MashDevelopment length / Splices
Upcoming Standard Changes
Stuart Nielsen
![Page 2: Upcoming Standard Changes Mash Training/Updates to Standard ssn.pdf · • Since MASH requires a tested TL-4 rail, Road Design decided to go to a safer rail profile. • Current bridge](https://reader033.fdocuments.in/reader033/viewer/2022060909/60a41ef09d6f58385203cb4b/html5/thumbnails/2.jpg)
BarrierRails
![Page 3: Upcoming Standard Changes Mash Training/Updates to Standard ssn.pdf · • Since MASH requires a tested TL-4 rail, Road Design decided to go to a safer rail profile. • Current bridge](https://reader033.fdocuments.in/reader033/viewer/2022060909/60a41ef09d6f58385203cb4b/html5/thumbnails/3.jpg)
NCHRP 350 – “Recommended Procedures for the Safety Performance Evaluation of Highway Features”• Publication in 1993• Implementation in 1998 - calculations
Manual for Assessing Safety Hardware (MASH)• Originally published in 2009 - Second edition published in 2016• All new hardware (barrier rails) must be tested to MASH (not NCHRP 350) starting January 1, 2011
![Page 4: Upcoming Standard Changes Mash Training/Updates to Standard ssn.pdf · • Since MASH requires a tested TL-4 rail, Road Design decided to go to a safer rail profile. • Current bridge](https://reader033.fdocuments.in/reader033/viewer/2022060909/60a41ef09d6f58385203cb4b/html5/thumbnails/4.jpg)
• Specifically the TL-4 rails have to have a minimum height of 36 inches instead of the current 32 inches.
• Since MASH requires a tested TL-4 rail, Road Design decided to go to a safer rail profile.
• Current bridge barrier rails designs are changing because our existing rails do not meet new the MASH requirements.
![Page 5: Upcoming Standard Changes Mash Training/Updates to Standard ssn.pdf · • Since MASH requires a tested TL-4 rail, Road Design decided to go to a safer rail profile. • Current bridge](https://reader033.fdocuments.in/reader033/viewer/2022060909/60a41ef09d6f58385203cb4b/html5/thumbnails/5.jpg)
• On National Highway System (NHS)• Bridge barriers let after December 31, 2019• New installation or full replacement• Existing systems do not need to be replaced• Full testing is required; finite element analysis alone is insufficient to validate NCHRP 350 devices meets MASH
FHWA/AASHTO Bridge Implementation Plan to meet MASH
![Page 6: Upcoming Standard Changes Mash Training/Updates to Standard ssn.pdf · • Since MASH requires a tested TL-4 rail, Road Design decided to go to a safer rail profile. • Current bridge](https://reader033.fdocuments.in/reader033/viewer/2022060909/60a41ef09d6f58385203cb4b/html5/thumbnails/6.jpg)
MASH
![Page 7: Upcoming Standard Changes Mash Training/Updates to Standard ssn.pdf · • Since MASH requires a tested TL-4 rail, Road Design decided to go to a safer rail profile. • Current bridge](https://reader033.fdocuments.in/reader033/viewer/2022060909/60a41ef09d6f58385203cb4b/html5/thumbnails/7.jpg)
Significant differences at TL‐4
![Page 8: Upcoming Standard Changes Mash Training/Updates to Standard ssn.pdf · • Since MASH requires a tested TL-4 rail, Road Design decided to go to a safer rail profile. • Current bridge](https://reader033.fdocuments.in/reader033/viewer/2022060909/60a41ef09d6f58385203cb4b/html5/thumbnails/8.jpg)
![Page 9: Upcoming Standard Changes Mash Training/Updates to Standard ssn.pdf · • Since MASH requires a tested TL-4 rail, Road Design decided to go to a safer rail profile. • Current bridge](https://reader033.fdocuments.in/reader033/viewer/2022060909/60a41ef09d6f58385203cb4b/html5/thumbnails/9.jpg)
![Page 10: Upcoming Standard Changes Mash Training/Updates to Standard ssn.pdf · • Since MASH requires a tested TL-4 rail, Road Design decided to go to a safer rail profile. • Current bridge](https://reader033.fdocuments.in/reader033/viewer/2022060909/60a41ef09d6f58385203cb4b/html5/thumbnails/10.jpg)
![Page 11: Upcoming Standard Changes Mash Training/Updates to Standard ssn.pdf · • Since MASH requires a tested TL-4 rail, Road Design decided to go to a safer rail profile. • Current bridge](https://reader033.fdocuments.in/reader033/viewer/2022060909/60a41ef09d6f58385203cb4b/html5/thumbnails/11.jpg)
![Page 12: Upcoming Standard Changes Mash Training/Updates to Standard ssn.pdf · • Since MASH requires a tested TL-4 rail, Road Design decided to go to a safer rail profile. • Current bridge](https://reader033.fdocuments.in/reader033/viewer/2022060909/60a41ef09d6f58385203cb4b/html5/thumbnails/12.jpg)
Base 1’-1
![Page 13: Upcoming Standard Changes Mash Training/Updates to Standard ssn.pdf · • Since MASH requires a tested TL-4 rail, Road Design decided to go to a safer rail profile. • Current bridge](https://reader033.fdocuments.in/reader033/viewer/2022060909/60a41ef09d6f58385203cb4b/html5/thumbnails/13.jpg)
Base 1’-3 1/2
![Page 14: Upcoming Standard Changes Mash Training/Updates to Standard ssn.pdf · • Since MASH requires a tested TL-4 rail, Road Design decided to go to a safer rail profile. • Current bridge](https://reader033.fdocuments.in/reader033/viewer/2022060909/60a41ef09d6f58385203cb4b/html5/thumbnails/14.jpg)
General Barrier Shape• Testing currently underway
• 39” Tall• 36” satisfy TL-4
• 3” future overlay
• Single Slope Front Face• Near vertical 1:19.5
• Vehicle stability
• Vertical Back• Sloped back acceptable
• Vertical more critical
Midwest Roadside Safety Facility
![Page 15: Upcoming Standard Changes Mash Training/Updates to Standard ssn.pdf · • Since MASH requires a tested TL-4 rail, Road Design decided to go to a safer rail profile. • Current bridge](https://reader033.fdocuments.in/reader033/viewer/2022060909/60a41ef09d6f58385203cb4b/html5/thumbnails/15.jpg)
![Page 16: Upcoming Standard Changes Mash Training/Updates to Standard ssn.pdf · • Since MASH requires a tested TL-4 rail, Road Design decided to go to a safer rail profile. • Current bridge](https://reader033.fdocuments.in/reader033/viewer/2022060909/60a41ef09d6f58385203cb4b/html5/thumbnails/16.jpg)
![Page 17: Upcoming Standard Changes Mash Training/Updates to Standard ssn.pdf · • Since MASH requires a tested TL-4 rail, Road Design decided to go to a safer rail profile. • Current bridge](https://reader033.fdocuments.in/reader033/viewer/2022060909/60a41ef09d6f58385203cb4b/html5/thumbnails/17.jpg)
![Page 18: Upcoming Standard Changes Mash Training/Updates to Standard ssn.pdf · • Since MASH requires a tested TL-4 rail, Road Design decided to go to a safer rail profile. • Current bridge](https://reader033.fdocuments.in/reader033/viewer/2022060909/60a41ef09d6f58385203cb4b/html5/thumbnails/18.jpg)
![Page 19: Upcoming Standard Changes Mash Training/Updates to Standard ssn.pdf · • Since MASH requires a tested TL-4 rail, Road Design decided to go to a safer rail profile. • Current bridge](https://reader033.fdocuments.in/reader033/viewer/2022060909/60a41ef09d6f58385203cb4b/html5/thumbnails/19.jpg)
Development length and lap lengths
AASHTO 7th AASHTO 8th
![Page 20: Upcoming Standard Changes Mash Training/Updates to Standard ssn.pdf · • Since MASH requires a tested TL-4 rail, Road Design decided to go to a safer rail profile. • Current bridge](https://reader033.fdocuments.in/reader033/viewer/2022060909/60a41ef09d6f58385203cb4b/html5/thumbnails/20.jpg)
Splice Lengths
AASHTO 7th three classes A,B and C AASHTO 8th two classes A and B
![Page 21: Upcoming Standard Changes Mash Training/Updates to Standard ssn.pdf · • Since MASH requires a tested TL-4 rail, Road Design decided to go to a safer rail profile. • Current bridge](https://reader033.fdocuments.in/reader033/viewer/2022060909/60a41ef09d6f58385203cb4b/html5/thumbnails/21.jpg)
Example – tension splice#6 epoxy coated bar 60 ksi2” concrete cover6” spacing
OldNew
Class C
Class B
Lap 3’-7Lap 3’-1
ld = 22”1.7*22”=
ld = 54”Ldf =33”1.3*33”=
![Page 22: Upcoming Standard Changes Mash Training/Updates to Standard ssn.pdf · • Since MASH requires a tested TL-4 rail, Road Design decided to go to a safer rail profile. • Current bridge](https://reader033.fdocuments.in/reader033/viewer/2022060909/60a41ef09d6f58385203cb4b/html5/thumbnails/22.jpg)
5d1 - Spacing > 6”, 2.5” cover, is it a top bar?
New 2’-5 Top Bar 3’-1
TB 2’-11?
![Page 23: Upcoming Standard Changes Mash Training/Updates to Standard ssn.pdf · • Since MASH requires a tested TL-4 rail, Road Design decided to go to a safer rail profile. • Current bridge](https://reader033.fdocuments.in/reader033/viewer/2022060909/60a41ef09d6f58385203cb4b/html5/thumbnails/23.jpg)
Transverse Steel Splice in a bridge deck. Length of splice? Tension?
![Page 24: Upcoming Standard Changes Mash Training/Updates to Standard ssn.pdf · • Since MASH requires a tested TL-4 rail, Road Design decided to go to a safer rail profile. • Current bridge](https://reader033.fdocuments.in/reader033/viewer/2022060909/60a41ef09d6f58385203cb4b/html5/thumbnails/24.jpg)
![Page 25: Upcoming Standard Changes Mash Training/Updates to Standard ssn.pdf · • Since MASH requires a tested TL-4 rail, Road Design decided to go to a safer rail profile. • Current bridge](https://reader033.fdocuments.in/reader033/viewer/2022060909/60a41ef09d6f58385203cb4b/html5/thumbnails/25.jpg)
![Page 26: Upcoming Standard Changes Mash Training/Updates to Standard ssn.pdf · • Since MASH requires a tested TL-4 rail, Road Design decided to go to a safer rail profile. • Current bridge](https://reader033.fdocuments.in/reader033/viewer/2022060909/60a41ef09d6f58385203cb4b/html5/thumbnails/26.jpg)
Future• Projects started after October 1, 2018 shall
use the AASHTO 8th edition• Standards will be updated as fast as possible
for MASH and splices / development lengths• Use standards “AS IS” until new standards
are updated• Non standard designs use new AASHTO 8th
development lengths (projects started after October 1, 2018).
![Page 27: Upcoming Standard Changes Mash Training/Updates to Standard ssn.pdf · • Since MASH requires a tested TL-4 rail, Road Design decided to go to a safer rail profile. • Current bridge](https://reader033.fdocuments.in/reader033/viewer/2022060909/60a41ef09d6f58385203cb4b/html5/thumbnails/27.jpg)