Draft U.P Rooftop Solar PV
Power Plant Policy
-
8/10/2019 UP Draft Rooftop SPP Policy
3/24
Objectives
To contributeto solar capacity additionand energy security
To optimally utilizethe available solar energy resourcein the State
To encourage developmentand promotionof environment benign solar energy
generation contributing to sustainable development
To enable stakeholders in reducing greenhouse gas emissions
To attract private sector participationin solar energy sector
To build favorable environment for setting up grid connected rooftop solar
photovoltaic power plants
To contribute investmentsin manufacturing, research & development in solar energy
sector
To enhance skills and create employment opportunities
To contribute to productive utilization of available sites To create public awarenessand environment consciousness amongst the citizens
-
8/10/2019 UP Draft Rooftop SPP Policy
4/24
TargetsGrid Connected Rooftop Solar Segment(by FY 2016-17) 20 MW
Public Institutions Private Institutions
10 MW 10 MW
-
8/10/2019 UP Draft Rooftop SPP Policy
5/24
Implementation Plan
The State shall encourage implementation of the grid connectedrooftopsolar photovoltaic power plantsfor captiveor self-consumptionfollowingnet energy metering/billing mechanism.
Rooftop Solar Photovoltaic Power Plants are proposed to be promoted underNet Energy Metering Mechanism up to 50 kW and Net Energy BillingMechanism above 50 kW.
Government/Public Institutions Deployment of rooftop solar photovoltaic plants for captive/self-consumption
on the offices of the government organisations, State government owned oraided institutions/organisations like training centres, hospitals , jails etc shallbe promoted by the State Government.
All the aforementioned institutions shall implement grid connected rooftopsolar photovoltaic power plant and generate & consume some percentage oftheir annual electricity consumption from such plant.
The rooftop solar photovoltaic power plant shall be implemented utilizing atleast 25% of the available plinth area.
-
8/10/2019 UP Draft Rooftop SPP Policy
6/24
Implementation Plan
Funds from the Government of Uttar Pradesh, may bemade available for implementation of Grid connectedRooftop Solar Photovoltaic Power Plant.
Private Institutions
All the Private Institutions shall be encouraged toimplement rooftop solar photovoltaic power plant, of
suitable capacity, on the roof of their premises/area,
generate & consume the electricity for their self-
consumption
-
8/10/2019 UP Draft Rooftop SPP Policy
7/24
Eligible Entities
Any person, which shall include any company or bodycorporate or association or body of individuals, whetherincorporated or not, shall be eligible to set up rooftop solarphotovoltaic power plant and approach nodal agency for
implementation of such power plants. Provided such plants are set up for the purpose of captive
use/self-consumption of electricity and such plants complywith the technical standards and specifications, if any,
specified by the Central/State Government. or through itsnominated nodal agency.
-
8/10/2019 UP Draft Rooftop SPP Policy
8/24
Rationale for Net Energy Metering for Rooftop Solar
Photovoltaic Projects
Public/Private Institutions
-
8/10/2019 UP Draft Rooftop SPP Policy
9/24
Movement of Energy Charges in the State
for select Consumer
Year FY09 FY10 FY11-FY13FY14
EXISTING
Reference
PETITION NO. :624,625,626,627,628 OF
200931 March 2010
PETITION NO. :624,625,626,627,628 OF
200931 March 2010
PETITION NO.: 738/2011 &792/2012
19 October 2012
Case No. 02,03,04,05,06 of2013
31 March 2013
Domestic (Urban)
0 - 200
3.00/kWh
3.45/kWh
3.45/kWh
4.00/kWh
201 - 500
3.30/kWh
3.80/kWh
3.80/kWh
4.50/kWh
>500
3.30/kWh
3.80/kWh
3.80/kWh
5.00/kWh
Non-Domestic
0 - 300
4.30/kWh
4.95/kWh
5.75/kWh
6.00/kWh
>300
4.30/kWh
4.95/kWh
6.00/kWh
6.50/kWh
Public InstitutionsAll Units
4.00/kWh
4.60/kWh
6.20/kWh
6.50/kWh
Private Institutions
All Units
4.30/kWh
4.95/kWh
6.75/kWh
6.75/kWh
Energy Charges in the Consumer categories have increased by 2/kWh in last 6 years Final billing rate include, fixed charges, energy charge, regulatory surcharge, electricity duty
-
8/10/2019 UP Draft Rooftop SPP Policy
10/24
Scenario Net Energy Metering Mechanism
0.00
1.00
2.00
3.00
4.00
5.00
6.00
7.00
8.00
9.00
Domestic Non-Domestic Public Institution Private Institution
/kWh
Fixed Charge Energy Charge Regulatory Surcharge Electricity Duty
Description DomesticNon-
DomesticPublic
InstitutionPrivate
Institution
Fixed Charge 0.75 1.00 1.11 1.11
Energy Charge 4.30 6.35 6.50 6.75
RegulatorySurcharge
0.19 0.27 0.28 0.29
Electricity Duty 0.05 0.08 0.08 0.08
Effective BillingRate
5.29 7.70 7.97 8.23
Charges of consumer categories as per the Case No. 02,03,04,05,06 of 2013 of UPERCFor public and private institution billing rate computation is carried out for connected load of 20kW
DescriptionWithoutSubsidy
With 30%GOISubsidy
Levellised Cost of Generation 9.13 6.65
-
8/10/2019 UP Draft Rooftop SPP Policy
11/24
Subsidy
State Nodal Agency shall facilitate in availingGovernment of India subsidy, if available forimplementation of such plants, to both Public and
Private Institutions / organisations.
-
8/10/2019 UP Draft Rooftop SPP Policy
12/24
Transaction Framework
for Net Energy Metering
-
8/10/2019 UP Draft Rooftop SPP Policy
13/24
Role of UP NEDA (To act as Nodal agency )
Facilitation in availing subsidy/incentive identification of sites suitable for deployment of solar power capacities Empanel system integrator for implementation of power plants. Organise competitive bidding for allotment of capacities to system
integrator Allotment of solar power capacities.
Support in establising procedures/protocols for easy adoption of solarpower Recommend and specify fee and charges necessary to operationalise
the framework Declaration of Government Orders from time to time Support in development of Regulatory Framework
Approvals from Empowered Committee headed by Cheif Secretary.
-
8/10/2019 UP Draft Rooftop SPP Policy
14/24
Provisions to be proposed to UPERC for
developing Net energy Metering /
Billing framework
-
8/10/2019 UP Draft Rooftop SPP Policy
15/24
Eligible Consumer
Net Metering
IndividualCapacity
Provisions proposedAll consumershaving contracted load of not less than
1kW shall be eligible
The power plant can be self-owned by the consumeror
owned by any other personand install the Power Plantfollowing the provisions of the Electricity Act, 2003 andamendment thereof
The eligibility of the consumer for availing net energymetering & billing arrangement shall cease to applyin case the eligible consumer defaults in settling theelectricity bills due for payment. The arrangementshall be restored after settlement of energy bills
Grid
Connectivity
Energy
Accounting
Solar Purchase
Obligation
Metering
Protocol
Other Charges
Eligible
Consumer
-
8/10/2019 UP Draft Rooftop SPP Policy
16/24
Individual Capacity
Net Metering
IndividualCapacity
Provisions proposedThe eligible consumer shall be allowed to off-set its entireelectricity imports from the host distribution Licenseeduringthe year;
The capacity of the solar photovoltaic power plant shall beequivalent to the contracted load of the consumer and theservice line for the consumer shall be utilized for grid
connectivity for evacuation at 415 V or below voltage level;The consumer may implement solar photovoltaic power plant ofhigher capacity, in excess of its existing contracted/sanctioned load,only after equivalent enhancement of its contracted/sanctioned loadby the distribution Licensee;
The consumer shall bear all expenses of laying new electricalline and related infrastructure, up to the network of distributionlicensee, for evacuation of generation due to implementation ofsolar photovoltaic power plant capacity in excess of contractedloadof the eligible consumer and/or export of generation above415 V voltage level,
Maximum capacity should be 500 kWp shall be allowed forimplementation at single site, after taking consent from thedistribution licensee
Grid
Connectivity
Energy
Accounting
Solar Purchase
Obligation
Metering
Protocol
Other Charges
Eligible
Consumer
-
8/10/2019 UP Draft Rooftop SPP Policy
17/24
Grid Connectivity
Net Metering
IndividualCapacity
Provision Proposed
Capacity Target for Distribution Licensee Distribution Licensee shall submit procedure, and amended
procedure, for implementing net energy metering mechanism forapproval of Uttar Pradesh Electricity Regulatory Commission
Distribution Licensee shall provide net energy meteringarrangement to eligible consumers within the stipulated timeafter receiving the written applicationin a prescribed formatand complete in all respect;
The cumulative capacity to be allowed at a particulardistribution transformer shall not exceed 15% of the peakcapacity of that distribution transformer, after that the
distribution licensee shall upgrade the capacity of distributiontransformer;
Grid Connectivity
Interconnectivity shall be as per Regulations specified by CEA orElectricity Supply Code specified by UPERC
GridConnectivity
Energy
Accounting
Solar Purchase
Obligation
Metering
Protocol
Other Charges
EligibleConsumer
-
8/10/2019 UP Draft Rooftop SPP Policy
18/24
Energy Accounting
Net Metering
IndividualCapacity
Provision Proposed Net Energy Metering Arrangement connectivity at 415 V
and below
Energy accounting shall be primarily on basis of netimport/export recorded in the bi-directional meter.
The distribution Licensee shall pursue energy bill on thebasis of net energy metered in the bi-directional meter.
Net Energy Metering Arrangement - connectivity at above415 V
Energy accounting shall be primarily on basis of two
separate meters for recording import from thedistribution Licensee and export of generation from solarphotovoltaic power plant, respectively.
The distribution Licensee shall pursue net energy billafter taking into account the reading in both the meters
GridConnectivity
Energy
Accounting
Solar Purchase
Obligation
Metering
Protocol
Other Charges
Eligible
Consumer
-
8/10/2019 UP Draft Rooftop SPP Policy
19/24
Solar Purchase Obligation
Net Metering
IndividualCapacity
Provisions proposed
The quantum of electricity consumed byeligible consumer, who is not defined asobligated entity, from the solar photovoltaicpower plant shall qualify as deemedRenewable Purchase Obligation (RPO) forthe distribution Licensee.
GridConnectivity
Energy
Accounting
Solar PurchaseObligation
Metering
Protocol
Other Charges
Eligible
Consumer
-
8/10/2019 UP Draft Rooftop SPP Policy
20/24
Metering Protocol
Net Metering
IndividualCapacity
Provisions proposed The type, accuracy & class, location of meters and metering arrangement
shall be governed by regulations notified by Central Electricity Authorityfrom time to time;
seeking connectivity with the grid above 415 V voltage level,
Central Electricity Authority (Installation and Operation of Meters)Regulations, 2006 and Central Electricity Authority (Installation
and Operation of Meters) Amendment Regulations, 2010 and anyamendment thereof
Power plant seeking connectivity with the grid at 415 V and belowvoltage levels,
Central Electricity Authority is notifying separate regulations ongrid interactive renewable energy plants, the same shall apply;
Procurement, testing, installation of new meter and replacement ofexisting meter with new and/or additional meter shall be undertakenby the host distribution Licenseeand shall recover the chargesfrom the eligible consumer as approved from the Commission
Solar Check meters shall be mandatoryfor installations havingcapacity more than 10 kW. For installations size of less than and equal
to 10 kW, the solar Check meters would be optional .
GridConnectivity
EnergyAccounting
Solar PurchaseObligation
MeteringProtocol
Other Charges
EligibleConsumer
-
8/10/2019 UP Draft Rooftop SPP Policy
21/24
Other charges
Net Metering
IndividualCapacity
Banking of power
The eligible consumer shall be allowed to bank 100% of the
electricitywith the Distribution Licensee,
The withdrawal of banked energy shall be allowed during theperiod other than 17:00 Hrs. to 22:00 Hrs., specified as peak hours,
The withdrawal of banked energy shall be allowed subject todeduction of 2%of the banked energy, in each month, as bankingchargespayable to the distribution Licensee in kind,
The banking of energy shall be allowed during the year from the date ofbanking or from 1stApril and ends on 31stMarch of the year.
The energy generated in a month shall be adjusted againstconsumption in that month and the balance if any shall be consideredas the banked energy for the month m. Similarly, the generation inconsecutive month, m+1, shall be first adjusted against the
consumption in that month. In a situation that the consumptionexceeds the generation during the month m+1, the energy banked inthe previous month(s) mshall be drawn to the extent.
The unutilized banked energyon the expiry of the year would betreated as free energy to the Distribution Licensee and nocommercial settlement shall be made
GridConnectivity
Energy
Accounting
Solar PurchaseObligation
MeteringProtocol
Other Charges
Eligible
Consumer
-
8/10/2019 UP Draft Rooftop SPP Policy
22/24
Other charges
Net Metering
IndividualCapacity
Wheeling of power In order to promote the rooftop solar photovoltaic projects, wheeling
charges and losses shall be nil during the first control period or when thetotal capacity 20 MW for rooftop solar power plant is being installed,whichever is earlier.
However, after such period the wheeling charges and losses for the use ofdistribution licensees network at respective voltage levels shall be as
determined by the Commission by general or specific orderCross Subsidy Surcharge
In case the solar photovoltaic power plant is owned by the eligibleconsumer, it shall not be liable to pay surcharge for consumption of thegenerated electricity for its own use. Provided it complies with therequirement of captive generating plant specified under Electricity Rules,
2005 In order to promote the rooftop solar projects, cross subsidy surcharge in
case the supply of power is made to the eligible consumer by any otherperson shall be nil during the first control period or when the totalcapacity 20 MW for rooftop solar power plant is being installed,whichever is earlier.
After such period such consumer or person shall be liable to paysurcharge as determined the Commission, from time to time.
GridConnectivity
Energy
Accounting
Solar PurchaseObligation
MeteringProtocol
Other Charges
Eligible
Consumer
-
8/10/2019 UP Draft Rooftop SPP Policy
23/24
Net Energy Meter ing Schematic Arrangement
Proposed to be connected at 415 V and below Proposed to be connected at above 415 V
-