UNIVERSITY OF SOUTH FLORIDA Marshall Student Center ... · General Contractor and Construction...

1
26 UNIVERSITY OF SOUTH FLORIDA Marshall Student Center, Panera Bread This project was a remodel for Aramark in the University of South Florida’s Marshall Student Center. The scope of work included a complete renovation of an existing restaurant space that was formerly used for Einstein Bros. Bagels and transforming the space into a Panera Bread. ENCOTECH’s scope included all new electrical, HVAC, walls, plumbing, food service equipment and finishes including floor and wall tile, ceilings, wall finishes and a new front service counter. General Contractor and Construction Management for Continuing Services, Projects Under $2,000,000 This project was completed early and on budget. SCHEDULED COMPLETION DATE: August 26, 2019 ACTUAL COMPLETION DATE: August 22, 2019 ORIGINAL BUDGET: $365,124 FINAL BUDGET: $365,124 OWNER: University of South Florida Contact: Matthew Marshall [email protected], (813) 974-3180 Aramark Contact: David Disalvo TEAM MEMBERS: Kelly Coyle (Project Manager), Joe Beucher (Superintendent), Michael Coyle (Project Coordinator), Robert Peterson (Foreman), Keith McKnight (Foreman), Terry Coyle (Admin) APPENDIX: ADDITIONAL PROJECTS

Transcript of UNIVERSITY OF SOUTH FLORIDA Marshall Student Center ... · General Contractor and Construction...

Page 1: UNIVERSITY OF SOUTH FLORIDA Marshall Student Center ... · General Contractor and Construction Management for Continuing Services, Projects Under $2,000,000 This project was completed

26

UNIVERSITY OF SOUTH FLORIDAMarshall Student Center, Panera Bread

This project was a remodel for Aramark in the University of South Florida’s Marshall Student Center. The scope of work included a complete renovation of an existing restaurant space that was formerly used for Einstein Bros. Bagels and transforming the space into a Panera Bread. ENCOTECH’s scope included all new electrical, HVAC, walls, plumbing, food service equipment and fi nishes including fl oor and wall tile, ceilings, wall fi nishes and a new front service counter.

General Contractor and Construction Managementfor Continuing Services, Projects Under $2,000,000

This project was completed early and on budget.

SCHEDULED COMPLETION DATE: August 26, 2019ACTUAL COMPLETION DATE: August 22, 2019

ORIGINAL BUDGET: $365,124FINAL BUDGET: $365,124

OWNER: University of South FloridaContact: Matthew [email protected], (813) 974-3180Aramark Contact: David Disalvo

TEAM MEMBERS: Kelly Coyle (Project Manager), Joe Beucher (Superintendent), Michael Coyle (Project Coordinator), Robert Peterson (Foreman), Keith McKnight (Foreman), Terry Coyle (Admin)

APPENDIX: ADDITIONAL PROJECTS

D_Architecture_Inc
Text Box
D_Architecture_Inc
Text Box
D_Architecture_Inc
Text Box
D_Architecture_Inc
Stamp
D_Architecture_Inc
Stamp
D_Architecture_Inc
Text Box
Address : 8810 Commodity Circle, Suite #18 Orlando, FL 32819 : phone (407) 354-5765 www.esicc.com
D_Architecture_Inc
Stamp