General Construction Inspector December 2017
00100 – General Conditions 3-1
Unit 300100
General Conditions
Unit 3 Topics:
Basic ODOT construction terminology
Inspector project authority and legal requirements
Order of document precedence
General quality of materials and workmanship requirements
Basics for measurement of quantity
General Construction Inspector December 2017
00100 – General Conditions 3-2
00100 – General Conditions
General Contract Conditions (Agency and Contractor)
Legalities
Responsibilities
Documentation requirements
Disagreements and claims
00100 – General Conditions
Organization (110)
Scope of Work (140)
Control of Work (150)
Source of Material (160)
Quality of Material (165)
Prosecution and Progress (180)
Measurement of Pay Quantity (190)
Payment (195)
General Construction Inspector December 2017
00100 – General Conditions 3-3
Definitions
First notification
Second notification
Third notification
00140 – Contractor Obligations
Contractor shall perform all Work determined by the Engineer to be necessary to complete the project
C14785
Contract No.
l O,ogon Dep11rrmont vthn•porl•l:On
Notification of Commencement and
Completion Dates for Contract Projects
1-5: Exit 61 (Louse Creek) Interchange Improvements 16062 C14785 Project Name (Section)
Pacific Highway
JRT Construction, LLC Contractor
Ted A. Paselk, PE
Project Manager
4/20/2015
Date
Josephine County
Project Manager Signature
First Notification
Key No.
CON03704 EA No.
NHPP-S00l (456)
Contract No.
3/7/2015 Date of Award
Date
Enter date on which the erection of a sign or plant, the development of aggregate sources, or the performance of a contract construction operation began.
Second Notification
Instructions: If applicable, list each completion date as listed in the Special Provisions under 00180.SO(h). Use the Add Another button to add lines for additional completion dates. lssue_a separate Second Note for each interim completion date and then issue a final Second Note once all of the work has been completed. If the completion date(s) have been modified by Contract Change Order, attach a copy of Page 1 of the CCO showing the modified date. If the completion date(s) are time counts or liquidated damages are being assessed to the_ project, attach a copy of the final Weekly Statement ofTime Charges to the Second Note.
Specified Completion Date Changed
from Section 00180.50(h) by CCO
1 September 9, 2015 !Zl
2 October 20, 2015 (CCO 9) �
All Claims for Additional Compensation Must Be Submitted By: (See subsection 00199.30 of the contract provisions for additional requirements)
CCONo.
6
9
Known items necessary to complete the requirements for "Third Notification" are:
Days Charged Date(s) the Work Was Completed Beyond
Specified Completion
and the Time Charges Stopped
0 September 3, 2015
0 October 20, 2015 RESCINDED
December 1 0, 2015
Second Notification is hereby RESCINDED for completion of compensable slope repair work. CCO 10 is pending that will address compensation for required slope repair work and Contract Time required for completion of the work.
Third Notification
X
X
Date
Enter the date on which all contract work was completed including corrective work, equipment and plant removal, site cleanup, and Project Manager's receipt of all certifications, bills and other documents required under the contract.
For mare information regarding time, refer to Chapter 13. Contract Time of the Construction Manual.
Distribution
Hard Copy: l:8J Original to Construction
l:8J Prime Contractor
734-3233 (02-2015)
Electronic Copy:
l:8J District Manager
l:8J Region Assurance Specialist
l:8J Region Survey Manager
l:8J Office of Civil Rights
l:8J Region Right of Way Manager
l:8J ODOT Contract Services
http://www.oregon.gov/ODOT /HWY /CONSTRUCTION/Pages/HwyCon stForms1 .aspx 1 of 1
3-5
General Construction Inspector December 2017
00100 – General Conditions 3-7
00150 – Control of Work
EngineerFull authority over Work
Project Manager (PM)Authority to administerthe contract
InspectorDelegated authorityfrom PM
00150.10(a) – Order of Precedence
Contract Change Orders
Special Provisions
Project PlansReviewed Stamped Working Drawings
Standard DrawingsApproved Unstamped Working Drawings
Supplemental Specifications
Standard SpecificationsAll other contract documents not listed above.
General Construction Inspector December 2017
00100 – General Conditions 3-8
00150.20 – Inspection
Right to inspect
Allowed access
Work not meetingspecificationsmay be rejected
00150.40 – Superintendent
Project communicationshould be directedto the superintendentincluding subcontractorwork
Superintendent shouldbe present for allon-site work
General Construction Inspector December 2017
00100 – General Conditions 3-9
00160 – Source of Materials and 00165 – Quality of Materials
Contractor must notify Engineer of sources
00165.70(a) No material incorporated without acceptablequality documentation
00180 – Prosecution and Progress
Prime Contractorshall direct andcoordinate all work
Project Manager mustapprove subcontractorbefore they beginworking
General Construction Inspector December 2017
00100 – General Conditions 3-10
00180.40 – Limitation of OperationsProject Schedule
00180.40 – Limitation of OperationsThree-week Look Ahead Schedule
1-5: EXIT 61(LOUSE CREEK) INTERCHANGE IMPROVEMENTSCONTRACT NUMBER 14785
ID I Jrask !Task Name lilMode
!Duration rota! Slack IStart IPredecessor�Successors IMar16,'15 IMar23,'15 1Mar30,'15 IApr61 ·1s IAprl3,'15 L�pr20,'15 1Apr27,'15 IMay1.'15 IMaru,-is Mayl81'15 IMay?S '15 IJunl '15 I s tvthW{IFlslsU-itJr1 FlslslJrWrl Fists �T�YTl Fl S1 slrJiWrl Flsls�lrWrli=ls sMrt;Jri Flsls�TWT Fl sis MrWr1 Fis ls J1�TI FislsfM'rw;, F1sls!Jr�TI F 1s
1
2
3
4
5
6
7
8
9 10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
.>? MILESTONES � :A'
; ,t
;I
; ,,.
� � �
ffi!� r;� � ...e?94
�� e!� �a;
[;a;
�a;
�� �� e!� !;� �� �� !;_9+
CONTRACT EXECUTION
PR£CONSTRUCTION MEETING
NOTICE TO PROCEED
FtRST NOTE
D LINE RAMP COMPLETE
SECOND NOTE (00180.SO(Hl})
SECOND NOTT {00180.SO(H2)
SUBMITTALS/ APPROVALS SCHEDULE
TRAFFIC CONTROL PLAN
SCHEDULE Of VALUES
ODOT SAFETY QUESTIONNAIRE
EROS[ON CONTROL PLAN
COMPOST BLANKET
POLLUTION CONTROL PLAN
QUALITY CONTROL PLAN
PROPOSED MATERIAL SOURCES
COMMERCIAL CONCRETE MIX DESlGN
ASPHALT MIX DESIGN
ASPHALT SAfITT EDGE
AGGREGATE BASE APPPROVAL
PIPE BAOCFlU/BEDDING
RIPRPAP APPROVAL
PERMANENT SIGNS/FOOTINGS
ILLUMINATION AND TRAFFIC SIGNAL
0 days? Odays 58.3 day_s 1 day 0 days Odays 6.7 days O days 0 days Odays 0 days 0 days 0 days 0 days 0.9days
0 days? 0 days Odays 6 days 7.7 days 5 days 0.6 days 5days 3.5 days 5days 7 days 7days 1.4 days Sdays 73 days 7days 1.4 days
Sdays 72.6 days 2days -6.2 days1 day -2.4 days
10 days 0 days 10 days 0 days 5 days 7.6 days 5 days Odays
5 days -2.4 days15 days 20 days
16 days 38.6 days
28 e_� DRILLED SHAFTS/DRIWNG EQUIPMENT 12 days 7.6 days
29 WATER QUALl1Y MIXTURE 5days Odays 30 SEED MIX 5days 1 day 31 0 days? 32
;- ? CONSTRUCTION ACTIVITIES 0 days?
Task
Spilt ... ,, ...... ,, .... ,, .. ,.Project: 032315-PROJECT SCHE
Milestone • Date: Fri 5/8/15
Summary I
Proje ct Summary I
I
Thu 3/26/15 Thu 3/26/15 27 3/26 ._c.ON.'.IRACUXECUTIO ... N-_______ _
Thu 4/16/15 Thu 4/16/15 11,12,14,15,1 34FS-l day,3' 4/16 �ECONSTRUCTION MEETING
Thu 3/26/15 Thu 3/26/15
Mon.4/20/15 Mon 4/20/15 13,3
Wed 6/10/15 Wed 6/10/15
Thu 8/27/15 Thu 8/27/15 135,18
Sat 10/10/15 Sat 10/10/15 145
Thu 3/19/15 Thu 3/19/15
Thu 3/26/15 Fri 4/3/15 4
Wed 4/8/15 Wed 4/15/15 4
Tue 4/7/15 Tue 4/14/15 4
Mon 3/30/15 Mon 4/6/15 4
Fri4/3/15 Tue 4/14/15 4
TueS/26/15 Tue 6/2/15 4
Fri4/3/15 Tue 4/14/15 4
Fri 4/17/15 Thu 4/23/15 4
Thu4/16/15 Fri4/17/15 4
MonS/ll/15 Mon 5/11/15 4
Tue 5/12/15 Wed S/27/15 4
Tue 5/12/15 Wed S/27/15 4
Thu 4/23/lS Thu 4/30/15 4
Thu 4/23/15 Thu 4/30/15 4
Mon 5/4/lS Mon 5/11/15 4
Mon 6/1/15 Wed 6/24/15 4
Mon 4/27/15 Thu 5/21/15 4,2
TueS/12/15 MonG/1/15 4
Mon 6/1/15 Mon 6/8/15 4
Tue 8/11/15 Tue 8/18/15 4
Inact1ve Task
Inactive Milestone
Inactive Summary
11,12,13,14,J 3/26 ._NOllCE .... �l'Ou-s:PcaR .... o .... c ... E,C....._n ____ __.__-,------..----,-------------�' I 4/20 + FIRST NOTE
I ... E
3/19 • SUBMITTtALS/APPROVALS I
3
3
5
3
3
97
3
7
56
70
73
70
133
136
81
145,135
3/26 -5.CHEDULE
3/30 .. 4/3
4/3
4/8 TRAFFIC CONTROL PLAN
4/7- -SCHEDULE (!J,f VALUES
-000-1'.-SAFETY QUESTIO�NAIRE-EROSION CONTROL PLAN
-OOLLUTION CONTROL PLAN
QU'AUTY CONTROl PLAN .... >
5/26 COM
Tj
II-------
I
4/23 ....-
4/23 ....
4/27..,..
AGGRE�.TE BASE APPPROVAL
PIPE BACKFILL/BEDDING
5/12
6/1
ILLUMINJl.TION AND TRJ
DRILL£
Manual Summary RoUup -===== External MIiestone <> Manual Progress
Manual Summary
Start-only
I 1 De<1dline
Manual Task I ._ ___ ___.� Finish-only
[
J
Critical
Critical Split
Progress Duration-ooly External Tasks
JRT CONSTRUCTION LLC
COST REDUCTION SCHEDULE PROPOSAL: 04-14-15 3-11
K&>E __ EXCAVATING
I N C O R P O R A T E D
Project Name
K&E Project No.
Owner Project No.
FFO - US101: SE 23RD DR- SW 35TH ST (LINCOLN CITY)
1239
14654
Item
No. Bid Item Description
1 Construct Concrete F ascia
2 Close SW 32nd Street
3 Install Topsoil/Dune grass
4 Signal Pole Drilled Shafts/Underground
5 Construct Moment Slab
6 Excavate Wall K
7 Construct Wall K
8 Build Subgrade
9 Place Agg Base
10 Prep for Curb
11 Finish Driveways
12 Install Curb
13 Filtera CIP Concrete Gutter
14 Backfill Wall E
15 Install Curb
16 Install Sidewalk
Work Area
WallE
32nd
23rd-32nd Rt
32nd
WallL
32nd
32nd
1005 to 1012 Rt
1005 to 1012 Rt
1005 to 1012 Rt
Dorey Cove
29th Parking
West Side
Wall E
1005 to 1012 Rt
1005 to 1012 Rt
3 WEEK LOOK-AHEAD SCHEDULE
Sun Mon Tue Wed Thu Fri
Work By Shift 3 4 5 6 7 8
CEI D
K&E D
Whites D
Aaken Corp D
CEI D
K&E D
CEI D
K&E D
K&E D
K&E D
� RK Construction D
� RK Construction D
K&E D
K&E D
: RK Constructio·n D
� RK Construction D
Schedule Dates: May
May
Sat Sun Mon Tue Wed Thu Fri
9 10 11 12 13 14 15
•:k ·.�:.
t ,� ·.- /�� ·t'\.,·
3rd to
Sat Sun
16 17
May
Mon Tue
18 19
! �i t(¥�
23rd
Wed Thu Fri Sat
20 21 22 23 Notes
��-: ' - ;
Date Submitted 5-5-15
3-12
General Construction Inspector December 2017
00100 – General Conditions 3-13
00180.50 – Contract Time
Contract completiondate
Second Notificationissued at end ofcontract work
Liquidated damages
00190 – Measurement of Pay Quantities
MeasurementGuidelinesEngineer’s decision is final
Lump Sum Bid ItemsLump sum breakdowns
General Construction Inspector December 2017
00100 – General Conditions 3-14
00190 – Measurement of Pay Quantities
Weigh Memos
– From certified scales
– Random check weights
,,
1-5: Exit 61 (Louse Creek) Interchange Improvements
SCHEDULE OF L.S. VALUES
lTEM DESCTIPTION TOTAL
SECTION 0001 TEMPORARY FEATURES AND APPURTENANCES
0010 MOBILIZATION
0020
0150
0210
0220
50% of the amount for mobilization when 5% is earned
I 00% of the amount for mobilization when I 0% is earned
TP&DT
April 20th to April 30th
May 1st to May 31st
June 1st to June 30th
July 1st to July 31st
August 1st to August 31st
September 1st to September 30th
October I st to October 10th
EROSION CONTROL
Erosion Control Plan
When 50% of the original contract amount is earned
When 75% of the orifinal contract amount is earned
Project completion
POLLUTION CONTROL PLAN
100% Following Approval
SECTION 0002 ROADWORK
CONSTRUCTION SURVEY WORK
7 Months/$25,000.00 = 3571.43 per month
RECEIVED
Office of Project Manager April
Crew 3830 May
June
APR 1 3 2015 July
August
D PM D APM D CASL O cs O INS O ccSeptember
0 ACTION REQUIRED October
BY:
$160,000.00
$80,000.00
$80,000.00
$25,000.00
$2,125.00
$4,150.00
$4,150.00
$4,150.00
$4,150.00
$4,150.00
$2,125.00
$1,000.00
$250.00
$250.00
$250.00
$250.00
$1,000.00
$1,000.00
$25,000.00
$2,125.00
$4,150.00
$4,150.00
$4,150.00
$4,150.00
$4,150.00
$2,125.00
50.00%
50.00%
8.50%
16.60%
16.60%
16.60%
16.60%
16.60%
8.50%
25%
25%
25%
25%
100.00%
8.50%
16.60%
16.60%
16.60%
16.60%
16.60%
8.50%
3-15
0230 REMOVAL OF STRUCTURES AND OBSTRUCTIONS
Removal of Guardrail $2000.00/812.5LF = $2.46/LF
Removae Inlets/Catch Basins Remove 18" cone pipe
0430 RECONDITIONING EXISTING ROADWAY
100% Upon Reconditioning
$6,000.00
$2,000.00
$2,000.00
$2,000.00
$1.00
33.33% 33.33%
33.33%
$1.00 100.00%
SECTION 0013 PERMANENT TRAFFIC CONTROL AND ILLUMINATION SYSTEMS
0640 REMOVE EXISTING SIGNS
27 EA- $3,400/27 equals $125.93 each
0650 REMOVE AND REINSTALL EXISTING SIGNS
0670 SIGN SUPPORT FOOTINGS
50% upon removal
50% upon installation
3 EA - $3,000/3 equals $1,000.00 each
0680 SIGNAL POLE MOUNTS
6 EA - $5,500/6 equals $916.67 each
0690 SECONDARY SIGN MOUNTS
12 EA - $1,000.00/12 equals $83.33 each
0700 TRIANGULAR BASE BREAKAWAY SIGN SUPPORTS
3 EA - $7,000.00/3 equals 2,333.33 each
0800 TRAFFIC SIGNAL INSTALLATION - 15 NB OFF RAMP AT MERI
Underground Wiring
Signal Erection
$3,400.00
$3,400.00 100.00%
$90.00
$45.00
$45.00
$3,000.00
50.00%
50.00%
$3,000.00 100.00%
$5,500.00
$5,500.00 100.00%
$1,000.00
$1,000.00 100.00%
$7,000.00
$7,000.00 100.00%
$189,000.00
$22,680.00
$41,580.00
$124,740.00
12.00%
22.00%
66.00%
3-16
0810 TRAFFIC SIGNAL MODIFICATION - MERLIN RD AT MONUME
0820 DETECTOR INSTALLATION
Underground
Wiring
Signal Erection
Upon completion
$48,900.00
$10,000.00
$19,800.00
$19,100.00
$2,820.00
20.00%
40.50%
39.50%
$2,820.00 100.00%
SECTION 0014 RIGHT-OF-WAY DEVELOPMENT AND CONTROL
0830 BIORETENTION POND, D00424
Excavation/Embankment
Install 6" Subsurface Drain Pipe
Install 12" Storm Sewer Pipe
Install Manhole, Modifed
Install Typd D Inlets
Water Quality Mixture!Plugs!Pavers/Landscape items
0840 WATER QUALITY SWALE, D00424
Excavation
Water Quality Mixture!Plugs!Pavers/Spreader Board/Landscape
$49,000.00
$4,900.00
$1,470.00
$3,675.00
$7,350.00
$5,880.00
$25,725.00
$12,000.00
$2,000.00
$100.00
10.00%
3.00%
7.50%
15.00%
12.00%
52.50%
16.70%
83.30%
3-17
General Construction Inspector December 2017
00100 – General Conditions 3-19
00195 – Payment
PaymentsConstitutes fullcompensation
Progress PaymentsMonthly
Retainage Release
00196, 00197, 00199
Extra Work
Change Order (CCO)
Force Account Work
General Construction Inspector December 2017
00100 – General Conditions 3-20
Key Inspection Points
Know your level of delegated authority
Check the schedule (3-week look ahead)
Be proactive, anticipate problems
Point out early to Contractor and PM non-specificationmaterials and workmanship
Be professional
Know your resources and contacts
Unit 3 Review:
Basic ODOT construction terminology
Inspector project authority and legal requirements
Order of document precedence
Quality of materials and workmanship requirements
Basics for measurement of quantity