Migration to SQL 2008 in a Mission Critical
Environment
Agenda
About 888
Upgrade Methodology
Upgrade Tools
Upgrade Process
Demo – Real-Time Migration
Agenda
About 888
Upgrade Methodology
Upgrade Tools
Upgrade Process
Demo – Real-Time Migration
888.com is a global online gaming company.
Our purpose is to provide quality entertainment for people who enjoy gambling.
Giving them the opportunity to do so in a safe, fun, fair, regulated and secure environment.
About 888
Our products
50 Production Instances
300 Development Instances
400 Databases
100 TB Of Data
24*7 Availability
99.95 Uptime
888 Database Environment
R&R Of DB Infrastructure Team
Installations Maintenance
Backups Indexes Statistics Data retention
Monitoring Performance Tuning Version Uploads Security
SQL 2008 Project Summary
50 production clustered instances were upgraded
300 development and QA instances were upgraded
All SQL server hosts upgraded windows 2008 R2 OS
Cut licensing costs by more than $500,000
Reduce load from IO subsystems by using SQL server compression
Minimal interference to the operation
DB Infrastructure Team
Ilanit Gat
Back officeFinance
Web
Ronny Sapir
Bingo3th party
Guy Hochman
DWHGaming
Adi Cohen
Guru
Agenda
About 888
Upgrade Methodology
Upgrade Tools
Upgrade Process
Demo – Real-Time Migration
In Place Upgrade
Advantages Simple No connection string changes No need to copy system objects – system DBs are
upgraded No need to copy the user databases
Disadvantages No control over the process A standby server is mandatory for a quick rollback
Side by Side Upgrade
Advantages Full control over the process A quick rollback OS upgrade can be included
Disadvantages The necessity of copying the system objects Connection string changes pose an overhead
In place Side by side
Control over the process
No Yes
OS Upgrade No Yes
Rollback Slow Fast
Copy system objects No Yes
Connection string change
No Yes
Copy user databases No Yes
In Side Upgrade
In Side Upgrade
Control over the process Yes
OS Upgrade Can be upgraded
Rollback Change back connection strings
Copy system objects Copy system objects efficiently
Connection string changes Eliminate connection string changes
Copy user databases Copy user databases efficiently
Copy System Objects Linked servers Jobs Configurations Logins and Credentials Server master key
By The Book: Generate Export/Import Scripts
Q: Can I copy system databases across different versions?
Copy system databases across different versions of SQL servers
System DBs System DBs
Connection String Change
By the book: Stop application Change connection strings Start application
Downtime Timeline
Q: Can we do it in one step and faster?
Stop allapps
Start all apps
DBsRO
2000/2005
DBs RW
2008
Backup log
Restore log
Downtime starts
Downtime ends
Conn string
changes
Server Identification Hostname / Virtual-name IP Port Service Name
Connection Examples: hostname\INST1 Virtual-name\INST1 (in clusters) Virtual-name, port IP, port
Q: What can I change?
Change the SERVER Identification
2005· REAL-APR-SQL\APR· 10.10.10.193· Port 1433
2008· REAL-APR-SQL2\APR· 10.10.10.198· Port 1433
Downtime Timeline
Stop allapps
Start all apps
DBsRO
2000/2005
DBs RW
2008
Backup log
Restore log
Downtime starts
Downtime ends
Conn string
changes
Copy User Databases
Storage Level Move LUNs Clone LUNs
Database Level Database Mirroring Log shipping - Works at the database level
Agenda
About 888
Upgrade Methodology
Upgrade Tools
Upgrade Process
Demo – Real-Time Migration
Installation Challenge #1
SQL 2008 Basic
InstallationSP1 CU6
Number of installations
Slipstream
Robocopy
Means to integrate packages of updates, patches or service-packs into one installation pack.
Slipstream Advantages
66% less installations
Less restarts & less failovers
Saves time
Installation Challenge #1
SQL 2008 Basic
Installation
SQL 2008 SP1CU6 SP1 CU6
Number of installations
Installation Challenge #2
SQL 2008 Full
Installation
Installation Duration
Silent Installation
Installation that does not display messages or windows during its progress
Silent Installation Advantages
Easy to use – less parameters than GUI
Saves time
Install many instances with one script
Coherence and uniformity in all environments
Silent Installation
Installation Challenge #2
SQL 2008 SP1CU6
SQL 2008 SP1CU6
Installation Duration
Copy User Databases
• Microsoft Log Shipping • Works at the database level
• 888 AutoRestore• Works at the instance level
In-House Tool – Autorestore
Auto Restore Implementation
An in-house tool that facilitates the control and management of restores from a central location
Uses transaction log backups from the source servers
Supports parallel restore operations
Works on an instance level (several databases) and not on a per-database basis (Mirroring)
Agenda
About 888
Upgrade Methodology
Upgrade Tools
Upgrade Process
Demo – Real-Time Migration
Pre-Migration
Run Windows cluster validation
Install a new instance on a new cluster
Perform a failover
Network – check open ports
Open UDP 1434 or create aliases
Preparation Stage
Pre-Migration
Instance 2005
Instance 2008
Instance2008
Windows 2008
Restore server objects by restoring the system databases
Windows 2003
Instance2000\2005
Preparation Stage
Restore Restore Upgrade
Pre-Migration
Auto-Restore
Copy user databases using instance level log shipping (Auto-Restore)
Windows 2003
Instance2000\2005
Windows 2008
Instance2008
Preparation Stage
Pre-Migration
Simulation Stage
Application sanity checks
System health checks – OS ,Storage, Host, Network
Migration Process (scripts, time)
Compression Preparations
Migration Day
1. Stop SQL server agent
2. Set all databases to read-only
3. Run last log backup for all databases
On 2000/2005 Instance
Actual Migration
4. Restore last logs with no recovery
5. Check if all the logs were restored from the old server
6. Restore with recovery for all databases
7. Set all databases to read-write
8. Fix orphan logins
9. Change compatibility to 100
On 2008 Instance
Actual Migration
10. Take offline the old instance group
11. Take offline the new instance group
12. Delete the old and the new virtual IP and name DNS records from the DNS server
Changing Instance Identification
Actual Migration
13. Clear the DNS server’s cache
14. Give the new server the old server’s virtual IP & name
15. Flush DNS cache clients of new server, Arpcache
16. Start the new instance group
Changing Instance Identification
Post-Migration
1. Perform Sanity Checks
2. Check NOC Alerts
3. Check SSIS, MSDTC and Job statuses
4. Run a Profiler’s Error Trace
5. Check SQL Error Log & Event Log
6. Check Performance Baseline
7. Run Full Backups
Compression
Compression Advisory – in-house utility Compression Scripts
Agenda
About 888
Upgrade Methodology
Upgrade Tools
Upgrade Process
Demo – Real-Time Migration