United States Department ofthe Interior BUREAU OF SAFETY AND ENVIRONMENTAL ENFORCEMENT
GulfofMexico OCS Region 1201 Elmwood Park Boulevard
New Orleans, Louisiana 70123-2394
In Reply Refer To: GE 1035A May 4, 2017
Mr. James Gibson Talos Eneigy Offshore LLC 500 Dallas Street, Suite 2000 Houston, TX 770024800
Dear Mr. Gibson:
Reference is made to your request dated February 20, 2017, with supplemental data submitted on April 24, 2017, to relinquish Pipeline Right-of-way (ROW) OCS- G28634 and to decommission by removal the associated pipeline segment number (PSN) 14829
For ease of reference, PSN 14829 is described as follows: Segment Number
Size (Inches)
Length (feet)
Service From To
14829 8 5,549 Gas/Condensate Platfonn A 16-inch SSTI Vermilion Area South Marsh Island
Area Block 51 Block 220
Effective Date of Relinquishment: Febmary 22, 2017
The approval is subject to the following:
Our review indicates that your proposed activities are inthe vicinity ofthe unidentified magnetic anomahes listed in the Enclosure 1, features that may represent significant archaeological resources. In accordance with 30 CFR 250.1007(a)(5), you must either (1) conduct an underwater archaeological investigation (diver and/or ROV investigations) prior to commencing activities to determine whether these features represent archaeological resources, or (2) ensure that all seafloor disturbing actions resulting from the proposed activities avoid the unidentified features by a distance greater than that listed in the Enclosure 1. Ifyou conduct an underwater archaeological investigation prior to commencing operations, contact either Dr. Jack Mon at (504) 736-1742 or Dr. Christopher Horrell at (504) 736-2796 at least two weeks prior to performing operations to obtain the investigation methodology. If you choose to avoid the features, submit anchor position plats, at a scale of 1-in. = 1,000-ft. with DGPS accuracy, with your decommissioning report required by 30 CFR 250.1753(b). These plats must depict the "as-placed" location of all anchors, anchor chains, wire ropes and cables on the seafloor (including sweep) and demonstrate that the features were not physically impacted by the decommissioning activities. Ifyou choose to avoid the features and no anchoring activities were conducted during
Page 2
pipeline decommissioning, provide a statement to that effect in lieu ofthe required anchor position plats.
In accordance with 30 CFR 250.1752, your request to decommission this pipeline by removal is hereby approved.
Pursuant to 30 CFR 250.141, your request to use an altemate procedure, flushing the pipeline until free of hydrocarbons, from 30 CFR 250.1752(b), the requirement to pig the pipeline, is hereby approved.
The aforementioned decommissioning operations must be completed within 180 days ofthe date ofthis letter and a decommissioning completion report must be submitted to this office within 30 days of completing the decommissioning.
PHILBF ly'PHILLIPSMITH
2017.05.04 SMITH 15:49:22 -OS'OO' (for) Bryan A. Domangue
Acting Regional Supervisor Regional Field Operations
Page 3
Enclosure No. 1
Magnetic Anomalies
Area/Block Shot Line
Number
Point Number
Intensity (Gammas)
Duration (Feet) Coordinates
Minimum Avoidance Distance
(Feet) SM220 28 28 61 100 X= 1738305
Y= 263920 LAT=29.389841408 LON=-92.155054313
150
SM220 103 15 117 150 X= 1741409 Y= 264213 LAT=29.390707989 LON=-92.145314616
200
TAL®S — — E N E R O Y I I C
February 20, 2017 **Amended April 24 2017**
U.S. Department ofthe Interior
Bureau of Safety and Environmental Enforcement 1201 Elmwood Park Boulevard New Orleans, Louisiana 70123-2394
Attention: Phillip Smith Pipeline Unit GE 1035A
RE: Amended Application to Relinquish Right-of-Way OCS-G 28634 and Remove Existing 8-inch Gas/Condensate Right-of-Way Pipeline Segment No. 14829, Originating at Vermilion Block 51 "A" and Terminating at South Marsh Island Block 220 16" SSTI, OCS Federal Waters, Gulf of Mexico, Offshore Louisiana
Dear Mr. Smith:
By letter dated February 20, 2017, Talos Energy Offshore, LLC (Talos) submitted an application to relinquish ROW OCS-G 28634 and decommission-in-place the existing 8-inch gas/condensate right-of-way pipeline Segment No. 14829 in its entirety, Vermilion/South Marsh Island Area, OCS Federal Waters, Gulf of Mexico, Offshore Louisiana. Due to being in a Sand/Sediment Area, BOEM Environmental Section determined that decommission in-place will not be permitted and that this pipeline must be removed.
Segment No. 14829 will be flushed with two pipeline volumes of seawater to displace hydrocarbons prior to decommissioning. Pursuant to 30 CFR 250.141, Talos hereby requests alternate compliance to flush the pipeline in lieu of pigging. The connecting pipeline company will not allow us to put a pig in their pipeline. Additionally, Talos requests a departure from 30 CFR 250.1751(b) to pig the pipeline at the time of decommissioning.
In support of our request, attached is proposed pipeline decommissioning procedure, As-Built, Subsea Tie-ln Piping Assembly drawing, and PayGov receipt confirming payment ofthe $2170.00 associated cost recovery fee.
Should you have any questions or require any additional information, please contact Patty Brewer at (713) 328-3016 or by e-mail at pbrewer(5)talosenergvllc.com.
Sincerely,
TALOS ENERGY OFFSHORE, LLC
Jarms B. Gibson assistant Secretary
TALOS ENERGY OFFSHORE, LLC 500 Dallas Street, Suite 2000, Houston, Texas 77002-4800
TAL®S E N E R G Y L L C
TALOS ENERGY OFFSHORE, LLC VR 51/SMI 220 AREA
PIPELINE ABANDONMENT SEGMENT NO. 14829
PROPOSED PIPELINE ABANDONMENT
1) RESPONSIBLE PARTY
a. Pipeline Operator Name: Talos Energy Offshore, LLC
b. Address: 500 Dallas St. Suite 2000 Houston, TX 77002-4727
c. Contact person(s) Title : Phone: Email :
d. Shore Base:
Patty Brewer Gene Williams Regulatory Specialist Facilities Engineering Manager 713-328-3016 713-328-3060 [email protected]
Fourchon, LA
2) PIPELINE INFORIVIATION
a. Segment Number: b. Size (inches): c. Length (feet): d. Service: e. From: Id. Name:
Area/Block: Coordinates:
Latitude: X:
f. To: Id. Name Area/Block
Coordinates: Latitude: X:
a. ROW Number:
S-14829
5,549 ft. Gas/Condensate 'A" Vermilion 51
29° 23' 0.69" N
1,735,065' 16" SSTI (Kinetica S-5140) SMI 220
29° 23' 28.12" N 1,739,889' OCS-G28634
BSEE Status:
Complex ID No. OCS Lease:
Longitude: Y: Complex ID No. OCS Lease:
Longitude: Y: BSEE Status:
OUT
1453-1 G-22605
92° 09' 54.63" W
261,646'
G-22648
92° 09' 0.33" W
264,383' ACT
3) PIPELINE DESCRIPTION
a. Configuration: b. Install Date (Year): c. Size: Diameter (in. d. Volume: e. Water Depth ( f t ) : f. Buried: g. Present Status:
Platform riser to subsea tie-in
2004 8.625" Wall Thickness: 0.500" 319 bbls. VR51-A: 18 ft., SMI 220 SSTI : 18 ft. Yes - minimum 3 ft. Out of service
Length: 5,549 ft.
4) PURPOSE
a. Description: Abandon and remove pipeline b. Length Removed 5,549 ft. c. Length to Remain Oft. d. Reason: Production depleted. Source platform to be removed. e. Proposed Aban. Date: April, 2017
Issue Date: 04/24/17 Revision Page 1 of 2
TALOS ENERGY OFFSHORE, LLC
A1 OP VR 51/SMI 220 AREA PIPELINE ABANDONMENT
SEGMENT NO. 14829
PROPOSED PIPELINE ABANDONMENT (Continued)
5) PROPOSED PROCEDURE
a. Brief description of the method to be used:
Permanent abandonment will be done in two phases
Phase 1 (Flush and disconnect pipeline at endpoints) 1) Divers will close the subsea ball valve at the SMI 220 subsea tie-in on the 16" Kinetica pipeline. 2) Pressure on the 8" pipeline segment 14829 from the VR 51-A platform to the subsea tie-in
will be bled down. 3) Divers will connect a hose from the subsea tie-in to a seawater pump on the deck of the DVS. 4) Seawater will be flushed down the line to the VR 51-A platform until the discharge at VR 51-A
is free of hydrocarbons. 5) Divers will disconnect the pipeline at the subsea tie-in and install caps. 6) The dive vessel will move to the VR 51-A platform and disconnect the pipeline from the
platform riser.
Phase 2 (Remove pipeline) 1) A removal barge will set up on one end of the pipeline. 2) The end of the pipeline will be brought to the surface and connected a pulling winch
on the deck of the removal barge. 3) The entire length of the line will be pulled to the surface and cut into lengths that can
be transported by truck. 4) All cut sections of the pipeline will be brought to shore and scrapped.
If using an anchored vessel, provide an anchor plat or maximum radius of anchors. Maximum 4000 ft. anchor radius for 4-pt anchor vessel in 18 ft. water depth.
6) ATTACHMENTS
Abandonment drawings Pipeline segment S-14829 As-Built SMI 220 8"x16" Subsea Tie-in
Issue Date: 04/24/17 Revision Page 2 of 2
SUB SEA TIE-IN SM 220
X - 1.739.669 Y - 264.383' LaL 29° 23' 28.12-N Long. 92° 09" 00.33"W
NAD 83
L a t 29° 23" 28.92"N LonQ. 9215 00.79^V
V H 3 Bois d'Arc Offshore Ltd.
OCS-G-22605
530"
RISER @ VR 51 "A"
X - 1,735.065' Y - 261,646' L a t 29' 23 00,69-N Long. 92' 09' 54.63"W
NAD 83
Lat. 29' 23' 01.49"N Long. 92' 09' 5 5 . 1 0 ^
0 500" 1.000' 1.000" 1.500" 2.000"
HORIZONTAL SCALE: l " = 1.000"
VR 31 -A- 1,735,065' 261,646' (D
BENO 1.735.088' 1 261,648'
2 1.735.120' 261.662'
3 1,735,816' 262,070' (4) BLOCK CROSSING 1,736.530' 262,479
5 1.736.543' 1 262.486'
5 1.737.261' 262.894'
7 1.738.002' 263.308 1
8 1.738,721' 1 263.721'
9 1.739.450' | 264.123' •,10) P L
CROSSING 1.739,625' | 264.224'
11 1.739.830' 264.342' S.S.T.I. SM 220 1,739.889•
1
264,383' TOTAL LENGTH: 5.549 FT. 1.05 Ml.
SM232 PRS Offshore L.P.
Juniper Energy L.P. OCS-G-22650
2-I cartlfy this plat represents the honzontal position of pipeline as identified by a survey performed under my supervision in accordance with generally accepted offshore surveying practices
^ \
W * * \ 'J. ' v.. •
Notes: 1 Cocrrtmatu ars rmhnncta :o in* Louawna
CoorOinaM Sysfm ol 1027. Soulh Zoom Unls artmU S Suvy t f i
2 This pim rmnnsans survtv ol tt* honzomsl posOon ofpipHn» mt HMo/ifaa (Knng contmjcooo
3 Diplh ol covr 31 rtponta nv Ovart is 3 5 to 4 0
Legend O - D*noi»s posilion ol anodes on pipaUna.
• - Dtnolss olhsr positions on ppatfvw
R O N N I E E D E A N . R P L S R E G I S T R A T I O N N O 5 3 1 4 - S T A T E O F T E X A S
OFFSHORE LTD. A S B U I L T 8
G A S C O N D E N S A T E P IPEL INE
F R O M V E R M I L I O N B L O C K 5 1 . "A" S T R U C T U R E
T O S O U T H M A R S H I S L A N D . B L O C K 2 2 0 . "SUB SEA T IE- IN"
Cochrane T E C H N O L O G I E S . I N C .
fJJTJ UJ-U3* I M A I t n t . LA.
PREPARED FOR: CHET MORRISON CONTRACTORS. INC HOUMA. LA. 70J63
OMMNC NO.: 670J-l.<3-g
OMfTEO ST: REV. N0J 0
oa. BY: r^f-Z Wil t 01-07-2003
too SHOT; 1 OF I
U l . = 9 2 ' 0 9 - 0 3 . 6 r w
U n q . - 2 a , W 3 3 . 3 6 " N
X - 1.739909
V - 26».373
Remove 10" section of 8" pipe
13
14
IS
16
• 7
18
18
aa
21
2 2
PLAN
KnuRM. eonou a. ao'-cft
SANO PJCS USED MOUND
4 OYER VALVES
25
SANO/CEUOJT a<cs ]_ , USED FOR ASSEMBLY SUPPORT j J -
SECTION "A-A" SCAU J / B T a l ' - O "
SfWO a w s NOT DRAM! TO SCALE
R E F E R E N C E O R A V / I N G S
MATEPIAL UST
PROJECT I D. 095332
OWNEER: O ' M TREJO
PROJECT tWJE: FAC /2253 Bol j d 1 « C SU-320
QLKWTnY UNITS OESCfiiPIlOH
20.0 r r P I P E , r .soo - ASTW A I D S c f i a S U J S a w e
20.0 FT PiPE. 2r .218" ASTU AlOS GfiB SLUS BASE
20.0 FT PIPE. 10" 500" WT GR-X52 SLUS OR ERW , API SL-PSL2. BARE
2.0 EA IK. REDUC1N0 r .500" X 4' .237" HOD ASTW A23* CH WO
1.0 EA TEE, 8 " .500* WELD, ASTU A23« GR WPB
1.0 EA fVAWCE. 6" MiSt 6 0 0 RTJ BUNO ASTU A105
1.0 EA TIE, 2" .218" V r t lD . ASTU A23« GR W B
1.0 EA ELL 5" .500" 30R 90 DEG WEID, ASTU A23« GR WPB
1.0 EA VALVE, a m , I t f ANSI 900 , RTJ X RTJ. API 6 0 FO WNUAL GEAR OPERATOR ANO HANOMKEL FOR SUB-SEA SERVICE PER EPE SPECS VALVE SPEC: EP-BALLVALVE
2.0 EA VALVT. BALL, f f ANSI 600 . WE X * E . API 60 FO IWT .500* CRB PIPE UAJjUAL GEAR OPERATOR ANO HANOAHEEL FOR SUB-SEA SERVICE PER EPE SPECS VALVE SPEC: EP - 8ALLVALVE
1.0 EA VALVE. SWUM CHECK, B" ANSI 600 HE X WE. AM 6 0 FO IWT .500" GRB PIPE WTN RTJ BOLTED BONNET MTH SOFT IRON OTAL RING GASKET SDLED mflOUGHOUT FOR SUBSEA SER.XE ViHTI SPECIAL LOCK OPEN WRENCH VAiVt SPEC: EP-CHECK VALVE
2.0 EA VALVC. BALL, f AJISI 600 RTJ X WE. API 60 FO TWT .218" CRB PiPE lEVER OPERATED C/W LEVER. FOR SUB-SEA SEW,CE PER EPE SPECS ALL FITTINGS TO BE STAINLESS STEEL EN BODY DRKV. VALVE SPEC; EP-BALLVALVE
ITTU NOT USED
(TEU NOT USED
FIANCE, SWIVEL RING 10" ASSI 900 RTJ USS S P - 4 4 . TWT .500" CR X - 5 2 P.PE
l l / J ISE, 8" ANSI 600 RTJ« I ASTU A105 TWT .500" GRB P^E
f l /NGE, 8" ANSI 600 RTJ BUNO ASTU A105 COAT 1/2" HPT
flANOE. ? ANSI 600 RTJViN ASTU A105 TWT .218" GRB PiPE
FLANGE, 2" ANSI 600 RTJ BUNO, ASTU A105 C04T 1/2" NPT
CONNECTION, HtOROTAJ3 1 ? X 1(f A«S1 900 BOLTED SUB-SEA
HOIE: VENDOR - OIL STATES WOUSTRES ((ffOROIECH DMS10N)
REDUCED, CONC, ICT .500" * T X 8" ^ 0 0 " WT, W L D GS X - 5 2 , USS S P - 7 5
STTJO. STEEL 5 / 8 " X 4 1/2" ALLOY W/2 HEX NUTS ASTU AI93 CL 2A CR 87 (FOR 2 " - 6 0 0 | ) NOTt S EXTRA ORDERED COAIINO SPEC; EP-COATBOLT PER EPE SPEC SC-204
30.0 EA STUO. STEEL I 1 /8 " X 8" ALLOY ASTU A193 a 2A Gfi B7 W/2 HEX NUTS EA ASTM ASTU A l 9 4 CL 2 8 GR 2H COAINO SPEC; PER S C - 2 0 4 NOTE: 8 AOOfllONAL ORDERED (8" ANSI €00)
22.0 EA STUO. STEEL 1 3 / 8 " X 10" ALLOY ASTU A193 CL 2A CR 87 W/2 HEX NUTS EA ASTU ASTM A I 9 4 CL 28 GR 2H COATINO SPEC: PER S C - 2 0 4 NOTE: 6 ADDITIONAL ORDERED ( I t f ANSI 900)
22.0 EA STUO, STEEL I 3/8?" X 11 3 / 4 ' AUOY ASTW A193 a 2A CR 87 W/2 HEX HUTS EA ASTU ASTU A194 CL 28 CR 2H COMING SPEC; PER S C - 2 0 4 NOTE: 6 ADDITIONAL. ORDERED (10* ANSI SOO)
4.0 EA GASKET. RINO 8* ANSI 500. SOFT IRON OTAL. R45 NOTE: 1 EXTRA ORDERED PER FLANGE CONNECTION
8.0 EA GASKET. N M 2" ANSI 600. SOFT IRON OTAL R23 HO I t : I EXTRA ORDERED PER FLANGE CONNECTION
4.0 EA GASKET, RINO 10" ANSI 900, SOFT IRON OTAL R53 NOTE; I EXTRA ORDERED PER FLANGE CONNECTION
2.0 EA VALVE. a>U. 1 /2 " 3000 PSI FPT FO SS LEVER OPERATED C/W LEVER
2.0 EA K f PIE. PIPE 1 / 2 " XH X 3 * ASTU AlOd TBE. SS
2.0 EA PLUG, HEX HEAO 1/2 " 3000 PSI. ASTM A403r3 ieL SS SCRO
1.0 EA ANOOE. BRACELET 8* TYPE GALVAUUW TAPERED ClTJNOER'Ci LENGTH - 12* THICKNESS - 1.50" IVBGHT - 44 LBS
1.0 EA
2.0 EA
1.0 EA
3.0 CA
1.0 EA
1.0 EA
1.0 EA
30.0 EA
2.0 EA CLAUP, ADJUSTABLE IS* X 8* PER 090 . T E - F 2 - 8 2 3 X - 1 3 0 O - 5 0 1
R E ^ / I S I O N S
W W OAIE
P*X'ta I O : M » »
n s j M p UXIOSSTAP
PRESSURE OATA
CLASS 1
DESIGN FACTOR: 0.5
DESGN PRESSURE: 1440 PSIQ
HYDROSTATIC TEST PRESSURE:
TEST DURATION: 8 HRS.
VALVE SECTION: 8 2 3 X - I 3 0 1
HAOP: 1440 UOP: 1440
2160 PSI U J N I U U M
2225 PSI MAXIMUM
C0UPL1A.NCE SERViCES:
TemesMO QftaPlp«irw M a PMa conptay
PLAN SECTION & MATERIALS SUBSEA TIE-IN PIPING ASSEMBLY BOIS d ' ARC FAC. # 2 2 5 8 S O U T H M A R S H I S L A N D , O U L F OF" M E I X I C O
™G-TE-F2-823X-1300-5D
TAL®S E N E R G Y L L C
February 20, 2017
U.S. Department o f t he Interior
Bureau of Safety and Environmental Enforcement
1201 Elmwood Park Boulevard
New Orleans, Louisiana 70123-2394
Attent ion: Angie Gobert
Pipeline Unit
GE 1035A
fiureou of Sofery and Environmentoi Enbramwl (BSEE)
R E C E I V E D FEB 2 2 2017
Office of Fieid Operations Pipeline Section
RE: Application to Relinquish Right-of-Way OCS-G 28634 and Decommission-in-Place Existing
8-inch Gas/Condensate Right-of-Way Pipeline Segment No. 14829, Originating at Vermilion
Block 51 "A" and Terminating at South Marsh Island Block 220 16" SSTI, OCS Federal Waters,
Gul fo fMex ico, Offshore Louisiana
Dear Ms. Gobert:
Pursuant to 30 CFR 250.1751, Talos Energy Offshore, LLC (Talos) respectfully requests approval to relinquish ROW OCS-G 28634 and decommission-in-place the existing 8-inch gas/condensate right-of-way pipeline Segment No. 14829 in its entirety, Vermilion/South Marsh Island Area, OCS Federal Waters, Gul fo fMex ico, Offshore Louisiana.
Segment No. 14829 will be flushed with two pipeline volumes of seawater to displace hydrocarbons
prior to decommissioning. Pursuant to 30 CFR 250.141, Talos hereby requests alternate compliance to
flush the pipeline in lieu of pigging. Additionally, Talos requests a departure from 30 CFR 250.1751(b)
to pig the pipeline at the time of decommissioning.
In support of our request, attached is proposed pipeline decommissioning procedure, As-Built, Subsea
Tie-ln Piping Assembly drawing, and PayGov receipt confirming payment o f t he $2170.00 associated cost
recovery fee.
Should you have any questions or require any additional information, please contact Patty Brewer at
(713) 328-3016 or by e-mail at [email protected].
Sincerely,
TALOS ENERGY OFFSHORE, LLC
!S B. Gibson
sistant Secretary
TALOS ENERGY OFFSHORE, LLC 500 Dallas Street, Suite 2000, Houston, Texas 77002-4800
TALOS ENERGY OFFSHORE, LLC
A m i ^5 VR 51/SMI 220 AREA PIPELINE ABANDONMENT
t N1 R 0 Y I I C SEGMENT NO. 14829
1) RESPONSIBLE PARTY
a. Pipeline Operator Name:
b. Address:
c. Contact person(s): Title : Phone : Email :
d. Shore Base:
PIPELINE INFORMATION 2)
3)
4)
a. Segment Number:
b. Size (inches):
c. Length (feet):
d. Service:
e. From: Id. Name: Area/Block:
Coordinates: Latitude: X:
f. To: Id. Name Area/Block
Coordinates: Latitude: X:
g. ROW Number:
PIPELINE DESCRIPTION
PURPOSE
a. Description:
b Reason:
c. Proposed Aban. Date:
PROPOSED PIPELINE ABANDONMENT
Talos Energy Offshore, LLC
500 Dallas St. Suite 2000 Houston. TX 77002-4727
Gene Williams Facilities Engineering Manager 713-328-3060
Patty Brewer
Regulatory Specialist
713-328-3016 [email protected]
Fourchon, LA
S-14829 BOEM Status: ACT
8"
5,549 ft.
Gas/Condensate
"A" Vermilion 51
29° 23' 0.69" N I ^ S ^ S '
16" SSTI (Kinetica S-5140) SMI 220
29° 23' 28.12" N 1.739,889'
OCS-G28634
Complex ID No. OCS Lease:
Longitude: Y:
Complex ID No. OCS Lease:
Longitude: Y:
BOEM Status:
1453-1 G-22605
92° 09' 54.63" W 261,646'
G-22648
92° 09' 0.33" W 264,383'
ACT
2004
a. Configuration:
b. Install Date (Year):
c. Size: Diameter (in.): 8.625"
d. Volume:
e. Water Depth (ft.):
f. Buried:
g. Present Status: Active
Platform riser to subsea tie-in
Wall Thickness: 0.500"
319 bbls.
Length: 5,549 ft.
VR 51-A : 18 ft., SMI 220 SSTI: 18 ft.
Yes - minimum 3 ft.
Abandon pipeline in place
Production depleted. Source platform to be removed.
April, 2017
Issue Date: 02/03/17 Revision Page 1 of 2
Nf* A I / S \ ^ TALOS ENERGY OFFSHORE, LLC
JX HO T% VR 51/SMI 220 AREA
1 km* KSr w PIPELINE ABANDONMENT E N E R G Y I I C SEGMENT NO. 14829
PROPOSED PIPELINE ABANDONMENT (Continued)
5) PROPOSED PROCEDURE
a. Brief description of the method to be used: Pipeline segment S-14829 will be flushed and filled with seawater prior to decommissioning.
For permanent abandonment:
VR51-A: 1) Mobilize a topside construction crew to the VR 51 -A platform. 2) Confirm a tapped blind flange with bleed valve has been installed on the departing
pipeline S-14829 and that S-14829 has been isolated from all upstream inputs. 3) Stand-by on diving operations.
SMI 220 SSTI : 1) Mobilize a 4-pt anchor DSV vessel to the SMI 220 8"x16" SSTI. 2) Locate and excavate the 8"x16" SSTI. 3) Close 10" valve #1 to isolate the 8" S-14829 from the 16" Kinetica pipeline. 4) Confirm 1/2" ball valve at flange #7 is closed and hex head plug is in place. 5) Install a pollution dome over 1/2" valve #3. 6) Remove the hex head plug from the 1/2" valve #3. 7) Connect an HP hose from the 1/2" valve #3 to a capture tank on the deck of the DSV. 8) Open 8" valve #2. 9) Open 1/2" valve #3 and bleed pressure off of 8" S-14829 pipeline 10) Open 2" bypass valve #6. Bleed pressure off of the 2" by-pass piping. 11) Close valve #2, #3, #4, & #6 12) Install a pollution dome over 8" flange #9. 13) Remove a 10' section of 8" pipe upstream of flange #9. 14) Plug and bury the end of the 8" pipeline S-14829 that will remain in place 3' BML. 15) Install a tapped blind flange with bleed valve on the 8" subsea valve assembly at flange #9. 16) Rig down from the 8" x 16" subsea valve assembly and move the DSV to VR 51-A.
VR51-A: 1) Position a pollution dome over the subsea cut locations at the base of the departing 8" riser. 2) Remove and recover a 10' section of the 8" pipeline downstream of the riser tubeturn. 3) Plug and bury the end of the 8" pipeline S-14829 that will remain in place 3' BML. 4) Topside crew will remove a section of the 8" riser above the boat landing. 5) Rig down and demob.
b. If using an anchored vessel, provide an anchor plat or maximum radius of anchors. Maximum 2000 ft. anchor radius for 4-pt anchor vessel in 18 ft. water depth.
6) ATTACHMENTS
Abandonment drawings : Pipeline segment S-14829 As-Built SMI 220 8"x16" Subsea Tie-in
Issue Date: 02/03/17 | Revision 0 | Page 2 of 2"
SUB SEA TIE-IN S M 220
X - 1,739.009 Y - 204.303• L a L 29* 23 ' 2 8 . 1 2 ^
L o n g . 9 2 ' 09" 00 .33"W
N A D 83
U L 2 9 23- 2a.92"N Long. 9 2 ' 0 9 0 0 . 7 9 W
6o/s d'Arc Offshore Ltd. OCS-G-22605
RISER @ VR 51 "A"
X - 1.735,065' Y - 261 ,646 ' L a t 2 9 23" 0 0 69-N b o n o . 9 2 ' 0 9 5 4 . 6 3 ^
N A D 83
L a t 2 9 ' 2 3 ' 0 1 . 4 9 - N L o n g . 9 2 ; 0 9 55.10"W
500' 500' 1.000' t . 500 ' 2.000"
HORIZONTAL SCALE: l " = 1.000'
T I C 1
j X i V ^iscn *
BI Vf 1 .735 .065 ' ' 261 ,646 ' <i | |
BENO 1.735 .088 ' 1 261 .648 '
2 I 1.735.120 ' ' 261.66?
3 i 1.735.816 ' 262 .070 ' ( « BU)CK CBOSSiMQ 1 . 7 3 6 . 5 3 0 2 6 2 . 4 7 9
5 1 1.736.543• 1 262 .486 ' , 1
6 1 . 7 3 7 . 2 6 1 ' | 262 ,894 '
7 1 .738 .002 ' 263 .308 ' '
8 1 .738 .72V I 2 6 3 . 7 2 1 '
9 i 1,739.450 ' i 264 .123 ' !10)PL ,
1.739.625 ' | 264 .224 '
11 1 1 , 7 3 9 . 8 3 a 1 264 .342 ' S.3.T.I. | SM 220 ' 1 . 7 3 9 . 8 8 9 264 .383 '
T O T A L L E N Q T H : 5 . 5 4 9 FT. 1.05 M l .
S M232 PRS Offshore L.P.
Juniper Energy L.P. OCS-G-22650
OFFSHORE LTD.
I cartlfy t h i t ptat rap rMan ts lha honzontal position of pipal ina as idanttfiad by a survey performad uodar my cupannaion in accoraanca with ganarafly accapteo o l h h o r * $u»vayiog practices
Notes: I Caartmtma tn rthnnctd / J nt Loumrt
Coonmmm Sytltm d mr. South Zont. Unt* tn tt U S Strrf fttl
7 Tin ft* nfnatm **r*r ti t» rvntert* pombcn a/&pttim mt tMnotita urmg conmuOan
J Dtaui ol catm tt netnta Sy » * i "> * 0 l—L
Legend
O - Dtnolti potitiar ol tnodt on ppttm
m • OnMM othtr pouw on pvttnt
ci/ol/oS QOMMIC C n C A M a n I c ' RONNIE E DEAN R P L S
REGISTRATION NO 5314 - STATE OF TEXAS
A S B U I L T 8" G A S C O N D E N S A T E P I P E L I N E
FROM VERMILION BLOCK 51 . W STRUCTURE
TO SOUTH MARSH ISLAND, BLOCK 220, 'SUB SEA TIE-IN"
Cochrane TECHNOLOGIES. INC.
Ltftrtr* . IA
PREPARED FOR: CHET MORRISON CONTRACTORS. WC HOUMA. LA. 70363
M0- « 7 0 3 - l . d f
oac f r
^ ' ^ ^
( W . NO--
O M t 0 1 - 0 7 - 2 0 0 3
SHOT: I OF I
PLAN
a nm*. i e» IWTA. r m « • •
" MM r mmtu mn mn an CMI i/r in u ruiut r wu uc "in nn nr am f t u rum. r MB wo iu am M * MM cau i/r
s VM acun M-UA • Mi | | HMI
Vyrail- ,««Ji'r ^ M n ' l n < »'•' ̂ to. vo I H C V - C W K U m i n v n K - H I
i / r i r nior rainiaaaD>/iiciiMi MM (v I I M IN
K l oSeuiD (11/ M B ioo)
** : rw* ic-VoK 1 1 " "
CAC*AIO ( I f iDfS MS]
M l . M i . l/T SOOt « ' rrt 10 t l •cut vtAuin c/o .iw"
UMMH - t r Mcmcn - i o r •ooa - o .ot
i f • r m M tc-fi-aiai-iXio-y • B- I -P AN SECTION & MATERIALS
BSEA TIE-IN PIPING A55EMI)LY BOIS cT ARC FAC. #2258
- S o TE-F2-823X-1300-5D|
-Pay.gov - Receipt Page 1 of 1
Receipt
Your payment is complete Pay.gov Tracking ID: 260H37LS Agency Tracking ID: 75179886496 Form Name: Application to Decommission a pipeline - ROW Application Name: BSEE Application to Decommission a ROW Pipeline - BU
Payment Information Payment Type: Debit or credit card Payment Amount: $2,170.00 Transaction Date: 02/06/2017 02:13:27 PM EST Payment Date: 02/06/2017 Region: GulfofMexico Contact: Patty Brewer 713-328-3016 Company Name/No: ERT, 03247 Pipeline Segment No: 14829 Originating Area/Block: Vermilion VR, 51 Terminating Area/Block: South Marsh Island SM, 220
Account Information Cardholder Name: Melissa Sassella Card Type: Master Card Card Number: ************5056
Email Confirmation Receipt Confirmation Receipts have been emailed to: [email protected]
htips://www.pay.gov/public/collection/confirm/prinl/260H37LS/MasterCard 2/6/7017