RESUME RESUME LAGAN AK AGANG LAGAN AK AGANG FIELD CONSTRUCTION SUPERINTENDENT FIELD CONSTRUCTION SUPERINTENDENT Career Objective: Willing to do the job as a construction superintendent in a well-established construction firm and apply all my skills and experience for the growth of the organization. PROFESSIONAL PROFILE PROFESSIONAL PROFILE Has over twenty five ( 25 ) years of experience in the field of onshore and offshore Construction, Maintenance, Hook-up and Commissioning, design engineering, fabrication of Power Plant, refinery and Oil and Gas Platform Modules/Topsides, jacket, and Living Quarters. Well versed in to assist in ensuring general functioning of the company and day to day routine offshore/onshore activities. Provide technical supports and field coordination for proper implementation of work. Involving for Work pack preparation, estimating, planning and scheduling. Development of piping design drawing, detailing, and materials take off. With knowledge in safety procedures, design specification and codes of practices, computer application such as Microsoft Project, Microsoft Access, Microsoft Excel, Microsoft Word, Computer Added Design, Micro Station 95 and familiar with PDMS ( Plant Design Management System ). PERSONAL ERSONAL D D ETAIL ETAIL NAME : LAGAN AK AGANG Lagan ak Agang Lot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri, Sarawak, East Malaysia Mobile: +6013 8000449 Email: [email protected]/[email protected][Type text] Page 1

Transcript of Updated CV-Lagan Field Supt

Page 1: Updated CV-Lagan Field Supt

RESUMERESUME

LAGAN AK AGANGLAGAN AK AGANG

FIELD CONSTRUCTION SUPERINTENDENTFIELD CONSTRUCTION SUPERINTENDENT

Career Objective:

Willing to do the job as a construction superintendent in a well-established construction firm and apply all my skills and experience for the growth of the organization.

PROFESSIONAL PROFILEPROFESSIONAL PROFILE Has over twenty five ( 25 ) years of experience in the field of onshore and offshore Construction, Maintenance, Hook-up and Commissioning, design engineering, fabrication of Power Plant, refinery and Oil and Gas Platform Modules/Topsides, jacket, and Living Quarters. Well versed in to assist in ensuring general functioning of the company and day to day routine offshore/onshore activities. Provide technical supports and field coordination for proper implementation of work. Involving for Work pack preparation, estimating, planning and scheduling. Development of piping design drawing, detailing, and materials take off. With knowledge in safety procedures, design specification and codes of practices, computer application such as Microsoft Project, Microsoft Access, Microsoft Excel, Microsoft Word, Computer Added Design, Micro Station 95 and familiar with PDMS ( Plant Design Management System ).

PPERSONALERSONAL D DETAILETAIL

NAME : LAGAN AK AGANG

GENDER : MALE

RACE : IBAN

NATIONALITY : MALAYSIAN

I.C NO. : 720115-13-5155

DATE OF BIRTH : 15TH JANUARY 1972

PLACE OF BIRTH : SUNGAI GAAT, BALEH, KAPIT

Lagan ak AgangLot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri,Sarawak, East MalaysiaMobile: +6013 8000449Email: [email protected]/[email protected][Type text] Page 1

Page 2: Updated CV-Lagan Field Supt

MARITAL STATUS : MARRIED

PASSPORT NO. : K 20802598

DATE OF ISSUE /EXPIRY : 9TH JANUARY 2013 – 8 JANUARY 2015

MEDICAL EXAMINATION/EXPIRY

: 9TH JANUARY 2013-8 JANUARY 2015 (DR.CHEU)

CORRESPONDENT ADDRESS : S/LOT 4495,JALAN SHANGRILLA,CENTURY PARK,BAKAM 98000 MIRI, SARAWAK. EAST MALAYSIA

TELEPHONE CONTACT : 06-013 8000449(Malaysian H/P)/+673 322 98888(Brunei)

EMAIL ADDRESS : [email protected]/[email protected]

OOTHERTHER I INFORMATIONNFORMATION

Language Proficiency English, Malay& Iban Computer Skills Microsoft Application (Word, Excel, Project, power point) and DOS Career expectation To work under tight and strict working schedule and challenging environment and

continuous career advancement. Personal Strengths Able to work independently with self-motivation, team-work, safety minded,

responsible, hardworking, and able to learn new scope of works. Sports / hobbies Badminton, football, table tennis, swimming. Expected Salary Neg.

EDUCATION BACKGROUND / QUALIFICATION

1988 – 1989 Completed Primary 6 Ulu Teru Primary School, Miri, Sarawak

1985 – 1987 Sijil rendah Pelajaran (Lower Certificate of Education) - Grade AMarudi secondary School, Sarawak, Malaysia

1992-1993

1994 – 1995

Sijil Pelajaran Malaysia (Malaysian Certificate of Education) - Grade Two Marudi secondary School, Sarawak, Malaysia –Calon Persendirian

Sijil Tinggi Persekolahan Malaysia ( Malaysia Higher School Certificate)-Lulus PenuhMarudi Secondary School,Sarawak,Malaysia-Calon Persendirian

Lagan ak AgangLot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri,Sarawak, East MalaysiaMobile: +6013 8000449Email: [email protected]/[email protected][Type text] Page 2

Page 3: Updated CV-Lagan Field Supt

TECHNICAL BACKGROUND

1. Programs attended

CERTIFICATION DATE Qualification ORGANIZER / CONDUCTOR

28th August 2015 Business Ethics & Cross Culture Course AKER SOLUTION .Sdn.Bhd,

13th June 2015 Incident Investigation and Reporting Course Megamas Training Co.Sdn.Bhd, Kuala Belait,Brunei

2nd September 2014 -2nd September 2018

Tropical FOET including Travel Safety By Boat and Tropical EBS.

Sribima Marine Training Centre, Miri, Sarawak

9th March 2014 Method Intergrated Project System ( MIPS ) AKER SULUTION Sdn.Bhd.

1 August 2013 31July 2015

Competent Front Line Worksite Supervisor Megamas Training Co.Sdn.Bhd.

29 March 2013 27 March 2016

Senior First Aid Course ATDC SDN BHD

12 February 2013 Leadership Training for Frontline Worksite Supervisor AKER SULUTION Sdn.Bhd.

4 August 2011- 3 August 2013

Competent Front Line Worksite Supervisor ( Refresher ) Megamas Training Co.Sdn.Bhd, Kuala Belait,Brunei

29 July 2011/28 July 2014

Permit To Work ( Refresher ) Megamas Training Co.Sdn.Bhd, Kuala Belait,Brunei

4 Nov 2010 Manual Handling Megamas Training Co.Sdn.Bhd, Kuala Belait,Brunei

21 Jan 2011 SKSWOOD Leadership And Management Development Programme

Brunel Shell Ptl.Com

25 August 2008/24 August 2011

Permit To Work System Training Megamas Training Co.Sdn.Bhd, Kuala Belait,Brunei

17 Nov 2009/16 Nov 2012

Senior First Aid Course Megamas Training Co.Sdn.Bhd, Kuala Belait,Brunei

1 Nov 2010/31 Nov 2014

Tropical FOET including Travel Safety By Boat and Tropical EBS.

Megamas Training Co.Sdn.Bhd, Kuala Belait,Brunei

4 Nov 2010 Manual Handling Course Megamas Training Co.Sdn.Bhd, Kuala Belait,Brunei

24 August 2010 Integrated Safe System Of Work Sentinel PRO(ISSOW) Training

Brunel Shell Ptl.Com.

17 Sept 2009 / 16 Nov 2011

Competent Front Line Worksite Supervisor (Refresher) Megamas Training Co.Sdn.Bhd, Kuala Belait,Brunei

24 March 2008 / 2 March 2011

Competent Worksite Supervisor Megamas Training Co.Sdn.Bhd, Kuala Belait,Brunei

Lagan ak AgangLot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri,Sarawak, East MalaysiaMobile: +6013 8000449Email: [email protected]/[email protected][Type text] Page 3

Page 4: Updated CV-Lagan Field Supt

3 March 2008 - 2 Feb.2011

Tropical FOET Inc.Travel Safety By Boat Incl. Tropical EBS (5618)

Sribima Marine Training Centre, Miri, Sarawak

25 March 2007 - 12 Jun 2008

Helicopter Underwater Escape Training (With EBS) Sribima Marine Training Centre, Miri, Sarawak

7-8 December 2006 Supervisory Safety Workshop Sarawak Shell Bhd. 14 March 2006 - 13 March 2009

Permit to Work Course(Applicant) BSTS SDN.BHD

23-25 February 2006 Becoming A Safety Leader Champion Executive Training International and ATDC Sendirian Berhad

18-19 June 2005 Managing Hazards At The Workplace and BSP Permit To Work System / Worksite Supervisors Course (PTW 1 & 2)

Megamas Training Co.Sdn.Bhd, Kuala Belait,Brunei

13-15 June 2005 Tropical Basic Offshore Safety Induction and Emergency Training (TBOSIET Course)

Sribima Marine Training Centre, Miri, Sarawak

10 Jun 2005-9 Jun 2008

Hydrogen Sulphide (H2S) Competency Course BSTS SDN.BHD

06 Oct 2004 - 05 Oct 2007

02 Day Combined Sea Survival & Offshore MSTS Asia Sdn Bhd

23 – 24 Oct 2003 PCSB Applicant (Permit to Work – PTW) Petronas Carigali Sdn Bhd (PCSB)

09-10 May 2003 Hydrogen Sulphide (H2S) Safety Training SMEP (Sarawak Shell Berhad)

24Jan 2003 Rigging & Slinging Course. Sribima Marine Training Centre, Miri, Sarawak

20 Jan 2003 Emergency First Aid Course. Sribima Marine Training Centre, Miri, Sarawak

08 June 2002 Hydrogen Sulphide (H2S) Safety Training SMEP (Sarawak Shell Berhad) 14 March 2002 Permit to Work Training (PTW) Sarawak Shell Berhad 15 Oct 2001 03 Day Combined Sea Survival & Offshore Sribima Marine Training Centre,

Miri, Sarawak 14 Oct 2004 Safety Procedures, HUET and Basic Fire Fighting & Self-

Rescue.Sribima Marine Training Centre, Miri, Sarawak

15 Nov 1999 Scaffolding Competent Person Inspection Course. Trident Training (M) Sdn Bhd

20 Nov 1998 Scaffolding Basic Part II. Trident Training (M) Sdn Bhd

08 July 1995 Scaffolding Basic Part I. Trident Training (M) Sdn Bhd

PPROFESSIONALROFESSIONAL E EXPERIENCEXPERIENCE

1)AKER SOLUTIONS SDN. BHD.

Duration : 1st January 2013 – Present

Position : Field Construction Superintendent

(Attached for Brunei Shell Petroleum (SCO/AEO) Summer / Winter Campaign)

Duties and Responsibilities

Lagan ak AgangLot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri,Sarawak, East MalaysiaMobile: +6013 8000449Email: [email protected]/[email protected][Type text] Page 4

Page 5: Updated CV-Lagan Field Supt

Provide support to Field Supervision and Operations Teams in order to ensure that all operational issues impacting production delivery are addressed,

Attend and address applicable actions arising out of the Daily Operations Morning Call. Day to day support for operation of the asset.. Develop, maintain and distribute procedures, work practices, standards and specifications utilized within offshore/

onshore production delivery team with appropriate support as required. Provide operations input to the Management of Engineering Change, including participation in, Hazards and other

relevant safety reviews. Liaise with Project and Technical Teams to provide operational input in order to ensure that any project is fit for

purpose and reflects operational best practice. Plan and ensure the coordination of Construction job. Ensures that the quality of work and materials is upheld. Supervises the subcontractor and ensure that they are punctual and that they deliver Writing project progress records and liaison with the supervisors and client site representative(CSR) Liaises with the client in operational aspect of the project ensure project milestone are being achieved. Responsible for offshore platform installation, expansion works, Tie-In and field construction activities as per work

pack description, spading list, onsite modification of pipes re-routing due to obstruction to existing facilities and field trouble shooting for the construction term.

Plan work daily activities. Arranging and make sure Permit To Work (PTW) in place. Monitoring work activities to conduct in safe manner in accordance with the companies’ policies and procedures.

To ensuring the welfare of personnel and the protection of assets and environment at all time. To ensuring the work activities completed, safe and achieve target.

Submit Daily Report to personnel on line.HSE & COMPLIANCE

Leads the Delivery Team in maintaining the highest regard for Safety and the Environment Is familiar with the appropriate statutory legislation, Case for safety and Safety Management Systems used to sup -

port the role Ensures all process plant equipment in hazardous and other areas is operated in accordance with the appropriate

legislation, guidelines, assurance and verification practices and is fully conversant with necessary performance standards

Completes regular offshore audits to ensure compliance with Safety and Operational Standards. Provides direction/input to risk assessment if required as operations responsible person Ensure by review / audit of procedures and work practices, that the safest and most cost effective operations meth -

ods are used, while minimizing any loss General inspection of workers and their performance and safety. Ensuring that the stipulated safety rules and regulations are met. Continue the use of Hazards Identification Plan (HIP) and the Safety Checklist.

Monitor and control offshore waste disposal in accordance with the BSP HSE Standard.

Main Projects

February – March ,2013 CONSTRUCTABILITY SITE SURVEY FOR EAST & WEST CAMPAIGN FIRE GALLEY PROTECTION AND DRIP PAN FOR CCS PUMP

STRAINERS( AMCX-09 CAMPAIGN)

Lagan ak AgangLot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri,Sarawak, East MalaysiaMobile: +6013 8000449Email: [email protected]/[email protected][Type text] Page 5

Page 6: Updated CV-Lagan Field Supt

April - June , 2013

June-August ‘2013

September-October 14, 2013

October 15-Dec.16, 2013

Dec 17,2013 – March 31 , 2014

SERVICE PLATFORM FOR BYPASS VALVE 10" BIDI(AMCX-09 CAM-PAIGN)

HEAVY LIFTING FOR NEW HELIDECK INSTALLATION AND AMPA 09 SHUTDOWN CAMPAIGN

AMCX09 HP COMPRESSOR UPGRADE. CPCX07 13 01 TURNAROUND CAMPAIGN-CPCX12 WELL TIE-IN

PROJECT AND PM SCOPE PIPING ,VALVE REPLAVEMENT AND BOATLANDING REPAIR WORK

AMCX06 13 01 TURNOAROUND CAMPAIGN-AMCX04 SHUTDOWN CAMPAIGN-PM SCOPE FOR VESSEL INSPECTION,VALVE AND PIP-ING REPLACEMENT

CPCX07 13 01 TURNAROUND CAMPAIGN-CPCX04 PRE-SHUTDOWN/SHUTDOWN AND POST SHUTDOWN SCOPE-VESSEL INSPECTION WORK,VALVE AND PIPING REPLACEMENT.

CPCX07 13 01TURNAROUND CAMPAIGN-CPCX03 PIPELINE RE-PLACEMENT PROJECT(PRP PROJECT) AND REDUNDANT PIPING DEMOLITION SCOPE

INSTALLATION OF NEW DECK EXTENSION AND SERVICE PLAT-FORM FOR PIPELINE REPLACEMENT PROJECT(PRP PROJECT).

CHAMPION-07 BROWN FIELD PROJECT-WELL TIE IN AND NEW MODULE INSTALLATION AT CHAMPION 1.

CHAMPION WATER FLOOD A2 (PHASE 2) PROJECT-INSTALLATION OF NEW TIE-IN/NEW MODULE/FIREWATER UPGRADING/INSTAL-LATION OF NEW SERVICE PLATFORM AT CHAMPION 33.

. May 1st ,2014 – June 17 , 2014 AMCX09 14 01-PRE-SHUTDOWN AND SHUTDOWN TURNAROUND CAMPAIGN.

AMDP11-PRE-SHUTDOWN/SHUTDOWN SCOPE-PRESSURE RELIEF VALVE REPLACEMENT CHANGE-OUT/INSPECTION,VESSEL CLEANING AND VESSEL INSPECTION,CORRODED PIPING RE-PLACEMENT AND STRUCTURAL REPLACEMENT.

AMDP25-PRE-SHUTDOWN/SHUTDOWN SCOPE-PRESSURE RELIEF VALVE REPLACEMENT CHANGE-OUT/INSPECTION,VESSEL CLEANING AND VESSEL INSPECTION,CORRODED PIPING RE-PLACEMENT AND STRUCTURAL REPLACEMENT.PROJECT SCOPE TO INSTALL NEW SERVICE PALTFORM FOR LIFE RAFT INSTALLA-TION.

AMCX15/24--PRE-SHUTDOWN/SHUTDOWN SCOPE-PRESSURE RE-LIEF VALVE REPLACEMENT CHANGE-OUT/INSPECTION,VESSEL CLEANING AND VESSEL INSPECTION,CORRODED PIPING RE-PLACEMENT AND STRUCTURAL REPLACEMENT.PROJECT SCOPE TO INSTALL NEW FCV AND FLOWLINE SWA247L MODIFICATION.

AMCX03--PRE-SHUTDOWN/SHUTDOWN SCOPE-PRESSURE RELIEF VALVE REPLACEMENT CHANGE-OUT/INSPECTION,VESSEL CLEANING AND VESSEL INSPECTION,CORRODED PIPING RE-PLACEMENT AND STRUCTURAL REPLACEMENT.PROJECT SCOPE-PRP2-INSTALL NEW PIPING AND REMOVE EXISTING LINE.

AMPA-06-EGRET CASCADE PROJECT-MODIFICATION OF DN80/DN150 GAS LIFT AND FUEL GAS LINE.

. June – 20TH July , 2014 FACX04 14 01-PRE-SHUTDOWN AND SHUTDOWN TURNAROUND CAMPAIGN.

Lagan ak AgangLot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri,Sarawak, East MalaysiaMobile: +6013 8000449Email: [email protected]/[email protected][Type text] Page 6

Page 7: Updated CV-Lagan Field Supt

FAPP/FADP-01-PRE-SHUTDOWN/SHUTDOWN SCOPE-PRESSURE RE-LIEF VALVE REPLACEMENT CHANGE-OUT/INSPECTION,VESSEL CLEANING AND VESSEL INSPECTION,CORRODED PIPING RE-PLACEMENT AND STRUCTURAL REPLACEMENT..

ADVANCE TIE-IN PRE-DRILL:1.INSTALLATION OF NEW FLOW-LINE,GAS LIFT LINES AND CASING BLOWDOWN LINES AND TIE-IN TO RESPECTIVE HEADERS. 2.INSTALLATION AND HOOK-UP OF CONTROL VALVES,MVFTS AND PSD VALVES.3.INSTALLATION AND HOOK-UP OF WELLHEAD CONTROL PANEL & PRESSURE RE-LIEF VALVE 4.RTU UPGRADE 5.REMOVAL OF THE EXISTING FA-51 WELL AND ITS ASSOCIATED FACILITIES.

. July 21st – 25th August, 2014

26th August – 14th October, 2014

CPCB07 14 01-PRE-SHUTDOWN AND SHUTDOWN TURNAROUND CAMPAIGN.

PRP-2 PROJECT-INSTALLATION OF NEW PIPING FOR GAS AND OIL LINE.

INSTALLATION OF NEW SERVICES PLATFORM FOR PRP-2 SCOPE SHUTDOWN SCOPE-REPLACE CORRODED VALVES AND PIP-

ING.VESSEL CLEANING AND VESSEL INSPECTION AMCX06 14 01-AMRJ-01 SHUTDOWN-REPLACE CORRODED

PIPING,RISER REPAIR WORK,VALVE AND BOLT/NUTS REPLACE-MENT

AMRP-06-HEAVY LIFTING FOR 24”/16”/12” & 10” ACTUATOR BALL VALVE REPLACEMENT.

AMDP-21-HEAVY LIFT FOR RISER GUARD FENDER INSTALLATION AND RISER IMPACT PROTECTION INSTALLATION.

SUMP VESSEL REPAIR WORK. PIPING,VALVES AND GASKET RE-PLACEMENT WORK.

15th October – 28st May, 2015 CPCA07 15 01 TA CAMPAIGN-PRE SHUTDOWN AT CPCX-04 AND CPDP-31.

SHUTDOWN AT CPCX04 AND CPDP-31-REPLACE CORRODED PIP-ING FOR PM SCOPE WITH VARIOUS SIZES-2”/3”/4”/6”/8” AND 12” FOR OIL LINE,GAS LINE ,WATER INJECTION LINE AND PROCESS DRAIN AND DECK DRAIN LINE.

REPLACEMENT OF CORRODED VALVES/STUDBOLT AND NUTS AND GASKETS

REPLACEMENT OF CORRODED STRUCTURAL FOR S3 SCOPE. CPCX-12-PRP-2 PROJECT-INSTALLATION OF NEW DECK SERVICE

PLATFORM FOR PID 2042 & 2506.INSTALL SUPPORT,HANDRAILS AND GRATINGS FOR NEW ESDV SERVIVE PLATFORM FOR PID 2505.

CPDP-31 CW A2 BROWNFIELD PROJECT-INSTALLATION OF NEW INTEGRATED MODULE SKID (IMS),NEW DECK EXTENSION,NEW K.O.DRUM MODULE,WELL HEAD CONTROL PANEL (WHCP) IN-STALLATION,PIPING DEMOLATION SCOPE,NEW E& I SKID,NEW VENT BOOM INSTALLTION, OFFSHORE PIPING & MODIFICATION AND WELL TIE-IN PROJECT.

29th May – 6th June, 2015 CPCX09 15 01 TA CAMPAIGN- SHUTDOWN AT AMPA-09

Lagan ak AgangLot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri,Sarawak, East MalaysiaMobile: +6013 8000449Email: [email protected]/[email protected][Type text] Page 7

Page 8: Updated CV-Lagan Field Supt

7th June – November, 2015 CPCB07 15 01 TA CAMPAIGN- CPDP-31 CWF-A2 Project-Water Injection Well Tie-In Scope-Installation or new Piping as per project scope, Demolition of existing line and Project Structural Installation.

CPCB07 15 01 TA CAMPAIGN- CPDP-10 and CPPP-10-Water Injection Tie-In Project at CPDP-04,PM Scope for Valve Replacement, Corroded Structural Replacement, Riser Inspection and Riser Repair Work, Relief Valve Inspection and Removal, Piping Replacement and Vessel Cleaning and Inspection.

FACB & FACX TA Campaign-Structural repair work at FAVJ-01.Turn-around Campaign at Fairley 04 Complex for Valve’s replacement, Vessel re-pair/inspection, corroded piping replacement, install new Porta Cabin at FAAP04 and corroded structural replacement work.

CPDP49 Green Field Project (Champion Intermediate Deep Project)-Installa-tion of new piping, structural, Electrical & Instrumentation and Commission-ing.

2) SKS WOOD SDN. BHD.

Duration : 25th August 2008 – 28th November 2012

Position : Construction Superintendent

(Attached for Brunei Shell Petroleum (SCO/AEO) Summer / Winter Campaign & Asset Integrity Retroration Team ( AIR Team ) at Chompion-07)

Duties and Responsibilities

Plan and ensure the coordination of construction jobs. Responsility of supervising the construction project. Ensures that the quality of work and materials is upheld and that the budget is followed as planned. Entitled with the total supervision of all the operations on the site. Ensure that the workers are implementing what is on the design plan. Monitor the workers and the progress of the project and reports to the employers as well as to the general crews. Held liable of any happenings at the construction site and sees to it that the project is completed in time and that the laid

down standards are met. Being on site to oversee all the construction process. Ensuring that both the health and safety project plans are implemented. Organizing the workers and ensuring that they are performing as required. General inspection of workers and their performance and safety. Ensuring that the stipulated safety rules and regulations are met. Follow the project construction process to ensure that it is completed in time. Supervises the subcontractor and ensures that they are punctual and that they deliver

Lagan ak AgangLot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri,Sarawak, East MalaysiaMobile: +6013 8000449Email: [email protected]/[email protected][Type text] Page 8

Page 9: Updated CV-Lagan Field Supt

Writing project progress records in liaison with the supervisors and client site representative (CSR) Liaise with the client in operational aspect of the project ensure project milestone are being achieved. Liaises with Senior Inspectors on the standard requirements of the site in terms of licenses and safety Responsible for offshore platform installation, expansion works, Tie-In and field construction activities as per work pack

description, spading list, onsite modification of pipes re-routing due to obstruction to existing facilities and field trouble shooting for the construction team.

Plan works daily activities. Arranging and apply Permit To Work(PTW).To conduct Daily Safety Meeting and Pre-Job Discussion base on JHA. Monitoring work activities, to conduct all activities in safe and efficient manner in accordance with the companies policies and procedures.

To ensuring the welfare of personnel and the protection of assets and environment at all time. To ensuring the work ac-tivities completed, safe and achieve target.

Submit Daily Progress Report to personnel on line.

Main Projects

November ‘08 BUGAN RECOVERY PROJECT August –October ‘08 MAGPIE FACILITIES UPGRADE PROJECT March ‘09 IDDJ01 09 01 SUMMER CAMPAIGN March - April ‘09 CPCB07 09 01 SUMMER CAMPAIGN May – June ‘09 AMCX09 09 01 SUMMER CAMPAIGN June - July ‘09 AMCX06 09 01 SUMMER CAMPAIGN August – Sept ‘09 CPCA0709 01 SUMMER CAMPAIGN Feb ‘10 CPCX07 10 01 PRE-SUMMER CAMPAIGN March ‘10 CPCB07 10 01 SUMMER CAMPAIGN June ‘10 CPCA07 10 01 MAJOR CAMOPAIGN August ‘10 CPCX07 10 01 BARGE CAMPAIGN Oct ‘10 IDCX01 10 01 SUMMER CAMPAIGN Nov ‘10 CPCX01 10 01 WINTER CAMPAIGN February –June ‘11 CHAMPION WATER FLOOD UPGRADE PROJECT July-September ‘11 FACX 04 11 01 SUMMER CAMPAIGN October-November ‘11 AMCX 06 11 01 SUMMER CAMPAIGN December ‘11 March ‘12 March-May ‘12 June-July ’12 August-October ’12

CPCX 07 11 01 WINTER CAMPAIGN SECX 01 12 01 TALI CAMPAIGN AMCX 09 12 01 AMPA CAMPAIGN FACX04 12 01 FAIRLEY-04 CAMPAIGN AMCX06 12 01 AMPA-06 SHUTDOWN CAMPAIGN CPCA07 12 01 AND MGCX01 12 01 CAMPAIGN-SHUTDOWN

1) JUSTRITE CONSTRUCTION & SERVICES SDN BHD

Joined Date : 8 March 2008-15 August 2008Position : Construction Supervisor.Project : Kikeh Spar Major Maintenance And Scaffolding ServiceClient : Murphy Sabah Oil Co.Ltd.

Duties and ResponsibilitiesLagan ak AgangLot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri,Sarawak, East MalaysiaMobile: +6013 8000449Email: [email protected]/[email protected][Type text] Page 9

Page 10: Updated CV-Lagan Field Supt

Responsible for offshore platform installation, expansion works, Tie-In and field construction activities as per work pack description, spading list, onsite modification of pipes re-routing due to obstruction to existing facilities and field trouble shooting for the construction team. Plan works daily activities.Arranging and apply Permit To Work(PTW).To conduct Daily Safety Meeting and Pre-Job Discussion base on JHA.Monitoring work activities,to conduct all activities in safe and efficient manner in accordance with the companies policies and procedures.To ensuring the welfare of personnel and the protection of assets and environment at all time.To ensuring the work activities completed,safe and achieve target.Liaise with the client in operational aspect of the project ensure project milestore are being achieved.Submit Daily Progress Report to personnel in line.

March-August 2008 WELL TIE-IN PROJECT-SHUTDOWN KIKEH SPAR MAJOR MAINTENANCE AND SCAFFOLDING PROJECT

WITH MURPHY SABAH OIL CO.LTD

2) PETRA RESOURCE SDN.BHD

Inclusive Date : 5th February 2005 – 15th January 2008Project : Provision of Major Maintenance, Hook-Up, Commissioning and

Construction ServicesPosition : Construction Supervisor / Acting Superintendent

Duties and Responsibilities

Plan and ensure the coordination of construction jobs. Responsility of supervising the construction project. Ensures that the quality of work and materials is upheld and that the budget is followed as planned. Entitled with the total supervision of all the operations on the site. Ensure that the workers are implementing what is on the design plan. Monitor the workers and the progress of the project and reports to the employers as well as to the general crews. Held liable of any happenings at the construction site and sees to it that the project is completed in time and that the laid

down standards are met. Being on site to oversee all the construction process. Ensuring that both the health and safety project plans are implemented. Ensuring that the budget is followed in terms of purchases and wages. Organizing the workers and ensuring that they are performing as required. Recording the total costs for materials bought and payment for work done. General inspection of workers and their performance and safety. Ensuring that the stipulated safety rules and regulations are met. Follow the project construction process to ensure that it is completed in time. Supervises the subcontractor and ensures that they are punctual and that they deliver Ensure that quality is preserved in the construction process and that the budget is maintained Writing project progress records in liaison with the supervisors and client site representative (CSR) Liaise with the client in operational aspect of the project ensure project milestone are being achieved. Liaises with Senior Inspectors on the standard requirements of the site in terms of licenses and safety Responsible for offshore platform installation, expansion works, Tie-In and field construction activities as per work pack

description, spading list, onsite modification of pipes re-routing due to obstruction to existing facilities and field trouble shooting for the construction team.

Plan works daily activities. Arranging and apply Permit To Work(PTW).To conduct Daily Safety Meeting and Pre-Job Discussion base on JHA. Monitoring work activities, to conduct all activities in safe and efficient manner in accordance with the companies policies and procedures.

Lagan ak AgangLot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri,Sarawak, East MalaysiaMobile: +6013 8000449Email: [email protected]/[email protected][Type text] Page 10

Page 11: Updated CV-Lagan Field Supt

To ensuring the welfare of personnel and the protection of assets and environment at all time. To ensuring the work ac-tivities completed, safe and achieve target.

Submit Daily Progress Report to personnel on line. February-December 05 SITE TEAM TO KINABALU PLATFORM AND BARTON PLATFORM

February-December 2006/07/08

FOR PRE-DRIL AND WELL TIE-IN PROJECT SITE TEAM TO E-11 AND B-11 FOR PRE-DRILL AND WELL TIE-IN

PROJECT BARTON MINIMALLY FILTERED SEAWATER INJECTION AND

DECK EXTENSION PROJECT

F23 AND F06 REJUVENATION PROJECT F23 BOAT LANDING UPGRADED PROJECT F23 AND F-06 PRE-DRILL AND WELL TIE-IN PROJECT

3) SKS WOOD SDN.BHD

Inclusive Date : 10th June 2005 - 1st October 2005Project : Brunei Shell Petroleum (SCO) Summer CampaignPosition : Assistant Construction Supervisor

Duties and Responsibilities

Responsible for offshore platform installation, expansion works, Tie-In and field construction activities as per work pack description, spading list, onsite modification of pipes re-routing due to obstruction to existing facilities and field trouble shooting for the construction team. To conduct hydro testing, pneumatic test and re-instatement test, site checks and verify installation and location as per approved drawings. To supervise piping, structure and rigging activities to be carried out and prepare shift progress report.

June-October 2005 CHAMPION-07 FLARE UPGRADE INSTALLATION OF NEW 5 GENERATOR ON CPEP-07 FAIRLEY-04 SHUTDOWN AND NEW QUARTERS INTERFACE AND

HELIDECK DRIP PAN.

4) SARKU ENGINEERING SDN.BHD.WOOD SDN.BHD

Inclusive Date : 15th February 2002 - 25th January 2005Project : Provision of Major Maintenance, Hook-Up, Commissioning and

Construction ServicesPosition : Shift Supervisor

Duties and Responsibilities

Lagan ak AgangLot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri,Sarawak, East MalaysiaMobile: +6013 8000449Email: [email protected]/[email protected][Type text] Page 11

Page 12: Updated CV-Lagan Field Supt

In general provide drafting services related to all structural and piping system for the above mentioned projects. Including complete detailing for the purpose of fabrication, erection, planning and project scheduling.

Base on piping general plans and P & ID, prepare comprehensive isometric drawing with sufficient technical information to cover necessary fabrication and erection activities including material take - off such piping system includes water fire protection, potable water, service air, ethylenelycol, fuel gas, crude oil, hydrogen, clycerine acidulation and fatty alcohol lines. Such materials of pipeline are follows: carbon steel, stainless steel, copper etc.

Provide input data on computerized material stock list using lotus 123. Prepare corresponding report for material availability.

Prepare detailed drawing of structural I-beams and trusses. Provide cutting plans for structural components, with accurate dimension to minimize waste

material off cuts. Prepare structural weld mans or weld joint configuration. Randomly verify critical actual dimensions of piping and structural material on site as per

fabrication drawing. Provide assistance to shop supervisors or lead-man in the interpretation of issued for

construction drawing. Prepare modification drawing and as built drawing.

February-December 2002 SITE TEAM TO M-01 PRE-DRILL ,HOOK-UP,MAJOR MAINTENACE ,COMMISSIONING AND WELL TIE-IN PROJECT

February-December 2003-2004

SITE TEAM TO KINABALU PLATFORM FOR PRE-DRILL AND WELL TIE-IN PROJECT

BARAM B AND BARAM A SHUTDOWN,HOOK-UP,MAJOR MAINTE-NANCE AND TIE-IN PROJECT

BARAM B-BADP-AA-REVISIT 2003-PCSB PROJECT B-11 HOOK-UP, MAJOR MAINTENANCE,CONSTRUCTION SERVICES

AND WELL TIE-IN PROJECT. E-11 REJUVENATION PROJECT

5) CLOUGH OFFSHORE, SINGAPORE

Inclusive Date : June 2000 - 25th January 2002Project : Combined Cycle Power Plant, 220 MW Block 1-2-3, Ratchaburi, Thailand.Position : Shift Supervisor / Commissioning Supervisor

Duties and Responsibilities

Study and review the (AFC) approved for construction drawings as per specification for the preparation of pre-fabrication.

Operate/review the PDMS design to check the interference between pipelines and other components.

Lagan ak AgangLot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri,Sarawak, East MalaysiaMobile: +6013 8000449Email: [email protected]/[email protected][Type text] Page 12

Page 13: Updated CV-Lagan Field Supt

Operate/review the PDMS design of each pipeline number to convert on isodraft for material take off checking as per client standard and specification.

Preparation of detailed isometric drawings, which is instructed to PDMS operator to in-put the (FW) field weld location and isometric line number for fabrication purposes.

Review AFC drawing, client specification, and reference necessary for the preparation of Purchase Inquiry Document of pipe, pipe fittings, valve, gasket, bolts & nuts and pipe support materials.

Prepare complete material take off (MTO) for material control and procurement of material. Responsible for the development of piping design drawing such as piping plan, piping

isometric, pipe supports and process flow diagram (P&ID). Provide technical assistance and coordination with the project management team for proper

implementation of project scope of work. Recommend design modification based on actual erection if there’s any obstruction or

interference with other components. Prepare technical bid evaluation (TBE) on piping materials and valves. Responsible in preparing and providing as built plan. Prepare ship loose list of pipe spools, pipe supports, valves, fittings and other miscellaneous

items for the project. Perform other duties and functions that maybe assigned by the immediate supervisor.

June 2000-January 2002 GE/RAYTHEON ASIA BADGER INC FOR COMBINED CYCLE POWER PLANT 2200MW BLOCK 1-2-3 RATCHABURI PROJECT.

6) CLOUGH OFFSHORE, SINGAPORE

Inclusive Date : March 2000 - June 2000Project : Thermal Power Plant (FDG) 1740 MW Ratchaburi, ThailandPosition : Shift Supervisor / Commissioning Supervisor

Duties and Responsibilities

Review consultant documents (drawings, specifications & references) for the preparation of design fabrication drawing, i.e. isometric drawing, pipe support drawing and other miscellaneous work for the project.

Prepare material take off needed for procurement of material. Prepare and provide purchase inquiry documents (PID). Prepare technical bid evaluation (TBE). Evaluate vendor proposals and product technical

conformity against client requirements and specifications. Prepare piping fabrication isometric drawing from piping plans. Review and revise drawing of

the pipe support as required. Check interferences or clashes between pipe lines and structure, equipments and other pipe

lines. Provide technical assistance and field coordination to ensure that works are properly

implemented and conform with the client specification.

March 2000-June 2000 MUTSUBISHI HEAVY INDUSTRY(MHI) FOR THEMAL POWER PLANT(FGD) 1740MW RATCHABURI PROJECT.

Lagan ak AgangLot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri,Sarawak, East MalaysiaMobile: +6013 8000449Email: [email protected]/[email protected][Type text] Page 13

Page 14: Updated CV-Lagan Field Supt

7) PERKASA PADU SDN.BHD. (PPSB)

Inclusive Date : 10th February 1998 - 24th December 1999Project : Maintenance, Hook-Up and Commissioning at

BCOT - Bintulu Crude Oil Terminal.Position : Shift Supervisor

Duties and Responsibilities

Review client specification and reference necessary for the preparation of purchase inquiry document (PID) of piping, pipe fittings, valve, gasket, bolt & nuts and pipe support materials.

Prepare material take off (MTO) of piping system for material control and procurement that also include piping specialty items.

Prepare and provide purchase inquiry documents (PID). Review vendor data of the winning vendor, coordinate, discuss and resolve technical issues

or comments by client engineers or representative, such vendor data are: assembly/detailed drawings, parts list etc.

Revised isometric drawing as per stringing result. Prepared job cards. Prepare pipe support fabrication drawing as per client standard. Prepare hand over documents as per client requirements such as piping isometric drawing

and mechanical flow diagram (MFD) per each system for final line check and acceptance. Prepare and provide as-built drawing. Perform other duties and function as may necessary to satisfactory complete a given task.

February 1998-December 1999

BCOT-BINTULU CRUDE OIL TERMINAL FOR MAJOR MAINTE-NANCE HOOK-UP AND COMMISSIONING PROJECT.

8) PERKASA PADU SDN. BHD (PPSB)

Inclusive Date : January 1995 - November 1997Project : Provision Of Consolidated Engineering and Construction Services For

Retrofits And Host Tie-In-EPMIPosition : Scaffolding Inspector / Supervisor

Duties and Responsibilities

To ensure that client “Permit To Work System” is complied with. To conduct site specific Tool Box Talk prior to start work. Planned scaffold activities as per requested and supervise scaffolding activities which to be carried out To signed scaffold Tag. To check and inspect the scaffold are:- That the standards are correctly aligned and properly supported at their bases That there is no undue deflection in ledgers and putlogs or transoms That no essential member of the structure has been removed. That all ties and braces are effective in stabilizing the structure.

Lagan ak AgangLot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri,Sarawak, East MalaysiaMobile: +6013 8000449Email: [email protected]/[email protected][Type text] Page 14

Page 15: Updated CV-Lagan Field Supt

That all couplers are properly tightened. That all scaffolds boards are sound and properly supported. That all guardrails and toe boards are in place. That all ladders are in good condition, properly supported and secured.

January 1995-November 1997

RETROFITS AND HOST TIE-IN PROJECT ON VARIOUS ESSO PLAT-FORM: GUNTONG D,GUNTONG A,JERNEH A,TABU AND TAPIS OFF-SHORE TERENGGANU.

IDRECO/NOEIL CONSORTIUM INC. AT FLUE GAS DESCULFFER-IZED RETROFIT PROJECT.

9) STOLT COMEX SEAWAY (S) Pte. Ltd.

Inclusive Date : 5th August 1992 - 30th July 1994Project : Major Maintenance, Hook-Up, and Construction ServicePosition : Shift Supervisor

Duties and Responsibilities

Responsible for the preparation of general arrangement plan, body plans, hydrostatic curves, capacity plan and other pertinent plans as required by approving classification society.

Responsible for the preparation of cutting plans for automatic condor cutting/automatic oxyacetylene cutting machine to facilitate mass production of material components such brackets, flat bars for I-beams fabrication and etc.Responsible for the preparation of docking plans for ship lift berthing and at respective laying of vessels at births for repairs.Responsible for the preparation of piping lay-out, isometric drawing spool drawing to include material take off required for fabrication and installation.Responsible for the preparation of drawing and details for modification of ship repairs.Prepared shell expansion plan to indicate the re-plating, renewed plate installed of anodes and other required for updating.Responsible for the preparation of as-built plan.Perform other related duties as may be assigned by immediate supervisor and department manager.

August 1992-July 1994 RETROFITS AND HOST TIE-IN PROJECT ON VARIOUS ESSO PLAT-FORM: GUNTONG D,GUNTONG A,JERNEH A,TABU AND TAPIS OFF-SHORE TERENGGANU.

10) STOLT COMEX SEAWAY (S) Pte Ltd

Inclusive Date : 15th February 1990 - 30th July 1992Project : Major Maintenance, Hook-Up and Construction ServicesPosition : Assistant Shift Supervisor

Duties and ResponsibilitiesLagan ak AgangLot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri,Sarawak, East MalaysiaMobile: +6013 8000449Email: [email protected]/[email protected][Type text] Page 15

Page 16: Updated CV-Lagan Field Supt

Responsible for work plan of piping, structure and rigging activities as per work pack description and spade listing. To implement and carry out company Quality / Safety / Environment Policies and Procedure. Conducted hydro test, site check and variety exact installation and location. Be able to give inputs, suggestion to the Yard Superintendent and improve the smooth and safety of work execution. Supervise piping, structure and rigging activities to be carried out and prepare shift progress report to the Yard Superintendent.

January 1990-July 1992 PREPARATION FOR PIPING.STRUCTURE AND GASKETS FOR OFF-SHORE PROJECT

HEAVY LIFTING FOR PLATFORM/JACKET INSTALLATION PIPING AND STRUCTURAL FABRICATION PROJECT

Referees:

1.Name : Robert White (Bob) Designation : HUC Construction Manager Tel : Email : robert_white @ murphyoilcorp.com

2. Name : Ahmad Yusni Ahmad Johari Designation : Murphy Well Supervisor Tel : 019-6500109 Email : ahmad_yusni @ murphyoilcorp.com

3. Name : Masation Maran Designation : Justrite Project Engineer Tel : 019-8884725 Email : [email protected]

4. Name : Gerald Sim/Hj.Samad Designation : SKSW Onshore Co-ordinator Tel : +673-8711732/8721732 Email : [email protected]

5. Name : Gerald Sim Designation: : Aker Solution West Manager Tel : +673-718 6435 Email : [email protected]

Lagan ak AgangLot 4495, Jalan Shangrilla, Century Park Bakam, 98000 Miri,Sarawak, East MalaysiaMobile: +6013 8000449Email: [email protected]/[email protected][Type text] Page 16