Update on Analysis and Simulations of Beam Tilt ......2007/05/07  · 23/04/2007 Beam Dynamics...

15
23/04/2007 Beam Dynamics Seminar: Update on Bunch Tilt Measurements Christopher Gerth Update on Analysis and Simulations of Beam Tilt Measurements in BC2 - Part 1 - Christopher Gerth, Kirsten Hacker, Eduard Prat

Transcript of Update on Analysis and Simulations of Beam Tilt ......2007/05/07  · 23/04/2007 Beam Dynamics...

Page 1: Update on Analysis and Simulations of Beam Tilt ......2007/05/07  · 23/04/2007 Beam Dynamics Seminar: Update on Bunch Tilt Measurements Christopher Gerth Outline 1. Introduction

23/04/2007 Beam Dynamics Seminar: Update on Bunch Tilt Measurements Christopher Gerth

Update on Analysis and Simulations of Beam Tilt Measurements in BC2

- Part 1 -

Christopher Gerth, Kirsten Hacker, Eduard Prat

Page 2: Update on Analysis and Simulations of Beam Tilt ......2007/05/07  · 23/04/2007 Beam Dynamics Seminar: Update on Bunch Tilt Measurements Christopher Gerth Outline 1. Introduction

23/04/2007 Beam Dynamics Seminar: Update on Bunch Tilt Measurements Christopher Gerth

Outline

1. Introduction / Experimental Setup

2. On-crest operation

3. Bunch tilt measurements

Page 3: Update on Analysis and Simulations of Beam Tilt ......2007/05/07  · 23/04/2007 Beam Dynamics Seminar: Update on Bunch Tilt Measurements Christopher Gerth Outline 1. Introduction

23/04/2007 Beam Dynamics Seminar: Update on Bunch Tilt Measurements Christopher Gerth

1) SR Camera Measurements

0 0.5 1 1.5 2 2.5 3 3.5 4 4.5-0.3

-0.2

-0.1

0

0.1

0.2

0.3

0.4

0.5

0.6

z [m]

x [m

]Reference orbit for bend angle -20 deg.

BPMOTR

SR camera

Horizontal position of the electron beam is related to the beam energy x = R16 * ∆E/E (x = 10 mm ≅ ∆E/E = 3%)

At location of SR camera bunch appears as if ‘streaked horizontally’

-5 -4 -3 -2 -1 0 1 2 3 4 5-5

0

5

10

z [mm]

x [m

m]

10 m

m

9o off-crest

Page 4: Update on Analysis and Simulations of Beam Tilt ......2007/05/07  · 23/04/2007 Beam Dynamics Seminar: Update on Bunch Tilt Measurements Christopher Gerth Outline 1. Introduction

23/04/2007 Beam Dynamics Seminar: Update on Bunch Tilt Measurements Christopher Gerth

1) New SR Port and Camera

Alignment Laser18o bend angle

Movement of mirror and camera needs to be automated

Page 5: Update on Analysis and Simulations of Beam Tilt ......2007/05/07  · 23/04/2007 Beam Dynamics Seminar: Update on Bunch Tilt Measurements Christopher Gerth Outline 1. Introduction

23/04/2007 Beam Dynamics Seminar: Update on Bunch Tilt Measurements Christopher Gerth

1) Layout New SR port

16o – 20.5o

mirror

Fast MCP Detector (single bunch resolution)

ICCD Camera (single bunch)

Alignment laser mirror

Page 6: Update on Analysis and Simulations of Beam Tilt ......2007/05/07  · 23/04/2007 Beam Dynamics Seminar: Update on Bunch Tilt Measurements Christopher Gerth Outline 1. Introduction

23/04/2007 Beam Dynamics Seminar: Update on Bunch Tilt Measurements Christopher Gerth

2) On-crest

140 150 160 170 1800

100

200

300

400

500

600

x [Pixel]

Bin

Con

tent

[arb

. uni

ts]

Horizontal Profile

Simulation:Off-crest phase: 2deg

Image of old test camera:Pronounced C shape!

Page 7: Update on Analysis and Simulations of Beam Tilt ......2007/05/07  · 23/04/2007 Beam Dynamics Seminar: Update on Bunch Tilt Measurements Christopher Gerth Outline 1. Introduction

23/04/2007 Beam Dynamics Seminar: Update on Bunch Tilt Measurements Christopher Gerth

3) Tilt Measurement: Data Evaluation

20 40 60 80 100 120 140

5

10

15

20

25

8 deg off-crest in ACC1Positive bump

20 40 60 80 100 120 140

5

10

15

20

25

No bump

Negative bump5

10

15

20

25

20 40 60 80 100 120 140

Page 8: Update on Analysis and Simulations of Beam Tilt ......2007/05/07  · 23/04/2007 Beam Dynamics Seminar: Update on Bunch Tilt Measurements Christopher Gerth Outline 1. Introduction

23/04/2007 Beam Dynamics Seminar: Update on Bunch Tilt Measurements Christopher Gerth

3) Tilt Measurement: Data Evaluation

200 400 600 800 1000 1200

50

100

150

200

250

300

Step 1) Find region of interest

20 40 60 80 100 120 140 160

5

10

15

20

25

30

Step 2) Find region of interest

120 125 130 135 140 145 1500

100

200

300

400

500

600

700

800

900

1000

120 125 130 135 140 145 150 1550

200

400

600

800

1000

1200

1400

Step 3) Find slice centre

Step 4) Linear Fit of slice centers gives tilt

Page 9: Update on Analysis and Simulations of Beam Tilt ......2007/05/07  · 23/04/2007 Beam Dynamics Seminar: Update on Bunch Tilt Measurements Christopher Gerth Outline 1. Introduction

23/04/2007 Beam Dynamics Seminar: Update on Bunch Tilt Measurements Christopher Gerth

3) Tilt Measurement: Data Evaluation

20 4 0 60 80 1 00 120 140

2

4

6

8

1 0

1 2

1 4

1 6

1 8

2 0

2 2

20 40 60 80 100 120 140 160

2

4

6

8

10

12

14

16

18

20

22

20 4 0 60 80 1 00 120 140

2

4

6

8

1 0

1 2

1 4

1 6

1 8

2 0

2 2

340 360 380 400 420 440 460 480 500 520134

134.5

135

135.5

136

136.5

137

137.5

138

138.5

139

Bump: 2.5

Bump: 0.0

-4 -3 -2 -1 0 1 2 3 4-2.5

-2

-1.5

-1

-0.5

0

0.5

1

1.5

Bump in 9ACC1 [mm]

Bum

p de

pend

ent t

ilt a

t D3B

C2

[deg

]

SR Camera BC2: Bunch tilt measurement 24-Jan-2007

Fitdata points

Bump: -2.5

Page 10: Update on Analysis and Simulations of Beam Tilt ......2007/05/07  · 23/04/2007 Beam Dynamics Seminar: Update on Bunch Tilt Measurements Christopher Gerth Outline 1. Introduction

23/04/2007 Beam Dynamics Seminar: Update on Bunch Tilt Measurements Christopher Gerth

3) Tilt Measurement: Data Evaluation

Raw data

-4 -3 -2 -1 0 1 2 3 4-2

-1.5

-1

-0.5

0

0.5

1

1.5

2

Bump in 9ACC1 [mm]

Bum

p de

pend

ent t

ilt a

t D3B

C2

[deg

]

SR Camera BC2: Bunch tilt measurement 24-Jan-2007

Fitdata points

Simulation by Kirsten Hacker

Page 11: Update on Analysis and Simulations of Beam Tilt ......2007/05/07  · 23/04/2007 Beam Dynamics Seminar: Update on Bunch Tilt Measurements Christopher Gerth Outline 1. Introduction

23/04/2007 Beam Dynamics Seminar: Update on Bunch Tilt Measurements Christopher Gerth

3) Tilt Measurement: Data Evaluation

-4 -3 -2 -1 0 1 2 3 4-2

-1.5

-1

-0.5

0

0.5

1

1.5

2

Bump in 9ACC1 [mm]

Bum

p de

pend

ent t

ilt a

t D3B

C2

[deg

]

SR Camera BC2: Bunch tilt measurement; # of slices: 19, Fit range: 5 - 15

systematic errorstatistical errorlinear fitsimulation

Raw data!

Measurement of20/02/2007 included

Page 12: Update on Analysis and Simulations of Beam Tilt ......2007/05/07  · 23/04/2007 Beam Dynamics Seminar: Update on Bunch Tilt Measurements Christopher Gerth Outline 1. Introduction

23/04/2007 Beam Dynamics Seminar: Update on Bunch Tilt Measurements Christopher Gerth

3) Measurement: Camera Tilt

Trim coil H2BC2 used to steer the beam horizontally

-18 -16 -14 -12 -10 -8 -6 -4 -2 0 2-0.16

-0.14

-0.12

-0.1

-0.08

-0.06

-0.04

-0.02

0

0.02

Horizontal Beam Position [mm]

Ver

tical

Bea

m P

ositi

on [m

m]

2007-03-13T070419-H2BC2TEST, SR Camera BC2: tilt 8.2 mrad

Linear fitdata points

Tilt of 8.2 mrad between Trim Coil and Camera!

Page 13: Update on Analysis and Simulations of Beam Tilt ......2007/05/07  · 23/04/2007 Beam Dynamics Seminar: Update on Bunch Tilt Measurements Christopher Gerth Outline 1. Introduction

23/04/2007 Beam Dynamics Seminar: Update on Bunch Tilt Measurements Christopher Gerth

4) Tilt Measurement: Comparison with Simulation

-4 -3 -2 -1 0 1 2 3 4-2

-1.5

-1

-0.5

0

0.5

1

1.5

2

Bump in 9ACC1 [mm]

Bum

p de

pend

ent t

ilt a

t D3B

C2

[deg

]

SR Camera BC2: Bunch tilt measurement; # of slices: 19, Fit range: 5 - 15

systematic errorstatistical errorlinear fitsimulation

1) Camera tilt corrected2) Shifted to simulation Result at 0 mm bump

Page 14: Update on Analysis and Simulations of Beam Tilt ......2007/05/07  · 23/04/2007 Beam Dynamics Seminar: Update on Bunch Tilt Measurements Christopher Gerth Outline 1. Introduction

23/04/2007 Beam Dynamics Seminar: Update on Bunch Tilt Measurements Christopher Gerth

4) Tilt Measurement: Comparison with Simulation

B um p: 2.2 m m

20 40 60 80 100 120 140

5

10

15

20

25

30

B um p: -2 .2 m m

20 40 60 80 100 120 140

5

10

15

20

25

30

B um p: -2 m m

20 40 60 80 100 120 140

5

10

15

20

25

30

B um p: 2 m m

20 40 60 80 100 120 140

5

10

15

20

25

30

Page 15: Update on Analysis and Simulations of Beam Tilt ......2007/05/07  · 23/04/2007 Beam Dynamics Seminar: Update on Bunch Tilt Measurements Christopher Gerth Outline 1. Introduction

23/04/2007 Beam Dynamics Seminar: Update on Bunch Tilt Measurements Christopher Gerth

4) Tilt Measurement: Comparison with Simulation

0 50 100 15014

14.5

15

15.5

16

16.5

17

17.5

18

18.5

19

0 50 100 1500.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1

Tilt Intensity Profile

Simulation

Measurement