University Mr. Joe Sample 2901 Lake Blvd. Cleveland, OH...

23
University Mr. Joe Sample 2901 Lake Blvd. Cleveland, OH 44101 University 2901 Lake Blvd. Cleveland, OH 44101 Building Remediation Sciences

Transcript of University Mr. Joe Sample 2901 Lake Blvd. Cleveland, OH...

UniversityMr. Joe Sample 2901 Lake Blvd. Cleveland, OH 44101

University 2901 Lake Blvd. Cleveland, OH 44101

Building Remediation Sciences

pureair
Highlight

September 18, 2014

University Mr. Joe Sample 2901 Lake Blvd. Cleveland, OH 44101

RE: Environmental Remediation Summary Report for the University

Dear Mr. Sample,

Pure Air Control Services, Inc. (PACS) is pleased to submit the Environmental Remediation Report for the Duct Cleaning, PURE-Decon Room Sanitization and PURE-Liner of two (2) units at the University located at 2901 Lake Blvd., Cleveland, OH 44101. This work was completed on September 18th, 2014.

The enclosed document illustrates:

Photo Documentation – before and after remediation

Daily Progress Reports

Thank you for providing Pure Air Control Services the opportunity to assist you with your IAQ concerns. If you should have any questions regarding the information in this Remediation Photo Summary Report, please contact me at 1-800-422-7873, ext. 602.

Respectfully submitted,

PURE AIR CONTROL SERVICES

Cynthia Bailey Business Operations Manager Building Remediation Sciences

Mechanical Division: St. Lic #CACO57992

Publisher of: THE IEQ REVIEW

Home of the: Indoor Air Quality Screen Test

Kit (IAQ-STK)

IAQ Advisory Board

Alan L. Wozniak, CIAQP President/CEO

Mark D. Wozniak, M.B.A., CIAQP Vice President

Rajiv Sahay, Ph.D. Laboratory Director

Ambuj Kumar, M.D., M.P.H. Environmental Health Consultant

Francisco T. Aquirre Senior IAQ Diagnostician Certified St. Lic. Class A

Cynthia M. Bailey Business Operations Manager

Dr. Monroe J. King, P.A. Allergist / Immunologist Medical Consultant

Mechanical License # CACO57992

“Indoor Air Diagnostic, Environmental Laboratory and Remediation Experts”

Corporate Office 4911 Creekside Drive · Suite C · Clearwater, FL 33760 · (727) 572-4550 · Toll Free: 1-800-422-7873 · Fax: (727) 572-5859

E-mail: [email protected] · Web Site: www.pureaircontrols.com

Client: University

Jobsite: University

Work Order:

Client ID:

Building ____

1. Action Shot 2. Contaminated Insulation BEFORE

2A. AFTER Removal of Insulation 2B. AFTER Being Lined

Client: University

Jobsite: University

Work Order:

Client ID:

Building ____

3. Return Duct BEFORE 3A. Return Duct AFTER

4. Return Duct BEFORE 4A. Return Duct AFTER

Client: University

Jobsite: University

Work Order:

Client ID:

Building ____

5. Return Duct BEFORE 5A. Return Duct AFTER

6. Return Duct BEFORE 6A. Return Duct AFTER

Client: University

Jobsite: University

Work Order:

Client ID:

Building ____

7. Insulation Removal 7A. Replaced Insulation

8. Supply Duct BEFORE 8A. Supply Duct AFTER

Client: University

Jobsite: University

Work Order:

Client ID:

Building ____

9. Supply Duct BEFORE 9A. Supply Duct AFTER

10. Supply Duct BEFORE 10A. Supply Duct AFTER

Client: University

Jobsite: University

Work Order:

Client ID:

Building ____

11. Supply Duct BEFORE 11A. Supply Duct AFTER

12. Supply Duct BEFORE 12A. Supply Duct AFTER

Client: University

Jobsite: University

Work Order:

Client ID:

Building ____

13. Blower Wheel BEFORE 13A. Blower Wheel AFTER

14. Steaming the Coils 15. Steaming the Coils

Client: University

Jobsite: University

Work Order:

Client ID:

Building ____

16. Supply Duct BEFORE 16A. Supply Duct AFTER

17. Supply Duct BEFORE 17A. Supply Duct AFTER

Client: University

Jobsite: University

Work Order:

Client ID:

Building ____

18. Supply Duct BEFORE 18A. Supply Duct AFTER

19. Supply Duct BEFORE 19A. Supply Duct AFTER

Client: University

Jobsite: University

Work Order:

Client ID:

Building ____

20. Supply Duct BEFORE 20A. Supply Duct AFTER

21. Supply Duct BEFORE 21A. Supply Duct AFTER

Client: University

Jobsite: University

Work Order:

Client ID:

Building ____

22. Supply Duct AFTER Insulation 23. Supply Duct AFTER Insulation

24. Supply Duct AFTER Insulation 25. Supply Duct AFTER Insulation

Client: University

Jobsite: University

Work Order:

Client ID:

Building ____

26. Supply Duct BEFORE 26A. Supply Duct AFTER Insulation

27. Supply Duct AFTER Insulation

Client: University

Jobsite: University

Work Order:

Client ID:

Building ____

28. Return Air Passover BEFORE 28A. Return Air Passover AFTER

29. Return Duct BEFORE 29A. Return Duct AFTER

Client: University

Jobsite: University

Work Order:

Client ID:

Building ____

30. Return Duct BEFORE 30A. Return Duct AFTER

31. Return Air Passover BEFORE 31A. Return Air Passover AFTER

Client: University

Jobsite: University

Work Order:

Client ID:

Building ____

32. Return Side Coil BEFORE 32A. Return Side Coil AFTER

33. Return Duct BEFORE 33A. Return Duct AFTER

Client: University

Jobsite: University

Work Order:

Client ID:

Building ____

34. Supply Duct BEFORE 34A. Supply Duct AFTER

35. Supply Duct BEFORE 35A. Supply Duct AFTER

Client: University

Jobsite: University

Work Order:

Client ID:

Building ____

36. Scrapped Supply Duct BEFORE 36A. Supply Duct AFTER Being Lined

37. Scrapped Supply Duct BEFORE 37A. Supply Duct AFTER Being Lined

Client: University

Jobsite: University

Work Order:

Client ID:

Building ____

38. Vertical Supply Duct BEFORE 38A. Vertical Supply Duct AFTER Being Lined

39. Interior Insulation BEFORE 39A. AFTER Being Lined

Client: University

Jobsite: University

Work Order:

Client ID:

Building ____

40. Drain Pan BEFORE 40A. Drain Pan AFTER Relining

41. Drain Pan BEFORE 41A. Drain Pan AFTER Relining

Client: University

Jobsite: University

Work Order:

Client ID:

Building ____

42. Drain Pan BEFORE 42A. Drain Pan AFTER Relining

43. Drying Process 44. Drying Process

PURE AIR CONTROL SERVICES, INC.

BUILDING REMEDIATION SCIENCES (BRS) DIVISION

DAILY PROGRESS REPORT

Client Day

Project Date

Attention Time In Time Out

Phone Project Personnel

Fax Supervisor Technician

P.O. # Technician Technician

PACS Quote # Technician Technician

Work Order # Technician Technician

Location / Floor : Remove Insulation

Unit #:

Model #: / Serial #:

Yes/No Work Description

N/A Using Upright Wet/Dry HEPA Vacuum the Interior of Unit was Vacuumed

N/A Interior of unit was disinfected

N/A AHU Blower Assembly was washed

YES Insulation Liner Removed

N/A Insulation Liner Replaced

N/A AHU Cabinet and Blower Housing was Painted-Brand New Unit

N/A Using the HEPA 5000 in conjunction with the Viper / mechanical Brush System, we cleaned _____ feet of supply ductwork

N/A The ductwork was then treated with BBJ / Portersept 3830 / Fosters 4020/ Fiberlock 8000

N/A Using the HEPA 5000 in conjunction with the Viper / Mechanical Brush System we cleaned _____ feet of return ductwork

N/A We then cleaned _____ Supply Grills using PK 900 / Multicide. All grills were re-installed after cleaning

N/A We then cleaned _____ Return grills using PK 900 / Multicide. All grills were re-installed after cleaning

N/A Particle counts and photo documentation were taken to ensure project QA/QC.

N/A After Remediation, all areas were cleaned and the AHU was brought back on line

N/A Today the remediation effort consisted of setting up containment in the ________ area

N/A Negative pressure was established prior to starting remediation

N/A We removed ______sq. feet of drywall / ______ sq. feet of carpet / ________ Other

N/A All material was double bagged, disinfected, then properly disposed of.

N/A

N/A Particle counts / photographs / containment pressure monitoring was performed in order to ensure project QA / QC.

Other Comments:

Today's remediation process at the University consisted of:

• The environmental removal of mold contaminated insulation in the supply ductwork & supply side of AHU # 2

• AHU # 2 & supply ductwork associated with this AHU, were mechanically brushed & HEPA vacuumed

• Section of the return ductwork was also cleaned, but not treated

• All work areas were cleaned & AHU was brought back on line before leaving the job site.

• All material was double bagged, disinfected & properly disposed of

• Lockout/tagout was in place throughout the remediation process and removed at the end of the shift

• All work areas were cleaned & AHU was brought back on line before leaving the job site.

We performed topical cleaning of the contained area located in / at __________, All surfaces were HEPA vacuumed then wet wiped

with multicide (or other antimicrobial)

03:30 PM

123-456-7890

None

University Thursday

09/18/14

Mr. Joe Sample 07:00 AM