Tempe Town Lake: A Sustainable Oasis
![Page 2: ULI Sustainability 5 19 2011](https://reader035.fdocuments.in/reader035/viewer/2022062706/557c4807d8b42a11668b45f7/html5/thumbnails/2.jpg)
Town Lake Purposes
Flood Control Economic
Development Recreation
Opportunities Environmental
Restoration
![Page 3: ULI Sustainability 5 19 2011](https://reader035.fdocuments.in/reader035/viewer/2022062706/557c4807d8b42a11668b45f7/html5/thumbnails/3.jpg)
![Page 4: ULI Sustainability 5 19 2011](https://reader035.fdocuments.in/reader035/viewer/2022062706/557c4807d8b42a11668b45f7/html5/thumbnails/4.jpg)
The Lake Channel - 1997
![Page 5: ULI Sustainability 5 19 2011](https://reader035.fdocuments.in/reader035/viewer/2022062706/557c4807d8b42a11668b45f7/html5/thumbnails/5.jpg)
![Page 6: ULI Sustainability 5 19 2011](https://reader035.fdocuments.in/reader035/viewer/2022062706/557c4807d8b42a11668b45f7/html5/thumbnails/6.jpg)
![Page 7: ULI Sustainability 5 19 2011](https://reader035.fdocuments.in/reader035/viewer/2022062706/557c4807d8b42a11668b45f7/html5/thumbnails/7.jpg)
![Page 8: ULI Sustainability 5 19 2011](https://reader035.fdocuments.in/reader035/viewer/2022062706/557c4807d8b42a11668b45f7/html5/thumbnails/8.jpg)
![Page 9: ULI Sustainability 5 19 2011](https://reader035.fdocuments.in/reader035/viewer/2022062706/557c4807d8b42a11668b45f7/html5/thumbnails/9.jpg)
![Page 10: ULI Sustainability 5 19 2011](https://reader035.fdocuments.in/reader035/viewer/2022062706/557c4807d8b42a11668b45f7/html5/thumbnails/10.jpg)
Hayden Ferry Lakeside:A waterfront urban oasis in the desert
![Page 11: ULI Sustainability 5 19 2011](https://reader035.fdocuments.in/reader035/viewer/2022062706/557c4807d8b42a11668b45f7/html5/thumbnails/11.jpg)
Motivators Establishing an new urban sub-market on a brown-field dry river bed
Geographic heart of Maricopa County 30 minute commute for nearly 4 million Phoenicians 5 major freeways within 2 miles; half a million past
the project daily Direct connection to Sky Harbor International Airport
![Page 12: ULI Sustainability 5 19 2011](https://reader035.fdocuments.in/reader035/viewer/2022062706/557c4807d8b42a11668b45f7/html5/thumbnails/12.jpg)
More Motivators:
ASU - the nation’s largest university - inexpensive & educated workforce
Organically grown, pedestrian friendly downtown connected to lake
2 new light rail stations linking Tempe with Phoenix
![Page 13: ULI Sustainability 5 19 2011](https://reader035.fdocuments.in/reader035/viewer/2022062706/557c4807d8b42a11668b45f7/html5/thumbnails/13.jpg)
Hurdles Starting a project in an unproven submarket with yet-
to-be completed lake High-rise construction would be located atop an
aquifer Stakeholder concerns on adjacent Native American
Lands Project directly lined up with two runways at Phoenix
Sky Harbor Airport Reducing acoustic reverberation between buildings
caused by flight path City unfamiliar with mixed use urban structures
![Page 14: ULI Sustainability 5 19 2011](https://reader035.fdocuments.in/reader035/viewer/2022062706/557c4807d8b42a11668b45f7/html5/thumbnails/14.jpg)
Goals & Desires
Recreate history – Tempe was the center of commerce in the 1800s
Create an iconic architecture Peak the interest of those flying over lake and freeway
commuters Engage “Corporate America” to work out of the box – ‘third
space’ Establish a minimal carbon footprint Engage all the human senses in a Disney-like manner Make this development experience memorable
![Page 15: ULI Sustainability 5 19 2011](https://reader035.fdocuments.in/reader035/viewer/2022062706/557c4807d8b42a11668b45f7/html5/thumbnails/15.jpg)
Incentives
8 Year property tax abatement Reduced land cost to offset unusual construction costs Expedited City Plan reviews ASU partnership on 99- year leased land Public/Private partnership on park space
![Page 16: ULI Sustainability 5 19 2011](https://reader035.fdocuments.in/reader035/viewer/2022062706/557c4807d8b42a11668b45f7/html5/thumbnails/16.jpg)
The Numbers Entitlements for 5 million sq ft FARs of 2.68 Annual assessments of $500,000+ Avg commercial parking ratio of
4/1000 sq ft 20% premium on construction Sold 8-story tower for $53M or
$265/ sq ft Sold 12-story tower for $93M or
$296/ sq ft Sold condos as high as $800/ sq ft
![Page 17: ULI Sustainability 5 19 2011](https://reader035.fdocuments.in/reader035/viewer/2022062706/557c4807d8b42a11668b45f7/html5/thumbnails/17.jpg)
Lessons Learned
Vertically phased parking structures are not cost effective Standardize Caisson footing size Consider retail uses as an amenity, not a revenue
generator Retain a good building code and ADA consultant Stick to your expertise; joint venture with others Embrace and “partner” with the local building inspectors
![Page 18: ULI Sustainability 5 19 2011](https://reader035.fdocuments.in/reader035/viewer/2022062706/557c4807d8b42a11668b45f7/html5/thumbnails/18.jpg)
Results
Creation award-winning , iconic development Lower carbon footprint, creation of a healthier
environment. World class tenants: Smith Barney, Metlife, KPMG,
Microsoft Record-setting valuations
![Page 19: ULI Sustainability 5 19 2011](https://reader035.fdocuments.in/reader035/viewer/2022062706/557c4807d8b42a11668b45f7/html5/thumbnails/19.jpg)
Contact UsChris Anaradian [email protected]/lake
Randy [email protected]
Find this presentation at: www.slideshare.net/tempegov