Upgrades and New Capabilities of the GFZ SLR Timing System · 10:47:12 Horizontal settin s SO ps /...
Transcript of Upgrades and New Capabilities of the GFZ SLR Timing System · 10:47:12 Horizontal settin s SO ps /...
![Page 1: Upgrades and New Capabilities of the GFZ SLR Timing System · 10:47:12 Horizontal settin s SO ps / 20 GSa/s Tri er settin s Mode: Type-A: Edge -84.203 ms.' Chl Wfml Pos: 3.22 div](https://reader036.fdocuments.in/reader036/viewer/2022070112/6053f70f9139f12bbb5bdfb5/html5/thumbnails/1.jpg)
Upgrades and New Capabilities of the GFZ SLR Timing System
Evan Hoffman, Ludwig Grunwaldt, Stefan Weisheit, Thomas Gerber
GFZ Potsdam
![Page 2: Upgrades and New Capabilities of the GFZ SLR Timing System · 10:47:12 Horizontal settin s SO ps / 20 GSa/s Tri er settin s Mode: Type-A: Edge -84.203 ms.' Chl Wfml Pos: 3.22 div](https://reader036.fdocuments.in/reader036/viewer/2022070112/6053f70f9139f12bbb5bdfb5/html5/thumbnails/2.jpg)
Timing System
Event Timer
High PerformanceCesium
Distribution Amp
GPS Receiver
RGG
Discrim.
TIC
SPAD PMT
StartDiode
OT Point
![Page 3: Upgrades and New Capabilities of the GFZ SLR Timing System · 10:47:12 Horizontal settin s SO ps / 20 GSa/s Tri er settin s Mode: Type-A: Edge -84.203 ms.' Chl Wfml Pos: 3.22 div](https://reader036.fdocuments.in/reader036/viewer/2022070112/6053f70f9139f12bbb5bdfb5/html5/thumbnails/3.jpg)
Timing System
Improvement in frequency stability by orders of magnitude 5 x 10-11 → 2.7 x 10-13 for 1000 sec avg.
Allows experiments requiring observations of independent timing source over long term
![Page 4: Upgrades and New Capabilities of the GFZ SLR Timing System · 10:47:12 Horizontal settin s SO ps / 20 GSa/s Tri er settin s Mode: Type-A: Edge -84.203 ms.' Chl Wfml Pos: 3.22 div](https://reader036.fdocuments.in/reader036/viewer/2022070112/6053f70f9139f12bbb5bdfb5/html5/thumbnails/4.jpg)
3 Way Test
![Page 5: Upgrades and New Capabilities of the GFZ SLR Timing System · 10:47:12 Horizontal settin s SO ps / 20 GSa/s Tri er settin s Mode: Type-A: Edge -84.203 ms.' Chl Wfml Pos: 3.22 div](https://reader036.fdocuments.in/reader036/viewer/2022070112/6053f70f9139f12bbb5bdfb5/html5/thumbnails/5.jpg)
3 Way Test
![Page 6: Upgrades and New Capabilities of the GFZ SLR Timing System · 10:47:12 Horizontal settin s SO ps / 20 GSa/s Tri er settin s Mode: Type-A: Edge -84.203 ms.' Chl Wfml Pos: 3.22 div](https://reader036.fdocuments.in/reader036/viewer/2022070112/6053f70f9139f12bbb5bdfb5/html5/thumbnails/6.jpg)
Clock Monitoring Software
Keeps log of CS to UTC PPS measurements for UTC trace-ability
Reports health of timing system Clock comparison and analysis
![Page 7: Upgrades and New Capabilities of the GFZ SLR Timing System · 10:47:12 Horizontal settin s SO ps / 20 GSa/s Tri er settin s Mode: Type-A: Edge -84.203 ms.' Chl Wfml Pos: 3.22 div](https://reader036.fdocuments.in/reader036/viewer/2022070112/6053f70f9139f12bbb5bdfb5/html5/thumbnails/7.jpg)
Geometry
![Page 8: Upgrades and New Capabilities of the GFZ SLR Timing System · 10:47:12 Horizontal settin s SO ps / 20 GSa/s Tri er settin s Mode: Type-A: Edge -84.203 ms.' Chl Wfml Pos: 3.22 div](https://reader036.fdocuments.in/reader036/viewer/2022070112/6053f70f9139f12bbb5bdfb5/html5/thumbnails/8.jpg)
Transmit Delay Measurements
![Page 9: Upgrades and New Capabilities of the GFZ SLR Timing System · 10:47:12 Horizontal settin s SO ps / 20 GSa/s Tri er settin s Mode: Type-A: Edge -84.203 ms.' Chl Wfml Pos: 3.22 div](https://reader036.fdocuments.in/reader036/viewer/2022070112/6053f70f9139f12bbb5bdfb5/html5/thumbnails/9.jpg)
Transmit Delay Measurements
![Page 10: Upgrades and New Capabilities of the GFZ SLR Timing System · 10:47:12 Horizontal settin s SO ps / 20 GSa/s Tri er settin s Mode: Type-A: Edge -84.203 ms.' Chl Wfml Pos: 3.22 div](https://reader036.fdocuments.in/reader036/viewer/2022070112/6053f70f9139f12bbb5bdfb5/html5/thumbnails/10.jpg)
Measurement Results
Average Std. Dev Sample Size
PD Cable Delay (ns) 92.327 0.013 7727
SD Cable Delay (ns) 5.083 0.009 39879
SD – PD Direct Meas. (ns) -33.238 0.009 62659
PD Peak-toPeak (mV) 220.76 5.738 12287
PD Fall time (ns) 0.766 0.022 12877
SD-ET Trigger Uncertainty (ns) 0.053 1
ND Glass Delay (ns) 0.009 Theoretical
Dist. Btw. INV of Telescopes (ns) 6.926 Given
STDDEV of Measurements 0.018
SD – PD Delays removed (ns) 53.998
Delay from TX INV cross to SD (ns)
50.535