![Page 1: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/1.jpg)
Understanding the Understanding the Performance of Modified Performance of Modified
Asphalts in MixturesAsphalts in MixturesNCHRP 90NCHRP 90--07, TPF 5(019)07, TPF 5(019)
Thomas HarmanThomas HarmanMaterials & Construction Team Leader, R&DMaterials & Construction Team Leader, R&D
Federal Highway AdministrationFederal Highway Administrationwww.TFHRC.govwww.TFHRC.gov
![Page 2: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/2.jpg)
United StatesUnited StatesNNational ational HHighway ighway SSystemystem
•• A A $1 trillion$1 trillion investment/priceless investment/priceless national assetnational asset
•• The way nearly all products moveThe way nearly all products move
•• InterInter--modal link to seamodal link to sea→→air air →→railrail
•• Permits our high quality of life & Permits our high quality of life & economic growtheconomic growth
![Page 3: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/3.jpg)
•• NHS is over 160,000 miles of pavementNHS is over 160,000 miles of pavement
–– most over 35 years old most over 35 years old
–– $59 billion shortfall to maintain condition$59 billion shortfall to maintain condition
•• SafetySafety tied to pavement conditiontied to pavement condition
•• Customer/User expectations Customer/User expectations
–– Safer pavementsSafer pavements
–– Smoother rideSmoother ride
–– Quieter pavementsQuieter pavements
–– Reduced delay & congestionReduced delay & congestion
United StatesUnited StatesNNational ational HHighway ighway SSystemystem
![Page 4: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/4.jpg)
Annual HMA InvestmentAnnual HMA Investment
•• $15 Billion$15 Billion
•• 500 M tons of HMA500 M tons of HMA
•• 30 M tons of binder30 M tons of binder
![Page 5: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/5.jpg)
Up 400%
Up 32%
Up 63%
Up 90%
Up 132%
Up 6%
Traffic congestion Traffic congestion on the rise!on the rise!
Compared with Compared with 1970:1970:
MilesTraveled
1970
Americans Drivers Vehicles Ton Miles Highways
![Page 6: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/6.jpg)
Cost ofCongestion
Hrs / Day When Roads
are Congested
Driver Time Lost in Rush
Hour
Following Following current current
congestion congestion trends:trends:
More than 8 hours per day!
About 80 hours per year!
More than $250 per year per American!
![Page 7: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/7.jpg)
Extra Vehicle Operating Cost per YearExtra Vehicle Operating Cost per YearDue to Due to PoorPoor Pavement ConditionPavement Condition
$ 41.5 Billion / year !$ 41.5 Billion / year !
$222
$432
$23
$0$50
$100$150$200$250$300$350$400$450$500
AVERAGE HIGH LOW
The Road Information Program (TRIP)April 2001
STATEAverages
![Page 8: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/8.jpg)
But Things are ImprovingBut Things are Improving
•• 2002 Report on Conditions and 2002 Report on Conditions and Performance of the NHSPerformance of the NHS–– 86.0% with acceptable ride quality86.0% with acceptable ride quality–– Up from 82.5% in 1993Up from 82.5% in 1993–– A trend reversalA trend reversal–– Most of the improvement on higher order Most of the improvement on higher order
highwayshighways–– What we are doing What we are doing –– we are doing better!we are doing better!
![Page 9: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/9.jpg)
Materials
Structural
Construction
Get In
Stay In
Get Out
Stay Out
![Page 10: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/10.jpg)
OutlineOutline
•• Superpave® Binder ETG DirectionSuperpave® Binder ETG Direction•• Preliminary FHWA ALF ResultsPreliminary FHWA ALF Results•• Next StepsNext Steps
•• Goal Goal -- Right materialsRight materialsprovide the best provide the best performance!performance!
![Page 11: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/11.jpg)
PAVPAV -- aging aging
RTFORTFO -- aging aging NoNo agingaging
TimeTime
RVRV DSRDSR BBRBBR
DTTDTT
Rutting Fatigue Cracking Thermal CrackingProduction Rutting Fatigue Cracking Thermal Cracking
![Page 12: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/12.jpg)
SuperpaveSuperpave®® Binder SpecificationBinder SpecificationRutting, Fatigue, and LowRutting, Fatigue, and Low--Temp. CrackingTemp. Cracking
WHEN WHAT HOW WHERE
Construction Safety
PumpabilityRutting
Flash PointRot Visc G* / sin δ
230 min 3 Pa-s max
T(high)
Early (RTFO) Rutting G* / sin δ T(high)
Late (+PAV)
Fatigue Low Temp
G* sin δ BBR/DTT
T(inter) TCR
![Page 13: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/13.jpg)
SuperpaveSuperpave® ® 20022002•• Asphalt Binder Implementation StatusAsphalt Binder Implementation Status
Implemented
In Progress
Undetermined
Implemented
In Progress
Undetermined
![Page 14: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/14.jpg)
SuperpaveSuperpave®® PlusPlus•• Elastic recoveryElastic recovery•• Forced ductilityForced ductility•• Toughness and tenacityToughness and tenacity•• Phase anglePhase angle•• Method Method
(mode and dose)(mode and dose)•• CombinationsCombinations
0
10
20
30
40
50
As is Modified
PG Grade Specifications
Num
ber
of S
tate
s14
![Page 15: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/15.jpg)
SuperpaveSuperpave® ® Performance GradingPerformance Grading
High Pav. Temp.50% Reliability
PG 70PG 64PG 58PG 52PG 46PG 40PG <34
PG 58→
←PG 58
![Page 16: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/16.jpg)
Adjusting Model for PerformanceAdjusting Model for Performance“Degree Days”“Degree Days”
Frequency and Damage vs. Temperature
0
2000
4000
6000
8000
10000
12000
11 15 19 23 27 31 35 39 43 47 51 55 59 63 67 71
Pavement Temperature, C
Freq
uenc
y, H
ours
0
0.02
0.04
0.06
0.08
0.1
0.12
0.14
0.16
0.18
Dam
age
FrequencyDamage
![Page 17: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/17.jpg)
SuperpaveSuperpave®® Binder SpecificationBinder SpecificationShort Term Aging Short Term Aging -- NCHRPNCHRP
?
![Page 18: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/18.jpg)
SuperpaveSuperpave®® Binder SpecificationBinder SpecificationRuttingRutting
?
G* / sin δ
1
Shear Stress, kPa
10 20
1
Shear Stain, mm/mm
10 20
![Page 19: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/19.jpg)
SuperpaveSuperpave®® Binder SpecificationBinder SpecificationFatigueFatigue
?
G* sin δ
StressStress
StrainStrain
ττmaxmax
γγmaxmax
![Page 20: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/20.jpg)
Little ResearchUsing
Microwave Technology
SuperpaveSuperpave®® Binder SpecificationBinder SpecificationLong Term AgingLong Term Aging
?
![Page 21: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/21.jpg)
SuperpaveSuperpave®® Binder SpecificationBinder SpecificationLow Temperature Cracking (Thermal Fatigue)Low Temperature Cracking (Thermal Fatigue)
?
R&D
![Page 22: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/22.jpg)
SuperpaveSuperpave®® IIIIPG based on Degree DaysPG based on Degree Days
WHEN WHAT HOW WHERE
Construction Safety
PumpabilityRutting
Flash PointRot Visc f’ (G* δ)
230 min 3 Pa-s max
T(high)
Early (GRF, TX) Rutting f’ (G* δ) T(high)
Late (PAV)
Fatigue Low Temp
f”(G*δ)DT DT ABCD
T(inter) TCR
![Page 23: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/23.jpg)
Output – Validation/Calibration Data, Specification Recommendations
RelationshipsRelationships
TRB Superpave Committee-Binder ETG-Mix/Aggregate ETG
TPF 5(019) / SPR 2(174)Technical Working GroupTWG
LaboratoryStudy 90-07
ALF LoadingResponse Data
CollaborativeResearchers
IndustrySupport
![Page 24: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/24.jpg)
Technical Working Group (TWG) Meeting December 5-6, 2002(17 States, 29 Industry Partners/Collaborative Researchers)
Not YetTPF-5(019)SPR-2(174)
![Page 25: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/25.jpg)
Final Test Matrix… Final Test Matrix…
AZCRM----70-22
1
PG70-22Control
2
AirBlown
3
SBS
4
TXTBCR
5
T-P
6
PG70-22
+Fibers
7
PG70-22
8
SBS64-40
9
AirBlown
10
SBS
11
T-P
12
![Page 26: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/26.jpg)
Mix DesignsMix DesignsFHWA 0.45 Power Chart
12.5 mm Nominal Maximum Size
0.075 0.3 1.18 4.75 9.5 12.5 25192.360
10
20
30
40
50
60
70
80
90
100
Sieve Size, mm
Perc
ent P
assi
ng
Moderate Traffic Mix
FHWA 0.45 Power Chart12.5 mm Nominal Maximum Size
0.075 0.3 1.18 4.75 9.5 12.5 25192.360
10
20
30
40
50
60
70
80
90
100
Sieve Size, mm
Perc
ent P
assi
ng
Superpave12.5mm NMSCoarse GradedPb = 5.3 %PG 74-28Ndes = 75
Arizona CRM12.5mm NMSCoarse GradedPb = 7.1 %PG 58-22 with17% CRM
![Page 27: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/27.jpg)
1 2 3 4 5 6 7 8 9 10 11 12
RuttingTest
FatigueTest
LaneALF Testing StatusALF Testing Status
*Initial Strain Measurements: 100% Complete*Rutting Tests: Shakedown Tests Complete (5, 9)*Rutting Tests: 5 of 12 Lanes Complete*Fatigue Tests: Shakedown Test Complete (1)
Completed Test Shakedown Test
![Page 28: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/28.jpg)
ALF ALF -- LaboratoryLaboratory
Preliminary ResultsPreliminary Results
![Page 29: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/29.jpg)
FHWA ALF
0
5
10
15
20
25
0 10,000 20,000 30,000 40,000 50,000 60,000 70,000 80,000ALF Passes, 45kN (10kip) at 64C
Rut
Dep
th, m
mTBCR 79-28SBS 64-40 / 71-38SBS 64-40 / 71-38Air Blown 74-28Ter-Polymer 74-31Control 72-23AZ CRM
![Page 30: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/30.jpg)
12.7 11.88.8
100mm
15.7 15.7
19.5
0.0
5.0
10.0
15.0
20.0
ALF
Rut
ting
afte
r 40,
000
Pass
es a
t 64°
C, (
mm
)
AZ CR E-T TBCR PG 70-22 Air Blown SBS 64-40
Asphalt Binder
Prelim inary ALF Results
![Page 31: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/31.jpg)
FHWA ALF
SBS 64-40: y = 0.3037x - 1.513, R2 = 0.98
TBCR: y = 0.1529x - 1.1525, R2 = 0.98
T-Polymer: y = 0.157x - 1.0456, R2 = 1.00
AZ CR: y = 0.1695x - 1.0816, R2 = 0.99Control: y = 0.1794x - 1.0318, R2 = 0.99
SBS 64-40: y = 0.2927x - 1.4978, R2 = 0.98Air Blown: y = 0.2366x - 1.3018, R2 = 0.99
-0.800
-0.700
-0.600
-0.500
-0.400
-0.300
-0.200
-0.100
0.0000 1 2 3 4 5 6
LOG (ALF Passess - 45kN(10 kips) at 64°C)
LOG
(Rut
ting
with
in A
C la
yer,
in) TBCR
SBS 64-40SBS 64-40Air BlownT-PolymerControlAZ CRLinear (SBS 64-40)Linear (TBCR)Linear (T-Polymer)Linear (AZ CR)Linear (Control)Linear (SBS 64-40)Linear (Air Blown)
![Page 32: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/32.jpg)
0.00
0.05
0.10
0.15
0.20
0.25
0.30
0.35
Slop
e: L
og(R
uttin
g)/L
og(P
asse
s)
TBCR SBS 64-40 SBS 64-40 Air Blown T-Polymer Control AZ CR
FHWA ALF
71-38 74-28 74-31 72-2379-28
![Page 33: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/33.jpg)
Preliminary ALF Data
AB
PG 70-22
TB CR
SBS 64-40E-T
AZ CR
R2 = 0.17
0.0
5.0
10.0
15.0
20.0
25.0
0.0 5.0 10.0 15.0 20.0 25.0
ALF Rut Depth at 40,000 Passes, 64°C
Fren
ch P
RT,
Rut
Dep
th a
t 60
,000
/ 74
°C, m
m
![Page 34: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/34.jpg)
Preliminary ALF Data
SBS 64-40
E-TPG 70-22
ABTBCR
AZ CR
R2 = 0.23
0
2,000
4,000
6,000
8,000
10,000
12,000
14,000
16,000
0.0 5.0 10.0 15.0 20.0 25.0
ALF Rut Depth at 40,000 Passes, 64°C
Ham
burg
, Whe
el P
asse
s to
20
mm
at 6
4°C
![Page 35: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/35.jpg)
Preliminary ALF Data
PG 70-22AB
SBS 64-40E-T
TBCR
AZ CR
R2 = 0.76
20,000
25,000
30,000
35,000
40,000
45,000
50,000
55,000
60,000
0.0 5.0 10.0 15.0 20.0 25.0
ALF Rut Depth at 40,000 Passes, 64°C
RSC
H, G
* at 1
0 H
z / 7
4°C
, MPa
![Page 36: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/36.jpg)
Preliminary ALF Results
SBS 64-40PG 70-22
AB
TB CR
AZ CR
AZ CR
R2 = 0.86
0
500
1,000
1,500
2,000
2,500
0.0 5.0 10.0 15.0 20.0 25.0
ALF Rut Depth at 40,000 Passes, 64°C
RSC
H C
ycle
s to
2%
CPS
S,
74°C
![Page 37: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/37.jpg)
SignificanceSignificance
•• Superpave Shear TesterSuperpave Shear TesterRepeated Shear at Constant Height toRepeated Shear at Constant Height to2% Cumulative Permanent Shear Strain2% Cumulative Permanent Shear StrainTracks ALF Rutting PerformanceTracks ALF Rutting Performance
Preliminary ALF Results
ABPG 70-22
TB CR
E-T
AZ CR
AZ CR
R2 = 0.86
0
500
1,000
1,500
2,000
2,500
0.0 5.0 10.0 15.0 20.0 25.0
ALF Rut Depth at 40,000 Passes, 64°C
RSC
H C
ycle
s to
2%
CPS
S, 7
4°C
![Page 38: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/38.jpg)
Superpave Performance TestsSuperpave Performance Tests
•• Dynamic Modulus, |E*|Dynamic Modulus, |E*|•• Flow TimeFlow Time•• Flow Number Flow Number –– Repeated CreepRepeated Creep
•• Ongoing Testing…Ongoing Testing…
![Page 39: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/39.jpg)
Binder Specification Binder Specification ParametersParameters
Preliminary ResultsPreliminary Results
![Page 40: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/40.jpg)
High Temperature High Temperature ParametersParameters
•• |G*|/sin δ|G*|/sin δ @@10 radians 10 radians (Superpave)(Superpave)
•• |G*|/(1|G*|/(1--(1/tanδ (1/tanδ sinδsinδ)))) @@0.25 radians 0.25 radians (Shenoy)(Shenoy)
•• % % γγaccacc Repeated Creep Repeated Creep @@ 300 Pa 300 Pa ((BahiaBahia))
•• η’η’ @@ 0.01 radians/s, LSV 0.01 radians/s, LSV ((DongreDongre’/D’Angelo)’/D’Angelo)
•• ηη00 @@ ~0 radians/s, ZSV ~0 radians/s, ZSV (Rowe)(Rowe)
•• MVRMVR, 1.225kg load, cc/10min , 1.225kg load, cc/10min ((ShenoyShenoy))
![Page 41: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/41.jpg)
High Spec. Temperature, THigh Spec. Temperature, THSHS
•• |G*|/sin δ = 2200 Pa|G*|/sin δ = 2200 Pa (Superpave)(Superpave)
•• |G*|/(1|G*|/(1--(1/tanδ (1/tanδ sinδsinδ)) = 50 Pa)) = 50 Pa (Shenoy)(Shenoy)
•• % % γγaccacc No CriterionNo Criterion ((BahiaBahia))
•• η’ = 250 Paη’ = 250 Pa--ss, LSV , LSV ((DongreDongre’/D’Angelo)’/D’Angelo)
•• ηη00 = 250 Pa= 250 Pa--ss, ZSV , ZSV (Rowe)(Rowe)
•• MRV = 50 cc/10min MRV = 50 cc/10min ((ShenoyShenoy))
![Page 42: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/42.jpg)
HighHigh--Temperature PerformanceTemperature PerformanceII--80, Nevada80, Nevada
Same gradation Same gradation -- different binders.different binders.
PG 63-22 modified No rutting
PG 67-22 unmodified 15mm of rutting
![Page 43: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/43.jpg)
High Temperature (Rutting)High Temperature (Rutting)Repeated Creep Recovery TestRepeated Creep Recovery Test
0
2000
4000
6000
8000
10000
12000
0 200 400 600 800 1000 1200
Time, (seconds)
Stra
in, (
%)
PG 63-22 Modified
PG 67-22 Neat AC
![Page 44: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/44.jpg)
Repeated Creep Test ResultsRepeated Creep Test ResultsTwo binders of Same PGTwo binders of Same PG--Grade Grade
4.80
4.90
5.00
5.10
5.20
5.30
5.40
5.50
487 492 497 502 507 512
Time (s)
Stra
in (m
m/m
m)
B 6281 (PG74-28)
B 6289 (PG74-31) Limited Recovery, ABALF, 15.7mm, s=0.24
Higher recovery, T-PALF, 8.8mm, s=0.15
![Page 45: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/45.jpg)
Repeated Creep Test ResultsRepeated Creep Test ResultsTwo binders of Different PGTwo binders of Different PG--GradesGrades
1.70
1.90
2.10
2.30
2.50
2.70
487 492 497 502 507 512
Time (s)
Stra
in (m
m/m
m)
B 6280 (PG71-38)
B 6286 (PG79-28)
TBCRALF, 8.8mm, s=0.15
SBSALF, 19.5mm, s=0.30
![Page 46: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/46.jpg)
Summary of Findings To DateSummary of Findings To DatePreliminary ResultsPreliminary Results
•• Current specification Current specification does notdoes not adequately adequately identify the benefits of modifiersidentify the benefits of modifiers
•• RSCHRSCH tracks ALF rutting performancetracks ALF rutting performance
•• A wide range of A wide range of high specification high specification temperature parameters are being temperature parameters are being evaluatedevaluated
![Page 47: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/47.jpg)
What’s NextWhat’s Next
•• Fatigue TestingFatigue Testing–– Two TemperaturesTwo Temperatures
•• Rutting TestingRutting Testing–– 7 Lanes7 Lanes
•• Additional SectionsAdditional Sections–– TBDTBD
•• Superpave SPTSuperpave SPT–– |E*|, Creep|E*|, Creep
•• Beam FatigueBeam Fatigue
•• LowLow--Temp StudyTemp Study–– ABCD, DT, TABCD, DT, TCRCR
![Page 48: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/48.jpg)
SuperpaveSuperpave®® II II –– 2005/62005/6PG based on Degree DaysPG based on Degree Days
WHEN WHAT HOW WHERE
Construction Safety
PumpabilityRutting
Flash PointRot Visc f’ (G* δ)
230 min 3 Pa-s max
T(high)
Early (GRF, TX) Rutting f’ (G* δ) T(high)
Late (PAV)
Fatigue Low Temp
f”(G*δ)DT DT ABCD
T(inter) TCR
![Page 49: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/49.jpg)
Binder Specification Binder Specification DirectionDirection
•• To better handle neat asphaltsTo better handle neat asphalts•• To address modifiersTo address modifiers•• To do it faster, To do it faster,
better, and better, and more economical!more economical!
*** RULES ***
TESTS NEED TO BE:
EASY TO SET UP
EASY TO PERFORM
EASY TO ANALYZE
![Page 50: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/50.jpg)
![Page 51: Understanding the Performance of Modified … Harman - ALF 2...Understanding the Performance of Modified Asphalts in Mixtures NCHRP 90-07, TPF 5(019) Thomas Harman Materials & Construction](https://reader031.fdocuments.in/reader031/viewer/2022022600/5b4317567f8b9a14058bb939/html5/thumbnails/51.jpg)