7/30/2019 Updated Project Schedule
1/38
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
W5J9JR-10-D-0005-0006 ANA GardezTotal 773 158 68 26J UL11A 05SEP13 -32
Milestones
Contract Milestones
KEY-0001 Notice to Proceed (NTP) 0 0 100 26J UL11A
KEY-0002 Project Duration 773* 158* 0 26J UL11A 05SEP13 -32
KEY-0003 End Date of Project 0 0 0 05SEP13 -32
Project Milestones
KEY-0004 Start Work on Project 0 0 100 27J UL11A
KEY-0005 Release Partial Letter for CON 1 0 100 09MAY12A 09MAY12A
KEY-0006 Release Letter for Full CON 1 1 0 01APR13 01APR13 -7
Pre-construction
Pre-construction Meetings
KEY-0007 Provide Documents for Pre-CON 6 0 100 27J UL11A 01AUG11A
KEY-0008 Hold Pre-CON Meeting 1 0 100 02AUG11A 02AUG11A
Pre-construction Submittals
KEY-0009 Submit ActivityHazard Analysis 1 0 100 02AUG11A 02AUG11A
KEY-0010 Submit Baseline Schedule 1 0 100 02AUG11A 02AUG11A
KEY-0011 Submit Accidend PreventionPlan 1 0 100 02AUG11A 02AUG11A
KEY-0012 Submit Quality Control Plan 1 0 100 02AUG11A 02AUG11A
KEY-0013 Submit Security Plan 1 0 100 02AUG11A 02AUG11A
KEY-0014 Approve Activity Hazard Analysis 14 0 100 03AUG11A 16AUG11A
KEY-0015 Approve Baseline Schedule 14 0 100 03AUG11A 16AUG11A
KEY-0016 Approve AccidentPreventionPlan 14 0 100 03AUG11A 16AUG11A
KEY-0017 Approve QC Plan by USACE 14 0 100 03AUG11A 16AUG11A
KEY-0018 Approved Security Plan by AED 14 0 100 03AUG11A 16AUG11A
2011 2012 2013J A S O N D J F M A M J J A S O N D J F M A M J J A S
Primavera Systems, Inc.
Start Date 26J UL11
Finish Date 05SEP13
Data Date 01APR13
Run Date 13APR13 10:09
Early Bar
Progress Bar
Critical Activity
PS19 FCEC UIProjects J V
W5J9JR-10-D-0005-0006 ANA Gardez
Project Management Layout
Sheet 1 of 38
Date Revision Checked Approved
-
7/30/2019 Updated Project Schedule
2/38
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
DBA Insurance
KEY-0019 DBA Insurance 1 0 100 26J UL11A 26AUG11A
Design
10% Design Submittal
DES-0001 Site Survey 22 0 100 10AUG11A 05SEP11A
DES-0003 10% Site Design Submittal 13 0 100 10OCT11A 25OCT11A
DES-0002 Geotechnical Report 12 0 100 26OCT11A 06NOV11A
DES-0004 10% Site Design Conference / Approval 14 0 100 26OCT11A 08NOV11A
DES-0014 Pay Request 10% Desgin 1 0 100 09NOV11A 09NOV11A
65% Design Submittal
DES-0005 65% Design Submittal 4 0 100 24MAR12A 27MAR12A
DES-0016 65% Design Conference / Approval 14 0 100 29MAR12A 08APR12A
DES-0006 Pay Request 65% Design 1 0 100 05J UN12A 05J UN12A
100% Design Submittall
DES-0009 100% Design Submittal 10 0 100 10OCT12A 24OCT12A
DES-0010 100% Design Conference / Approval 14 0 100 25OCT12A 31OCT12A
DES-0020 Pay Request 100% Design 1 0 100 01NOV12A 01NOV12A
ProcurementCivil/Structural
Concrete Reinforecement
PRO-0001 Submit Reinforcement Steel 5 0 100 13NOV11A 17NOV11A
PRO-0002 Approved Reinforcement Steel 14 0 100 18NOV11A 01DEC11A
PRO-0003 Issue Parchase Order for SS 2 0 100 17DEC11A 19DEC11A
PRO-0004 Delivery of SS to J obsite 5 0 100 08MAY12A 11MAY12A
2011 2012 2013J A S O N D J F M A M J J A S O N D J F M A M J J A S
Primavera Systems, Inc.
Start Date 26J UL11
Finish Date 05SEP13
Data Date 01APR13
Run Date 13APR13 10:09
Early Bar
Progress Bar
Critical Activity
PS19 FCEC UIProjects J V
W5J9JR-10-D-0005-0006 ANA Gardez
Project Management Layout
Sheet 2 of 38
Date Revision Checked Approved
-
7/30/2019 Updated Project Schedule
3/38
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
PRO-0064 Production of Concrete 10 0 100 12MAY12A 21MAY12A
3D Panel
PRO-0009 Submit 3D Data Sheet 5 0 100 21APR12A 25APR12A
PRO-0010 Approve 3D Data 14 0 100 25APR12A 05MAY12APRO-0011 Issue Purchase Order for 3D 5 0 100 05MAY12A 09MAY12A
PRO-0072 Production of 3D for Project 10 0 100 10MAY12A 20MAY12A
PRO-0012 Deliver of 3D to J obsite 5 0 100 21MAY12A 25MAY12A
K Span
PRO-0060 Submit K Span 5 0 100 21APR12A 25APR12A
PRO-0061 Approve K Span 14 0 100 25APR12A 08MAY12A
PRO-0062 Manufacturing of K Span 10 0 100 09MAY12A 19MAY12APRO-0063 Deliver of K Span to J obsite 5 0 100 19MAY12A 23MAY12A
Architectural
Joint Sealant
PRO-0005 Submit J oint Sealants 5 0 100 15APR12A 19MAY12A
PRO-0006 Approved J oint Sealants 14 0 100 20APR12A 03MAY12A
PRO-0007 Issue Purchase Order for SJ S 5 0 100 05MAY12A 09MAY12A
PRO-0068 Material's Production for Project 15 0 100 09MAY12A 23MAY12A
PRO-0008 Delivery of SJ S at J obsite 5 0 100 23MAY12A 27MAY12A
Doors & Frames
PRO-0013 Submit Doors & Frames 5 0 100 02OCT11A 11OCT11A
PRO-0014 Approved Doors & Frames 14 0 100 12OCT11A 25OCT11A
PRO-0015 Issue Purchase Order for DR 2 0 100 29OCT11A 30OCT11A
PRO-0016 Manufacturing of Doors 10 0 100 12MAY12A 21MAY12APRO-0017 Delivery of Doors to J obsite 5 0 100 22J UN12A 01J UL12A
Windows and Frames
PRO-0018 Submit Windows & Frames 5 0 100 18SEP11A 27SEP11A
PRO-0019 Approved Windows & Frames 14 0 100 12MAY12A 25MAY12A
PRO-0020 Issue Pruchase Order for WDW 2 0 100 25MAY12A 26MAY12A
PRO-0021 Manufacturing of Windows 10 0 100 10NOV12A 19NOV12A
PRO-0022 Delivery of Windows to J obsite 5 0 100 20NOV12A 01J AN13A
2011 2012 2013J A S O N D J F M A M J J A S O N D J F M A M J J A S
Primavera Systems, Inc.
Start Date 26J UL11
Finish Date 05SEP13
Data Date 01APR13
Run Date 13APR13 10:09
Early Bar
Progress Bar
Critical Activity
PS19 FCEC UIProjects J V
W5J9JR-10-D-0005-0006 ANA Gardez
Project Management Layout
Sheet 3 of 38
Date Revision Checked Approved
-
7/30/2019 Updated Project Schedule
4/38
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
Stucco & Paint
PRO-0023 Sumbit Stucco, Paint&Coating 5 0 100 20APR12A 24APR12A
PRO-0024 Approve Stucco, Paint&Coating 14 0 100 24APR12A 07MAY12A
PRO-0025 Purchase Order for Stucco & P 2 0 100 07MAY12A 08MAY12APRO-0066 Material's Manufacturing for Project 18 0 100 01OCT12A 07OCT12A
PRO-0026 Deliver Stucco & P at J obsite 6 0 100 07OCT12A 14OCT12A
Electrical
Generator
PRO-0027 Submit Generator Product Data 10 0 100 31MAR12A 09APR12A
PRO-0028 Approve Generator Product Data 14 0 100 09APR12A 16APR12A
PRO-0029 Purchase Order for Generator 2 0 100 21APR12A 22APR12A
PRO-0030 Manufacturing the Generators 30 30 0 01APR13 30APR13 7
PRO-0031 Shipment of Generator 20 20 0 01MAY13 20MAY13 7
PRO-0032 Deliver of Generator at site 15 15 0 21MAY13 04J UN13 7
Lighting System
PRO-0033 Submit Lighting System 10 0 100 03SEP11A 13SEP11A
PRO-0034 Approve Lighting System 14 0 100 17SEP11A 30SEP11A
PRO-0035 Purchase Order for LTG SYS 2 0 100 01OCT11A 02OCT11A
PRO-0036 Shipment Lighting System 20 0 100 01DEC12A 01J AN13A
PRO-0037 Deliver of LTG SYS Material 8 0 100 01J AN13A 28FEB13A
Pannel Board and Transfer Switch
PRO-0038 Submit EP & TRANS Switch 1 0 100 29AUG11A 29AUG11A
PRO-0039 Approve EP & TRANS Switch 14 0 100 29AUG11A 03SEP11A
PRO-0040 Purchase Order for EP/TRANS SW 2 0 100 10SEP11A 11SEP11APRO-0041 Manufacture EP/TRANS Switch 60 60 0 01APR13 30MAY13 -31
PRO-0042 Shipment of EP & TRANS Switch 40 40 0 31MAY13 09J UL13 -31
PRO-0043 Delivere EP & TRANS SW at Site 10 10 0 10J UL13 19J UL13 -31
Electrical Distribution System
PRO-0044 Submit ELECT Distribution MAT 1 0 100 08SEP11A 08SEP11A
PRO-0045 Approve ELECT Distribution MAT 14 0 100 08SEP11A 13SEP11A
PRO-0046 PurchaseOrder forELEC Material 1 0 100 15SEP11A 15SEP11A
2011 2012 2013J A S O N D J F M A M J J A S O N D J F M A M J J A S
Primavera Systems, Inc.
Start Date 26J UL11
Finish Date 05SEP13
Data Date 01APR13
Run Date 13APR13 10:09
Early Bar
Progress Bar
Critical Activity
PS19 FCEC UIProjects J V
W5J9JR-10-D-0005-0006 ANA Gardez
Project Management Layout
Sheet 4 of 38
Date Revision Checked Approved
-
7/30/2019 Updated Project Schedule
5/38
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
PRO-0048 Shipment of ELECT Material 6 3 50 23APR12A 03APR13 41
PRO-0049 Deliver ELECT Material at site 3 1 50 28APR12A 01APR13 41
PRO-0047 Manufacturing of ELEC Material 5 0 100 25MAY12A 05J UN12A
Mechanical
PRO-0055 Submit Mechcanical Matrials 1 1 0 02APR13 02APR13 -7
PRO-0056 Approve Mechcanical Matrials 14 14 0 03APR13 16APR13 -7
PRO-0057 Purchase Order Mechcanical Matrials 2 2 0 17APR13 18APR13 -7
PRO-0058 Shipment of Mechcanical Matrials 45 45 0 19APR13 02J UN13 -7
PRO-0059 Deliver Mechcanical Matrials to the site 15 15 0 03J UN13 17J UN13 -7
Plumbing
Water and Sewer Pipes
PRO-0050 Submit Water & Sewer Pipes 30 0 100 17SEP11A 22SEP11A
PRO-0051 Approve Water & Sewer Pipes 14 0 100 23SEP11A 05OCT11A
PRO-0052 Purchase Order-W & Sewer Pipes 2 0 100 08OCT11A 09OCT11A
PRO-0053 Shipment of W & Sewer Pipes 35 0 100 16APR12A 21MAY12A
PRO-0054 Deliver W & Sewer Pipe at site 35 0 100 22APR12A 26MAY12A
Construction
Mobilization
MOB-0001 Grading/Leveling the Area 19 0 100 10SEP11A 29SEP11A
MOB-0002 Install. of Fence around Camp Area 20 0 100 30SEP11A 15OCT11A
MOB-0012 Installation of Conexes 10 0 100 16OCT11A 26OCT11A
MOB-0022 Construction of Buildings 20 0 100 27OCT11A 08DEC11A
SiteworkSite Demolition/Grading
SDG-0001 Grubbing of Site 10 0 100 01APR12A 05J UN12A
SDG-0002 Grading & Demolising 9 0 100 04APR12A 20OCT12A
SDG-0003 Removing Materials from site 12 0 100 10APR12A 23OCT12A
2011 2012 2013J A S O N D J F M A M J J A S O N D J F M A M J J A S
Primavera Systems, Inc.
Start Date 26J UL11
Finish Date 05SEP13
Data Date 01APR13
Run Date 13APR13 10:09
Early Bar
Progress Bar
Critical Activity
PS19 FCEC UIProjects J V
W5J9JR-10-D-0005-0006 ANA Gardez
Project Management Layout
Sheet 5 of 38
Date Revision Checked Approved
-
7/30/2019 Updated Project Schedule
6/38
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
Soccer Field Irrigation System
STO-0001 Layout for Irrigation Pipes 10 10 0 01APR13 11APR13 27
STO-0002 Excavation/leveling/Lay Pipes 20 20 0 13APR13 05MAY13 27
STO-0003 Backfilling/Compaction 20 20 0 06MAY13 28MAY13 27STO-0004 Punchlist Correction 8 8 0 29MAY13 06J UN13 27
STO-0005 Finish & Handover 1 1 0 08J UN13 08J UN13 27
Road Network, Walkways, Parking
Roads
RPS-0007 Road Layout 2 0 100 01MAY12A 15MAY12A
RPS-0008 Road Sub-Grade 15 0 100 07MAY12A 23MAY12A
RPS-0009 Compact Sub-Grade of Road 15 0 100 12MAY12A 03J UN12A
RPS-0010 Road Base Course 14 0 100 17MAY12A 22MAY12ARPS-0011 Compact Base-Course of Road 10 0 100 24MAY12A 15SEP12A
RPS-0012 Asphalt pavement 10 0 100 12SEP12A 23SEP12A
RPS-0024 Soil Ditch 10 0 100 18SEP12A 29SEP12A
RPS-0013 Test & Completion 2 2 0 01APR13 02APR13 35
Crush Around Building
RPS-0014 Layout/Level of Crush 1 1 0 13APR13 13APR13 57
RPS-0015 Sub Grade for Crush 10 10 0 14APR13 24APR13 57
RPS-0017 Compaction of Crush all arround Building 15 15 0 16APR13 02MAY13 57RPS-0018 Test & Completion for Crush 1 1 0 04MAY13 04MAY13 57
Concrete walkways
RPS-0019 Layout for Sidewalks 2 2 0 03APR13 04APR13 35
RPS-0020 Sub Base for Sidewalks 15 15 0 06APR13 22APR13 35
RPS-0021 Base Course for Sidewalks 15 15 0 23APR13 09MAY13 35
RPS-0022 Pour Concrete for Sidewalks 15 15 0 11MAY13 27MAY13 35
RPS-0023 Test & Completion of Sidewalks 2 2 0 28MAY13 29MAY13 35
Athletic Field & TrackField & Track
RPS-0025 Layout Athletic Field & Track 1 0 100 12MAY12A 12MAY12A
RPS-0026 Excavation Athletic Field & Track 10 0 100 15MAY12A 26MAY12A
RPS-0027 Backfiling/Compaction Athletic Field & Track 14 0 100 21MAY12A 18J UL12A
RPS-0028 Grass/Cursh for Athletic 10 10 0 01APR13 11APR13 75
RPS-0029 Test & Completion of Field & Track 1 1 0 13APR13 13APR13 75
2011 2012 2013J A S O N D J F M A M J J A S O N D J F M A M J J A S
Primavera Systems, Inc.
Start Date 26J UL11
Finish Date 05SEP13
Data Date 01APR13
Run Date 13APR13 10:09
Early Bar
Progress Bar
Critical Activity
PS19 FCEC UIProjects J V
W5J9JR-10-D-0005-0006 ANA Gardez
Project Management Layout
Sheet 6 of 38
Date Revision Checked Approved
-
7/30/2019 Updated Project Schedule
7/38
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
Volleyball Fields
1st Field
RPS-0030 Layout Volleyball Fields 1 0 100 12MAY12A 12MAY12A
RPS-0031 Excavation Volleyball Fields 10 0 100 20MAY12A 16J UL12A
RPS-0032 Backfiling / Compaction Volleyball Fields 10 0 100 03J UL12A 16J UL12ARPS-0033 Sand for Volleyball Fields 10 0 100 22J UL12A 26AUG12A
RPS-0034 Test & Completion Volleyball Fields 1 1 0 01APR13 01APR13 85
2nd Field
RPS-0035 Layout Volleyball Fields 1 0 100 12MAY12A 12MAY12A
RPS-0036 Excavation Volleyball Fields 12 0 100 16MAY12A 24J UL12A
RPS-0037 Backfiling / Compaction Volleyball Fields 12 0 100 04J UN12A 26AUG12A
RPS-0038 Sand for Volleyball Fields 12 0 100 18NOV12A 01DEC12A
RPS-0039 Test & Completion Volleyball Fields 1 1 0 01APR13 01APR13 85
Force ProtectionPersonnel Bunker
BUNKER #1,2,3
FPR-0001 Layout for Bunker #1,2,3 1 0 100 18NOV12A 18NOV12A
FPR-0002 Casting for Bunker #1,2,3 8 0 100 19NOV12A 27NOV12A
FPR-0003 Construct Bunker #1,2,3 4 0 100 21NOV12A 09J AN13A
FPR-0004 Cmplt Sandbag & T. Barriers of B. #1,2,3 6 6 70 10DEC12A 07APR13 79
FPR-0005 Test & Completion of Bunker #1,2,3 1 1 0 08APR13 08APR13 79
BUNKER #4,5,6
FPR-0006 Layout for Bunker #4,5,6 1 0 100 02DEC12A 02DEC12AFPR-0007 Casting for Bunker #4,5,6 8 0 100 03DEC12A 17DEC12A
FPR-0008 Construct Bunker #4,5,6 4 0 100 18DEC12A 09J AN13A
FPR-0009 Cmplt Sandbag & T. Barriers of B. #4,5,6 6 6 70 10FEB13A 07APR13 78
FPR-0010 Test & Completion of Bunker #4,5,6 1 1 0 08APR13 08APR13 78
BUNKER #7,8,9
FPR-0012 Casting Bunker #7,8,9 8 0 100 18DEC12A 26DEC12A
FPR-0011 Layout for Bunker #7,8,9 1 0 96 18DEC12A 31MAR13 85
FPR-0013 Construct Bunker #7,8,9 4 0 100 20DEC12A 14J AN13A
FPR-0014 Cmplt Sandbag & T. Barriers of B. #7,8,9 6 6 25 10J AN13A 07APR13 79
FPR-0015 Test & Completion of Bunker #7,8,9 1 1 0 09APR13 09APR13 78
BUNKER #10,11,12,13
FPR-0016 Layout for Bunker #10,11,12,13 1 0 100 31DEC12A 31DEC12A
FPR-0017 Casting for Bunker #10,11,12,13 10 0 100 31DEC12A 03J AN13A
FPR-0018 Construct Bunker #10,11,12,13 4 0 100 06J AN13A 14J AN13A
FPR-0019 Cmplt Sandbag & T.Barriers of B.#10,11,12,13 6 6 25 18MAR13A 07APR13 78
FPR-0020 Test & Completion of Bunker#10,11,12,13 1 1 0 08APR13 08APR13 78
BUNKER #14,15,16,17
FPR-0021 Layout for Bunker #14,15,16,17 1 0 100 31DEC12A 31DEC12A
FPR-0022 Casting for Bunker #14,15,16,17 10 0 100 31DEC12A 06J AN13A
2011 2012 2013J A S O N D J F M A M J J A S O N D J F M A M J J A S
Primavera Systems, Inc.
Start Date 26J UL11
Finish Date 05SEP13
Data Date 01APR13
Run Date 13APR13 10:09
Early Bar
Progress Bar
Critical Activity
PS19 FCEC UIProjects J V
W5J9JR-10-D-0005-0006 ANA Gardez
Project Management Layout
Sheet 7 of 38
Date Revision Checked Approved
-
7/30/2019 Updated Project Schedule
8/38
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
FPR-0023 Construct Bunker #14,15,16,17 4 0 100 06J AN13A 14J AN13A
FPR-0024 Cmplt Sandbag & T.Barriers of B. #14,15,16,17 6 6 0 01APR13 07APR13 79
FPR-0025 Test & Completion of Bunker #14,15,16,17 1 1 0 09APR13 09APR13 78
FPR-0026 Layout for Bunker #18,19,20,21 1 0 100 10DEC12A 11DEC12A
FPR-0027 Casting for Bunker #18,19,20,21 10 0 100 12DEC12A 22DEC12A
FPR-0028 Construct Bunker #18,19,20,21 4 0 100 23DEC12A 14J AN13A
FPR-0029 Cmplt Sandbag & T.Barriers of B.#18,19,20,21 6 6 25 18MAR13A 07APR13 79
FPR-0030 Test & Completion of Bunker#18,19,20,21 1 1 0 08APR13 08APR13 79
FPR-0031 Layout for Bunker #22,23,24,25 1 0 100 10DEC12A 11DEC12A
FPR-0032 Casting for Bunker #22,23,24,25 10 0 100 12DEC12A 23DEC12A
FPR-0033 Construct Bunker #22,23,24,25 4 0 100 24DEC12A 14J AN13A
FPR-0034 Cmplt Sandbag & T.Barriers of B.#22,23,24,25 6 6 25 18MAR13A 07APR13 79
FPR-0035 Test & Completion of Bunker#22,23,24,25 1 1 0 08APR13 08APR13 79
FPR-0036 Area Layout for ECP 1 0 100 12MAY12A 12MAY12A
FPR-0044 ECP Construct Main Drop Gate 7 0 100 19MAY12A 25MAY12A
FPR-0037 ECP FDN Works 8 0 100 02J UN12A 09J UN12A
FPR-0038 Slab on Grade Work for ECP 12 0 100 12AUG12A 28AUG12A
FPR-0039 CMU Wall&Slab Work for ECP 14 0 100 15AUG12A 28AUG12A
FPR-0040 ECP Plaster & Insulation 15 0 100 10NOV12A 17MAR13A
FPR-0042 ECP Internal & External Paint 10 10 50 14J AN13A 10APR13 86
FPR-0041 ECP Install Doors & Windows 4 4 0 01APR13 04APR13 82FPR-0043 ECP Install Barriers 12 12 0 05APR13 16APR13 82
FPR-0045 Test & Completion for ECP 2 2 0 17APR13 18APR13 82
FPR-0046 Area Layout for Wall 1 0 100 01APR12A 12MAY12A
FPR-0047 Excavation for Wall 8 0 100 03APR12A 12MAY12A
FPR-0048 Wall Backfilling/Compaction 7 0 95 12APR12A 31MAR13 69
FPR-0049 Wall PCC Works 5 0 100 14MAY12A 12SEP12A
FPR-0050 Wall Masonary Work 18 18 96 14MAY12A 18APR13 80
FPR-0051 Wall Copping 18 0 100 13SEP12A 31MAR13A
FPR-0052 Wall-Install Concertina Wire 15 15 75 10NOV12A 15APR13 80
FPR-0053 Wall-Test & Completion 5 5 0 16APR13 20APR13 80
FPR-0054 FPs Layout 1 0 100 12MAY12A 12MAY12A
FPR-0055 FPs Excavation 4 0 100 13MAY12A 13J AN13A
FPR-0057 FPs HESCO Installation 14 0 100 28MAY12A 09J AN13A
FPR-0056 FPs Backfilling & Compaction 5 0 100 11SEP12A 14J AN13A
FPR-0058 FPs Sand Bag 9 9 0 01APR13 09APR13 89
2011 2012 2013J A S O N D J F M A M J J A S O N D J F M A M J J A S
Primavera Systems, Inc.
Start Date 26J UL11
Finish Date 05SEP13
Data Date 01APR13
Run Date 13APR13 10:09
Early Bar
Progress Bar
Critical Activity
PS19 FCEC UIProjects J V
W5J9JR-10-D-0005-0006 ANA Gardez
Project Management Layout
Sheet 8 of 38
Date Revision Checked Approved
-
7/30/2019 Updated Project Schedule
9/38
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
FPR-0059 FPs Test & Completion 2 2 0 10APR13 11APR13 89
Guard Tower
FPR-0060 GT - Layout 1 0 100 08APR12A 10MAY12A
FPR-0061 GT - Excavation 4 0 100 12MAY12A 15MAY12A
FPR-0063 GT - Foundation & Ring Beam Works 10 0 100 12MAY12A 22MAY12A
FPR-0062 GT - Watering, Backfilling & Compaction 5 0 100 14MAY12A 19MAY12A
FPR-0064 GT - Formwork & RFT for Slab on Grade 15 0 100 18J UN12A 05J UL12A
FPR-0065 GT - Concrete Works for Slab on Grade 7 0 100 23J UN12A 02J UL12A
FPR-0066 GT - Installation of CMU Wall&Slab 10 0 100 13SEP12A 20DEC12A
FPR-0067 GT - Plaster and Insulation 15 15 65 10FEB13A 17APR13 63
FPR-0068 GT - Electrical Works 8 8 80 18FEB13A 09APR13 63
FPR-0070 GT - Internal & External Painting 10 10 70 27FEB13A 11APR13 67
FPR-0069 GT - Bitumens&Corregated Sheets Inst. 6 6 0 10APR13 16APR13 63
FPR-0071 GT - Door&Windows Installation 4 4 0 17APR13 21APR13 63
FPR-0072 GT - Test & Commissioning 1 1 0 22APR13 22APR13 63FPR-0073 GT - Punch list Correction 4 4 0 23APR13 27APR13 63
Trash Collection Point
Trash Collect ion Point #1,2,3,4,5
TCP-0001 TPT#1 - Construct 14 14 80 06MAY12A 16APR13 67
TCP-0002 TPT#1 - Install Fence 4 4 0 17APR13 21APR13 67
TCP-0003 TPT#1 - Inspection 1 1 0 22APR13 22APR13 67
Trash Collection Point #6,7,8,9
TCP-0004 TPT#2 - Construct 14 14 80 07MAY12A 16APR13 67
TCP-0005 TPT#2 - Install Fence 4 4 0 17APR13 21APR13 67
TCP-0006 TPT#2 - Inspection 1 1 0 22APR13 22APR13 67
Trash Collect ion Point #10,11,12
TCP-0007 TPT#3 - Construct 14 14 80 08MAY12A 16APR13 67
TCP-0008 TPT#3 - InstalI Fence 4 4 0 17APR13 21APR13 67
TCP-0009 TPT#3 - Inspection 1 1 0 22APR13 22APR13 67
Trash Collect ion Point #13,14,15
TCP-0010 TPT#4 - Construct 14 14 80 08MAY12A 16APR13 67
TCP-0011 TPT#4 - Install Fence 4 4 0 17APR13 21APR13 67
TCP-0012 TPT#4 - Inspection 1 1 0 22APR13 22APR13 67
Cover Walkway for Corps Headquarters
Foundations
CWW-0001 CW- Layout 1 0 100 12MAY12A 12MAY12A
2011 2012 2013J A S O N D J F M A M J J A S O N D J F M A M J J A S
Primavera Systems, Inc.
Start Date 26J UL11
Finish Date 05SEP13
Data Date 01APR13
Run Date 13APR13 10:09
Early Bar
Progress Bar
Critical Activity
PS19 FCEC UIProjects J V
W5J9JR-10-D-0005-0006 ANA Gardez
Project Management Layout
Sheet 9 of 38
Date Revision Checked Approved
-
7/30/2019 Updated Project Schedule
10/38
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
CWW-0002 CW- Excavation 7 0 100 13MAY12A 03OCT12A
CWW-0003 CW- Watering, Backfilling & Compaction 4 4 25 20MAY12A 04APR13 36
CWW-0004 CW- Graveling 7 7 0 06APR13 13APR13 36
CWW-0005 CW- Foundation & Ring Beam 10 10 0 14APR13 24APR13 36
Superstructure & Close-in
CWW-0008 CW- Column Installation 10 10 0 25APR13 06MAY13 36
Archi tectural - Exter ior
CWW-0009 CW- Corregated Sheet Inst. 8 8 0 07MAY13 15MAY13 36
Inspections, Punchlists
CWW-0010 CW- Test & Commission 2 2 0 16MAY13 18MAY13 36
CWW-0011 CW- Punchlist Correction 8 8 0 19MAY13 27MAY13 36
CWW-0012 CW- Finish and Handover 1 1 0 28MAY13 28MAY13 36
Bleacher Enclosures
Bleacher #1
OTH-0001 Bleacher #1- Layout 1 0 100 14MAY12A 14MAY12A
OTH-0002 Bleacher #1 - Construct FDN 15 0 100 15MAY12A 18J UL12A
OTH-0004 Bleacher #1- Construct COL 12 0 100 03J UN12A 18J UL12A
OTH-0005 Bleacher #1-Construct Stairs 12 0 100 07J UN12A 18J UL12A
OTH-0006 Bleacher #1- Install CORR Sheet 12 0 100 14AUG12A 30AUG12A
OTH-0003 Bleacher #1- Slab on Grade 18 2 90 18NOV12A 02APR13 76OTH-0010 Bleacher #1 Test & Commission 2 2 0 03APR13 04APR13 76
OTH-0011 Bleacher #1 Punchlist Correction 5 5 0 06APR13 10APR13 76
OTH-0012 Bleacher #1 Finish and Handover 1 1 0 11APR13 11APR13 76
Bleacher #2
OTH-0013 Bleacher #2- Layout 1 0 100 14MAY12A 25J UN12A
OTH-0014 Bleacher #2 - Construct FDN 15 0 100 26J UN12A 17J UL12A
OTH-0015 Bleacher #2- Slab on Grade 18 18 0 01APR13 21APR13 48
OTH-0016 Bleacher #2- Construct COL 12 12 0 10APR13 23APR13 48
OTH-0017 Bleacher #2-Construct Stairs 12 12 0 17APR13 30APR13 48
OTH-0018 Bleacher #2- Install CORR Sheet 12 12 0 22APR13 05MAY13 48
OTH-0019 Bleacher #2 Test & Commission 2 2 0 06MAY13 07MAY13 48
OTH-0020 Bleacher #2 Punchlist Correction 5 5 0 08MAY13 13MAY13 48
OTH-0021 Bleacher #2 Finish and Handover 1 1 0 14MAY13 14MAY13 48
2011 2012 2013J A S O N D J F M A M J J A S O N D J F M A M J J A S
Primavera Systems, Inc.
Start Date 26J UL11
Finish Date 05SEP13
Data Date 01APR13
Run Date 13APR13 10:09
Early Bar
Progress Bar
Critical Activity
PS19 FCEC UIProjects J V
W5J9JR-10-D-0005-0006 ANA Gardez
Project Management Layout
Sheet 10 of 38
Date Revision Checked Approved
-
7/30/2019 Updated Project Schedule
11/38
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
Utilities
Water Supply and Distribution System
Water Distribut ion
WSD-0004 Layout for Water Pipes 1 0 100 07APR12A 10J AN13A
WSD-0005 Excavation for Water Pipes 8 8 96 25J UN12A 09APR13 66WSD-0006 Lay Site Water Pipes 10 10 90 04J UL12A 11APR13 66
WSD-0008 Construction of Water Manholes 12 12 70 09J UL12A 14APR13 66
WSD-0009 Test & Completion for W Pipes 10 10 60 05OCT12A 11APR13 70
WSD-0007 Check W Pipes & Backfill 2 2 80 02DEC12A 16APR13 66
WSD-0010 Punchlist Correction - W Pipes 5 5 0 17APR13 22APR13 66
WSD-0011 Finish and Handover - W Pipes 1 1 0 23APR13 23APR13 66
Sanitary Sewer System
Sewage Collection
SSS-0001 Layout for Sewer Pipes 1 0 100 04APR12A 21J UN12A
SSS-0002 Excavation for Sewer Pipe 8 8 97 07APR12A 09APR13 62
SSS-0003 Install Sewer Pipes 10 10 96 13MAY12A 11APR13 62
SSS-0004 Checking & Backfill Sewer Pipe 10 10 96 18J UN12A 11APR13 62
SSS-0005 Construction of Sewer Manholes 18 18 83 27J UN12A 21APR13 62
SSS-0006 Test & Completion - Sewer Pipe 18 18 75 05OCT12A 21APR13 62
SSS-0007 Correct Punchlist - Sewer Pipe 5 5 0 22APR13 27APR13 62
SSS-0008 Finish & Handover - Sewer Pipe 1 1 0 28APR13 28APR13 62
Site Electrical Distribution NetworkPower Distribution
ELE-0015 Layout for ELECT Pipes 2 0 100 07APR12A 16MAY12A
ELE-0016 Excavation for ELECT Pipes 6 6 96 09APR12A 07APR13 35
ELE-0018 Lay Electrical Pipes 10 10 80 06MAY12A 11APR13 35
ELE-0019 Concrete Work for Duct Bank 12 12 91 18J UN12A 14APR13 35
ELE-0024 Checking & Backfill Elect Pipes 10 10 93 20J UN12A 11APR13 42
ELE-0017 Electrical Manholes 20 20 90 23J UN12A 23APR13 42
ELE-0020 Electrical Cable Pulling 15 15 0 15APR13 01MAY13 35ELE-0021 Test & Commission 4 4 0 02MAY13 06MAY13 47
ELE-0022 Puchlist Correction 5 5 0 07MAY13 12MAY13 49
ELE-0023 Finish and Handover 1 1 0 13MAY13 13MAY13 49
Power Generation
Emergency Generator for Headquarter
ELE-0009 Install Emergncy Generator 9 9 0 05J UN13 15J UN13 6
ELE-0010 Install Control Panel for Generator 12 12 0 10J UN13 23J UN13 6
ELE-0011 Test & Commission 2 2 0 24J UN13 25J UN13 6
ELE-0012 Puchlist Correction 5 5 0 26J UN13 01J UL13 6
2011 2012 2013J A S O N D J F M A M J J A S O N D J F M A M J J A S
Primavera Systems, Inc.
Start Date 26J UL11
Finish Date 05SEP13
Data Date 01APR13
Run Date 13APR13 10:09
Early Bar
Progress Bar
Critical Activity
PS19 FCEC UIProjects J V
W5J9JR-10-D-0005-0006 ANA Gardez
Project Management Layout
Sheet 11 of 38
Date Revision Checked Approved
2011 2012 2013
-
7/30/2019 Updated Project Schedule
12/38
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
ELE-0013 Finishing & Handover 1 1 0 02J UL13 02J UL13 6
Site Communication System
COM-0001 Layout for Communication SYS 1 0 100 13MAY12A 15MAY12A
COM-0002 Excavation for Conduits 7 5 90 16MAY12A 06APR13 62COM-0005 Construct Communication Manholes 17 17 80 20J UN12A 20APR13 62
COM-0003 Install Counduits 9 5 80 11OCT12A 06APR13 74
COM-0004 Backfilling & Compaction 3 5 75 18OCT12A 06APR13 74
COM-0006 Testing & Completion - Com Sys 2 2 0 21APR13 22APR13 62
COM-0007 Punchlist Correction - Com Sys 4 4 0 23APR13 27APR13 62
COM-0008 Finish & Handover - Com Sys 1 1 0 28APR13 28APR13 62
Buildings
Arms Storage Bui ldings #100
Foundations
AB1-0001 100 S.ASB - Layout 1 0 100 01J AN12A 02J AN12A
AB1-0002 100 S.ASB - Excavation Work 6 0 100 03J AN12A 12J AN12A
AB1-0003 100 S.ASB - Concrete Work for Footings 9 0 100 05J UN12A 14J UN12A
AB1-0004 100 S.ASB - Under Ground Electrical Works 6 0 100 09J UN12A 17J UN12A
AB1-0005 100 S.ASB - Backfilling/Capillary Water Barrier 3 0 100 16J UN12A 14J UL12A
AB1-0006 100 S.ASB - Slab on Grade 6 0 100 13SEP12A 19SEP12A
Superstructure & Close-in
AB1-0008 100 S.ASB - Construction of Shear walls 10 0 100 15OCT12A 25OCT12A
AB1-0007 100 S.ASB - Construction of CMU Walls 10 0 100 10NOV12A 20NOV12A
AB1-0012 100 S.ASB - Steel J oists, Welding Plate& Purlins 6 6 0 01APR13 07APR13 52
Archi tectural - Exter ior
AB1-0010 100 S.ASB - Exterior Door Installation 2 2 90 10FEB13A 02APR13 67
AB1-0014 100 S.ASB - Roof insullation 8 0 100 20MAR13A 28MAR13A
AB1-0015 100 S.ASB - External Paint 12 4 60 27MAR13A 04APR13 65
AB1-0013 100 S.ASB - Seam Metal Roof (Corr. Sheet) 6 6 0 14APR13 20APR13 52Archi tectural - Interior
AB1-0016 100 S.ASB - Plastering 10 0 100 29NOV12A 30NOV12A
AB1-0017 100 S.ASB - Internal Painting 10 4 80 27FEB13A 04APR13 65
Electrical
AB1-0018 100 S.ASB - Conduits & Fittings 10 4 90 01DEC12A 04APR13 63
AB1-0019 100 S.ASB - Electrical Wiring Works 10 4 50 28MAR13A 04APR13 63
AB1-0020 100 S.ASB - Lighting Fix ,Cover Plates Inst. 1 1 0 06APR13 06APR13 63
2011 2012 2013J A S O N D J F M A M J J A S O N D J F M A M J J A S
Primavera Systems, Inc.
Start Date 26J UL11
Finish Date 05SEP13
Data Date 01APR13
Run Date 13APR13 10:09
Early Bar
Progress Bar
Critical Activity
PS19 FCEC UIProjects J V
W5J9JR-10-D-0005-0006 ANA Gardez
Project Management Layout
Sheet 12 of 38
Date Revision Checked Approved
2011 2012 2013
-
7/30/2019 Updated Project Schedule
13/38
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
AB1-0022 100 S.ASB - Panel Boards 5 5 0 20J UL13 24J UL13 -25
Mechanical
AB1-0024 100 S.ASB - Electric Heater Install 4 4 80 28MAR13A 04APR13 65
AB1-0021 100 S.ASB - Exhaust Fans install 1 1 0 07APR13 07APR13 63
Inspections, Punchlists
AB1-0023 100 S.ASB - Test & Commission 2 2 0 25J UL13 27J UL13 -25
AB1-0025 100 S.ASB - Punchlist Works 5 5 0 28J UL13 03AUG13 -25
AB1-0026 100 S.ASB - Finishing & Handover 1 1 0 04AUG13 04AUG13 -25
Arms Storage Bui ldings #101
Foundations
AB2-0001 101 S.ASB - Layout 1 0 100 04APR12A 07APR12A
AB2-0002 101 S.ASB - Excavation Work 4 0 100 05APR12A 09APR12AAB2-0003 101 S.ASB - Concrete Work for Footings 9 0 100 21APR12A 02MAY12A
AB2-0004 101 S.ASB - Backfilling/Capillary Water Barrier 6 0 100 14MAY12A 20MAY12A
AB2-0006 101 S.ASB - Slab On Grade 6 0 100 23MAY12A 02J UL12A
AB2-0005 101 S.ASB - Under Ground Electrical Works 6 0 100 21J UN12A 16J UL12A
Superstructure & Close-in
AB2-0007 101 S.ASB - Construction of CMU Walls 10 0 100 03J UL12A 17J UL12A
AB2-0008 101 S.ASB - Construction of Shear walls 10 0 100 05J UL12A 17J UL12A
AB2-0009 101 S.ASB - Steel J oists, Welding Plate& Purlins 7 7 90 18MAR13A 08APR13 61
Archi tectural - Exter ior
AB2-0012 101 S.ASB - External Paint 12 0 100 15OCT12A 23J AN13A
AB2-0010 101 S.ASB - Roof insulation 10 7 75 09MAR13A 08APR13 61
AB2-0011 101 S.ASB - Seam Metal Roof (Corr. Sheet) 7 7 85 28MAR13A 08APR13 61
AB2-0013 101 S.ASB - Ext Door Installation 8 8 0 01APR13 09APR13 61
Archi tectural - Interior
AB2-0014 101 S.ASB - Plastering 10 0 100 30SEP12A 09OCT12AAB2-0015 101 S.ASB - Internal Painting 10 7 90 01NOV12A 08APR13 61
Electrical
AB2-0016 101 S.ASB - Conduits & Fittings 10 7 95 01DEC12A 08APR13 61
AB2-0017 101 S.ASB - Electrical Wiring Works 10 7 95 01J AN13A 08APR13 61
AB2-0018 101 S.ASB - Lighting Fix ,Cover Plates Inst 7 7 10 05FEB13A 08APR13 61
AB2-0019 101 S.ASB - Panel Boards 9 9 0 20J UL13 29J UL13 -25
2011 2012 2013J A S O N D J F M A M J J A S O N D J F M A M J J A S
Primavera Systems, Inc.
Start Date 26J UL11
Finish Date 05SEP13
Data Date 01APR13
Run Date 13APR13 10:09
Early Bar
Progress Bar
Critical Activity
PS19 FCEC UIProjects J V
W5J9JR-10-D-0005-0006 ANA Gardez
Project Management Layout
Sheet 13 of 38
Date Revision Checked Approved
A ti it A ti it O i R % E l E l T t l 2011 2012 2013
-
7/30/2019 Updated Project Schedule
14/38
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
Mechanical
AB2-0021 101 S.ASB - Exhaust Fans inst 10 7 60 03J AN13A 08APR13 62
AB2-0020 101 S.ASB - Electric Heater Inst 1 1 0 09APR13 09APR13 61
Inspections, Punchlists
AB2-0022 101 S.ASB - Test & Commission 2 2 0 30J UL13 31J UL13 -25
AB2-0023 101 S.ASB - Punchlist Works 5 5 0 01AUG13 06AUG13 -25
AB2-0024 101 S.ASB - Finishing & Handover 1 1 0 07AUG13 07AUG13 -25
Arms Storage Bui ldings #102
Foundations
AB3-0001 102 S.ASB - Layout 2 0 100 01J AN12A 02J AN12A
AB3-0002 102 S.ASB - Excavation Work 6 0 100 03J AN12A 09J AN12A
AB3-0003 102 S.ASB - Concrete Work for Footings 9 0 100 12MAY12A 21MAY12AAB3-0004 102 S.ASB - Backfilling/Capillary Water Barrier 6 0 100 04J UN12A 21J UN12A
AB3-0005 102 S.ASB - Under Ground Electrical Works 6 0 100 07J UN12A 21J UN12A
AB3-0006 102 S.ASB - Slab on Grade 6 0 100 09J UN12A 23J UN12A
Superstructure & Close-in
AB3-0007 102 S.ASB - Construction of CMU Walls 10 0 100 24J UN12A 04J UL12A
AB3-0008 102 S.ASB - Construction of Shear walls 10 0 100 05J UL12A 16J UL12A
AB3-0009 102 S.ASB - Steel J oists, Welding Plate& Purlins 7 7 0 01APR13 08APR13 57
Archi tectural - Exter ior
AB3-0012 102 S.ASB - External Paint 18 0 100 01J AN13A 30J AN13A
AB3-0013 102 S.ASB - Ext Door Instalation 10 10 90 20FEB13A 16APR13 57
AB3-0010 102 S.ASB - Roof Insulation 12 0 100 27MAR13A 29MAR13A
AB3-0011 102 S.ASB - Seam Metal Roof (Corr. Sheet) 8 8 0 09APR13 17APR13 57
Archi tectural - Interior
AB3-0014 102 S.ASB - Plastering 10 0 100 28OCT12A 20NOV12A
AB3-0015 102 S.ASB - Internal Painting 10 10 90 10DEC12A 11APR13 57Electrical
AB3-0016 102 S.ASB - Conduits & Fittings 4 4 90 10NOV12A 04APR13 67
AB3-0017 102 S.ASB - Electrical Wiring Works 8 4 90 20FEB13A 04APR13 67
AB3-0018 102 S.ASB - Lighting Fix ,Cover Plates Inst 1 1 0 04APR13 04APR13 67
AB3-0019 102 S.ASB - Panel Boards 2 2 0 19J UN13 20J UN13 4
Mechanical
AB3-0021 102 S.ASB - Exhaust Fans Inst 1 1 0 17APR13 17APR13 57
2011 2012 2013J A S O N D J F M A M J J A S O N D J F M A M J J A S
Primavera Systems, Inc.
Start Date 26J UL11
Finish Date 05SEP13
Data Date 01APR13
Run Date 13APR13 10:09
Early Bar
Progress Bar
Critical Activity
PS19 FCEC UIProjects J V
W5J9JR-10-D-0005-0006 ANA Gardez
Project Management Layout
Sheet 14 of 38
Date Revision Checked Approved
Activity Activity Orig Rem % Early Early Total 2011 2012 2013
-
7/30/2019 Updated Project Schedule
15/38
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
AB3-0020 102 S.ASB - Electric Heater Inst 1 1 0 18J UN13 18J UN13 4
Inspections, Punchlists
AB3-0022 102 S.ASB - Test & Commission 2 2 0 22J UN13 23J UN13 4
AB3-0023 102 S.ASB - Punchlist Works 5 5 0 24J UN13 29J UN13 4
AB3-0024 102 S.ASB - Finishing & Handover 1 1 0 30J UN13 30J UN13 4
Arms Storage Bui ldings #103
Foundations
AB4-0001 103 S.ASB - Layout 1 0 100 02J AN12A 02J AN12A
AB4-0002 103 S.ASB - Excavation Work 6 0 100 03J AN12A 09J AN12A
AB4-0003 103 S.ASB - Concrete Work for Footings 4 0 100 14J AN12A 20MAY12A
AB4-0004 103 S.ASB - Backfilling/Capillary Water Barrier 6 0 100 03J UN12A 23J UN12A
AB4-0005 103 S.ASB - Under Ground Electrical Works 6 0 100 06J UN12A 23J UN12A
AB4-0006 103 S.ASB - Slab on Grade 6 0 100 12J UN12A 23J UN12A
Superstructure & Close-in
AB4-0007 103 S.ASB - Construction of CMU Walls 15 0 100 24J UN12A 10J UL12A
AB4-0008 103 S.ASB - Construction of Shear walls 18 0 100 11J UL12A 30J UL12A
AB4-0009 103 S.ASB - Steel J oists, Welding Plate& Purlins 10 10 0 01APR13 11APR13 50
Archi tectural - Exter ior
AB4-0012 103 S.ASB - External Paint 10 2 95 18NOV12A 02APR13 60
AB4-0013 103 S.ASB - Ext Door Installation 5 5 90 21FEB13A 06APR13 57
AB4-0010 103 S.ASB - Roof insullation 10 10 90 27MAR13A 11APR13 49
AB4-0011 103 S.ASB - Seam Metal Roof (Corr. Sheet) 5 5 0 13APR13 17APR13 50
Archi tectural - Interior
AB4-0014 103 S.ASB - Plastering 10 0 100 18SEP12A 28SEP12A
AB4-0015 103 S.ASB - Internal Painting 10 5 90 04DEC12A 06APR13 57
Electrical
AB4-0017 103 S.ASB - Electrical Wiring Works 12 12 95 03J AN13A 14APR13 47AB4-0016 103 S.ASB - Conduits & Fittings 10 10 90 10J AN13A 11APR13 49
AB4-0018 103 S.ASB - Lighting Fix ,Cover Plates Inst 2 2 0 15APR13 16APR13 47
AB4-0019 103 S.ASB - Panel Boards 9 9 0 23J UN13 02J UL13 -6
Mechanical
AB4-0021 103 S.ASB - Exhaust Fans Inst 1 1 0 17APR13 17APR13 47
AB4-0020 103 S.ASB - Electric Heater Inst 1 1 0 18J UN13 18J UN13 -6
J A S O N D J F M A M J J A S O N D J F M A M J J A S
Primavera Systems, Inc.
Start Date 26J UL11
Finish Date 05SEP13
Data Date 01APR13
Run Date 13APR13 10:09
Early Bar
Progress Bar
Critical Activity
PS19 FCEC UIProjects J V
W5J9JR-10-D-0005-0006 ANA Gardez
Project Management Layout
Sheet 15 of 38
Date Revision Checked Approved
Activity Activity Orig Rem % Early Early Total 2011 2012 2013
-
7/30/2019 Updated Project Schedule
16/38
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
Inspections, Punchlists
AB4-0022 103 S.ASB - Test & Commission 2 2 0 03J UL13 04J UL13 -6
AB4-0023 103 S.ASB - Punchlist Works 5 5 0 06J UL13 10J UL13 -6
AB4-0024 103 S.ASB - Finishing & Handover 1 1 0 11J UL13 11J UL13 -6
Arms Storage Bui ldings #104
Foundations
AB5-0001 104 S.ASB - Layout 1 0 100 01APR12A 01APR12A
AB5-0002 104 S.ASB - Excavation Work 5 0 100 02APR12A 07APR12A
AB5-0003 104 S.ASB - Concrete Work for Footings 12 0 100 14APR12A 20MAY12A
AB5-0004 104 S.ASB - Backfilling/Capillary Water Barrier 6 0 100 03J UN12A 27J UN12A
AB5-0006 104 S.ASB - Slab on Grade 10 0 100 05J UN12A 30J UN12A
AB5-0005 104 S.ASB - Under Ground Electrical Works 6 0 100 06J UN12A 26J UN12A
Superstructure & Close-in
AB5-0008 104 S.ASB - Construction of Shear walls 10 0 100 01J UL12A 12J UL12A
AB5-0007 104 S.ASB - Construction of CMU Walls 10 0 100 14AUG12A 27AUG12A
AB5-0009 104 S.ASB - Steel J oists, Welding Plate& Purlins 8 8 0 01APR13 09APR13 54
Archi tectural - Exter ior
AB5-0012 104 S.ASB - External Paint 13 10 70 03FEB13A 11APR13 57
AB5-0013 104 S.ASB - Ext Door Installation 6 6 90 20FEB13A 07APR13 62
AB5-0010 104 S.ASB - Roof Insulation 12 10 90 27MAR13A 11APR13 57
AB5-0011 104 S.ASB - Seam Metal Roof (Corr. Sheet) 6 6 0 10APR13 16APR13 54
Archi tectural - Interior
AB5-0014 104 S.ASB - Plastering 15 0 100 26NOV12A 05DEC12A
AB5-0015 104 S.ASB - Internal Painting 15 6 90 10DEC12A 07APR13 62
Electrical
AB5-0016 104 S.ASB - Conduits & Fittings 10 0 100 10DEC12A 20FEB13A
AB5-0017 104 S.ASB - Electrical Wiring Works 10 10 95 21FEB13A 11APR13 57AB5-0018 104 S.ASB - Lighting Fix ,Cover Plates Inst 10 10 95 22FEB13A 11APR13 57
AB5-0019 104 S.ASB - Panel Boards 6 6 0 19J UN13 25J UN13 0
Mechanical
AB5-0020 104 S.ASB - Electric Heater Inst 1 1 0 13APR13 13APR13 57
AB5-0021 104 S.ASB - Exhaust Fans inst 1 1 0 18J UN13 18J UN13 0
Inspections, Punchlists
AB5-0022 104 S.ASB - Test & Commission 2 2 0 26J UN13 27J UN13 0
J A S O N D J F M A M J J A S O N D J F M A M J J A S
Primavera Systems, Inc.
Start Date 26J UL11
Finish Date 05SEP13
Data Date 01APR13
Run Date 13APR13 10:09
Early Bar
Progress Bar
Critical Activity
PS19 FCEC UIProjects J V
W5J9JR-10-D-0005-0006 ANA Gardez
Project Management Layout
Sheet 16 of 38
Date Revision Checked Approved
-
7/30/2019 Updated Project Schedule
17/38
Activity Activity Orig Rem % Early Early Total 2011 2012 2013J A S O N D J F M A M J J A S O N D J F M A M J J A S
-
7/30/2019 Updated Project Schedule
18/38
ID Description Dur Dur Start Finish Float
Mechanical
GFC-0029 Nrth Prt Exhaust Fan Installation 10 10 40 27MAR13A 29J UN13 1
GFC-0030 Nrth Prt Unit Heater Installation 10 10 10 28MAR13A 29J UN13 1
GFC-0031 Nrth Prt AC Split Installation 10 10 0 30APR13 11MAY13 43
Plumbing
GFC-0032 Nrth Prt Hot & Cold Water Piping 15 15 25 01DEC12A 17APR13 44
GFC-0034 Nrth Prt Toilet & Misc.Accessories 4 4 0 18APR13 22APR13 44
GFC-0033 Nrth Prt Toilet Sanitry Fixture Installation 15 15 0 23APR13 09MAY13 44
Fire Protection System
GFC-0035 Nrth Prt Smoke Detector Installation 1 1 10 29MAR13A 02APR13 83
GFC-0036 Nrth Prt Fire Extinguisher Installation 1 1 0 18J UN13 18J UN13 10
Communications
GFC-0037 Nrth Prt Telephone and Data wall recepticle Inst 15 15 35 02J AN13A 17APR13 63
Inspections, Punchlists
GFC-0038 Nrth Prt Test & Commission 2 2 0 25J UL13 27J UL13 -21
GFC-0039 Nrth Prt Punchlist Works 5 5 0 28J UL13 01AUG13 -21
GFC-0040 Nrth Prt Finishing & Handover 1 1 0 03AUG13 03AUG13 -21
Corps Headquarters (West)
Foundations
GFC-0042 West Prt GFCC Building Layout 1 0 100 07APR12A 07APR12A
GFC-0043 West Prt GFCC Excavation 4 0 100 14MAY12A 17MAY12A
GFC-0044 West Prt GFCC Watering, Backfilling & Compaction 5 0 100 20MAY12A 16J UN12A
GFC-0047 West Prt GFCC Formwork & RFT for Slab on Grade 14 0 100 18J UN12A 12J UL12A
GFC-0048 West Prt San Sewer Piping under Slab on Grade 5 0 100 21J UN12A 14AUG12A
GFC-0045 West Prt GFCC Foundation & Ring Beam Works 15 0 100 21J UN12A 12SEP12A
GFC-0046 West Prt GFCC BKFLNG, CMPCTN, CAP. & Vap. Bars 5 0 100 25J UN12A 12J UL12A
GFC-0049 West Prt Concrete Works for Slab on Grade 6 0 100 14J UL12A 15NOV12A
Superstructure & Close-in
GFC-0050 West Prt Installation of Shear Walls 8 0 100 17J UL12A 22SEP12A
GFC-0051 West Prt Installation of 3D Panels Walls 15 0 100 04AUG12A 12DEC12A
GFC-0052 West Prt Scaffolding for 3D Roof Slab 3 0 100 25SEP12A 12DEC12A
GFC-0053 West Prt Instalaltion of 3D Panels Roof Slabs 10 0 100 28SEP12A 12DEC12A
GFC-0054 West Prt Shotcreting for 3D Panels Roof & Walls 10 3 85 03OCT12A 03APR13 50
GFC-0055 West Prt Pouring Concrete on Roof 10 0 100 06OCT12A 13J AN13A
GFC-0073 West Prt Truss Installation 12 12 75 13DEC12A 14APR13 53
J A S O N D J F M A M J J A S O N D J F M A M J J A S
Primavera Systems, Inc.
Start Date 26J UL11
Finish Date 05SEP13
Data Date 01APR13
Run Date 13APR13 10:09
Early Bar
Progress Bar
Critical Activity
PS19 FCEC UIProjects J V
W5J9JR-10-D-0005-0006 ANA Gardez
Project Management Layout
Sheet 18 of 38
Date Revision Checked Approved
Activity Activity Orig Rem % Early Early Total 2011 2012 2013J A S O N D J F M A M J J A S O N D J F M A M J J A S
-
7/30/2019 Updated Project Schedule
19/38
ID Description Dur Dur Start Finish Float
Archi tectural - Exter ior
GFC-0058 West Prt Exterior Doors Installation 10 10 40 01DEC12A 11APR13 68
GFC-0056 West Prt Cold Asphalt Damp Proofing 15 0 100 13DEC12A 27J AN13A
GFC-0057 West Prt Corregated Sheet Installation for 3D 12 10 67 13FEB13A 11APR13 68
GFC-0059 West Prt Window Installation 10 10 50 14FEB13A 11APR13 68
GFC-0060 West Prt External Painting 15 10 30 27FEB13A 11APR13 68
GFC-0085 West Prt Corregated Sheet Installation for Truss 12 12 50 27MAR13A 14APR13 53
Archi tectural - Interior
GFC-0062 West Prt Plaster Works 15 10 80 21NOV12A 11APR13 55
GFC-0063 West Prt Interior Doors Installation 10 10 36 28J AN13A 11APR13 60
GFC-0064 West Prt Internal Painting 15 10 55 01FEB13A 11APR13 60
GFC-0084 West Prt Glass Wool Insulation 12 12 70 28MAR13A 14APR13 53
GFC-0061 West Prt Terrazzo Tiles 15 15 0 04APR13 21APR13 50
GFC-0086 West Prt False Ceiling 15 15 0 01APR13 17APR13 53GFC-0065 West Prt Sealed Concrete 7 7 0 20J UL13 27J UL13 -23
Electrical
GFC-0066 West Prt Elec PVC Conduits & Fittings & Boxes 5 0 100 01J AN13A 23MAR13A
GFC-0068 West Prt Duplex and switch installation 10 10 45 03J AN13A 11APR13 68
GFC-0067 West Prt Electrical Wiring Works 5 5 50 10J AN13A 06APR13 65
GFC-0069 West Prt Lighting Fix. & Cover Plates Inst 2 2 0 22APR13 23APR13 50
GFC-0070 West Prt Panel Board Installation 5 5 0 20J UL13 24J UL13 -23
Mechanical
GFC-0071 West Prt AC Split Installation 1 1 0 18J UN13 18J UN13 10
GFC-0072 West Prt Exhaust Fan Installation 1 1 0 18J UN13 18J UN13 10
Plumbing
GFC-0074 West Prt Hot & Cold Water Piping 15 15 25 01DEC12A 17APR13 55
GFC-0075 West Prt Kitchen & Misc.Accessories 5 5 0 18APR13 23APR13 57
GFC-0076 West Prt Kithen Fixture Installation 8 8 0 18APR13 27APR13 55
Fire Protection System
GFC-0077 West Prt Smoke Detector Installation 1 1 0 23APR13 23APR13 58
GFC-0078 West Prt Fire Extinguisher Installation 1 1 0 18J UN13 18J UN13 10
Communications
GFC-0079 West Prt Tele and Data wall receptacle Insta 15 15 40 02J AN13A 17APR13 63
J A S O N D J F M A M J J A S O N D J F M A M J J A S
Primavera Systems, Inc.
Start Date 26J UL11
Finish Date 05SEP13
Data Date 01APR13
Run Date 13APR13 10:09
Early Bar
Progress Bar
Critical Activity
PS19 FCEC UIProjects J V
W5J9JR-10-D-0005-0006 ANA Gardez
Project Management Layout
Sheet 19 of 38
Date Revision Checked Approved
Activity Activity Orig Rem % Early
S
Early Total 2011 2012 2013J A S O N D J F M A M J J A S O N D J F M A M J J A S
-
7/30/2019 Updated Project Schedule
20/38
ID Description Dur Dur Start Finish Float
Inspections, Punchlists
GFC-0080 West Prt Test & Commission 2 2 0 28J UL13 29J UL13 -23
GFC-0081 West Prt Punchlist Works 5 5 0 30J UL13 04AUG13 -23
GFC-0082 West Prt Finishing & Handover 1 1 0 05AUG13 05AUG13 -23
Corps Headquarters (South)
Foundations
GFC-0087 Sout Prt GFCC Building Layout 1 0 100 07APR12A 07APR12A
GFC-0088 Sout Prt GFCC Excavation 5 0 100 12MAY12A 16MAY12A
GFC-0089 Sout Prt GFCC Watering, Backfilling & Compaction 5 0 100 16MAY12A 16J UN12A
GFC-0092 Sout Prt GFCC Formwork & RFT for Slab on Grade 14 0 100 20J UN12A 10J UL12A
GFC-0091 Sout Prt GFCC BKFLNG, CMPCTN, CAP. & Vap. Bars 5 0 100 26J UN12A 18NOV12A
GFC-0093 Sout Prt San Sewer Piping under Slab on Grade 8 0 100 01J UL12A 11J UL12A
GFC-0090 Sout Prt GFCC Foundation & Ring Beam Works 15 0 100 14J UL12A 12SEP12A
GFC-0094 Sout Prt Concrete Works for Slab on Grade 6 0 100 16J UL12A 09J AN13A
Superstructure & Close-in
GFC-0095 Sout Prt Installation of Shear Walls 8 0 100 13AUG12A 22SEP12A
GFC-0096 Sout Prt Installation of 3D Panels Walls 15 0 100 13SEP12A 23J AN13A
GFC-0097 Sout Prt Scaffolding for 3D Roof Slab 3 0 100 25SEP12A 12DEC12A
GFC-0098 Sout Prt Instalaltion of 3D Panels Roof Slabs 12 0 100 28SEP12A 23DEC12A
GFC-0099 Sout Prt Shotcreting for 3D Panels Roof & Walls 15 12 87 13OCT12A 14APR13 49
GFC-0100 Sout Prt Pouring Concrete on roof 12 0 100 20OCT12A 23J AN13A
GFC-0101 Sout Prt Truss Installation 10 10 50 25MAR13A 11APR13 51
Archi tectural - Exter ior
GFC-0105 Sout Prt Exterior Doors Installation 12 10 10 01DEC12A 11APR13 68
GFC-0102 Sout Prt Cold Asphalt Damp Proofing 10 10 60 24FEB13A 11APR13 57
GFC-0103 Sout Prt Corregated Sheet Installation for 3D 10 10 40 25FEB13A 11APR13 61
GFC-0107 Sout PrtExternal Painting 10 10 45 26FEB13A 11APR13 68
GFC-0104 Sout Prt Corregated Sheet Installation for Truss 10 10 10 27MAR13A 23APR13 51
GFC-0106 Sout PrtWindow Installation 12 12 0 01APR13 14APR13 61
Archi tectural - Interior
GFC-0111 Sout Prt Interior Doors Installation 10 10 30 01DEC12A 11APR13 53
GFC-0109 Sout Prt Plaster Works 15 15 85 03DEC12A 17APR13 53
GFC-0113 Sout Prt Internal Painting 10 10 60 27FEB13A 11APR13 61
GFC-0110 Sout Prt Glass Wool Insulation 10 10 40 27MAR13A 23APR13 51
GFC-0108 Sout Prt Terrazzo Tiles 12 12 0 15APR13 28APR13 49
GFC-0112 Sout Prt False Ceiling 2 2 0 24APR13 25APR13 51
GFC-0114 Sout Prt Sealed Concrete 5 5 0 23J UL13 28J UL13 -24
J A S O N D J F M A M J J A S O N D J F M A M J J A S
Primavera Systems, Inc.
Start Date 26J UL11
Finish Date 05SEP13
Data Date 01APR13
Run Date 13APR13 10:09
Early Bar
Progress Bar
Critical Activity
PS19 FCEC UIProjects J V
W5J9JR-10-D-0005-0006 ANA Gardez
Project Management Layout
Sheet 20 of 38
Date Revision Checked Approved
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
2011 2012 2013J A S O N D J F M A M J J A S O N D J F M A M J J A S
-
7/30/2019 Updated Project Schedule
21/38
ID Description Dur Dur Start Finish Float
Electrical
GFC-0115 Sout Prt Ele PVC Conduits & Fittings & Boxes 5 5 90 01FEB13A 07APR13 65
GFC-0116 Sout Prt Electrical Wiring Works 5 5 40 21FEB13A 07APR13 65
GFC-0118 Sout Prt Duplex and switch installation 10 10 20 28FEB13A 11APR13 77
GFC-0117 Sout Prt Lighting Fix. & Cover Plates Inst 2 2 0 13APR13 14APR13 61
GFC-0119 Sout Prt Panel Board Installation 5 5 0 20J UL13 24J UL13 -21
Mechanical
GFC-0120 Sout Prt AC Split Installation 1 1 0 01APR13 01APR13 77
GFC-0121 Sout Prt Exhaust Fan Installation 1 1 0 18J UN13 18J UN13 10
GFC-0131 Sout Prt Unit Heater Installation 1 1 0 18J UN13 18J UN13 10
Plumbing
GFC-0122 Sout Prt Hot & Cold Water Piping 15 15 25 01DEC12A 17APR13 53
GFC-0124 Sout Prt Toilet Sanitry Fixture Installation 3 3 0 18APR13 21APR13 55
GFC-0123 Sout Prt Toilet & Misc.Accessories 5 5 0 18APR13 23APR13 53
Fire Protection System
GFC-0125 Sout Prt Smoke Detector Installation 2 2 0 18J UN13 19J UN13 6
GFC-0126 Sout Prt Fire Extinguisher Installation 2 2 0 20J UN13 22J UN13 7
Communications
GFC-0127 Sout Prt Telephone and Data wall recepticle Inst 3 3 38 01MAR13A 23J UN13 6
Inspections, Punchlists
GFC-0128 Sout Prt Test & Commission 2 2 0 29J UL13 30J UL13 -24
GFC-0129 Sout Prt Punchlist Works 5 5 0 31J UL13 05AUG13 -24
GFC-0130 Sout PrtFinishing & Handover 1 1 0 06AUG13 06AUG13 -24
Kandak Headquarters
Foundations
KAN-0001 KHQ - Layout 1 0 100 08APR12A 16J UN12AKAN-0002 KHQ - Excavation Work 4 0 100 09APR12A 20J UN12A
KAN-0003 KHQ - Watering, Backfilling & Compaction 5 0 100 17J UN12A 21J UN12A
KAN-0004 KHQ - Foundation & Ring Beam Works 7 0 100 23J UN12A 11J UL12A
KAN-0005 KHQ - BKFLNG, CMPCTN, CAP. & Vap. Barriers 7 0 100 10J UL12A 12AUG12A
KAN-0006 KHQ - Formwork & RFT for Slab on Grade 8 0 100 16J UL12A 12AUG12A
KAN-0007 KHQ - Concrete Works for Slab on Grade 2 0 100 11NOV12A 09J AN13A
Superstructure & Close-in
KAN-0008 KHQ - Inst of Steel Bar for Stem Wall 10 0 100 25J UL12A 12AUG12A
Primavera Systems, Inc.
Start Date 26J UL11
Finish Date 05SEP13
Data Date 01APR13
Run Date 13APR13 10:09
Early Bar
Progress Bar
Critical Activity
PS19 FCEC UIProjects J V
W5J9JR-10-D-0005-0006 ANA Gardez
Project Management Layout
Sheet 21 of 38
Date Revision Checked Approved
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
2011 2012 2013J A S O N D J F M A M J J A S O N D J F M A M J J A S
-
7/30/2019 Updated Project Schedule
22/38
ID Description Dur Dur Start Finish Float
KAN-0009 KHQ - Concrete for Stem Walls 12 0 100 10SEP12A 09J AN13A
KAN-0010 KHQ - Installation of K Span 15 0 100 28OCT12A 26FEB13A
Archi tectural - Exter ior
KAN-0013 KHQ - Windows Installation 8 8 50 05DEC12A 09APR13 45
KAN-0011 KHQ - Ext Door Instalation 8 8 40 05J AN13A 09APR13 45
KAN-0012 KHQ - Ext Painting of Stem Wall 7 7 75 01MAR13A 08APR13 46
Archi tectural - Interior
KAN-0014 KHQ - Plaster for Stem Wall 15 15 90 10NOV12A 17APR13 21
KAN-0015 KHQ - Spray Insulation 7 7 0 18APR13 25APR13 21
KAN-0017 KHQ - Inst. gypsum board 10 10 0 27APR13 07MAY13 21
KAN-0016 KHQ - Inst. Suspended Ceiling 15 15 0 27APR13 13MAY13 26
KAN-0018 KHQ - Interior Doors Inst 5 5 0 08MAY13 13MAY13 21
KAN-0019 KHQ - Sealed Concrete for floor 5 5 0 21MAY13 26MAY13 26
Electrical
KAN-0020 KHQ - Ele PVC Conduits/Fittings/Boxes 6 0 100 01MAR13A 08MAR13A
KAN-0021 KHQ - Electrical Wiring Works 7 7 0 01APR13 08APR13 56
KAN-0022 KHQ - Lighting Fix.&Cover Plates Inst 6 6 0 14MAY13 20MAY13 26
KAN-0023 KHQ - Duplex & Switch Inst 8 8 0 14MAY13 22MAY13 21
KAN-0024 KHQ - Panel Board Inst 3 3 0 20J UL13 22J UL13 -23
Mechanical
KAN-0026 KHQ - Exhaust Fan Inst. 2 2 0 18J UN13 19J UN13 2KAN-0025 KHQ - AC Split Installation 3 3 0 18J UN13 20J UN13 -1
KAN-0027 KHQ - Unit Heater Inst. 2 2 0 22J UN13 23J UN13 -1
Plumbing
KAN-0028 KHQ - Hot&Cold Water Piping 9 9 50 05DEC12A 11APR13 51
KAN-0029 KHQ - Toilet & Misc. Accessories 5 5 0 13APR13 17APR13 54
KAN-0030 KHQ - Toilet Sanitry Fixture Inst. 8 8 0 13APR13 21APR13 51
Fire Protection System
KAN-0031 KHQ - Fire Extinguisher Inst. 3 3 0 20J UN13 23J UN13 2
Inspections, Punchlists
KAN-0032 KHQ - Test & Commission 2 2 0 23J UL13 24J UL13 -23
KAN-0033 KHQ - Punchlist Works 5 5 0 25J UL13 30J UL13 -23
KAN-0034 KHQ - Finishing & Handover 1 1 0 31J UL13 31J UL13 -23
Primavera Systems, Inc.
Start Date 26J UL11
Finish Date 05SEP13
Data Date 01APR13
Run Date 13APR13 10:09
Early Bar
Progress Bar
Critical Activity
PS19 FCEC UIProjects J V
W5J9JR-10-D-0005-0006 ANA Gardez
Project Management Layout
Sheet 22 of 38
Date Revision Checked Approved
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
2011 2012 2013J A S O N D J F M A M J J A S O N D J F M A M J J A S
-
7/30/2019 Updated Project Schedule
23/38
ID Description Dur Dur Start Finish Float
Administration Building #109
Foundations
ADM-0001 ADB 109 - Layout 2 0 100 09APR12A 10APR12A
ADM-0002 ADB 109 - Excavation Work 4 0 100 12APR12A 16APR12A
ADM-0003 ADB 109 - Watering, Backfilling & Compaction 4 0 100 16APR12A 22APR12A
ADM-0004 ADB 109 - Foundation & Ring Beam 10 0 100 10MAY12A 18NOV12A
ADM-0005 ADB 109 - BKFLNG, CMPCTN, CAP. & Vap. Barriers 8 0 100 16J UN12A 24J UN12A
ADM-0006 ADB 109 - Formwork & RFT for Slab on Grade 10 0 100 19J UN12A 30J UN12A
ADM-0007 ADB 109 - Concrete Works for Slab on Grade 4 0 100 26J UN12A 30J UN12A
Superstructure & Close-in
ADM-0008 ADB 109 - Inst. of Steel Bar for Stem Walls 4 0 100 01J UL12A 04J UL12A
ADM-0009 ADB 109 - Concrete for Stem Walls 7 0 100 02J UL12A 20SEP12A
ADM-0010 ADB 109 - Installation of K Span 13 0 100 01OCT12A 09OCT12A
Archi tectural - Exter ior
ADM-0013 ADB 109 - Windows Inst 6 0 100 29NOV12A 16J AN13A
ADM-0012 ADB 109 - Ext. Painting of Stem Walls 13 13 15 18MAR13A 15APR13 39
ADM-0011 ADB 109 - Ext. Door Inst 5 5 0 09APR13 14APR13 57
Archi tectural - Interior
ADM-0014 ADB 109 - Plaster Work for steam Walls 8 0 100 10OCT12A 18OCT12A
ADM-0015 ADB 109 - Spray Insulation 7 7 70 10DEC12A 08APR13 37
ADM-0017 ADB 109 - Inst. of gypsum Board 8 8 10 18DEC12A 09APR13 37
ADM-0019 ADB 109 - Sealed Concrete for Floor 4 4 20 23MAR13A 04APR13 68
ADM-0018 ADB 109 - Interior Doors Instalation 5 5 0 10APR13 15APR13 39
ADM-0016 ADB 109 - Inst. of Suspended Ceiling 8 8 0 10APR13 18APR13 39
Electrical
ADM-0020 ADB 109 - Ele PVC Conduits/Fittings/Boxes 9 7 75 18FEB13A 08APR13 38
ADM-0023 ADB 109 - Duplex & Switch Inst 7 7 0 10APR13 17APR13 37
ADM-0021 ADB 109 - Electrical Wiring Works 6 6 0 18APR13 24APR13 37
ADM-0022 ADB 109 - Lighting Fix. & Cover Plates Inst. 7 7 0 22APR13 29APR13 37
ADM-0024 ADB 109 - Panel Board Inst. 3 3 0 20J UL13 22J UL13 -25
Mechanical
ADM-0026 ADB 109 - Exhaust Fan Installation 3 3 30 28MAR13A 20J UN13 -1
ADM-0025 ADB 109 - AC Split Installation 5 5 0 30APR13 05MAY13 37
ADM-0027 ADB 109 - Unit Heater Installation 2 2 0 06MAY13 07MAY13 37
Primavera Systems, Inc.
Start Date 26J UL11
Finish Date 05SEP13
Data Date 01APR13
Run Date 13APR13 10:09
Early Bar
Progress Bar
Critical Activity
PS19 FCEC UIProjects J V
W5J9JR-10-D-0005-0006 ANA Gardez
Project Management Layout
Sheet 23 of 38
Date Revision Checked Approved
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
2011 2012 2013J A S O N D J F M A M J J A S O N D J F M A M J J A S
-
7/30/2019 Updated Project Schedule
24/38
p
Plumbing
ADM-0028 ADB 109 - Hot & Cold Water Piping 7 7 50 01DEC12A 08APR13 54
ADM-0029 ADB 109 - Toilet & Misc. Accessories 5 5 0 09APR13 14APR13 54
ADM-0030 ADB 109 - Toilet Sanitry Fixture Inst 6 6 0 09APR13 15APR13 54
Fire Protection System
ADM-0031 ADB 109 - Fire Extinguisher Inst. 3 3 0 08MAY13 11MAY13 37
Inspections, Punchlists
ADM-0032 ADB 109 - Test & Commission 2 2 0 23J UL13 24J UL13 -25
ADM-0033 ADB 109 - Punchlist Works 7 7 0 25J UL13 01AUG13 -25
ADM-0034 ADB 109 - Finishing & Handover 1 1 0 03AUG13 03AUG13 -25
Large Latrine #110
Foundations
LA1-0001 LTB 110- Layout 2 0 100 04APR12A 05APR12A
LA1-0002 LTB 110- Excavation Work 5 0 100 07APR12A 11APR12A
LA1-0003 LTB 110- Watering, Backfilling & Compaction 5 0 100 14APR12A 19APR12A
LA1-0004 LTB 110- Foundation & Ring Beam 12 0 100 21APR12A 11J UN12A
LA1-0005 LTB 110- BKFLNG, CMPCTN, CAP. & Vap. Barriers 9 0 100 12J UN12A 11J UL12A
LA1-0006 LTB 110- Formwork & RFT for Slab on Grade 12 0 100 14J UN12A 11J UL12A
LA1-0007 LTB 110- Concrete Works for Slab on Grade 4 0 100 25J UN12A 16SEP12A
Superstructure & Close-in
LA1-0008 LTB 110- Inst. Steel Bar for Stem Walls 13 0 100 17J UN12A 02J UL12A
LA1-0009 LTB 110- Concrete for Stem Walls 15 0 100 19J UN12A 27OCT12A
LA1-0010 LTB 110- Installation of K Span 20 0 100 01OCT12A 09OCT12A
Archi tectural - Exter ior
LA1-0011 LTB 110- Exterior Door Installaion 6 6 45 18DEC12A 07APR13 56
LA1-0013 LTB 110- Windows Installation 7 0 100 20DEC12A 26J AN13A
LA1-0012 LTB 110- Ext. Painting of Stem Walls 10 7 90 18FEB13A 08APR13 56
Archi tectural - Interior
LA1-0014 LTB 110- Plaster Work for Steam Walls 12 0 100 18NOV12A 01DEC12A
LA1-0018 LTB 110- Int. Doors Installation 7 7 30 30DEC12A 08APR13 56
LA1-0015 LTB 110- Spray Insulation 7 7 0 01APR13 08APR13 36
LA1-0017 LTB 110- Inst of gypsum Board 12 12 0 09APR13 22APR13 36
LA1-0016 LTB 110- Inst. of gypsum Board Ceiling 12 12 0 23APR13 06MAY13 36
LA1-0019 LTB 110- Tiles for floor 10 10 0 04MAY13 14MAY13 36
Primavera Systems, Inc.
Start Date 26J UL11
Finish Date 05SEP13
Data Date 01APR13
Run Date 13APR13 10:09
Early Bar
Progress Bar
Critical Activity
PS19 FCEC UIProjects J V
W5J9JR-10-D-0005-0006 ANA Gardez
Project Management Layout
Sheet 24 of 38
Date Revision Checked Approved
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
2011 2012 2013J A S O N D J F M A M J J A S O N D J F M A M J J A S
-
7/30/2019 Updated Project Schedule
25/38
Electrical
LA1-0020 LTB 110- Ele PVC Conduits/Fittings/Boxes 5 0 100 18FEB13A 23FEB13A
LA1-0023 LTB 110- Duplex & Switch Inst. 5 5 0 23APR13 28APR13 40
LA1-0021 LTB 110- Electrical Wiring Works 3 3 0 06APR13 08APR13 56
LA1-0022 LTB 110- Lighting Fix. & Cover Plates Inst. 3 3 0 04MAY13 06MAY13 36
LA1-0024 LTB 110- Panel Board Inst. 3 3 0 20J UL13 22J UL13 -24
Mechanical
LA1-0026 LTB 110- Exhaust Fan Inst. 1 1 90 01MAR13A 18J UN13 5
LA1-0027 LTB 110- Unit Heater Installation 1 1 0 18J UN13 18J UN13 6
Plumbing
LA1-0028 LTB 110- Hot & Cold Water Piping 7 7 50 01DEC12A 08APR13 64
LA1-0030 LTB 110- Toilet Sanitry Fixture Inst. 7 7 50 02FEB13A 08APR13 67
LA1-0029 LTB 110- Toilet & Misc. Accessories 5 5 0 09APR13 14APR13 64
Fire Protection System
LA1-0031 LTB 110- Fire Extinguisher Inst. 1 1 0 19J UN13 19J UN13 5
Inspections, Punchlists
LA1-0032 LTB 110- Test & Commission 2 2 0 23J UL13 24J UL13 -23
LA1-0033 LTB 110- Punchlist Works 5 5 0 25J UL13 30J UL13 -23
LA1-0034 LTB 110- Finishing & Handover 1 1 0 31J UL13 31J UL13 -23
Large Latrine #111
Foundations
LA2-0001 LTB 111- Layout 2 0 100 05APR12A 07APR12A
LA2-0002 LTB 111- Excavation Work 5 0 100 08APR12A 12APR12A
LA2-0003 LTB 111- Watering, Backfilling & Compaction 5 0 100 14APR12A 09OCT12A
LA2-0004 LTB 111- Foundation & Ring Beam Works 12 0 100 15MAY12A 28MAY12A
LA2-0005 LTB 111- BKFLNG, CMPCTN, CAP. & Vap. Barriers 2 0 100 05J UN12A 11J UN12A
LA2-0006 LTB 111- Formwork & RFT for Slab on Grade 12 0 100 12J UN12A 25J UN12A
LA2-0007 LTB 111- Concrete for Slab on Grade 7 0 100 14J UL12A 17SEP12A
Superstructure & Close-in
LA2-0008 LTB 111- Inst of Steel Bar for Stem Walls 12 0 100 18J UN12A 03J UL12A
LA2-0009 LTB 111- Inst. of Concrete Stem Walls 15 0 100 04J UL12A 01OCT12A
LA2-0010 LTB 111- Installation of K Span 15 0 100 01OCT12A 09OCT12A
Archi tectural - Exter ior
LA2-0013 LTB 111- Windows Installation 7 0 100 24DEC12A 31J AN13A
Primavera Systems, Inc.
Start Date 26J UL11
Finish Date 05SEP13
Data Date 01APR13
Run Date 13APR13 10:09
Early Bar
Progress Bar
Critical Activity
PS19 FCEC UIProjects J V
W5J9JR-10-D-0005-0006 ANA Gardez
Project Management Layout
Sheet 25 of 38
Date Revision Checked Approved
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
2011 2012 2013J A S O N D J F M A M J J A S O N D J F M A M J J A S
-
7/30/2019 Updated Project Schedule
26/38
LA2-0011 LTB 111- Ext. Door installaion 5 5 40 19J AN13A 06APR13 12
LA2-0012 LTB 111- Ext. Painting of Stem Walls 15 15 30 26MAR13A 17APR13 26
Archi tectural - Interior
LA2-0014 LTB 111- Plaster for Steam Walls 7 0 100 18NOV12A 25NOV12A
LA2-0015 LTB 111- Spray Insulation 7 7 0 07APR13 14APR13 12
LA2-0016 LTB 111- Inst of gypsum Board Ceiling 6 6 0 15APR13 21APR13 39LA2-0017 LTB 111- Inst. of gypsum Board 10 10 0 15APR13 25APR13 12
LA2-0018 LTB 111- Int. Doors Installation 7 7 0 27APR13 04MAY13 12
LA2-0019 LTB 111- Tiles for floor 15 15 0 24APR13 11MAY13 39
Electrical
LA2-0020 LTB 111- Ele PVC Conduits/Fittings/Boxes 4 0 100 18FEB13A 21FEB13A
LA2-0021 LTB 111- Electrical Wiring Works 5 5 0 01APR13 06APR13 52
LA2-0022 LTB 111- Lighting Fix. & Cover Plates Inst. 2 2 0 22APR13 23APR13 39
LA2-0024 LTB 111- Panel Board Installation 6 6 0 20J UL13 25J UL13 -26LA2-0023 LTB 111- Duplex & Switch Inst. 2 2 0 09J UN13 10J UN13 12
Mechanical
LA2-0025 LTB 111- Exhaust Fan Installation 1 1 90 01MAR13A 18J UN13 5
LA2-0026 LTB 111- Unit Heater Installation 1 1 0 19J UN13 19J UN13 5
Plumbing
LA2-0027 LTB 111- Hot & Cold Water Piping 7 7 25 01DEC12A 09APR13 60
LA2-0029 LTB 111- Toilet Sanitry Fixture Inst. 7 7 10 01MAR13A 09APR13 65LA2-0028 LTB 111- Toilet & Misc. Accessories 4 4 0 10APR13 14APR13 60
Fire Protection System
LA2-0030 LTB 111- Fire Extinguisher Inst. 1 1 0 18J UN13 18J UN13 6
Inspections, Punchlists
LA2-0031 LTB 111- Test & Commission 2 2 0 27J UL13 28J UL13 -26
LA2-0032 LTB 111- Punchlist Works 5 5 0 29J UL13 03AUG13 -26
LA2-0033 LTB 111- Finishing & Handover 1 1 0 04AUG13 04AUG13 -26
Large Latrine #112
Foundations
LA3-0001 LTB 112- Layout 2 0 100 07APR12A 08APR12A
LA3-0002 LTB 112- Excavation Work 5 0 100 11APR12A 16APR12A
LA3-0003 LTB 112- Watering, Backfilling & Compaction 5 0 100 21APR12A 25APR12A
LA3-0004 LTB 112- Foundation & Ring Beam Works 15 0 100 12MAY12A 11J UN12A
LA3-0005 LTB 112- BKFLNG, CMPCTN, CAP. & Vap. Barriers 9 0 100 12J UN12A 21J UN12A
Primavera Systems, Inc.
Start Date 26J UL11
Finish Date 05SEP13
Data Date 01APR13
Run Date 13APR13 10:09
Early Bar
Progress Bar
Critical Activity
PS19 FCEC UIProjects J V
W5J9JR-10-D-0005-0006 ANA Gardez
Project Management Layout
Sheet 26 of 38
Date Revision Checked Approved
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
2011 2012 2013J A S O N D J F M A M J J A S O N D J F M A M J J A S
-
7/30/2019 Updated Project Schedule
27/38
LA3-0006 LTB 112- Formwork & RFT for Slab on Grade 12 0 100 23J UN12A 05J UL12A
LA3-0007 LTB 112- Concrete Works for Slab on Grade 8 0 100 07J UL12A 18SEP12A
Superstructure & Close-in
LA3-0008 LTB 112- Inst. of Steel Bar for Stem Walls 12 0 100 25J UN12A 10J UL12A
LA3-0009 LTB 112- Concrete Stem Walls 12 0 100 11J UL12A 02OCT12A
LA3-0010 LTB 112- Installation of K Span 15 0 100 02OCT12A 09OCT12A
Archi tectural - Exter ior
LA3-0011 LTB 112- Ext. Door Installaion 8 8 50 17DEC12A 08APR13 29
LA3-0012 LTB 112- Ext. Painting of Stem Walls 15 15 60 17DEC12A 17APR13 29
LA3-0013 LTB 112- Windows Installation 9 0 100 25DEC12A 04FEB13A
Archi tectural - Interior
LA3-0014 LTB 112- Plaster for Steam Walls 10 0 100 10NOV12A 20NOV12A
LA3-0015 LTB 112- Spray Insulation 7 7 0 09APR13 15APR13 29LA3-0016 LTB 112- Inst. of gypsum Board ceiling 7 7 0 16APR13 22APR13 29
LA3-0017 LTB 112- Inst. of gypsum Board 15 15 0 23APR13 07MAY13 29
LA3-0019 LTB 112- Tiles for floor 10 10 0 27APR13 07MAY13 42
LA3-0018 LTB 112- Interior Doors Inst. 12 12 0 08MAY13 21MAY13 25
Electrical
LA3-0020 LTB 112- Ele PVC Conduits/Fittings/Boxes 4 0 100 17FEB13A 20FEB13A
LA3-0021 LTB 112- Electrical Wiring Works 5 5 0 01APR13 06APR13 56
LA3-0022 LTB 112- Lighting Fix. & Cover Plates Inst. 3 3 0 23APR13 25APR13 42LA3-0023 LTB 112- Duplex & Switch Inst. 2 2 0 22MAY13 23MAY13 25
LA3-0024 LTB 112- Panel Board Inst. 3 3 0 20J UL13 22J UL13 -23
Mechanical
LA3-0025 LTB 112- Exhaust Fan Inst. 1 1 80 01MAR13A 18J UN13 2
LA3-0026 LTB 112- Unit Heater Inst. 1 1 0 19J UN13 19J UN13 2
Plumbing
LA3-0027 LTB 112- Hot & Cold Water Piping 7 7 50 01DEC12A 09APR13 57LA3-0029 LTB 112- Toilet Sanitry Fixture Inst. 7 7 10 01MAR13A 09APR13 62
LA3-0028 LTB 112- Toilet & Misc. Accessories 4 4 0 10APR13 14APR13 57
Fire Protection System
LA3-0030 LTB 112- Fire Extinguisher Inst. 1 1 0 19J UN13 19J UN13 5
Inspections, Punchlists
LA3-0031 LTB 112- Test & Commission 2 2 0 23J UL13 24J UL13 -23
Primavera Systems, Inc.
Start Date 26J UL11
Finish Date 05SEP13
Data Date 01APR13
Run Date 13APR13 10:09
Early Bar
Progress Bar
Critical Activity
PS19 FCEC UIProjects J V
W5J9JR-10-D-0005-0006 ANA Gardez
Project Management Layout
Sheet 27 of 38
Date Revision Checked Approved
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
LA3 0032 LTB 112 P hli tW k 5 5 0 25J UL13 30J UL13 23
2011 2012 2013J A S O N D J F M A M J J A S O N D J F M A M J J A S
-
7/30/2019 Updated Project Schedule
28/38
LA3-0032 LTB 112- Punchlist Works 5 5 0 25J UL13 30J UL13 -23
LA3-0033 LTB 112- Finishing & Handover 1 1 0 31J UL13 31J UL13 -23
Large Latrine #113
Foundations
L4-0001 LTB 113- Layout 1 0 100 07APR12A 07APR12A
L4-0002 LTB 113- Excavation Work 5 0 100 11APR12A 16APR12A
L4-0003 LTB 113- Watering, Backfilling & Compaction 5 0 100 17APR12A 22APR12A
L4-0004 LTB 113- Foundation & Ring Beam Works 12 0 100 01MAY12A 20MAY12A
L4-0005 LTB 113- BKFLNG, CMPCTN, CAP. & Vap. Barriers 9 0 100 21MAY12A 02J UN12A
L4-0006 LTB 113- Formwork & RFT for Slab on Grade 12 0 100 03J UN12A 23J UN12A
L4-0007 LTB 113- Concrete for Slab on Grade 12 0 100 24J UN12A 08J UL12A
Superstructure & Close-in
L4-0008 LTB 113- Inst. of Steel Bar for Steam Walls 10 0 100 30J UN12A 10J UL12A
L4-0009 LTB 113- Inst. of Concrete Steam Walls 12 0 100 11J UL12A 09DEC12AL4-0010 LTB 113- Installation of K Span 15 0 100 02DEC12A 06DEC12A
Archi tectural - Exter ior
L4-0011 LTB 113- Exterior Door Inst. 6 6 40 26DEC12A 07APR13 64
L4-0013 LTB 113- Windows Installation 12 0 100 01J AN13A 09FEB13A
L4-0012 LTB 113- Ext. Painting of Stem Walls 14 14 60 20MAR13A 16APR13 49
Archi tectural - Interior
L4-0014 LTB 113- Plaster Work for Steam Walls 7 7 20 10J AN13A 08APR13 19
L4-0015 LTB 113- Spray Insulation 7 7 0 09APR13 16APR13 19
L4-0016 LTB 113- Inst. of gypsum Board Ceiling 10 10 0 17APR13 28APR13 19
L4-0017 LTB 113- Inst. of gypsum Board 14 14 0 17APR13 02MAY13 35
L4-0019 LTB 113- Tiles for floor 10 10 0 01MAY13 12MAY13 19
L4-0018 LTB 113- Int. Doors Installation 15 15 0 04MAY13 20MAY13 35
Electrical
L4-0020 LTB 113- Ele PVC Conduits/Fittings/Boxes 4 0 100 26FEB13A 02MAR13A
L4-0021 LTB 113- Electrical Wiring Works 5 5 0 01APR13 06APR13 39L4-0022 LTB 113- Lighting Fix. & Cover Plates Inst 2 2 0 29APR13 30APR13 19
L4-0023 LTB 113- Duplex & Switch Inst. 5 5 0 04MAY13 08MAY13 35
L4-0024 LTB 113- Panel Board Inst. 3 3 0 20J UL13 22J UL13 -24
Mechanical
L4-0025 LTB 113- Exhaust Fan Inst. 2 2 90 27MAR13A 19J UN13 -1
L4-0026 LTB 113- Unit Heater Inst. 2 2 0 20J UN13 22J UN13 -1
Primavera Systems, Inc.
Start Date 26J UL11
Finish Date 05SEP13
Data Date 01APR13
Run Date 13APR13 10:09
Early Bar
Progress Bar
Critical Activity
PS19 FCEC UIProjects J V
W5J9JR-10-D-0005-0006 ANA Gardez
Project Management Layout
Sheet 28 of 38
Date Revision Checked Approved
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
Pl bi
2011 2012 2013J A S O N D J F M A M J J A S O N D J F M A M J J A S
-
7/30/2019 Updated Project Schedule
29/38
Plumbing
L4-0029 LTB 113- Toilet Sanitry Fixture Inst. 9 9 10 01MAR13A 10APR13 61
L4-0027 LTB 113- Hot & Cold Water Piping 7 7 0 13MAY13 20MAY13 19
L4-0028 LTB 113- Toilet & Misc. Accessories 4 4 0 21MAY13 25MAY13 19
Fire Protection System
L4-0030 LTB 113- Fire Extinguisher Inst. 2 2 0 23J UN13 24J UN13 1
Inspections, Punchlists
L4-0031 LTB 113- Test & Commission 2 2 0 23J UL13 24J UL13 -23
L4-0032 LTB 113- Punchlist Works 5 5 0 25J UL13 30J UL13 -23
L4-0033 LTB 113- Finishing & Handover 1 1 0 31J UL13 31J UL13 -23
Large Latrine #114
Foundations
LA5-0001 LTB 114- Layout 1 0 100 08APR12A 08APR12A
LA5-0002 LTB 114- Excavation Work 5 0 100 14APR12A 19APR12A
LA5-0003 LTB 114- Watering, Backfilling & Compaction 5 0 100 21APR12A 26APR12A
LA5-0004 LTB 114- Foundation & Ring Beam Works 12 0 100 28APR12A 10MAY12A
LA5-0005 LTB 114- BKFLNG, CMPCTN, CAP. & Vap. Barriers 9 0 100 12MAY12A 21MAY12A
LA5-0006 LTB 114- Formwork & RFT for Slab on Grade 12 0 100 22MAY12A 05J UN12A
LA5-0007 LTB 114- Concrete for Slab on Grade 4 0 100 06J UN12A 11J UN12A
Superstructure & Close-in
LA5-0008 LTB 114- Inst. Steel Bar for Stem Walls 4 0 100 16J UN12A 09SEP12A
LA5-0009 LTB 114- Concrete for Stem Walls 8 0 100 11J UL12A 18SEP12A
LA5-0010 LTB 114- Installation of K Span 15 0 100 15AUG12A 26SEP12A
Archi tectural - Exter ior
LA5-0011 LTB 114- Ext. Door Installaion 15 15 40 18DEC12A 17APR13 8
LA5-0013 LTB 114- Windows Installation 15 0 100 05J AN13A 09FEB13A
LA5-0012 LTB 114- Ext. Painting of Stem Walls 18 18 0 27APR13 16MAY13 26
Archi tectural - Interior
LA5-0014 LTB 114- Plaster Work for Stem Walls 7 0 100 10OCT12A 17OCT12A
LA5-0015 LTB 114- Spray Insulation 7 7 0 18APR13 25APR13 8
LA5-0016 LTB 114- Inst. of gypsum Board Ceiling 6 6 0 27APR13 02MAY13 8
LA5-0017 LTB 114- Inst. of gypsum Board 15 15 0 27APR13 13MAY13 29
LA5-0018 LTB 114- Int. Doors Installation 10 10 0 18MAY13 28MAY13 26
LA5-0019 LTB 114- Tiles for Floor 15 15 0 12MAY13 28MAY13 8
Primavera Systems, Inc.
Start Date 26J UL11
Finish Date 05SEP13
Data Date 01APR13
Run Date 13APR13 10:09
Early Bar
Progress Bar
Critical Activity
PS19 FCEC UIProjects J V
W5J9JR-10-D-0005-0006 ANA Gardez
Project Management Layout
Sheet 29 of 38
Date Revision Checked Approved
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
Electrical
2011 2012 2013J A S O N D J F M A M J J A S O N D J F M A M J J A S
-
7/30/2019 Updated Project Schedule
30/38
Electrical
LA5-0020 LTB 114- Ele PVC Conduits/Fittings/Boxes 4 0 100 18FEB13A 21FEB13A
LA5-0021 LTB 114- Electrical Wiring Works 5 5 0 01APR13 06APR13 31
LA5-0022 LTB 114- Lighting Fix. & Cover Plates Inst. 3 3 0 04MAY13 06MAY13 8
LA5-0023 LTB 114- Duplex & Switch Inst. 5 5 0 20MAY13 25MAY13 26
LA5-0024 LTB 114- Panel Board Inst. 3 3 0 20J UL13 22J UL13 -24
Mechanical
LA5-0025 LTB 114- Exhaust Fan Inst. 1 1 90 28MAR13A 18J UN13 2
LA5-0026 LTB 114- Unit Heater Inst. 1 1 0 18J UN13 18J UN13 2
Plumbing
LA5-0028 LTB 114- Toilet & Misc. Accessories 5 5 10 01MAR13A 06APR13 64
LA5-0027 LTB 114- Hot & Cold Water Piping 7 7 0 29MAY13 05J UN13 8
LA5-0029 LTB 114- Toilet Sanitry Fixture Inst. 4 4 0 06J UN13 10J UN13 8
Fire Protection System
LA5-0030 LTB 114- Fire Extinguisher Inst. 1 1 0 19J UN13 19J UN13 5
Inspections, Punchlists
LA5-0031 LTB 114- Test & Commission 2 2 0 23J UL13 24J UL13 -23
LA5-0032 LTB 114- Punchlist Works 5 5 0 25J UL13 30J UL13 -23
LA5-0033 LTB 114- Finishing & Handover 1 1 0 31J UL13 31J UL13 -23
Large Latrine #115
Foundations
LA6-0001 LTB 115- Layout 1 0 100 09APR12A 09APR12A
LA6-0002 LTB 115- Excavation Work 5 0 100 14APR12A 19APR12A
LA6-0003 LTB 115- Watering, Backfilling & Compaction 5 0 100 21APR12A 25APR12A
LA6-0004 LTB 115- Foundation & Ring Beam 12 0 100 26APR12A 10MAY12A
LA6-0005 LTB 115- BKFLNG, CMPCTN, CAP. & Vap. Barriers 9 0 100 12MAY12A 24MAY12A
LA6-0006 LTB 115- Formwork & RFT for Slab on Grade 12 0 100 26MAY12A 10J UN12A
LA6-0007 LTB 115- Concrete for Slab on Grade 4 0 100 11J UN12A 16J UN12A
Superstructure & Close-in
LA6-0008 LTB 115- Inst. of Steel Bar for Stem Walls 4 0 100 20J UN12A 25J UN12A
LA6-0009 LTB 115- Concrete Stem Walls 8 0 100 26J UN12A 19J AN13A
LA6-0010 LTB 115- Installation of K Span 15 0 100 27NOV12A 05DEC12A
Archi tectural - Exter ior
LA6-0013 LTB 115- Windows Installation 10 0 100 05J AN13A 09FEB13A
Primavera Systems, Inc.
Start Date 26J UL11
Finish Date 05SEP13
Data Date 01APR13
Run Date 13APR13 10:10
Early Bar
Progress Bar
Critical Activity
PS19 FCEC UIProjects J V
W5J9JR-10-D-0005-0006 ANA Gardez
Project Management Layout
Sheet 30 of 38
Date Revision Checked Approved
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
LA6-0011 LTB 115- Ext. Door Installaion 15 15 40 05J AN13A 17APR13 11
2011 2012 2013J A S O N D J F M A M J J A S O N D J F M A M J J A S
-
7/30/2019 Updated Project Schedule
31/38
LA6 0011 LTB 115 Ext. Door Installaion 15 15 40 05J AN13A 17APR13 11
LA6-0012 LTB 115- Ext. Painting of Steam Walls 15 15 20 21MAR13A 17APR13 27
Archi tectural - Interior
LA6-0014 LTB 115- Plaster for Stem Walls 7 0 100 18MAR13A 25MAR13A
LA6-0015 LTB 115- Spray Insulation 7 7 0 18APR13 25APR13 11
LA6-0016 LTB 115- Inst. of gypsum Board Ceiling 6 6 0 27APR13 02MAY13 11LA6-0017 LTB 115- Inst. of gypsum Board 14 14 0 27APR13 12MAY13 23
LA6-0018 LTB 115- Int. Doors Installation 10 10 0 13MAY13 23MAY13 23
LA6-0019 LTB 115- Tiles for Floor 15 15 0 07MAY13 23MAY13 11
Electrical
LA6-0020 LTB 115- Ele PVC Conduits/Fittings/Boxes 4 0 100 26FEB13A 20MAR13A
LA6-0021 LTB 115- Electrical Wiring Works 5 5 0 01APR13 06APR13 34
LA6-0022 LTB 115- Lighting Fix. & Cover Plates Inst. 3 3 0 04MAY13 06MAY13 11
LA6-0023 LTB 115- Duplex & Switch Inst. 4 4 0 20MAY13 23MAY13 23LA6-0024 LTB 115- Panel Board Installation 3 3 0 20J UL13 22J UL13 -24
Mechanical
LA6-0025 LTB 115- Exhaust Fan Installation 1 1 90 26MAR13A 18J UN13 2
LA6-0026 LTB 115- Unit Heater Installation 1 1 0 18J UN13 18J UN13 2
Plumbing
LA6-0027 LTB 115- Hot & Cold Water Piping 7 7 0 25MAY13 01J UN13 11
LA6-0029 LTB 115- Toilet Sanitry Fixture Inst. 4 4 0 02J UN13 05J UN13 12LA6-0028 LTB 115- Toilet & Misc. Accessories 5 5 0 02J UN13 06J UN13 11
Fire Protection System
LA6-0030 LTB 115- Fire Extinguisher Inst. 1 1 0 19J UN13 19J UN13 5
Inspections, Punchlists
LA6-0031 LTB 115- Test & Commission 2 2 0 23J UL13 24J UL13 -23
LA6-0032 LTB 115- Punchlist Works 5 5 0 25J UL13 30J UL13 -23
LA6-0033 LTB 115- Finishing & Handover 1 1 0 31J UL13 31J UL13 -23
MWR Building #105D
Foundations
MWR-0001 MWR 105D- Layout 1 0 100 01APR12A 01APR12A
MWR-0002 MWR 105D- Excavation Work 3 0 100 02APR12A 04APR12A
MWR-0003 MWR 105D- Watering, Backfilling & Compaction 4 0 100 05APR12A 09APR12A
MWR-0004 MWR 105D- Foundation & Ring Beam 8 0 100 14APR12A 25APR12A
MWR-0005 MWR 105D- BKFLNG, CMPCTN, CAP. & Vap. Barriers 8 0 100 10J UN12A 18J UN12A
Primavera Systems, Inc.
Start Date 26J UL11
Finish Date 05SEP13
Data Date 01APR13
Run Date 13APR13 10:10
Early Bar
Progress Bar
Critical Activity
PS19 FCEC UIProjects J V
W5J9JR-10-D-0005-0006 ANA Gardez
Project Management Layout
Sheet 31 of 38
Date Revision Checked Approved
Activity
ID
Activity
Description
Orig
Dur
Rem
Dur
% Early
Start
Early
Finish
Total
Float
MWR-0006 MWR 105D- Formwork & RFT for Slab on Grade 10 0 100 19J UN12A 30J UN12A
2011 2012 2013J A S O N D J F M A M J J A S O N D J F M A M J J A S
-
7/30/2019 Updated Project Schedule
32/38
J J
MWR-0007 MWR 105D- Concrete for Slab on Grade 7 0 100 01J UL12A 08J UL12A
Superstructure & Close-in
MWR-0008 MWR 105D- Inst. of Steel Bar for Stem Walls 6 0 100 09J UL12A 25SEP12A
MWR-0009 MWR 105D- Inst of Concrete Stem Walls 9 0 100 26SEP12A 19NOV12A
MWR-0010 MWR 105D- Installation of K Span 13 0 100 03OCT12A 24NOV12AArchi tectural - Exter ior
MWR-0011 MWR 105D- Ext. Door Installation 9 9 90 14FEB13A 15APR13 44
MWR-0012 MWR 105D- Ext. Painting of Stem Walls 16 16 90 14FEB13A 23APR13 43
MWR-0013 MWR 105D- Windows Installation 6 6 50 25FEB13A 22APR13 44
Archi tectural - Interior
MWR-0014 MWR 105D- Plaster Work for Stem Walls 6 0 100 20NOV12A 26NOV12A
MWR-0015 MWR 105D- Spray Insulation 4 4 25 25NOV12A 04APR13 43MWR-0016 MWR 105D- Fence Installation 9 9 0 06APR13 15APR13 47
DPW-0018 MWR 105D- Int. Doors Installation 6 6 0 24APR13 30APR13 43
MWR-0019 MWR 105D- Sealed Concrete for Floor 4 4 0 30APR13 04MAY13 46
Electrical
MWR-0020 MWR 105D- Ele PVC Conduits/Fittings/Boxes 8 0 100 14FEB13A 23FEB13A
MW