.fdocuments.in/reader034/viewer/2022042410/5f280bd12fb7ee5c16201fe5/html5/thumbnails/43.jpg)
NORTH
•
•
DRAFT PRELIMINARY CONCEPT MASTER PLAN – JANUARY 12, 2016