Ultrasonic Clamp-on Flowmeter - Forbes Marshall · CG 34 xxxxxx S/N: A06 xxxxx P = Passive NC = Not...

44
Ultrasonic Clamp-on Flowmeter OPTISONIC 6300 Quick Start

Transcript of Ultrasonic Clamp-on Flowmeter - Forbes Marshall · CG 34 xxxxxx S/N: A06 xxxxx P = Passive NC = Not...

Page 1: Ultrasonic Clamp-on Flowmeter - Forbes Marshall · CG 34 xxxxxx S/N: A06 xxxxx P = Passive NC = Not ... for the installation menu, X1...X9.8.4 2 Read the advised ... mechanical installation"

Ultrasonic Clamp-on Flowmeter

OPTISONIC 6300 Quick Start

Page 2: Ultrasonic Clamp-on Flowmeter - Forbes Marshall · CG 34 xxxxxx S/N: A06 xxxxx P = Passive NC = Not ... for the installation menu, X1...X9.8.4 2 Read the advised ... mechanical installation"

OPTISONIC 6300

7.30959.22.00 2

General safety notes

You can find additional information on the CD-ROM provided, in the manual, the data sheet, special manuals and certificates.

Installation, mounting, commissioning, and maintenance can be performed only by trained personnel.

Responsibility for suitability and intended use of this instrument rests solely with the user.

The supplier accepts no liability for inappropriate use by the customer.

Improper installation and operation may lead to loss of warranty. Moreover, the "general terms and conditions" on the back of the bill apply, which form the basis for the sales contract.

If you have to send the device back to the manufacturer or supplier, fill out the form contained on the CD-ROM and enclose it with the device. Unless this form is completely filled out, it will unfortunately not be possible for KROHNE to perform repair or inspection.

Respect general and local electrical safety requirements.

Page 3: Ultrasonic Clamp-on Flowmeter - Forbes Marshall · CG 34 xxxxxx S/N: A06 xxxxx P = Passive NC = Not ... for the installation menu, X1...X9.8.4 2 Read the advised ... mechanical installation"

OPTISONIC 6300

www.krohne.com 3

Scope of delivery

1 Signal converter, wall version or field version2 Quick Start3 CD-ROM (including Handbook, Quick Start, Technical Datasheet, Support database, movie)4 Factory calibration report5 Sensor OPTISONIC 6000 plus cover6 Metal strap7 Mineral coupling grease8 Signal cable plus connector cap

UFC 300

0% 50 100

X3

mh

3

OPTISONIC 6000

Manufactured: 2006Tm: -40 ... +120�C

Ta= -40 ... +70�C

IP66/67 according to EN 60529S/N: A06 xxxxx

Calibration nr.: xxxxxxxxx

Altometer, DordrechtNL - 3313 LC

1

2

5

6

78

4 3

OPTISONIC 6000

Manufactured: 2006Tm: -40 ... +120�C

Ta= -40 ... +70�C

IP66/67 according to EN 60529S/N: A06 xxxxx

Calibration nr.: xxxxxxxxx

Altometer, DordrechtNL - 3313 LC

Page 4: Ultrasonic Clamp-on Flowmeter - Forbes Marshall · CG 34 xxxxxx S/N: A06 xxxxx P = Passive NC = Not ... for the installation menu, X1...X9.8.4 2 Read the advised ... mechanical installation"

OPTISONIC 6300

7.30959.22.00 4

Additionally for large version:

1 2nd sensor OPTISONIC 6000 plus cover2 90 degree screw driver3 4 fixing units4 positioning tool5 2 metal straps6 signal cable plus connector cap7 cable box plus signal cable

OPTISONIC 6000

Manufactured: 2006Tm: -40 ... +120�C

Ta= -40 ... +70�C

IP66/67 according to EN 60529S/N: A06 xxxxx

Calibration nr.: xxxxxxxxx

Altometer, DordrechtNL - 3313 LC

OPTISONIC 6000

Manufactured: 2006Tm: -40 ... +120�C

Ta= -40 ... +70�C

IP66/67 according to EN 60529S/N: A06 xxxxx

Calibration nr.: xxxxxxxxx

Altometer, DordrechtNL - 3313 LC

1 2

67

3

45

Page 5: Ultrasonic Clamp-on Flowmeter - Forbes Marshall · CG 34 xxxxxx S/N: A06 xxxxx P = Passive NC = Not ... for the installation menu, X1...X9.8.4 2 Read the advised ... mechanical installation"

OPTISONIC 6300

www.krohne.com 5

Visual check

• Visual check at rail 1 and flow converter 2 (IO sticker is inside the

converter housing).

NOTE!Rail is marked Ta in most cases. Only for dual path / dual pipe versions you receive a second rail marked Tb.If you ordered a large version, you receive two rails, both marked with Ta!

21

(FE)PE

POW

ERIN

PUT

/ OU

TPU

T

L(L+)N(L-) A = Active

CG 34 xxxxxx S/N: A06 xxxxx

P = Passive NC = Not connected

P

P

P

P

PULSE OUT / STATUS OUTImax = 100 mA@f<= 10 Hz; = 20 mA@f<=12 kHzVo = 1.5 V @ 10 mA; Umax = 32 VDC

A

STATUS OUT

STATUS OUT / CONTROL INImax = 100 mA; Vmax = 32 VDC

Imax = 100 mAVmax = 32 VDCVon > 19 VDC, Voff < 2.5 VDC;

CURRENT OUT ( HART )ActivePassive

( Terminals A & A+);( Terminals A & A- );

RLmax = 1 kohmVmax = 32 VDC

D -

C

D

C -

B -

B

A +A -A

UFC 300

0% 50 100

X3

mh

3

Manufactured: 2006

S/N Ta:

S/N Tc:S/N Tb:

Altometer, DordrechtNL - 3313 LC

UFC300

www.krohne.com

100-230 V AC

A06 xxxxxA06 xxxxxA06 xxxxx

50-60 Hz 22 VAOPTISONIC 6000 yyy

Manufactured: 2006Tm: -40 ... +120�C

Ta= -40 ... +70�C

IP66/67 according to EN 60529S/N: A06 xxxxx

Calibration nr.: xxxxxxxxx

Altometer, DordrechtNL - 3313 LC

OPTISONIC 6000

Manufactured: 2006Tm: -40 ... +120�C

Ta= -40 ... +70�C

IP66/67 according to EN 60529S/N: A06 xxxxx

Calibration nr.: xxxxxxxxx

Altometer, DordrechtNL - 3313 LC

Page 6: Ultrasonic Clamp-on Flowmeter - Forbes Marshall · CG 34 xxxxxx S/N: A06 xxxxx P = Passive NC = Not ... for the installation menu, X1...X9.8.4 2 Read the advised ... mechanical installation"

OPTISONIC 6300

7.30959.22.00 6

Inlet, outlet and recommended mounting area

1 Min. 10 DN2 Min. 5 DN3 OK, 120°

Page 7: Ultrasonic Clamp-on Flowmeter - Forbes Marshall · CG 34 xxxxxx S/N: A06 xxxxx P = Passive NC = Not ... for the installation menu, X1...X9.8.4 2 Read the advised ... mechanical installation"

OPTISONIC 6300

www.krohne.com 7

General mechanical installation

Installation of the rails with the metal strapsInstallation of the rails with the metal strapsInstallation of the rails with the metal strapsInstallation of the rails with the metal straps

NOTE!This chapter explains the basic handlings that are used throughout this Quick Start. Do not execute them at first reading!

Page 8: Ultrasonic Clamp-on Flowmeter - Forbes Marshall · CG 34 xxxxxx S/N: A06 xxxxx P = Passive NC = Not ... for the installation menu, X1...X9.8.4 2 Read the advised ... mechanical installation"

OPTISONIC 6300

7.30959.22.00 8

• 7: Repeat steps 1...6 at the other side of the rail.

Change the position of the transducerChange the position of the transducerChange the position of the transducerChange the position of the transducer

• Unlock the floating transducer 2 by turning the locking knob 1 counter

clockwise.

• Slide the transducer 2 to the advised mounting distance 3 (menu X9.4).

6

Page 9: Ultrasonic Clamp-on Flowmeter - Forbes Marshall · CG 34 xxxxxx S/N: A06 xxxxx P = Passive NC = Not ... for the installation menu, X1...X9.8.4 2 Read the advised ... mechanical installation"

OPTISONIC 6300

www.krohne.com 9

• Lock the transducer by turning the locking knob 1 clockwise.

Greasing the transducer surfacesGreasing the transducer surfacesGreasing the transducer surfacesGreasing the transducer surfaces

Page 10: Ultrasonic Clamp-on Flowmeter - Forbes Marshall · CG 34 xxxxxx S/N: A06 xxxxx P = Passive NC = Not ... for the installation menu, X1...X9.8.4 2 Read the advised ... mechanical installation"

OPTISONIC 6300

7.30959.22.00 10

Mounting the coverMounting the coverMounting the coverMounting the cover

Page 11: Ultrasonic Clamp-on Flowmeter - Forbes Marshall · CG 34 xxxxxx S/N: A06 xxxxx P = Passive NC = Not ... for the installation menu, X1...X9.8.4 2 Read the advised ... mechanical installation"

OPTISONIC 6300

www.krohne.com 11

General instructions for programmingHuman machine interface (HMI)Human machine interface (HMI)Human machine interface (HMI)Human machine interface (HMI)

1 Product name2 X shows optical button is activated3 Indication of menu number4 Block indicates the menu level5 0...100%6 Infrared sensor7 Operating keys (see table below for description)8 : scroll

1

2

3

8

7

4

5

6

Page 12: Ultrasonic Clamp-on Flowmeter - Forbes Marshall · CG 34 xxxxxx S/N: A06 xxxxx P = Passive NC = Not ... for the installation menu, X1...X9.8.4 2 Read the advised ... mechanical installation"

OPTISONIC 6300

7.30959.22.00 12

Start installation menuStart installation menuStart installation menuStart installation menu

• Connect converter to power supply and power up converter.

First and second page appear intermittently

Key Description Used symbol

start installation, select menu

>

return ^

down

up

+ escape > +

Page 13: Ultrasonic Clamp-on Flowmeter - Forbes Marshall · CG 34 xxxxxx S/N: A06 xxxxx P = Passive NC = Not ... for the installation menu, X1...X9.8.4 2 Read the advised ... mechanical installation"

OPTISONIC 6300

www.krohne.com 13

• Keep left button ">" pressed, until in display appears "release key now"

Page 14: Ultrasonic Clamp-on Flowmeter - Forbes Marshall · CG 34 xxxxxx S/N: A06 xxxxx P = Passive NC = Not ... for the installation menu, X1...X9.8.4 2 Read the advised ... mechanical installation"

OPTISONIC 6300

7.30959.22.00 14

Installation menuInstallation menuInstallation menuInstallation menu

• > ^

X1...X7X1 language > select from list using > ^

X2 GDC IR interface > activate / cancel ^

X3 units > X3.1, X3.2, …X3.1 size > select from list using > ^

X3.2 volume flow > select from list using > ^

X3.3 velocity > select from list using > ^

X3.4 density > select from list using > ^

X3.5 viscosity > select from list using > ^

X4 number of pipes > 1 pipe / 2 pipes ^

(X5 becomes active if one pipeone pipeone pipeone pipe is selected in X4)

X5 number of paths > 1 path / 2 paths ^

(underneath X6 becomes active if one pipeone pipeone pipeone pipe is selected in X4)

(Note: the measurement results of path 1 and path 2path 1 and path 2path 1 and path 2path 1 and path 2 are averaged !)

(underneath X6 and X7 become active if two pipestwo pipestwo pipestwo pipes are selected in X4)

X6 pipe data / pipe data 1 > X6.2, X6.3, …X6.2 pipe tag > fill in 12 pos using > ^

X6.3 diameter > fill in using > ^

X6.4 pipe material > select from list using > ^

X6.5 VoS pipe material > read advise or fill in using >

^

X6.6 wall thickness > fill in using > ^

X6.7 liner material > select from list using > ^

Page 15: Ultrasonic Clamp-on Flowmeter - Forbes Marshall · CG 34 xxxxxx S/N: A06 xxxxx P = Passive NC = Not ... for the installation menu, X1...X9.8.4 2 Read the advised ... mechanical installation"

OPTISONIC 6300

www.krohne.com 15

X6.8 VoS liner material > read advise or fill in using >

^

X6.9 liner thickness > fill in using > ^

X6.10 fluid > select from list using > ^

X6.11 VoS fluid > read advise or fill in using >

^

X6.12 density > read advise or fill in using >

^

X6.13 viscosity > fill in using > ^

X7 pipe data 2 >

X7.1 copy pipe 1 data > start to copy ?

if no: copy pipe 1 data appears Go to X7Fill in menu X7.2 up to X7.13: is similar to X6.2 up to X6.13

^

if yes: copy pipe 1 data appears after copy process

^

Page 16: Ultrasonic Clamp-on Flowmeter - Forbes Marshall · CG 34 xxxxxx S/N: A06 xxxxx P = Passive NC = Not ... for the installation menu, X1...X9.8.4 2 Read the advised ... mechanical installation"

OPTISONIC 6300

7.30959.22.00 16

X9...X10X9 install transd. 1 > X9.1, X9.2,…

X9.1 transducer set > read preset Ta,Tb,Tc / confirm or overrule using >

X9.2 calibration number read ^

X9.3 number of traverses

> read preset 1,2,4 / confirm or overrule using >

X9.4 mount transducers at

read advise ^

please wait: decounting 30 seconds

X9.5 act. flow, preliminary

read ^

X9.6 check signal read (0 - 100 %) ^

X9.7 actual distance > fill in using > ^

(start optimization loop)

X9.8.1 optimize distance ? yes/no ^

if no: go to X9.9

if yes: continue with X9.8.2

X9.8.2 act. VoS fluid read ^

X9.8.3 continue ? yes/no ^

if no: go to X9.9

if yes: continue with X9.8.4

X9.8.4 VoS fluid read / confirm or overrule using >

^

X9.8.5 mount transducers at

read advise ^

(end optimization loop; next menu appearing is X9.8.1)

(underneath X10 becomes active if two pipes or two pathstwo pipes or two pathstwo pipes or two pathstwo pipes or two paths are selected in X4 or X5)

X10 install transd. 2 >

Page 17: Ultrasonic Clamp-on Flowmeter - Forbes Marshall · CG 34 xxxxxx S/N: A06 xxxxx P = Passive NC = Not ... for the installation menu, X1...X9.8.4 2 Read the advised ... mechanical installation"

OPTISONIC 6300

www.krohne.com 17

submenus identical to X9.1 up to X9.12

^

Page 18: Ultrasonic Clamp-on Flowmeter - Forbes Marshall · CG 34 xxxxxx S/N: A06 xxxxx P = Passive NC = Not ... for the installation menu, X1...X9.8.4 2 Read the advised ... mechanical installation"

OPTISONIC 6300

7.30959.22.00 18

Instrument versionsThe OPTISONIC 6300 Flowmeter is available for three diameter ranges as small, medium and large version. The procedure to install a large version differs from the procedure for a small and medium version.

1 Rail, small version2 Rail, medium version3 Choose for V-mode or ...4 Choose for W-mode5 Make settings in converter

NOTE!For the small and medium version, proceed with the chapter "instructions for small and medium version" for specific instructions.

Page 19: Ultrasonic Clamp-on Flowmeter - Forbes Marshall · CG 34 xxxxxx S/N: A06 xxxxx P = Passive NC = Not ... for the installation menu, X1...X9.8.4 2 Read the advised ... mechanical installation"

OPTISONIC 6300

www.krohne.com 19

1 Enter the values for the installation menu, X1...X9.8.42 Read the advised mounting distance in menu X9.8.53 Choose for Z-mode (default) or ...4 Choose for V-mode5 Finish the installation menu

NOTE!For the large version, proceed with the chapter "instructions for large version" for specific instructions.

UP

UP

DOWN

DOWN

DOWN

X.1 ... X.9.8.4 X.9.8.5150mm

UP

Page 20: Ultrasonic Clamp-on Flowmeter - Forbes Marshall · CG 34 xxxxxx S/N: A06 xxxxx P = Passive NC = Not ... for the installation menu, X1...X9.8.4 2 Read the advised ... mechanical installation"

OPTISONIC 6300

7.30959.22.00 20

Installation instructions for small and medium version

1 Small version: single pipe / single path2 Medium version: single pipe / single path3 Small version: single pipe / dual path4 Medium version: single pipe / dual path5 Small version: dual pipe / single path6 Medium version: dual pipe / single path

1 2

3 4

5 6

Page 21: Ultrasonic Clamp-on Flowmeter - Forbes Marshall · CG 34 xxxxxx S/N: A06 xxxxx P = Passive NC = Not ... for the installation menu, X1...X9.8.4 2 Read the advised ... mechanical installation"

OPTISONIC 6300

www.krohne.com 21

• Mount the rail, see chapter "General mechanical installation"

• Make all electrical connections

Rail versionRail versionRail versionRail version Diameter rangeDiameter rangeDiameter rangeDiameter range Preferred measuring modesPreferred measuring modesPreferred measuring modesPreferred measuring modes

Small DN15...100 / 0.5...4" < DN25: W-mode (4 traverses)

DN25: V-mode (2 traverses)

Medium DN50...400 / 2...16" V-mode (2 traverses)

1 Connect the green cable to "DOWN"2 Connect the blue cable to "UP"3 Turn the screws clockwise to secure the cap

3313 LC, DordrechtThe Netherlands

OPTISONIC 6000 SMALL

Manufactured: 2006Tm: -40 ... +120�C

Ta= -40 ... +70�C

IP66/67 according to EN 60529XXXX

1

2

3

Page 22: Ultrasonic Clamp-on Flowmeter - Forbes Marshall · CG 34 xxxxxx S/N: A06 xxxxx P = Passive NC = Not ... for the installation menu, X1...X9.8.4 2 Read the advised ... mechanical installation"

OPTISONIC 6300

7.30959.22.00 22

1 Connect blue cable to 1U (to 2U for 2nd sensor) and the green cable to 1D (2D for 2nd sensor)2 Communication I/O3 Power supply: 24 VAC/DC or 100...240 VAC

Page 23: Ultrasonic Clamp-on Flowmeter - Forbes Marshall · CG 34 xxxxxx S/N: A06 xxxxx P = Passive NC = Not ... for the installation menu, X1...X9.8.4 2 Read the advised ... mechanical installation"

OPTISONIC 6300

www.krohne.com 23

• Power up the converter (do not mount and/or connect the rails yet)

• Fill in menu X1...X7 (see section "Installation menu" in chapter "General

instructions for programming")

• X9.1: Check the reading with the sensor code (Ta/Tb) on rail. Press enter

• X9.2: Check the reading with the calibration number on the nameplate.

Press enter

• X9.3: Check the factory preset number of traverses (default: 2, for DN<25:

4)

• X9.4: Read the advised mounting distance and position the transducer at

that distance . Press enter

• X9.5: Read the preliminary flow speed. Press enter

1 Cover, electronics compartment2 Cover, terminal compartment for power supply and inputs/outputs3 Cover, sensor terminal compartment4 Cable entry for power5 Cable entry for inputs/outputs6 Cable entry for sensor cable

1 2

3

4

56

1U 2U1D

3U 3D

2D

Page 24: Ultrasonic Clamp-on Flowmeter - Forbes Marshall · CG 34 xxxxxx S/N: A06 xxxxx P = Passive NC = Not ... for the installation menu, X1...X9.8.4 2 Read the advised ... mechanical installation"

OPTISONIC 6300

7.30959.22.00 24

• X9.6: Read the actual signal strength

• X9.7: Confirm or adjust the reading with the actual distance on the rail.

• X9.8: Optimization loop. Repeat steps X9.8.1...X9.8.5 until the advised

mounting distance does not change more than 0.5%:

• X9.8.1: Optimise distance?

• X9.8.2: Read the velocity of sound of the fluid

• X9.8.3: Continue?

• X9.8.4: Confirm or adjust the velocity of sound

• X9.8.5: Read the advised mounting distance and reposition the transducer

• X9.9: Read the preliminary flow speed

CAUTION!Advice on signal strength:Advice on signal strength:Advice on signal strength:Advice on signal strength:Signal > 75%:Signal > 75%:Signal > 75%:Signal > 75%: good signal, optimization loop not neededSignal 50...75%:Signal 50...75%:Signal 50...75%:Signal 50...75%: fairly good signal, optimization loop can improve the signalSignal 10...50%:Signal 10...50%:Signal 10...50%:Signal 10...50%: low signal, optimization loop neededSignal < 10%:Signal < 10%:Signal < 10%:Signal < 10%: bad or no signal, check settings in menu X6, increase transducer distance and/or go into the optimization loop.

0% %50 100

Page 25: Ultrasonic Clamp-on Flowmeter - Forbes Marshall · CG 34 xxxxxx S/N: A06 xxxxx P = Passive NC = Not ... for the installation menu, X1...X9.8.4 2 Read the advised ... mechanical installation"

OPTISONIC 6300

www.krohne.com 25

• X9.10: Path ready? If you enter "No" then the installation is not saved. If

you enter "Yes" the installation can be saved in X9.11. If you have:

1 path or pipe: you are finished, proceed with X9.11

2 paths: go to X9 for the 2nd path

2 pipes: go to X10 for the 2nd pipe

• X9.11: End Installation? If you enter "No" the installation is not saved, go

to X9. If you enter "Yes" the installation is saved and the measurement

screen will appear.

• Mount the cover (see the section "mounting the cover" in chapter

"General mechanical installation")

Page 26: Ultrasonic Clamp-on Flowmeter - Forbes Marshall · CG 34 xxxxxx S/N: A06 xxxxx P = Passive NC = Not ... for the installation menu, X1...X9.8.4 2 Read the advised ... mechanical installation"

OPTISONIC 6300

7.30959.22.00 26

Installation instructions for large version

NOTE!You need a calculator, measuring band and pen & paper to install a large version

1 Single pipe, single path2 Single pipe, dual path3 Dual pipe

OPTISONIC 6000

Manufactured: 2006Tm: -40 ... +120�C

Ta= -40 ... +70�C

IP66/67 according to EN 60529S/N: A06 xxxxx

Calibration nr.: xxxxxxxxx

Altometer, DordrechtNL - 3313 LC

OPTISONIC6000

Manufactured: 2006Tm: -40 ... +120�C

Ta= -40 ... +70�C TT

IP66/67 according to EN 60529S/N:A06 xxxxx

Calibration nr.:xxxxxxxxx

Altometer, DordrechtNL- 3313 LC L

OPTISONIC 6000

Manufactured: 2006Tm: -40 ... +120�C

Ta= -40 ... +70�C

IP66/67 according to EN 60529S/N: A06 xxxxx

Calibration nr.: xxxxxxxxx

Altometer, DordrechtNL - 3313 LC

OPTISONIC 6000

Manufactured: 2006Tm: -40 ... +120�C

Ta= -40 ... +70�C

IP66/67 according to EN 60529S/N: A06 xxxxx

Calibration nr.: xxxxxxxxx

Altometer, DordrechtNL - 3313 LC

OPTISONIC6000

Manufactured: 2006Tm: -40 ... +120�C

Ta= -40 ... +70�C TT

IP66/67 according to EN 60529S/N:A06 xxxxx

Calibrationnr.:xxxxxxxxx

Altometer,DordrechtNL- 3313 LC

OPTISONIC 6000

Manufactured: 2006Tm: -40 ... +120�C

Ta= -40 ... +70�C

IP66/67 according to EN 60529S/N: A06 xxxxx

Calibration nr.: xxxxxxxxx

Altometer, DordrechtNL - 3313 LC

OPTISONIC 6000

Manufactured: 2006Tm: -40 ... +120�C

Ta= -40 ... +70�C

IP66/67 according to EN 60529S/N: A06 xxxxx

Calibration nr.: xxxxxxxxx

Altometer, DordrechtNL - 3313 LC

OPTISONIC 6000

Manufactured: 2006Tm: -40 ... +120�C

Ta= -40 ... +70�C

IP66/67 according to EN 60529S/N: A06 xxxxx

Calibration nr.: xxxxxxxxx

Altometer, DordrechtNL - 3313 LC

OPTISONIC 6000

Manufactured: 2006Tm: -40 ... +120�C

Ta= -40 ... +70�C

IP66/67 according to EN 60529S/N: A06 xxxxx

Calibration nr.: xxxxxxxxx

Altometer, DordrechtNL - 3313 LC

1

2

3

Page 27: Ultrasonic Clamp-on Flowmeter - Forbes Marshall · CG 34 xxxxxx S/N: A06 xxxxx P = Passive NC = Not ... for the installation menu, X1...X9.8.4 2 Read the advised ... mechanical installation"

OPTISONIC 6300

www.krohne.com 27

NOTE!Default measuring mode is the Z-mode. This will work in most cases. V-mode is possible for DN450/600...2000 (minimum depends on application). It is easier to install, but you will need more free pipe length

3313 LC, DordrechtThe Netherlands

OPTISONIC 6000 SMALL

Manufactured: 2006Tm: -40 ... +120�C

Ta= -40 ... +70�C

IP66/67 according to EN 60529XXXX

Page 28: Ultrasonic Clamp-on Flowmeter - Forbes Marshall · CG 34 xxxxxx S/N: A06 xxxxx P = Passive NC = Not ... for the installation menu, X1...X9.8.4 2 Read the advised ... mechanical installation"

OPTISONIC 6300

7.30959.22.00 28

• Power up the converter (do not mount and/or connect the rails yet)

• Fill in menu X1...X7 as described in section "Installation menu" in chapter

"General instructions for programming". Select "1 path" initially in X5

• X9.1: Check the reading with the sensor code (Ta/Tb) on rail

• X9.2: Check the reading with the calibration number on the nameplate

• X9.3: Check the factory preset number of traverses (default: 1 for Z-mode)

• X9.4: Read the advised mounting distance. Write it down, you need it later

• X9.5: Press enter

• X9.6: Press enter. Wait for 30 seconds

• X9.7: Press enter

• X9.8: Optimization loop. Enter "No" in X9.8.1

• X9.9: Press enter

• X9.10: Path ready? Enter "Yes"

• X9.11: End Installation? Enter "Yes"

1 2

3

4

56

1U 2U1D

3U 3D

2D

Page 29: Ultrasonic Clamp-on Flowmeter - Forbes Marshall · CG 34 xxxxxx S/N: A06 xxxxx P = Passive NC = Not ... for the installation menu, X1...X9.8.4 2 Read the advised ... mechanical installation"

OPTISONIC 6300

www.krohne.com 29

Mounting the UP railMounting the UP railMounting the UP railMounting the UP rail

CAUTION!Make sure that you mount the rail parallel to the pipe. Mount the fixing units and the cable box as shown below

1 Align the UP rail with the pipeline.2 Fixing units3 Turn screws clockwise to secure.4 Mark the position.5 Cable box

Page 30: Ultrasonic Clamp-on Flowmeter - Forbes Marshall · CG 34 xxxxxx S/N: A06 xxxxx P = Passive NC = Not ... for the installation menu, X1...X9.8.4 2 Read the advised ... mechanical installation"

OPTISONIC 6300

7.30959.22.00 30

• Pull the metal strap through the upper slit of the UP rail 1.

• Take the metal strap around the pipe (45...60°) 2.

• Push the end of the metal strap in the lower slit of the fixing unit 3.

• Take the other side of the metal strap around the pipe to the fixing unit 4.

• Mount the cable box (only for downstream metal strap) 5.

Page 31: Ultrasonic Clamp-on Flowmeter - Forbes Marshall · CG 34 xxxxxx S/N: A06 xxxxx P = Passive NC = Not ... for the installation menu, X1...X9.8.4 2 Read the advised ... mechanical installation"

OPTISONIC 6300

www.krohne.com 31

• Push the metal strap through the upper slit of the fixing unit 6.

• Pull the metal strap moderately tight by hand 7.

CAUTION!Choose between Z and V mode before you proceed. The Advised Distance (menu X9.4) must be > 246 mm / 9,7" for V-mode.

Set transducer positions for both rails according to the table below.

Advised distance [mm]Advised distance [mm]Advised distance [mm]Advised distance [mm] Transducer position [mm]Transducer position [mm]Transducer position [mm]Transducer position [mm]

100...250 -65

>250 0

Page 32: Ultrasonic Clamp-on Flowmeter - Forbes Marshall · CG 34 xxxxxx S/N: A06 xxxxx P = Passive NC = Not ... for the installation menu, X1...X9.8.4 2 Read the advised ... mechanical installation"

OPTISONIC 6300

7.30959.22.00 32

Mounting the DOWN rail for Z-modeMounting the DOWN rail for Z-modeMounting the DOWN rail for Z-modeMounting the DOWN rail for Z-mode

Measure the outer diameter of the pipe with a measuring band.For Z-mode, you must install the DOWN rail at the opposite location at the pipe. There are two possible ways to find the exact location:

1. FIND THE LOCATION WITH A FIXED REFERENCE POINT

Calculate the half of the outer diameter. Mark this 180° alignment line on the pipe.

Page 33: Ultrasonic Clamp-on Flowmeter - Forbes Marshall · CG 34 xxxxxx S/N: A06 xxxxx P = Passive NC = Not ... for the installation menu, X1...X9.8.4 2 Read the advised ... mechanical installation"

OPTISONIC 6300

www.krohne.com 33

• Mount the DOWN rail in such a way that the transducer is at the marked

location

2. FIND THE LOCATION WITH THE SUPPLIED POSITIONING TOOL

1 Measure the distance between the transducer of the UP rail and the reference point.2 Add the Advised Distance and mark the location on the alignment line.

• Mount the positioning tool to the UP rail as shown.

OPTISONIC 6000

Manufactured: 2006Tm: -40 ... +120�C

Ta= -40 ... +70�C

IP66/67 according to EN 60529S/N: A06 xxxxx

Calibration nr.: xxxxxxxxx

Altometer, DordrechtNL - 3313 LC

UP

Page 34: Ultrasonic Clamp-on Flowmeter - Forbes Marshall · CG 34 xxxxxx S/N: A06 xxxxx P = Passive NC = Not ... for the installation menu, X1...X9.8.4 2 Read the advised ... mechanical installation"

OPTISONIC 6300

7.30959.22.00 34

1 Mark the cables at a distance of 1.63 x outer diameter.2 Outer diameter of pipeline

INFORMATION!For large diameters you can use the weight of the metal plates to throw the cable around the pipe. First release one of the cables in that case!

• Pull the V-shaped plate in the downstream direction as much as possible. Pay attention that the cables are not obstructed. Put the two V-marks on the pipeline.

• Do the same in the upstream direction.

CAUTION!Repeat above steps to check if you find the same points

OPTISONIC 6000

Manufactured: 2006Tm: -40 ... +120�C

Ta= -40 ... +70�C

IP66/67 according to EN 60529S/N: A06 xxxxx

Calibration nr.: xxxxxxxxx

Altometer, DordrechtNL - 3313 LC

Page 35: Ultrasonic Clamp-on Flowmeter - Forbes Marshall · CG 34 xxxxxx S/N: A06 xxxxx P = Passive NC = Not ... for the installation menu, X1...X9.8.4 2 Read the advised ... mechanical installation"

OPTISONIC 6300

www.krohne.com 35

• Mount the DOWN rail in such a way that the transducer is at the marked

location.

• Calculate the middle of the alignment line between the 4 V-marks as shown.

1 Advised Distance as shown in menu X9.42 Measure the distance between the transducer and the end of the UP rail.3 Determine and mark the location of the transducer of the DOWN rail: 3 = 1 - 2

OPTISONIC 6000

Manufactured: 2006Tm: -40 ... +120�C

Ta= -40 ... +70�C

IP66/67 according to EN 60529S/N: A06 xxxxx

Calibration nr.: xxxxxxxxx

Altometer, DordrechtNL - 3313 LC

Page 36: Ultrasonic Clamp-on Flowmeter - Forbes Marshall · CG 34 xxxxxx S/N: A06 xxxxx P = Passive NC = Not ... for the installation menu, X1...X9.8.4 2 Read the advised ... mechanical installation"

OPTISONIC 6300

7.30959.22.00 36

• Grease all transducers, see "General mechanical installation"

NOTE!It can be necessary to install the DOWN rail as shown below.

UP

DOWN

1

Page 37: Ultrasonic Clamp-on Flowmeter - Forbes Marshall · CG 34 xxxxxx S/N: A06 xxxxx P = Passive NC = Not ... for the installation menu, X1...X9.8.4 2 Read the advised ... mechanical installation"

OPTISONIC 6300

www.krohne.com 37

Mounting the DOWN rail in V-modeMounting the DOWN rail in V-modeMounting the DOWN rail in V-modeMounting the DOWN rail in V-mode

For V-mode, you must install the DOWN rail in line with the UP rail. It is easier to install than the Z-mode, but you need more free pipe length. V-mode is possible for DN450/600...2000 (minimum depends on application)

1 Fixing units2 Reference marking3 Cable box4 Advised Distance, X9.45 Minimum distance between UP and DOWN rail: 110 mm / 4.3"

DOWNUP

Page 38: Ultrasonic Clamp-on Flowmeter - Forbes Marshall · CG 34 xxxxxx S/N: A06 xxxxx P = Passive NC = Not ... for the installation menu, X1...X9.8.4 2 Read the advised ... mechanical installation"

OPTISONIC 6300

7.30959.22.00 38

Electrical connectionsElectrical connectionsElectrical connectionsElectrical connections

1 Connect the blue cable to the UP rail.2 Connect the green cable to the DOWN rail.3 Make connections in cable box.4 Cable to converter5 Turn the screws clockwise to secure the caps.

Page 39: Ultrasonic Clamp-on Flowmeter - Forbes Marshall · CG 34 xxxxxx S/N: A06 xxxxx P = Passive NC = Not ... for the installation menu, X1...X9.8.4 2 Read the advised ... mechanical installation"

OPTISONIC 6300

www.krohne.com 39

1 Connect blue cable to 1U (to 2U for 2nd sensor) and the green cable to 1D (2D for 2nd sensor)2 Communication I/O3 Power supply: 24 VAC/DC or 100...240 VAC

Page 40: Ultrasonic Clamp-on Flowmeter - Forbes Marshall · CG 34 xxxxxx S/N: A06 xxxxx P = Passive NC = Not ... for the installation menu, X1...X9.8.4 2 Read the advised ... mechanical installation"

OPTISONIC 6300

7.30959.22.00 40

• Go through menu X1...X7 as described in section "Installation menu" in

chapter "General instructions for programming". Correct X5 if needed.

• X9.1: Press enter

• X9.2: Press enter

• X9.3: Press enter

• X9.4: Press enter

• X9.5: Read the preliminary flow speed. Press enter

1 Cover, electronics compartment2 Cover, terminal compartment for power supply and inputs/outputs3 Cover, sensor terminal compartment4 Cable entry for power5 Cable entry for inputs/outputs6 Cable entry for sensor cable

NOTE!See also the section "Installation menu" in chapter "General instructions for programming".

1 2

3

4

56

1U 2U1D

3U 3D

2D

Page 41: Ultrasonic Clamp-on Flowmeter - Forbes Marshall · CG 34 xxxxxx S/N: A06 xxxxx P = Passive NC = Not ... for the installation menu, X1...X9.8.4 2 Read the advised ... mechanical installation"

OPTISONIC 6300

www.krohne.com 41

• X9.6: Check signal

• X9.7: Confirm or adjust the reading with the actual distance on the rail.

• X9.8: Optimization loop. Repeat steps X9.8.1...X9.8.5 until the advised

mounting distance does not change more than 0.5%:

• X9.8.1: Optimise distance?

• X9.8.2: Read the velocity of sound of the fluid

• X9.8.3: Continue?

• X9.8.4: Confirm or adjust the velocity of sound

• X9.8.5: Read the advised mounting distance and reposition the transducer

• X9.9: Read the preliminary flow speed

CAUTION!Advice on signal strength:Advice on signal strength:Advice on signal strength:Advice on signal strength:Signal > 75%:Signal > 75%:Signal > 75%:Signal > 75%: good signal, optimization loop not neededSignal 50...75%:Signal 50...75%:Signal 50...75%:Signal 50...75%: fairly good signal, optimization loop can improve the signalSignal 10...50%:Signal 10...50%:Signal 10...50%:Signal 10...50%: low signal, optimization loop neededSignal < 10%:Signal < 10%:Signal < 10%:Signal < 10%: bad or no signal, check settings in menu X6, increase transducer distance and/or go into the optimization loop.

0% %50 100

Page 42: Ultrasonic Clamp-on Flowmeter - Forbes Marshall · CG 34 xxxxxx S/N: A06 xxxxx P = Passive NC = Not ... for the installation menu, X1...X9.8.4 2 Read the advised ... mechanical installation"

OPTISONIC 6300

7.30959.22.00 42

• X9.10: Path ready? If you enter "No" then the installation is not saved. If

you enter "Yes" the installation can be saved in X9.11. If you have:

1 path or pipe: you are finished, proceed with X9.11

2 paths: go to X9 for the 2nd path

2 pipes: go to X10 for the 2nd pipe

• X9.11: End Installation? If you enter "No" the installation is not saved, go

to X9. If you enter "Yes" the installation is saved and the measurement

screen will appear.

• Mount the cover (see section "mounting the cover" in chapter "General

mechanical installation")

Page 43: Ultrasonic Clamp-on Flowmeter - Forbes Marshall · CG 34 xxxxxx S/N: A06 xxxxx P = Passive NC = Not ... for the installation menu, X1...X9.8.4 2 Read the advised ... mechanical installation"

OPTISONIC 6300

www.krohne.com 43

Page 44: Ultrasonic Clamp-on Flowmeter - Forbes Marshall · CG 34 xxxxxx S/N: A06 xxxxx P = Passive NC = Not ... for the installation menu, X1...X9.8.4 2 Read the advised ... mechanical installation"

OPTISONIC 6300

7.30959.22.00 44

Contact

KROHNE AltometerKROHNE AltometerKROHNE AltometerKROHNE AltometerKerkeplaat 123313 LC DordrechtPostbus 1103300 AC Dordrecht, the Netherlandswww.krohne.com