UMass Design Building: Timber...

25
2/2/2016 1 UMass Design Building: Timber Talk Dr. Peggi Clouston, Ph.D., P. Eng. Associate Professor Building and Construction Technology Program, UMass [email protected] UMass Design Building, Amherst MA Image credit : Leers Weinzapfel Associates UMass Design Building Thursday 1/21/16 First structure of its kind in the US! 86,000 sq. ft. institutional building Glulam. CLT, wood-concrete composites, hybrid trusses Go UMass!

Transcript of UMass Design Building: Timber...

Page 1: UMass Design Building: Timber Talkblogs.umass.edu/bct597f-clouston/files/2011/01/DB-Tours-Jan-2016.pdfcertified wood, recycled/reused/sal vaged materials, local sourcing of materials,

2/2/2016

1

UMass Design Building: Timber TalkDr. Peggi Clouston, Ph.D., P. Eng.Associate Professor

Building and Construction Technology Program, [email protected]

UMass Design Building, Amherst MA

Image credit : Leers Weinzapfel Associates

UMass Design Building

Thursday 1/21/16

First structure of its kind in the US! 86,000 sq. ft. institutional building Glulam. CLT, wood-concrete composites,

hybrid trusses Go UMass!

Page 2: UMass Design Building: Timber Talkblogs.umass.edu/bct597f-clouston/files/2011/01/DB-Tours-Jan-2016.pdfcertified wood, recycled/reused/sal vaged materials, local sourcing of materials,

2/2/2016

2

What is timber engineering? “high-tech”

Prince George Airport, British ColumbiaPhoto credit: McFarlane Green Biggar (MBG) Architects

“bold and beautiful”

“revolutionary”

“eco-friendly”

“new”

Tallest mass timber building in North America at 27m high

Tall Timber is ‘in’

Wood Innovation and Design Center (WIDC) British Columbia, CAPhoto credit: McFarlane Green Biggar (MBG) Architects

Page 3: UMass Design Building: Timber Talkblogs.umass.edu/bct597f-clouston/files/2011/01/DB-Tours-Jan-2016.pdfcertified wood, recycled/reused/sal vaged materials, local sourcing of materials,

2/2/2016

3

World wide competition

Forte Building Melbourne, Australia

Tallest in the world at 32m high Soon to open at 49m high

Treet BuildingBergen, Norway

TIMBER TOWER PROJECT by SOM

42 storiesproposed!

Page 4: UMass Design Building: Timber Talkblogs.umass.edu/bct597f-clouston/files/2011/01/DB-Tours-Jan-2016.pdfcertified wood, recycled/reused/sal vaged materials, local sourcing of materials,

2/2/2016

4

Primary drivers:

Sustainability&Innovation

“Wood can help to earn points in categories typically found in green building rating systems— including certified wood, recycled/reused/salvaged materials, local sourcing of materials, waste minimization,

indoor air quality, advanced building techniques and skills and life cycle impacts” …

Quote source: ReTHINK Wood

WRNS Studio, San Francisco

Green Building Awards

Office Building for GlaxoSmithKline Inc., QuebecNordic CLT. Photo credit © Stéphane Groleau

Page 5: UMass Design Building: Timber Talkblogs.umass.edu/bct597f-clouston/files/2011/01/DB-Tours-Jan-2016.pdfcertified wood, recycled/reused/sal vaged materials, local sourcing of materials,

2/2/2016

5

Sustainability and wood

• Wood is the only major renewable building material

• Wood is recyclable and triggered biodegradable

• Wood products store carbon

• Life Cycle Assessment (LCA) studies show wood to have a comparatively small environmental footprint

• Wood creates a healthy indoor environment

Carbon sequestration and storage

• Wood and wood products store carbon until they burn or biodegrade

Photo credit: Neuweiser (creative commons)

Page 6: UMass Design Building: Timber Talkblogs.umass.edu/bct597f-clouston/files/2011/01/DB-Tours-Jan-2016.pdfcertified wood, recycled/reused/sal vaged materials, local sourcing of materials,

2/2/2016

6

Image courtesy of Joseph Mayo of Mahlum | Architects Inc.

Wood products capture carbon

Life Cycle Assessment (LCA) Study

Image source: ReTHINK WOOD® - Building Green with Wood (Module 2)

Page 7: UMass Design Building: Timber Talkblogs.umass.edu/bct597f-clouston/files/2011/01/DB-Tours-Jan-2016.pdfcertified wood, recycled/reused/sal vaged materials, local sourcing of materials,

2/2/2016

7

Image source: Prof. DDI Michael Flach

Healthy Indoor Environment

• Humidity control

• Stress reducing effects:

http://woodworks.org/wp-content/uploads/Wood-Human-Health11.pdf

• Advanced adhesives w/ minimal to no off-gasing

UMass Design Building

Page 8: UMass Design Building: Timber Talkblogs.umass.edu/bct597f-clouston/files/2011/01/DB-Tours-Jan-2016.pdfcertified wood, recycled/reused/sal vaged materials, local sourcing of materials,

2/2/2016

8

Primary drivers:

Sustainability&Innovation

High-tech wood

Glulam

Cross Laminated Timber

Parallel Strand Lumber (a type of SCL)Wood Concrete Composites

Page 9: UMass Design Building: Timber Talkblogs.umass.edu/bct597f-clouston/files/2011/01/DB-Tours-Jan-2016.pdfcertified wood, recycled/reused/sal vaged materials, local sourcing of materials,

2/2/2016

9

Art Gallery of Ontario, TorontoPhoto credit: Thomas Mayer

• Used for over 100 years• Covered in IBC• Manufacturing and design info. by AITC • Minimum X-sections ~6”x8” (columns), ~5”x10” (beams)• Spans up to 60’

Glulam

L1 - Dense

L2

L2

L3

compressionside

tensionside

The secret behind Glulam strength

• Defects are dispersed• Layup is engineered

Page 10: UMass Design Building: Timber Talkblogs.umass.edu/bct597f-clouston/files/2011/01/DB-Tours-Jan-2016.pdfcertified wood, recycled/reused/sal vaged materials, local sourcing of materials,

2/2/2016

10

Design Building Glulam Column Installation 1/26/16

Earth Sciences Building at the University of British Columbia, Vancouver. Source: Structurlam Products, LP

Cross-laminated timber (CLT)

Page 11: UMass Design Building: Timber Talkblogs.umass.edu/bct597f-clouston/files/2011/01/DB-Tours-Jan-2016.pdfcertified wood, recycled/reused/sal vaged materials, local sourcing of materials,

2/2/2016

11

• 3/5/7 layers• ≥ 4in thick as floors and ≥ 3in as roofs• panels up to 12ft by 60ft• Adhesives in accordance with

ANSI/APA PRG 320

Image source: KLH LTD

• Built in 10 weeks by five workers!

Forte, Melbourne -10 story CLT structure

Image source: KLH LTD

Video:https://www.youtube.com/watch?v=cqXygHyU5ws

Page 12: UMass Design Building: Timber Talkblogs.umass.edu/bct597f-clouston/files/2011/01/DB-Tours-Jan-2016.pdfcertified wood, recycled/reused/sal vaged materials, local sourcing of materials,

2/2/2016

12

Bertsche connector

HBV system

SFS Intec VB Screws

Photo credit : SFS Intec

Image: Bertsche System, GmbH

Wood-concrete composites

Design Building floors

Page 13: UMass Design Building: Timber Talkblogs.umass.edu/bct597f-clouston/files/2011/01/DB-Tours-Jan-2016.pdfcertified wood, recycled/reused/sal vaged materials, local sourcing of materials,

2/2/2016

13

UMass WCC research

Failure line

Steel failure

Benefit of composite action

Publications

❖ Clouston P, Schreyer A. 2012.“Experimental Evaluation of ConnectorSystems for Wood Concrete CompositeFloor systems in Mill BuildingRenovations.” International Journal of theConstructed Environment, Volume 2,Issue 1, pp.131-144.

❖ Clouston P, Schreyer A. 2008. “Designand Use of Wood-Concrete Composites”.ASCE Practice Periodical on StructuralDesign and Construction, 13(4), pp. 167-175

❖ Clouston P, Bathon L, Schreyer A. 2005.“Shear and Bending Performance of aNovel Wood-Concrete CompositeSystem”. ASCE Journal of StructuralEngineering. 131(9), pp.1404-1412

❖ Clouston P, Civjan S, Bathon L. 2004.“Experimental Behavior of a ContinuousMetal Connector for a Wood-ConcreteComposite System”. Forest ProductsJournal. 54(6) pp. 76-84

Page 14: UMass Design Building: Timber Talkblogs.umass.edu/bct597f-clouston/files/2011/01/DB-Tours-Jan-2016.pdfcertified wood, recycled/reused/sal vaged materials, local sourcing of materials,

2/2/2016

14

Passive Fire Protection

Durability

Page 15: UMass Design Building: Timber Talkblogs.umass.edu/bct597f-clouston/files/2011/01/DB-Tours-Jan-2016.pdfcertified wood, recycled/reused/sal vaged materials, local sourcing of materials,

2/2/2016

15

View from North Pleasant Street

Image credit : Leers Weinzapfel Associates

View of atrium and exhibit space

Page 16: UMass Design Building: Timber Talkblogs.umass.edu/bct597f-clouston/files/2011/01/DB-Tours-Jan-2016.pdfcertified wood, recycled/reused/sal vaged materials, local sourcing of materials,

2/2/2016

16

Page 17: UMass Design Building: Timber Talkblogs.umass.edu/bct597f-clouston/files/2011/01/DB-Tours-Jan-2016.pdfcertified wood, recycled/reused/sal vaged materials, local sourcing of materials,

2/2/2016

17

Page 18: UMass Design Building: Timber Talkblogs.umass.edu/bct597f-clouston/files/2011/01/DB-Tours-Jan-2016.pdfcertified wood, recycled/reused/sal vaged materials, local sourcing of materials,

2/2/2016

18

Page 19: UMass Design Building: Timber Talkblogs.umass.edu/bct597f-clouston/files/2011/01/DB-Tours-Jan-2016.pdfcertified wood, recycled/reused/sal vaged materials, local sourcing of materials,

2/2/2016

19

Page 20: UMass Design Building: Timber Talkblogs.umass.edu/bct597f-clouston/files/2011/01/DB-Tours-Jan-2016.pdfcertified wood, recycled/reused/sal vaged materials, local sourcing of materials,

2/2/2016

20

Page 21: UMass Design Building: Timber Talkblogs.umass.edu/bct597f-clouston/files/2011/01/DB-Tours-Jan-2016.pdfcertified wood, recycled/reused/sal vaged materials, local sourcing of materials,

2/2/2016

21

Page 22: UMass Design Building: Timber Talkblogs.umass.edu/bct597f-clouston/files/2011/01/DB-Tours-Jan-2016.pdfcertified wood, recycled/reused/sal vaged materials, local sourcing of materials,

2/2/2016

22

Page 23: UMass Design Building: Timber Talkblogs.umass.edu/bct597f-clouston/files/2011/01/DB-Tours-Jan-2016.pdfcertified wood, recycled/reused/sal vaged materials, local sourcing of materials,

2/2/2016

23

Page 24: UMass Design Building: Timber Talkblogs.umass.edu/bct597f-clouston/files/2011/01/DB-Tours-Jan-2016.pdfcertified wood, recycled/reused/sal vaged materials, local sourcing of materials,

2/2/2016

24

Page 25: UMass Design Building: Timber Talkblogs.umass.edu/bct597f-clouston/files/2011/01/DB-Tours-Jan-2016.pdfcertified wood, recycled/reused/sal vaged materials, local sourcing of materials,

2/2/2016

25

Image credit : Leers Weinzapfel Associates

The south wing in a day…