Update on Infrastructure, Regulatory Compliance, Waste Disposition & Transportation
EM Site-Specific Advisory Board Chairs Meeting
Mark GilbertsonAssociate Principal Deputy Assistant Secretary for Regulatory and Policy Affairs,
EM-4
Office of Environmental Management
October 19, 2017
![Page 2: Update on Infrastructure, Regulatory Compliance, Waste … · 2017-12-14 · •Los Alamos National Laboratory have completed two-thirds of treatment of the remediated nitrate salt](https://reader034.fdocuments.in/reader034/viewer/2022050112/5f4e0a3fb6968c1e4a63d62e/html5/thumbnails/2.jpg)
www.energy.gov/EM 2
Overview
• The Current EM Organization Structure
• Infrastructure and Facility Highlights
• Regulatory Accomplishments
• Low-Level Radioactive Waste (LLW) Policy & Goals
• Waste Disposition Highlights
• Status of Greater-Than-Class C (GTCC) LLW and GTCC-like Waste Disposal
• Update on Transuranic (TRU) Waste Shipments to the Waste Isolation Pilot Plant (WIPP)
• Transportation
![Page 3: Update on Infrastructure, Regulatory Compliance, Waste … · 2017-12-14 · •Los Alamos National Laboratory have completed two-thirds of treatment of the remediated nitrate salt](https://reader034.fdocuments.in/reader034/viewer/2022050112/5f4e0a3fb6968c1e4a63d62e/html5/thumbnails/3.jpg)
EM-5 Corporate Services
APDAS
EM-3 Field Operations
APDAS
Savannah River National Laboratory
EM-3.1 Safety, Security, and Quality Assurance DAS
ADAS
3.11 Field Operations Oversight/CNS
EM-3.3 Chief EngineerChief Engineer
3.31 Major Constructions and Modifications
3.32 Operations and Processes
EM-3.2 Technology DevelopmentDirector
EM-1 Assistant Secretary
EM-2 Principal Deputy Assistant Secretary
EM-2.1 Chief of StaffDCOS
EM-5.1 Resource ManagementActing, DAS
ADAS
5.11 Budget and Planning
5.111 Budget
5.112 Program Planning
5.12 Information Systems
5.13 Workforce Management
EM-5.2 Acquisition & Project Management DAS ADAS
5.21 Acquisition and Contract Management
5.22 Project Management
EM-5.3 CommunicationsActing Director
5.31 External Affairs
5.32 Communications Services
Organization Chart
8/01/2017
- International Program- Correspondence Center
EM-4 Regulatory and Policy Affairs
APDAS
Field Sites
- Carlsbad- Idaho- Los Alamos- Oak Ridge- Office of River Protection- Portsmouth & Paducah- Richland- Savannah River Site- EM Consolidated Business
Center
EMCBC Field Sites- Moab- ETEC- SPRU- West Valley- LBNL- Brookhaven- EM-NV
- EM NNSA Sites (NNSS, LLNL, SNL)
- HQ Field Liaisons
EM-4.1 Infrastructure Management and Disposition Policy
Director
4.11 Infrastructure and D&D
4.12 Subsurface Closure
EM-4.2 Waste and Materials ManagementDAS
4.21 National TRU Program
4.22 Waste Disposal
4.23 Nuclear Materials
4.24 Packaging & Transportation
EM-4.3 Regulatory Intergovernmental andStakeholder Engagement
Director
4.31 Regulatory Compliance
4.32 Intergovernmental and Stakeholder Programs
3.111 Safety Management
3.112 Operational Safety
3.113 Standards and Quality Assurance (Robe
3.114 Safeguards, Security, and Emergency Preparedness
Special Projects Office
![Page 4: Update on Infrastructure, Regulatory Compliance, Waste … · 2017-12-14 · •Los Alamos National Laboratory have completed two-thirds of treatment of the remediated nitrate salt](https://reader034.fdocuments.in/reader034/viewer/2022050112/5f4e0a3fb6968c1e4a63d62e/html5/thumbnails/4.jpg)
www.energy.gov/EM 4
Infrastructure & Facility Highlights
• D&D characterization completed at Oak Ridge Y-12 Biology Complex.
• Making good progress at SRS with respect to commissioning of Salt Waste Processing Facility and establishing connections from tank farms to the facility
• As recommended in the December 2016 Excess Contaminated Facilities Report to Congress, this FY, EM completed “walkdowns” at non-EM excess contaminated facilities at Oak Ridge, Lawrence Livermore National Laboratory, Los Alamos National Laboratory and Savannah River Site.
• Transfer of Oak Ridge’s 206-acre Duct Island parcel to Community Reuse Organization of East Tennessee.
• In response to the PUREX tunnel event, a contaminated Excess Facilities Extent of Condition Review is in progress.
• Hanford Plutonium Finishing Plant demolition nearing completion.
![Page 5: Update on Infrastructure, Regulatory Compliance, Waste … · 2017-12-14 · •Los Alamos National Laboratory have completed two-thirds of treatment of the remediated nitrate salt](https://reader034.fdocuments.in/reader034/viewer/2022050112/5f4e0a3fb6968c1e4a63d62e/html5/thumbnails/5.jpg)
www.energy.gov/EM 5
Regulatory Accomplishments
DOE Order 435.1 Oversight Program Update:
• The DOE Order 435.1 Oversight Program is being implemented in FY 2018 and consists of evaluating sites that manage HLW, TRU waste, and LLW for compliance with the Order.
• This Program was developed as part of the Corrective Action Plan for EM: Radiological Release Event at WIPP in February 2014.
National Dialogue Update:
• The National Dialogue between EPA and the States is ongoing.
• In August, EM leadership had the opportunity to meet with representatives from EPA and state regulators in New Mexico.
• Discussion focused on EPA Superfund Task Force report and ongoing EM priorities.
![Page 6: Update on Infrastructure, Regulatory Compliance, Waste … · 2017-12-14 · •Los Alamos National Laboratory have completed two-thirds of treatment of the remediated nitrate salt](https://reader034.fdocuments.in/reader034/viewer/2022050112/5f4e0a3fb6968c1e4a63d62e/html5/thumbnails/6.jpg)
www.energy.gov/EM 6
Regulatory Accomplishments Cont.
• EM and the Office of Legacy Management (LM) are supporting update of the. Closure for the Seventh Generation – A Report from the Stewardship Committee of the 1999 Closure for the Seventh Generation Report (1999).
• This report highlights DOE’s progress in the area of long term stewardship since 1999, including establishing the Office of Legacy Management (LM) and creating DOE directives related to long term stewardship.
• EM and LM are also collaborating with the STGWG on their report recommendations to us for continuous improvement of our DOE long term stewardship mission and stakeholder education and awareness.
• We expect STGWG to finalize and recommend issuance of this report in their next meeting in November.
![Page 7: Update on Infrastructure, Regulatory Compliance, Waste … · 2017-12-14 · •Los Alamos National Laboratory have completed two-thirds of treatment of the remediated nitrate salt](https://reader034.fdocuments.in/reader034/viewer/2022050112/5f4e0a3fb6968c1e4a63d62e/html5/thumbnails/7.jpg)
www.energy.gov/EM 7
LLW Policy & Goals
• DOE Order 435.1 defines policy and allows DOE sites to use on-site and off-site disposal paths, as well as commercial treatment and disposal facilities.
• DOE closely monitors potential changes in the commercial market –treatment and disposal waste volumes are considerably lower since legacy wastes are largely gone.
• Low-level Waste Disposal Facility Federal Review Group (LFRG) Goals:
o Confirm that the disposal of LLW at DOE facilities is conducted in a manner that is protective of public health and safety and the environment by providing regulatory oversight.
o Ensure consistency in approach and application with the design, construction, operation, and closure of LLW disposal facilities.
o Ensure compliance with DOE 435.1 requirements.
![Page 8: Update on Infrastructure, Regulatory Compliance, Waste … · 2017-12-14 · •Los Alamos National Laboratory have completed two-thirds of treatment of the remediated nitrate salt](https://reader034.fdocuments.in/reader034/viewer/2022050112/5f4e0a3fb6968c1e4a63d62e/html5/thumbnails/8.jpg)
www.energy.gov/EM 8
Waste Disposition Highlights
• In February 2017, the Idaho site marked the completion of a 15-year effort to retrieve 65,000 cubic meters of TRU waste at the Advanced Mixed Waste Treatment Project for eventual off-site shipment.
• Los Alamos National Laboratory have completed two-thirds of treatment of the remediated nitrate salt drums. The estimated completion date for treatment is November 2017.
• In July 2017, workers completed the construction of the 33-million gallon Saltstone Disposal Unit 6 at Savannah River Site.
• In September 2017, demolition began on the vitrification facility at West Valley Demonstration Project.
![Page 9: Update on Infrastructure, Regulatory Compliance, Waste … · 2017-12-14 · •Los Alamos National Laboratory have completed two-thirds of treatment of the remediated nitrate salt](https://reader034.fdocuments.in/reader034/viewer/2022050112/5f4e0a3fb6968c1e4a63d62e/html5/thumbnails/9.jpg)
www.energy.gov/EM 9
Complex-wide LLW/MLLW Disposal Rates by Disposal Location
19.16
22.99
16.67
23.16
7.98
12.20
0.920.56 0.58 0.61 0.79
0.231.01 1.34 1.32
1.05 1.131.30
0.71
0
5
10
15
20
25
FY13 Actual FY14 Actual FY15 Actual FY16 Actual FY17 FY18
Mill
ion
s o
f C
ub
ic F
eet
OnSite Commercial NNSS TBD
![Page 10: Update on Infrastructure, Regulatory Compliance, Waste … · 2017-12-14 · •Los Alamos National Laboratory have completed two-thirds of treatment of the remediated nitrate salt](https://reader034.fdocuments.in/reader034/viewer/2022050112/5f4e0a3fb6968c1e4a63d62e/html5/thumbnails/10.jpg)
www.energy.gov/EM 10
Status on GTCC LLRW & GTCC-Like Waste Disposal
• In February 2016, DOE published the Final Environmental Impact Statement for the Disposal of Greater-Than-Class C (GTCC) Low-Level Radioactive Waste and GTCC-Like Waste.
o GTCC LLW has radionuclide concentrations that exceed the limits for Class C LLW. Current inventory is ~12,000 cubic meters.
o GTCC LLW currently does not have a defined disposal path.
o GTCC-like waste is DOE owned or generated LLW or TRU waste with characteristics similar to GTCC LLW, and with no identified disposal path.
o Preferred alternative: land disposal at generic commercial facilities and/or WIPP geologic repository.
• In accordance with the Energy Policy Act of 2005, before the Secretary of Energy makes a final decision on the disposal alternative(s) to be implemented, a Report to Congress must be submitted.
o The Report to Congress is in Departmental concurrence.
![Page 11: Update on Infrastructure, Regulatory Compliance, Waste … · 2017-12-14 · •Los Alamos National Laboratory have completed two-thirds of treatment of the remediated nitrate salt](https://reader034.fdocuments.in/reader034/viewer/2022050112/5f4e0a3fb6968c1e4a63d62e/html5/thumbnails/11.jpg)
www.energy.gov/EM 11
Path Forward
Issue Record of Decision
Await Congressional Action
Submit Report to Congress
The Report to Congress will: • Describe alternatives under
consideration• Identify waste volume,
concentration, and other relevant characteristics
• Identify the Federal and non-Federal options for disposal
• Describe actions to ensure safe disposal of identified radioactive wastes
• Describe projected costs• Identify options for ensuring that
the beneficiaries of the activities resulting from the generation of GTCC LLW bear all reasonable costs of disposing of such wastes
• Identify statutory authority required for disposal of GTCC LLW
![Page 12: Update on Infrastructure, Regulatory Compliance, Waste … · 2017-12-14 · •Los Alamos National Laboratory have completed two-thirds of treatment of the remediated nitrate salt](https://reader034.fdocuments.in/reader034/viewer/2022050112/5f4e0a3fb6968c1e4a63d62e/html5/thumbnails/12.jpg)
www.energy.gov/EM 12
Overview of Waste Disposition Activities
Spring 2017 LLW Forum Meeting
Doug TonkayDirector of Waste Disposal
Office of Environmental Management
April 25, 2017
Update on TRU Waste Shipments to WIPP
WIPP shipments resumed in April 2017
![Page 13: Update on Infrastructure, Regulatory Compliance, Waste … · 2017-12-14 · •Los Alamos National Laboratory have completed two-thirds of treatment of the remediated nitrate salt](https://reader034.fdocuments.in/reader034/viewer/2022050112/5f4e0a3fb6968c1e4a63d62e/html5/thumbnails/13.jpg)
www.energy.gov/EM 13
• Current emplacement rates are 5-6 shipments per week
• The goal is to continue to ramp-up emplacements in FY 2018
• Emplacement ramp-up depends on:
o Altering work shifts
o Efficiencies with operational experience
o Adequate ventilation is available for all underground activities
Update on TRU Waste Shipments to WIPP cont.
![Page 14: Update on Infrastructure, Regulatory Compliance, Waste … · 2017-12-14 · •Los Alamos National Laboratory have completed two-thirds of treatment of the remediated nitrate salt](https://reader034.fdocuments.in/reader034/viewer/2022050112/5f4e0a3fb6968c1e4a63d62e/html5/thumbnails/14.jpg)
www.energy.gov/EM 14
• Sites currently shipping (shipments
through end of September)
o Idaho National Laboratory (48)
o Savannah River Site (9)
o Waste Control Specialists (12)
o Oak Ridge National Laboratory (5)
• Los Alamos National Laboratory expected to begin shipping later in FY 2018
Update on TRU Waste Shipments to WIPP cont.
• Sites estimated to ship in the next few years:
o Argonne National Laboratory
o Lawrence Livermore National Laboratory
o Sandia National Laboratory
![Page 15: Update on Infrastructure, Regulatory Compliance, Waste … · 2017-12-14 · •Los Alamos National Laboratory have completed two-thirds of treatment of the remediated nitrate salt](https://reader034.fdocuments.in/reader034/viewer/2022050112/5f4e0a3fb6968c1e4a63d62e/html5/thumbnails/15.jpg)
www.energy.gov/EM 15
• Provides guidance, tools, and support for DOE programs to assure safe, compliant, reliable, and efficient packaging & transportation of the Department's materials (hazardous and non-hazardous)
• Management & approval of Type B & fissile packaging certification
• Transportation regulations & standards support
• DOE motor carrier evaluations
• Negotiates national freight rate tenders/contracts
• Transportation emergency preparedness & stakeholder outreach
EM’s Office of Packaging and Transportation
![Page 16: Update on Infrastructure, Regulatory Compliance, Waste … · 2017-12-14 · •Los Alamos National Laboratory have completed two-thirds of treatment of the remediated nitrate salt](https://reader034.fdocuments.in/reader034/viewer/2022050112/5f4e0a3fb6968c1e4a63d62e/html5/thumbnails/16.jpg)
www.energy.gov/EM 16
FY16 DOE Shipments
![Page 17: Update on Infrastructure, Regulatory Compliance, Waste … · 2017-12-14 · •Los Alamos National Laboratory have completed two-thirds of treatment of the remediated nitrate salt](https://reader034.fdocuments.in/reader034/viewer/2022050112/5f4e0a3fb6968c1e4a63d62e/html5/thumbnails/17.jpg)
www.energy.gov/EM 17
FY16 EM Shipments
![Page 18: Update on Infrastructure, Regulatory Compliance, Waste … · 2017-12-14 · •Los Alamos National Laboratory have completed two-thirds of treatment of the remediated nitrate salt](https://reader034.fdocuments.in/reader034/viewer/2022050112/5f4e0a3fb6968c1e4a63d62e/html5/thumbnails/18.jpg)
www.energy.gov/EM 18
Questions?