environment, Safety, QUality and energymanagement policy
3
being an innovative company, voestalpine Schienengmbh is committed to the highest principles of environ-ment, quality, safety and energy. in order to take thesematters into account and to guarantee their day-to-dayimplementation to a high standard, the integrated management system has to fulfil the requirements of iSo 9001 and iSo 14001, the regulations of the emaS ordinance, the standard ohSaS 18001 and iSo 50001. as from may 2017, these have formed binding guidelinesin the areas of environment, quality, safety and energy.
Quality for uS meanS meetinG » requirements and expectations of internal and external customers and suppliers» market requirements, especially just in time deliveries of ultra-long head hardened rails that are ready to be installed» the development, production and supply of products and services which comply with customer demands and expectations.
environmental protection and enerGy for uS meanS » the continuous reduction of environmental impact» the compliance with relevant statutory environmental requirements» the consideration of environmental impacts of development, production, supply and recycling of our products» the avoidance of accidentally caused emissions and continuous control in compliance with environmental policy and its objectives» open communication with the public, customers, suppliers and authorities» that contracting parties working at our premises meet our environmental regulations
» the best possible protection of resources» continuous improvement of energy efficiency» making the best possible use of existing energy.
Safety for uS meanS » the compliance with applicable industrial safety laws and other requirements that the company is obliged to meet» the maintenance of our employees' health by means of active prevention measures and activities for healthy people» the open communication with employees, interested parties and authorities» the continuous development and implementation of measures for accident prevention: prevention of work-related diseases and promotion of health» the continuous improvement of occupational safety and health» the continuous hazard determination, risk assessment and risk control of hazards for employees and third parties» the obligation of all employees and contracting parties to comply with the occupational safety and health regulations and to actively cooperate in their implementation» age-based working is a permanent objective.
Quality, environmental protection, energy, occupational safety and health are equally importantcompany objectives for us. the sense of responsibility for environment, quality, safety and health is encouraged in each employee by means of the "continuous improvement process" and consolidated by advanced training measures. management monitorsand regularly assesses the effectiveness of the integrated management system.
management policy voestalpine Schienen gmbh
dr. eva aigner di frederick Kübler di martin reicher di dietmar Weiss
4
organiZational chart voestalpine Schienen gmbh
purchasing
leeb (pU)
fB
legaldepartmentgrübler (pU)
fr
controlling *
Sorgmann
fc
financedepartment
Zmölnig (pU)
ff
Human resources
Kutschi
fp
it-management
rath
fi
managementaccounting & reportingZirbisegger
fc 1
Balancestaxes
Zmölnig (pU)
Hr competence
centerKutschi (pU)
measures & performancecontrolling
plank
treasury / ac-counts / receiva-
ble payablegruber
personnel- &organisationaldevelopmentdel negro (pU)
asset management
harler
Hr-Services
Kutschi (pU)
Works council
ang arb
ff 1 fp 1
fc 2 ff 2 fp 2
ff 3 fp 3
fp r
f / aiGner
* incl. risk managementStatus: 1 may 2018
dr. eva aigner
5
communication
galler (pU)
KK
Sales
Jungwirth
Kv
Strategicmarketing
platzer
Km
product-management
Jörg
Kp
production
reicher (pU)
tp
technology
reicher (pU)
tQ
anlagen-management
Zorn
ta
logistic
mader (pU)
Bl
Service
Weiss (pU)
BS
order processing &Ship logistic
eder
Sales-depart-ment Kv 1
girsch
rolling mill
Windisch
testing & inspection
Qu-statisticsStruzl
Systems engineering
electricoberpichler
Shipping &customs Handling
huber
competencecenter
WeldingZlatnik
Sales Service
fuchs
Sales-depart-ment Kv 2
Strouhal
finishing mill
mader
research & development
brantner
Systems engineeringmechanicsWeichbold
Special logistics
baier
technical customer
ServiceJörg (pU)
Sales-depart-ment Kv 3
pesec
rolling technology
pernsteiner
Heat treatmenttechnology
perner
plant projects
reichmann
industrial accountancy
brandl
Sales-depart-ment Kv 4
pichler
maintenance
Zorn (pU)
Sales-depart-ment Kv 5
liberge
production planning & Schedulinglempradl
Kv i Kv 1 tp 1 tQ 1 ta 1 Bl 1 BS 1
Kv 5 Kv 2 tp 2 tQ 2 ta 2 Bl 2
Kv t Kv 3 tp 3 tQ 3 ta 3
t-BW
Kv 4 tp 4
Kv 5 tp 5
management-systems **
rauscher
occupationalSafety
friese
t-mS t-Si
K / KüBler t / reicHer B / WeiSS
** environment, Quality, energy, Safety
di frederick Kübler di martin reicher di dietmar Weiss
6
input
oils, lubricants, and chemicalsnatural gaselectricitycompressed air hot water oxygendrinking water pure water cooling Water
output
ScaleScraphazardous wastenon-hazardous wastenoX
co2
coprocess waste water
Key figUreS
the following figures refer to one ton of produced rails, input stock and permanent way profiles (total output 545,497 t).
Quantity
110,009274,278
43,51029,039,257
13,7715,842
68,7242,024,789
85,204
Quantity
4,18931,703
401,7701,858,381
22,58748,947,000
10,8802,109,993
unit
kgmWhmWh
m³mWh
m³m³m³m³
unit
tt
kgkgkgkgkgm³
2017/2018
0.20170.50280.0798
53.23450.02520.01070.12603.71180.1562
2017/2018
7.679258.1176
0.73653.40680.0414
89.72920.01993.8680
2016/2017
0.06730.48860.0832
51.24340.01840.02420.12773.78180.0648
2016/2017
10.272156.6699
1.13433.36380.0446
87.13920.02573.8466
2015/2016
0.37250.49980.0769
46.61720.01170.00540.11964.20900.0050
2015/2016
8.901458.3177
0.94302.14830.1093
88.42390.03074.2140
Unit
kgmWhmWhm³mWhm³m³m³m³
Unit
kgkgkgkgkgkgkgm³
7
8
compariSonWaSte management
Key number G description 2016/2017 in kg 2017/2018 in kg
17201 not contaminated wood packaging and timber waste 14,870 28,14017209 g Wood, impregnated with tar oil 0 017213 g Wooden packaging contaminated 107,780 127,34018718 Waste paper, board and paper, uncoated 9,245 16,25031103 Waste from furnace cleaning (from metallurgical processes) 0 23,78031111 Steelworks and foundry debris 10,240 031405 glass fibre mat 1,660 7,68031409 building rubble (no construction site trash) 9,340 9,94031411 Spoil with background contamination 963,550 031414 fireclay 139,000 225,95031416 mineral fiber (glas, mineral wool) 120 18,60031424 other contaminated soil 389,050 1,123,85031427 concrete rubble 28,000 226,95031434 Used filters and absorbents 0 031440 g blasting material waste 4,160 031444 abrasives 5,088 10,45531468 White glass (glass packaging) 73 031489 moulds and casting sands 9,819 4,00031614 Sludge from iron works 11,600 035102 g Scale and hammer waste products, hazardous 0 3,00035103 iron and steel waste contaminated 112,659 8,20035103 g contaminated iron and steel waste, hazardous 42,220 54,38035105 ferrous metal packaging and containers 1,890 6,89535106 g ferrous metal packaging with residual content 29,686 11,07635201 g electrical & electronic devices with environment-relevant quantities of hazardous parts 1,780 035202 electrical and electronic device parts 0 035205 g cooling and ac machines with coolants containing cfcs and fcs 544 1,71435206 g air conditioning machines with other coolants 0 035212 g visual display units including cathode ray 28 035220 g old electrical and electronic equipment 0 035230 g old electrical and electronic equipment, small 4,112 6,95035231 old electrical and electronic equipment, small 0 035314 cables 3,316 5,65635315 non-ferrous metal scrap 200 23535322 g lead batteries 0 035338 g batteries, unsorted 27 2535339 g fluorescent lamps 70 38452725 g other watery concentrates 206,990 054102 g Used oil 22,556 1,440
g = gefährlicher abfall = hazardous waste
9
Key number G description 2016/2017 in kg 2017/2018 in kg
54201 g oil gatch 140 5,52054202 g fats 19,986 2,51054401 g Synthetic coolants and lubricants 34,320 60,70054402 g drilling and grinding emulsions 4,630 054408 g other oil-water mixtures 84,200 85,88054702 g oil separator contents 5,520 10,12054912 bitumen, asphalt 0 95,10054926 g Used oil binding materials 5,360 1,74054929 g oil containers 198 054930 g Solid grease & oil contaminated materials (waste from garages, production facilities & petrol stations) 24,450 27,31355502 g Used varnishes, paint, if solvent 0 055509 printing ink residues, copier toners 98 055513 old paint, old dye hardened 0 24057127 g plastic packaging with hazardous residue 2,008 059305 g laboratory waste and chemical residues 24 9059803 g Spray cans with residual content 1,495 1,58891101 domestic waste and domestic waste-like waste 42,037 34,12091201 packing material and board boxes 3,585 55091207 light fraction from packaging collection 8,850 9,25091401 bulk waste 21,765 2,54092105 trees and shrubbery cuttings 0 0
total 2,388,339 2,260,151
Hazardous waste G 602,284 401,770non-hazardous waste 1,786,055 1,858,381
interim storage:31427 concrete rubble 28,000 031614 Sludge from iron works 0 15,100
internal utilization:35103 iron and steel waste contaminated 211,600 15,40035102 Scale and hammer waste products, mill scale 8,791,500 11,876,850
Sales:35102 Scale and hammer waste products, mill scale 1,262,100 2,97535103 iron and steel waste contaminated 0 239,200 17202 construction timber and demolition wood 0 90,250
10
material balance – inpUtQUantitieS 2017/2018
Quantities unit
raw materials:Steel blooms for rails and permanent way material 581,334 t
auxiliary and operating media:oils and lubricants 110,009 kgmetal rolls 933 trefractory products 2 tacetylene (gas) 1,576 m³packing material 29,640 kgWood 1,941 m³
energy sources:heating oil 4,030 lcoke 0 kgpetrol 1,323 ldiesel 27,487 lnatural gas 274,278 mWhelectricity 43,510 mWhcompressed air 29,039,257 m³oxygen 5,842 m³
Water:hot water 13,771 mWh drinking water 68,724 m³cooling water 85,204 m³pure water 2,024,789 m³
11
material balance – oUtpUtQUantitieS 2017/2018
Quantities unit
rails, input stock and superstructure profiles 545,497 tScale 4,189 tScrap incl. plant scrap 31,703 tSamples rolls 853 t
non-hazardous waste 1,858,381 kg
Hazardous waste 401,770 kg
nox 22,587 kgco2 48,947 tco 10,880 kgprocess waste water 2,109,993 m³
12
developmentShipping volUmeS
development of shipping volumes and type of shipment: rails (in tons) of business years 2013/2014 to 2017/2018
600,000
550,000
500,000
450,000
400,000
350,000
300,000
250,000
200,000
150,000
100,000
50,000
02014 – 2015
572,455
2015 – 2016
582,879
2013 – 2014
520,027
2016 – 2017
546,398
truck
via railway to ship
railway
7.20 %
11.67 %
81.13 %
551,206
2017 – 2018
13
continUoUSimprovement program (cip)
n proposals submitted in the context of the cipn cost saving in €
each of the 700 employees of our company participates,as a member of a group, in the continuous improvementprogram. this process was introduced in 1996. the groupsmeet regularly at their place of work so that they can present and implement their ideas and improvement suggestions in familiar surroundings. if these ideas are successfully implemented, the employees are rewarded within the framework of the employee suggestions system.
each group includes a trained speaker and is supported by coaches in order to ensure quick implementation. in addition, the employee suggestion system makes sure that all employees are involved in the active implementation of environmental objectives. in this manner the company has set up an important forum for ideas for ecological and economic development.
2,500
2,000
1,500
1,000
500
02013 – 2014 2014 – 2015 2015 – 2016
1,814
2016 – 2017
2,500,000
2,000,000
1,500,000
1,000,000
500,000
0
1,555,000
1,2851,343,000
1,033
2,100,000
1,367 1,255,000
2017 – 2018
1,6091,470,500
14
teammanagement SyStemS
di peter friese
Stefanie Werschonig
ing. hermann rauscher
Kerstin egger
ing. herwig otto
ing. andreas Schmidt
ing. mario radischnig
15
the best performers out of 16,000 suppliers were awarded in 16 different categories by the ecovadis platform.
Since 2007 the voestalpine Schienen gmbh has been taking part annually in the analysis of ecovadis and has always been counting to the topperformers in the last years. this brings additionalcompetitive advantages among our customers, e.g. Sncf (french national railway) and db (german railway), who also focus more and more on environment and sustainability.
We won this award due to our constant efforts tocontinuously improve in the areas of environmentand sustainability.
ecovadiSaWardthe voestalpine Schienen GmbH has beenawarded Sustainability leadership award by the ecovadis platform in the category Best performer in Heavy manufacturing.
award ceremony in paris during the Sustain 2018,third and fourth from left: Stefanie Werschonig and hermann rauscher / management systems voestalpine Schienen gmbh
16
corporate targetS
corporate targetS Safety
customers / market
StaffQuality
environment / energy
research & development
production
costsStorage quantityinvestment program
agenda item
Safetycustomers / market
Qualityenvironment / energy
research & development
production
costsStorage quantityinvestment program
Staff qualificationStaff satisfaction
agenda item S
17
2017 / 2018 Staff
2018 / 2019» reduce ltifr (lost time injury frequency rate) from 16 to 13» implementation of the defined occupational safety investment program» minimum sales quantity 540,000 t» revenue increase in order to compensate the increased steel costs» implementation of market launch concepts for new rail grades» target-oriented, deepening staff training » implementation of measures out of maZe 2016 and t-mag 2018» certification management systems according to iSo 45001:2018 / optimization management systems according to iSo 9001» Specific energy consumption minus 1 % for vignol rails» environment management system iSo 14001; emaS: expansion by epd certificate (environmental product declaration)» completion of Xr2 project with fixation of a railtrack test» closing of the project optimization temperature measurings» continuation of evidence of railtrack performance for flawless rail grades» output increase from 93.8% to 94.0% » further increase of specific shift performance» implementation of measures out of "100-points-program" for technological, procedural and planning-oriented process improvements, entire implementation tpm» fulfillment of the ambitious cost optimization programs cip and f3» average stock level in the finished goods store 25,700 t» time and cost-effective implementation of the investment program, among others:» completion of reinforcement of Ultra flexible rail mill » enlargement of testing center building» performance optimization Sbl2 » installment of a new testing technology to detect longitudinal cracks (emat)
target
» reduce ltifr (lost time injury frequency rate) from 19.6 to 16 yeS» minimum sales quantity 530,000 to yeS» revenue stabilization with ebit = 6 % of turnover no» certification of management system according to iSo 9001:2015 yeS» Specific energy consumption minus 1.5 % for vignol rails no» certification of the environmental management system according to iSo 14001:2015 yeS» Start of two rail tests with new grades yeS» development of grades according to target products portfolio for three strategic fields of business yeS» optimization of temperature measurements in production process no» output increase from 93.7 to 93.8 % no» net production and shipment: 530,000 tons with 15-18 shifts yeS partially» enrolement and increase of tpm-operations to the whole machinery tp1 yeS / tp2 no» Strict compliance with cost optimized budget rules yeS» determination and compliance with optimized storage quantities per length range and profile group no» deadline and cost-related implementation of the investment program, among others:» framewear strengthening no / Storage of utilities yeS partially» occupational safety topics yeS / pre-project saw-drilling line ii yeS / pre-project ultrasonic device new no » execution of the planned training program yeS» derivation of an action plan based on staff satisfaction survey 2016 yeS
target Status
18
emaSenvironmental eXpertiSe
the managing emaS environmental experts authorised to sign, dipl. ing. christian reznerof the environmental expert organizationtüv Süd landesgesellschaft Österreich GmbHcampus 21, europaring a04301, a-2345 Businesspark Wien Süd registration number at-v-0003
confirm the inspection, that the site or the entire organization, respectively, as stated in the environmental declaration of the organization
voestalpine Schienen GmbHKerpelystraße 199, a-8700 leobenwith registration number at-000183
fulfils all requirements of the regulation (ec) no. 1221/2009 of the european parliament and of the council of 25 november 2009 on the voluntary participation by organizations in a community eco-management and audit scheme (emaS).
With the signature of this declaration, we confirm that» assessment and validation were performed in full compliance with the requirements of regulation (ec) no. 1221/2009,» the results of assessment and validation confirm that there is no evidence for non-compliance with applicable environmental regulations,» the data and statements of the environmental declaration of the organization/the site provide a reliable, credible and true image of any activities of the organization or the site, respectively, within the area stated in the environmental declaration.
the environmental expert organization tÜv SÜd landesgesellschaft Österreich gmbh has been authorised for the c24.10-0 (nace-code 2008) via notification by the federal ministry of agriculture,forestry, environment and Water management.
leoben, may 28, 2018
the managing environmental experts authorised to sign of tÜv SÜd landesgesellschaft Österreich gmbh, campus 21, europaring a04301, a-2345 businesspark Wien Süd, austria
this site operates an environmental management system and its environmental performance is reported to the public in accordance with the community eco management and audit scheme on the industrial environmental protection of this site (reg. no. at-000183).
19
ing. hermann rauscher environmental officer
voestalpine Schienen gmbhKerpelystraße 199, 8700 leoben, austria phone: +43 50304-26-3473telefax: +43 [email protected]/schienen
our environmental officer, hermann rauscher, would be delighted to provide you with moredetailed information regarding thelatest environmental statement, the environmental objectives of the company and environmentalmeasures taken so far.
imprintcopyright owner & publisher: voestalpine Schienen gmbh8700 leoben, Kerpelystraße 199
responsible for content:board of management of voestalpine Schienen gmbh
concept and design: buero zwo design und kommunikations-gmbh8605 Kapfenberg, Koloman-Wallisch-platz 1phone: +43 03862-26800
voestalpine Schienen GmbHKerpelystraße 1998700 leoben, austria t. +43/50304/26-0f. +43/50304/66-4954www.voestalpine.com/schienen
SuStainaBly printed!
» effectiveness over efficiency
less bad is not good enough. you don't create useful products just by reducing harmful substances. environmental effectiveness is about doing the right thing. So you can actually leave a large footprint with a clear conscience.
» Waste = food
the cradle to cradle™ concept avoids any waste. like in nature, all substances remain a closed circuit. cradle to cradle™ print products by gugler* were optimized for recycling. the sludge created in the process can re-enter the biological cycle.
» not a single health risk
all ingredients of the cradle to cradle™ print products were analysed in collaboration with the environmental research institute epea. they meet the highest requirements in terms of health compatibility, such as allergy risks etc. even the ash of incinerated print products can be safely disposed in a kitchen garden.