Anglia Level Crossing Reduction Strategy Update – December 2016 Over the past few years Network Rail has been working hard to better manage its level crossings and the risks they pose. It has developed proposals for the possible closure or change to public rights of way at around 130 level crossings in Anglia. Closing or modifying level crossings can help to bring about a number of benefits: Improve the safety of level crossing users Deliver a more efficient and reliable railway, which is vital in supporting the regional and UK economy Reduce the ongoing operating and maintenance cost of the railway Reduce delays to trains, pedestrians and other highway users Improve journey time reliability for railway, highway and other rights of way users The level crossings in this initial phase of the Anglia programme do not include any new railway bridges or underpasses and offer benefits which are currently affordable and deliverable. A second round of public consultation was held in September / October 2016 on our preferred options for the possible closure or change to public rights of way at around 130 level crossings in Anglia. This information pack is to update you on which proposals have been significantly changed within Cambridgeshire, as a result of the feedback received from the public and stakeholders. Please note that proposals which are unchanged or have minor modifications from the September consultation are not included in this public information update. We have made notable changes to our proposals at the following level crossings in Cambridgeshire. The following pages provide you with details of our latest proposals for these level crossings. These are also available on the project website: www.networkrail.co.uk/ anglialevelcrossings. Please note, proposals for other level crossings in the programme that are not referred to in this information pack are unchanged or have minor modifications only. Update on Anglia Level Crossing Proposals Changes resulting from consultation - Cambridgeshire

Transcript of Update on Anglia Level Crossing Proposals...Anglia Level Crossing Reduction Strategy Update –...

Page 1: Update on Anglia Level Crossing Proposals...Anglia Level Crossing Reduction Strategy Update – December 2016 Over the past few years Network Rail has been working hard to better manage

Anglia Level Crossing Reduction Strategy Update – December 2016

Over the past few years Network Rail has been working hard to better manage its level crossings and the risks

they pose. It has developed proposals for the possible closure or change to public rights of way at around 130

level crossings in Anglia. Closing or modifying level crossings can help to bring about a number of benefits:

Improve the safety of level crossing users

Deliver a more efficient and reliable railway, which is vital in supporting the regional and UK economy

Reduce the ongoing operating and maintenance cost of the railway

Reduce delays to trains, pedestrians and other highway users

Improve journey time reliability for railway, highway and other rights of way users

The level crossings in this initial phase of the Anglia programme do not include any new railway bridges or

underpasses and offer benefits which are currently affordable and deliverable.

A second round of public consultation was held in September / October 2016 on our preferred options for the

possible closure or change to public rights of way at around 130 level crossings in Anglia.

This information pack is to update you on which proposals have been significantly changed within Cambridgeshire,

as a result of the feedback received from the public and stakeholders.

Please note that proposals which are unchanged or have minor modifications from the September consultation are

not included in this public information update.

We have made notable changes to our proposals at the following level crossings in Cambridgeshire.

The following pages provide you with details of our latest proposals for these level crossings. These are also available on the project website: www.networkrail.co.uk/ anglialevelcrossings. Please note, proposals for other level crossings in the programme that are not referred to in this information pack are unchanged or have minor modifications only.

Update on Anglia

Level Crossing Proposals

Changes resulting from consultation - Cambridgeshire

Page 2: Update on Anglia Level Crossing Proposals...Anglia Level Crossing Reduction Strategy Update – December 2016 Over the past few years Network Rail has been working hard to better manage

Anglia Level Crossing Reduction Strategy Update – December 2016

Barrington Road is one of the level crossings in the County of

Cambridgeshire. It is located in Foxton Parish and has the postcode

CB22 6SJ. This is a public road with a prohibition of driving. The

railway at this crossing carries passenger and freight trains with a

line speed of 90 mph. There are generally 147 trains passing through

this level crossing per day. A photo of the crossing is shown here.

Public consultation was held in September 2016 on the preferred

option (at the time) for this level crossing. 122 questionnaire

responses were received. Key themes included:

Safety concerns about cyclists having to cross the A10 twice

in certain circumstances.

Closing the crossing would not connect and integrate cyclists with the proposed new A10 cycleway.

Suggestions that the A10 should be widened to accommodate pedestrians and cyclists, therefore avoiding

the need to cross the road.

Length of diversion for some users

This flyer is to update you on changes to our proposals as a result of the feedback received in September from the

public and stakeholders for the Barrington Road level crossing.

Our revised proposals are to close Barrington Road level crossing to all users. Level crossing infrastructure would be

removed and fencing installed to prevent trespass onto the railway. Foxton level crossing would be altered to

accommodate both northbound and southbound 3m wide shared pedestrian/cycle facilities. This would be achieved

by narrowing the Cambridge Road carriageway (A10) over approximately 80 metres and making use of the existing

verges. The proposed cycle facilities would tie in with the existing A10 cycleway. In addition, a new 3m wide shared

footpath/cyclepath would be created through the wooded area to the west of Cambridge Road to link to Barrington

Road. Consideration will be given to ensure the route is suitably lit to minimise environmental impact. A pedestrian

refuge island is proposed at the new desire line across the A10. An overview of the revised proposals is shown on the

drawing overleaf.

Anglia

Level Crossing Proposals C06 – Barrington Road

Foxton Parish

Page 3: Update on Anglia Level Crossing Proposals...Anglia Level Crossing Reduction Strategy Update – December 2016 Over the past few years Network Rail has been working hard to better manage

New 2m wide pedestrianrefuge island

Proposed 2mwide footpath

Proposed fencing to tieinto existing features

Foxton level crossing to remain with narrowed lanes to allow continuouspedestrian/cycleways to each side. Extent of required landtake to be further investigated

Shared 3m wide pedestrian cycleway to both east and westsides of Cambridge Road to link to existing facilities

Proposed 3m wide sharedpedestrian cycleway with lighting

Bus stop laybyretained

Laybay retainedwith modifications

Relocated access tostation northern platform

Amended access to stationsouthern platform

2

4

6

8

1

2

4

4a

76

SB

GP

TCB

Trac kCottage

Shelte r

Hawthorne

Eve rglad e s

El Sub Sta

CAMB

RIDGE

ROAD

A10

STATION ROAD

BARRINGTON ROAD

RAILWAY

FoxtonMcb

2

C06 - Barrington Road ProposalLevel crossing to be closed to all users

For Inform ation

1:1,000Scale at A3 Drawing N o.

Ch'k'd Ap p 'dDe scrip tion DwnDateRe v

JASSJTW CP1 N ov 2016

P:\Le e d s\Easte rn\367516 - GRIP 2-4 - Anglia Le ve l Crossings.JAS\GIS\Pub lic Inform ation Up d ate \04 MX Ds\367516 Cam b rid ge shire Pub lic Inform ation Up d ate .m xd

MMD-367516-C06-PIU-001© Mott MacDonald Ltd .This d ocum e nt is issue d for the p arty whic h c om m issione d it and for sp e c ific p urp ose s conne cte d with the cap tione d p roje c t only. It should not b e re lie d up on b y any othe r p arty or use d for any othe r p urp ose .W e ac c e p t no re sp onsib ility for the c onse que nc e s of this d ocum e nt b e ing re lie d up on b y any othe r p arty, or b e ing use d for any othe r p urp ose , or containing any e rror or om ission whic h is d ue to an e rror or om ission in d ata sup p lie d to use b y othe r p artie s.

Anglia Le ve l Crossing Re d uction Strate gyPub lic Inform ation Up d ate

E Chk

SRP© Crown cop yright and d atab ase rights 2016 Ord nanc e Surve y 0100040692.This d ata m ust not b e p asse d onto any c ontractor/s or third p artie s without p e rm ission from N e twork Rail’s OS Map Te am and /orwithout your c ontractor/s d uly signe d -up to the OS FCDC Contractor Lic e nc e (se e attachm e nt). Se nd ing and /or sharing of OS d atato/with e xte rnal third -p artie s such as N e twork Rail’s Contractors, the ir d e le gate d age nts and /or re p re se ntative s, without p rop e rgove rnanc e will p ut the Contractor (and N e twork Rail b y e xte nsion) in b re ac h of the OS Contractor Lic e nse c ond itions of agre e m e nt.

0 50 100Me tre s

C06 - Barrington Road Cam b rid ge shire , Foxton CP

The ab ove c olours ap p ly to se ctions 1, 2 and 3 ab ove .

SECTION 1: LEVEL CROSSINGS

Future De ve lop m e nts whe rep lanning d e tails are availab le

Brid le way (p ub lic)

Rights to b e m od ifie d as p art of this p roje ct

Carriage way W alkingFootway W alkingV e rge W alking

The line style s ab ove illustrate the typ e of right of way e xtant or p rop ose d .The colour is p e r se ction 4 b e low.

Rights not m od ifie d as p art of this p roje ct

N o c hange and not p artof d ive rsionUse of e xisting right of wayas p art of d ive rsionChange of status to e xistingright of way

Closure of e xistingright of wayCre ation of ne wright of way

Fe nc ing

Gate s

The ab ove sym b ols ind icate e xisting le ve l crossing locations.The ring c olours are as p e r se ction 4 b e low.

SECTION 2: TYPE OF RIGHT OF WAYFootp ath (p ub lic)

Re stricte d b yway (p ub lic)

Byway op e n to all traffic (p ub lic)(e xc lud ing ad op te d highway)

SECTION 3: PROPOSED USE OF ADOPTED HIGHWAY

Road / Trac k (p rivate )

W he re the p rop osals m ay d ive rt use rs onto an ad op te d highway, the ab ove sym b ols d e notewhe re a footway is availab le , a ve rge only, or if ne ithe r a footway or ve rge is availab le andp e d e strians would ne e d to walk in the carriage way.

SECTION 5: ASSOCIATED INFRASTRUCTURE

SECTION 4: PROPOSED STATUS CHANGE

1. The layout shown on this d rawing is ind icative and m ay b e sub je ct to change at d e taile d d e sign.

This Proje ct Third Party Proje cts

Page 4: Update on Anglia Level Crossing Proposals...Anglia Level Crossing Reduction Strategy Update – December 2016 Over the past few years Network Rail has been working hard to better manage

Anglia Level Crossing Reduction Strategy Update – December 2016

Ely North Junction is one of the level crossings in the County of

Cambridgeshire. It is located in Ely Parish and has the postcode CB7

4TZ. This is a stop, look and listen footpath crossing where the user

has to decide whether it is safe to cross. The railway at this level

crossing carries passenger and freight trains with a line speed of 60

mph. There are generally 194 trains passing through this level

crossing per day. A photo of the crossing is shown here.

Public consultation was held in September 2016 on the preferred

option (at the time) for this level crossing. 6 questionnaire responses

were received. Key themes included:

The footpath is a key link from the settlement of Ely to the

wider countryside

The diversion includes too much road (footway) walking

The right of way to the east of the railway should be retained to allow access to the woodland area

This flyer is to update you on changes to our proposals as a result of the feedback received in September from the

public and stakeholders for the Ely North Junction level crossing.

Our revised proposals are to close Ely North Junction level crossing to all users. Crossing infrastructure would be

removed and fencing installed to prevent trespass onto the railway. Rather than diverting footpath 11 along the

industrial unit access road to Ely Road, as previously proposed, footpath 11 would be retained up to the level crossing.

Users would be diverted, to western Queen Adelaide level crossing to the north, along a new 2m wide footpath

adjacent to the railway. The new footpath would be in Network Rail land past the residential dwelling and field

margins in private land to the south. The proposal would significantly reduce walking adjacent to the main road.

New fencing would be provided between the new footpath and railway and also between the footpath and the field

(currently used as a paddock). The existing footpath which runs south along the railway from the eastern Queen

Adelaide crossing would be retained, with a short section leading up to C08 being extinguished. An overview of the

revised proposals is shown on the drawing overleaf.

Anglia

Level Crossing Proposals C08 – Ely North Junction

Ely Parish

Page 5: Update on Anglia Level Crossing Proposals...Anglia Level Crossing Reduction Strategy Update – December 2016 Over the past few years Network Rail has been working hard to better manage

RAILW AY

GREAT RIV ER OUSE

Proposed fencing to tieinto existing features.

Users on southernfootway along Ely Road

Proposed fencingalong the footpath

Proposed 1.5m wide footpathin Network Rail land

Proposed 2m widefootpath in field margin

2

3 1

4

41

38

29

32

51

1230

58

55

66

21

60 46

2739

19

22 14

23

41a

18

Pp

Pp

Ho

Ha ll

TCBFarm

Mast

Mast

Ta n k

Ta n k

L Twr

Ston e Ston eSton e

Pum p

Tower

ShelterB 1382 B 1382

Ston es

Ga ra ge

Fa c tory

Lightin g

ELY ROAD

El Sub Sta

En gin e Shed

Rose De Lisieux

Queen

Adela ide

RIVE

R GR

EAT O

USE

QueenAdelaide

QueenAdelaide

13

11

C08 - Ely North Junction ProposalLevel crossing closed to all users

For In form a tion

1:2,000Sc a le a t A3 Dra win g N o.

Ch'k'd App'dDesc ription DwnDateRev

JASSJTW CP1 N ov 2016

P:\Leeds\Eastern \367516 - GRIP 2-4 - An glia Level Crossin gs.JAS\GIS\Pub lic In form a tion U pdate\04 MXDs\367516 Ca m b ridgeshire Pub lic In form a tion U pda te.m xd

MMD-367516-C08-PIU -001© Mott Ma c Don a ld Ltd.This doc um en t is issued for the pa rty whic h c om m ission ed it a n d for spec ific purposes con n ec ted with the c a ption ed projec t on ly. It should n ot b e relied upon b y a n y other party or used for a n y other purpose.W e a c c ept n o respon sib ility for the con sequen c es of this doc um en t b ein g relied upon b y a n y other party, or b ein g used for a n y other purpose, or con ta in in g a n y error or om ission whic h is due to a n error or om ission in data supplied to use b y other pa rties.

An glia Level Crossin g Reduc tion StrategyPub lic In form ation U pda te

E Chk

SRP© Crown copyright a n d da ta b a se rights 2016 Ordn a n c e Survey 0100040692.This data m ust n ot b e pa ssed on to a n y c on tra c tor/s or third pa rties without perm ission from N etwork Ra il’s OS Ma p Tea m a n d/orwithout your c on tra c tor/s duly sign ed-up to the OS FCDC Con tra c tor Lic en c e (see a tta c hm en t). Sen din g a n d/or sha rin g of OS da tato/with extern a l third-pa rties suc h as N etwork Ra il’s Con tra c tors, their delega ted a gen ts a n d/or represen tatives, without propergovern a n c e will put the Con tra c tor (a n d N etwork Ra il b y exten sion ) in b rea c h of the OS Con tra c tor Lic en se c on dition s of a greem en t.

0 50 100Metres

C08 - Ely N orth Jun c tion Ca m b ridgeshire, Ely CP

The a b ove c olours apply to section s 1, 2 a n d 3 a b ove.

SECTION 1: LEVEL CROSSINGS

Future Developm en ts wherepla n n in g deta ils are a va ila b le

Bridlewa y (pub lic )

Rights to b e m odified a s part of this project

Ca rria gewa y W a lkin gFootwa y W a lkin gV erge W a lkin g

The lin e styles a b ove illustrate the type of right of wa y exta n t or proposed.The colour is per sec tion 4 b elow.

Rights n ot m odified a s part of this projec t

N o c ha n ge a n d n ot partof diversionU se of existin g right of wa yas pa rt of diversionCha n ge of sta tus to existin gright of wa y

Closure of existin gright of wa yCreation of n ewright of wa y

Fen c in g

Ga tes

The a b ove sym b ols in dic a te existin g level crossin g loc a tion s.The rin g c olours are as per section 4 b elow.

SECTION 2: TYPE OF RIGHT OF WAYFootpath (pub lic )

Restric ted b ywa y (pub lic )

Bywa y open to a ll tra ffic (pub lic )(exc ludin g a dopted highwa y)

SECTION 3: PROPOSED USE OF ADOPTED HIGHWAY

Roa d / Tra c k (priva te)

W here the proposa ls m a y divert users on to a n a dopted highwa y, the a b ove sym b ols den otewhere a footwa y is a va ila b le, a verge on ly, or if n either a footwa y or verge is ava ila b le a n dpedestria n s would n eed to wa lk in the c a rria gewa y.

SECTION 5: ASSOCIATED INFRASTRUCTURE

SECTION 4: PROPOSED STATUS CHANGE

1. The la yout shown on this dra win g is in dic a tive a n d m a y b e sub ject to c ha n ge at deta iled design .

This Projec t Third Party Projec ts

Page 6: Update on Anglia Level Crossing Proposals...Anglia Level Crossing Reduction Strategy Update – December 2016 Over the past few years Network Rail has been working hard to better manage

Anglia Level Crossing Reduction Strategy Update – December 2016

Leonards is one of the level crossings in the County of

Cambridgeshire. It is located in Soham Parish and has the postcode

CB7 5HX. This is a stop, look and listen public footpath crossing

where the user has to decide whether it is safe to cross. The railway

at this crossing carries passenger and freight trains with a line speed

of 75 mph. There are generally 83 trains passing through this level

crossing per day. A photo of the crossing is shown here.

Public consultation was held in September 2016 on the preferred

option (at the time) for this level crossing. 2 questionnaire

responses were received. Key themes included:

Concerns that the diversion route is too long

Safety concerns about the diversion route along Mill Drove

Comments that the proposal would be a less enjoyable walking route

This flyer is to update you on changes to our proposals as a result of the feedback received in September from the

public and stakeholders for Leonards level crossing.

Our revised proposals are to close Leonards level crossing to all users. Crossing infrastructure would be removed and

fencing installed to prevent trespass onto the railway. The new proposal would still divert users to the road level

crossing on Mill Drove but the quantity of road / verge walking has been reduced. For users approaching from the

western side of the railway, a new 2m wide footpath which would be created to link footpath 114 to Mill Drove. On

the eastern side, users would have a more direct new footpath, which joins with footpath 101. An overview of the

revised proposals is shown on the drawing overleaf.

Anglia

Level Crossing Proposals C20 – Leonards

Soham Parish

Page 7: Update on Anglia Level Crossing Proposals...Anglia Level Crossing Reduction Strategy Update – December 2016 Over the past few years Network Rail has been working hard to better manage

ROSS P EERS SP ORTS CENTRE

Proposed 2m wide infield margin footpath

Proposed 2mwide footpath

Proposed fencing to tieinto existing features

Footpath 114 to be madepassable for pedestrians

FB

FB

FB

Sluice

Moat

P a th (um)

P a th (um )

Path (um )

Closes

MILL DROVE

The Ga te house

Mill Drove Fa rm

RAILWAY

MillDrove

114

101

113

114

100

C20 - Leonards ProposalLevel crossing closed to all users

For Inform a tion

1:2,500Sca le a t A3 Drawing No.

Ch'k'd App'dDescription DwnDateRev

JASSJTWCP 1 Nov 2016

P :\Le e d s\Easte rn\367516 - GRIP 2-4 - Ang lia Leve l Crossing s.JAS\GIS\P ublic Inform a tion Upd ate \04 MX Ds\367516 Ca m brid g e shire P ublic Inform a tion Upd a te.m xd

MMD-367516-C20-P IU-001© Mott Ma cDona ld Ltd .This d ocum e nt is issue d for the pa rty which com m issione d it a nd for spe cific purpose s conne cte d with the ca ptione d proje ct only. It should not be re lie d upon by a ny othe r pa rty or use d for a ny othe r purpose .We a ccept no re sponsibility for the conse que nce s of this d ocum e nt be ing re lie d upon by a ny othe r pa rty, or be ing use d for a ny othe r purpose , or conta ining a ny e rror or om ission which is d ue to a n e rror or om ission in d a ta supplie d to use by othe r pa rtie s.

Ang lia Leve l Crossing Re d uction Strate g yP ublic Inform a tion Upd a te

E Chk

SRP© Crown copyrig ht a nd d a tabase rig hts 2016 Ord na nce Surve y 0100040692.This d ata m ust not be pa sse d onto a ny contra ctor/s or third pa rtie s without pe rm ission from Ne twork Ra il’s OS Ma p Te a m a nd /orwithout your contra ctor/s d uly sig ne d -up to the OS FCDC Contra ctor Lice nce (se e a tta chm e nt). Se nd ing a nd /or sha ring of OS d a tato/with e xte rna l third -pa rtie s such as Ne twork Ra il’s Contra ctors, the ir d e le g a te d a g e nts a nd /or re pre se ntative s, without prope rg ove rna nce will put the Contra ctor (a nd Ne twork Ra il by e xte nsion) in bre a ch of the OS Contra ctor Lice nse cond itions of a g re e m e nt.

0 50 100Metre s

C20 - Le ona rd s Ca m brid g e shire , Soha m CP

The a bove colours a pply to sections 1, 2 a nd 3 above .

SECTION 1: LEVEL CROSSINGS

Future Deve lopm e nts whe repla nning d e ta ils a re a va ila ble

Brid le wa y (public)

Rig hts to be m od ifie d a s pa rt of this proje ct

Ca rria g e wa y Wa lkingFootwa y Wa lkingVe rg e Wa lking

The line style s above illustra te the type of rig ht of wa y exta nt or propose d .The colour is pe r section 4 be low.

Rig hts not m od ifie d a s pa rt of this proje ct

No cha ng e a nd not pa rtof d ive rsionUse of e xisting rig ht of wa yas pa rt of d ive rsionCha ng e of sta tus to e xistingrig ht of wa y

Closure of existingrig ht of wa yCre a tion of ne wrig ht of wa y

Fe ncing

Ga tes

The above sym bols ind icate existing le ve l crossing locations.The ring colours a re as pe r section 4 be low.

SECTION 2: TYPE OF RIGHT OF WAYFootpath (public)

Re stricte d bywa y (public)

Bywa y ope n to a ll tra ffic (public)(exclud ing a d opte d hig hwa y)

SECTION 3: PROPOSED USE OF ADOPTED HIGHWAY

Roa d / Track (priva te)

Whe re the proposa ls m a y d ive rt use rs onto a n a d opte d hig hwa y, the above sym bols d e notewhe re a footwa y is ava ila ble , a ve rg e only, or if ne ithe r a footwa y or ve rg e is ava ila ble a ndpe d e stria ns would ne e d to wa lk in the ca rria g e wa y.

SECTION 5: ASSOCIATED INFRASTRUCTURE

SECTION 4: PROPOSED STATUS CHANGE

1. The la yout shown on this d ra wing is ind ica tive a nd m a y be subje ct to cha ng e at d e ta ile d d e sig n.

This P roje ct Third P a rty P roje cts

Page 8: Update on Anglia Level Crossing Proposals...Anglia Level Crossing Reduction Strategy Update – December 2016 Over the past few years Network Rail has been working hard to better manage

Anglia Level Crossing Reduction Strategy Update – December 2016

Poplar Drove and Willow Row / Willow Road are level crossings in

the County of Cambridgeshire. They are located in Littleport Parish

and have postcodes CB6 1FB and CB6 1EE respectively. Poplar

Drove is a private user worked crossing with telephone, although

there are alleged public rights over the crossing.

Willow Row / Willow Road is a public byway (Byway Open to all

Traffic) user worked crossing. The railway at these crossings carries

passenger and freight trains with a line speed of up to 90mph.

There are up to 76 trains passing through this level crossing per day.

Photos of the crossings are shown here.

Public consultation was held in September 2016 on the preferred

option (at the time) for these level crossings. 3 questionnaire

responses were received. Key themes included:

Concerns that the diversion route via Willow Road would be

too difficult to cycle over as it lacks a metalled surface

Comments that the proposal doesn’t address safety issues

This flyer is to update you on changes to our proposals as a result

of the feedback received in September from the public and

stakeholders for the Poplar Drove and Willow Row / Willow Road

level crossings.

Our revised proposals are to provide access at Poplar Drove for pedestrians, equestrians and cyclists. Access would

also be retained for two-wheeled motorised vehicles and private registered users (e.g. local landowners / farmers).

Restrictions would be put in place to prevent larger public vehicle use.

Willow Row / Willow Road would be closed to all users.

Crossing infrastructure would be removed from both crossings and fencing installed to prevent trespass onto the

railway. A new 3m wide bridleway would be created in field margins running on the eastern side of the railway

between these two level crossings and would include a steel bridleway bridge. The new bridleway would be

constructed to an appropriate standard with new wayfinding signs with details to be discussed and agreed with the

local authority. In addition, an eastern section of byway 30 of about 450 metres, would be downgraded to a

bridleway with private rights maintained for field access. The western section of byway 30 between Willow Row

/Willow Road up to the intersection of byway 31 would be extinguished.

Anglia

Level Crossing Proposals C26 – Poplar Drove & C27 – Willow Row / Willow Road

Littleport Parish

C26 – Poplar Drove

C27 – Willow Row

Page 9: Update on Anglia Level Crossing Proposals...Anglia Level Crossing Reduction Strategy Update – December 2016 Over the past few years Network Rail has been working hard to better manage

RAILWAY

TEN MILE DRO VE

PO PLAR DRO VE

W ILLO W RO W DRIVE

HALE FEN

Downgrade existing Byway Open to All Traffic to abridleway with private vehicle rights for field access

Proposed 3mwide bridleway

Proposed steelbridleway bridge

Existing vehiculargates to be removed

Proposedbridleway gates

Proposed fencing to tieinto existing features

ETL

ETL

Ruin

Track

The Bungalow

Mow Fe n

WILLOW ROW DRIVE

RAILW

AY

POPLAR DROVE

RIVER GREA

T OUSE

31

30

32 C26 - Poplar Drove ProposalPrivate: User rights retained

Public: Non-motoriseduser rights retained.

Restriction to allow onlytwo-wheeled vehicle useover the level crossing

C27 - Willow Row / Willow Road ProposalLevel crossing closed to all users.

For Inform ation

1:5,000Scale at A3 Drawing No.

Ch'k'd Ap p 'dDe scrip tion DwnDateRe v

JASSJTW CP1 Nov 2016

P:\Le e d s\Easte rn\367516 - GRIP 2-4 - Anglia Le ve l Crossings.JAS\GIS\Pub lic Inform ation Up d ate \04 MX Ds\367516 Cam b rid ge shire Pub lic Inform ation Up d ate .m xd

MMD-367516-C26-PIU-001© Mott MacDonald Ltd .This d ocum e nt is issue d for the p arty whic h c om m issione d it and for sp e c ific p urp ose s conne cte d with the cap tione d p roje c t only. It should not b e re lie d up on b y any othe r p arty or use d for any othe r p urp ose .W e ac c e p t no re sp onsib ility for the c onse que nc e s of this d ocum e nt b e ing re lie d up on b y any othe r p arty, or b e ing use d for any othe r p urp ose , or containing any e rror or om ission whic h is d ue to an e rror or om ission in d ata sup p lie d to use b y othe r p artie s.

Anglia Le ve l Crossing Re d uction Strate gyPub lic Inform ation Up d ate

E Chk

SRP© Crown cop yright and d atab ase rights 2016 O rd nanc e Surve y 0100040692.This d ata m ust not b e p asse d onto any c ontractor/s or third p artie s without p e rm ission from Ne twork Rail’s O S Map Te am and /orwithout your c ontractor/s d uly signe d -up to the O S FCDC Contractor Lic e nc e (se e attachm e nt). Se nd ing and /or sharing of O S d atato/with e xte rnal third -p artie s such as Ne twork Rail’s Contractors, the ir d e le gate d age nts and /or re p re se ntative s, without p rop e rgove rnanc e will p ut the Contractor (and Ne twork Rail b y e xte nsion) in b re ac h of the O S Contractor Lic e nse c ond itions of agre e m e nt.

0 50 100Me tre s

C26 - Pop lar Drove Cam b rid ge shire , Little p ort CP

The ab ove c olours ap p ly to se ctions 1, 2 and 3 ab ove .

SECTION 1: LEVEL CROSSINGS

Future De ve lop m e nts whe rep lanning d e tails are availab le

Brid le way (p ub lic)

Rights to b e m od ifie d as p art of this p roje ct

Carriage way W alkingFootway W alkingVe rge W alking

The line style s ab ove illustrate the typ e of right of way e xtant or p rop ose d .The colour is p e r se ction 4 b e low.

Rights not m od ifie d as p art of this p roje ct

No c hange and not p artof d ive rsionUse of e xisting right of wayas p art of d ive rsionChange of status to e xistingright of way

Closure of e xistingright of wayCre ation of ne wright of way

Fe nc ing

Gate s

The ab ove sym b ols ind icate e xisting le ve l crossing locations.The ring c olours are as p e r se ction 4 b e low.

SECTION 2: TYPE OF RIGHT OF WAYFootp ath (p ub lic)

Re stricte d b yway (p ub lic)

Byway op e n to all traffic (p ub lic)(e xc lud ing ad op te d highway)

SECTION 3: PROPOSED USE OF ADOPTED HIGHWAY

Road / Trac k (p rivate )

W he re the p rop osals m ay d ive rt use rs onto an ad op te d highway, the ab ove sym b ols d e notewhe re a footway is availab le , a ve rge only, or if ne ithe r a footway or ve rge is availab le andp e d e strians would ne e d to walk in the carriage way.

SECTION 5: ASSOCIATED INFRASTRUCTURE

SECTION 4: PROPOSED STATUS CHANGE

1. The layout shown on this d rawing is ind icative and m ay b e sub je ct to change at d e taile d d e sign.

This Proje ct Third Party Proje cts

Page 10: Update on Anglia Level Crossing Proposals...Anglia Level Crossing Reduction Strategy Update – December 2016 Over the past few years Network Rail has been working hard to better manage

Anglia Level Crossing Reduction Strategy Update – December 2016

Second Drove and Cross Keys are level crossings in the County of

Cambridgeshire. They are located in Ely Parish and have postcodes

CB7 4UA and CB7 4UE respectively.

Second Drove is a stop, look and listen public footpath level crossing

where the user has to decide whether it is safe to cross. This level

crossing is protected by whistle boards. Whistle boards are only

effective between the hours of 07:00 – 23:00; outside of these

hours train drivers are not allowed to use their horns. The railway at

Second Drove level crossing carries passenger and freight trains with

a line speed of 60mph and generally has 194 trains passing through

per day.

Cross Keys is a stop, look and listen public footpath level crossing

where the user has to decide whether it is safe to cross. The railway

at Cross Keys level crossing carries passenger and freight trains with

a line speed of 80mph and generally has 57 trains passing through

per day. Photos of the crossings are shown here.

Public consultation was held in September 2016 on the preferred

option (at the time) for these level crossings. 7 questionnaire

responses were received for Second Drove, and 4 for Cross Keys.

Key themes included:

Concerns that the diversion route along the railway is

unsuitable for dog walkers

Comments that if Second Drove is to close, it is important that Adelaide level crossing remain open

Length of diversion at Cross Keys level crossing

Suggestions that a circular route should be created by including a footpath between Adelaide level crossing

and Cross Keys level crossing

This flyer is to update you on changes to our proposals as a result of the feedback received in September from the

public and stakeholders for the Second Drove and Cross Keys level crossings.

Our revised proposals are to close both Second Drove and Cross Keys level crossings to all users. Crossing

infrastructure would be removed and fencing installed to prevent trespass onto the railway. The diversion route for

the closure of Second Drove is similar to the one shown in the previous round of consultation, with users being

diverted to Clayway level crossing to the north west. The route on the eastern side of the railway has been shortened.

The main change to the proposal is the addition of a 2m wide footpath between Adelaide level crossing (which will

remain open) and Cross Keys level crossing. This will create a circular route to the west of the railway. The new

footpath would be constructed to an appropriate standard with new wayfinding signs with details to be discussed

and agreed with the local authority. An overview of the revised proposals is shown on the drawing overleaf.

Anglia

Level Crossing Proposals C09 – Second Drove & C24 – Cross Keys

Ely Parish

C09 – Second Drove

C24 – Cross Keys

Page 11: Update on Anglia Level Crossing Proposals...Anglia Level Crossing Reduction Strategy Update – December 2016 Over the past few years Network Rail has been working hard to better manage

Proposed fencing to tieinto existing features

Proposed bridleway gatesat Clayway Level crossing.

Use of existingunderbridge

Proposed 2m widefootpath in field margin

Proposed steelfootbridge

Proposed composite (steeland concrete) footbridge

Proposed 2m widefootpath in field margin

Proposed composite (steeland concrete) footbridge

Proposed fencing to tieinto existing features

Level crossing removed fromthe project and to remain open

Proposed 2m widefootpath in field margin

Tra c k

Trac k

Tra c k

Sluic e

Sluic e

Ho use

(Tra c k)

The Ba rn

Path (um)

Path (um)

Path (um)

Path (um)

Path (um)

Pump Ho use

The Old Sta b les

BRANCH BAN K

BRANCH BAN K

Kettleswo rth

The Co a c h Ho useCla ywa y Fa rm

Cla ywa y Fa rm Co tta ge

Pa d na l FenSECON

D DROVE (Tra c k

)

CLAYW AY DR

OV E (Trac k)

RAILWAY

RAILW

AY

RIVE

R GR

EAT O

USE

Clayway

Adelaide

57

5015

1349

25

15

25

52

53

C24 - Cross Keys ProposalLevel crossing closed to all users

C09 - Second Drove ProposalLevel crossing closed to all users

Fo r Info rma tio n

1:7,500Sc a le a t A3 Dra wing N o .

Ch'k'd App'dDesc riptio n DwnDa teRev

JASSJTW CP1 N o v 2016

P:\Leed s\Ea stern\367516 - GRIP 2-4 - Anglia Level Cro ssings.JAS\GIS\Pub lic Info rma tio n Upd a te\04 MX Ds\367516 Ca mb rid geshire Pub lic Info rma tio n Upd a te.mxd

MMD-367516-C24-PIU-001© Mo tt Ma c Do na ld Ltd .This d o c ument is issued fo r the pa rty whic h c o mmissio ned it a nd fo r spec ific purpo ses c o nnec ted with the c a ptio ned pro jec t o nly. It sho uld no t b e relied upo n b y a ny o ther pa rty o r used fo r a ny o ther purpo se.W e a c c ept no respo nsib ility fo r the c o nsequenc es o f this d o c ument b eing relied upo n b y a ny o ther pa rty, o r b eing used fo r a ny o ther purpo se, o r c o nta ining a ny erro r o r o missio n whic h is d ue to a n erro r o r o missio n in d a ta supplied to use b y o ther pa rties.

Anglia Level Cro ssing Red uctio n Stra tegyPub lic Info rma tio n Upd a te

E Chk

SRP© Cro wn c o pyright a nd d a ta b a se rights 2016 Ord na nc e Survey 0100040692.This d a ta must no t b e pa ssed o nto a ny c o ntra c to r/s o r third pa rties witho ut permissio n fro m N etwo rk Ra il’s OS Ma p Tea m a nd /o rwitho ut yo ur c o ntra c to r/s d uly signed -up to the OS FCDC Co ntra c to r Lic enc e (see a tta c hment). Send ing a nd /o r sha ring o f OS d a tato /with externa l third -pa rties suc h a s N etwo rk Ra il’s Co ntra c to rs, their d elega ted a gents a nd /o r representa tives, witho ut pro pergo verna nc e will put the Co ntra c to r (a nd N etwo rk Ra il b y extensio n) in b rea c h o f the OS Co ntra c to r Lic ense c o nd itio ns o f a greement.

0 50 100Metres

C24 - Cro ss Keys Ca mbrid geshire, Ely CP

The a b o ve c o lo urs a pply to sectio ns 1, 2 a nd 3 a b o ve.

SECTION 1: LEVEL CROSSINGS

Future Develo pments wherepla nning d eta ils a re a va ila b le

Brid lewa y (pub lic )

Rights to b e mo d ified a s pa rt o f this pro ject

Ca rria gewa y W a lkingFo o twa y W a lkingV erge W a lking

The line styles a b o ve illustra te the type o f right o f wa y exta nt o r pro po sed .The c o lo ur is per sec tio n 4 b elo w.

Rights no t mo d ified a s pa rt o f this pro jec t

N o c ha nge a nd no t pa rto f d iversio nUse o f existing right o f wa ya s pa rt o f d iversio nCha nge o f sta tus to existingright o f wa y

Clo sure o f existingright o f wa yCrea tio n o f newright o f wa y

Fenc ing

Ga tes

The a b o ve symb o ls ind ic a te existing level cro ssing lo c a tio ns.The ring c o lo urs a re a s per sectio n 4 b elo w.

SECTION 2: TYPE OF RIGHT OF WAYFo o tpa th (pub lic )

Restric ted b ywa y (pub lic )

Bywa y o pen to a ll tra ffic (pub lic )(exc lud ing a d o pted highwa y)

SECTION 3: PROPOSED USE OF ADOPTED HIGHWAY

Ro a d / Tra c k (priva te)

W here the pro po sa ls ma y d ivert users o nto a n a d o pted highwa y, the a b o ve symb o ls d eno tewhere a fo o twa y is a va ila b le, a verge o nly, o r if neither a fo o twa y o r verge is a va ila b le a ndped estria ns wo uld need to wa lk in the c a rria gewa y.

SECTION 5: ASSOCIATED INFRASTRUCTURE

SECTION 4: PROPOSED STATUS CHANGE

1. The la yo ut sho wn o n this d ra wing is ind ic a tive a nd ma y b e sub ject to c ha nge a t d eta iled d esign.

This Pro jec t Third Pa rty Pro jec ts

Page 12: Update on Anglia Level Crossing Proposals...Anglia Level Crossing Reduction Strategy Update – December 2016 Over the past few years Network Rail has been working hard to better manage

Anglia Level Crossing Reduction Strategy Update – December 2016

We appreciate you taking the time to read this information and we hope it has been useful to you. The information in this pack is also available on the project website: www.networkrail.co.uk/anglialevelcrossings

If you have any queries about the scheme in general, please contact the Network Rail helpline (03457 11 41 41 or on

the project website). If you wish to comment on the proposals, please use the project email address:

[email protected]. Alternatively, please write to Network Rail free of charge by putting

FREEPOST ANGLIA LEVEL CROSSING PROPOSALS on an envelope and including your comments inside.

Next steps

Further assessment work and preparation of a draft Transport and Works Act Order for submission in March

2017

Formal objection / representation period

Formal public scrutiny, the form of which will be decided by the Secretary of State for Transport

Update on Anglia

Level Crossing Proposals

Thank you