UK/Norway mentoring 16-17th March

Geir HelgesenSales –Director

1

Page 2: UK/Norway mentoring 16-17 th March Geir Helgesen Sales –Director 1.

The Abbon value proposition

The Abbon performance monitoring system ”Making real-time flow rates per well available in the operation center”

Long term contract - CoP

Ongoing contract CoP Synergy & Turnkey Solutions

Field tests-CoP & Qatar

Page 3: UK/Norway mentoring 16-17 th March Geir Helgesen Sales –Director 1.

Optimum Online Onshore Operations Center

Overview

PerformanceMonitoring

ProcessTrending

AnalysisTools

1

2

3

4

Ekofisk Operations CentreMonday March 22nd 20003

Last Optimum Run: 07:00:00 CET Well Performance Split per Platform In-Field Distribution Process Transport Ekofisk Mimic

Daily Well Performance

Production Potential

Actual Production

Average Production Last 24h

Average Production this month

Current values

Trend

385 550

374 800

388 800

404 000 BOE

BOE

BOE

BOE

Graphics

Show Top Ten Wells

Actual Daily Production

382,000

383,000

384,000

385,000

386,000

387,000

388,000

1 3 5 7 9 11 13 15 17 19

March 2003

BO

E

Show Ten Worst Wells

Quit New Cancel

Select NewClose Graphics Combine

Onshore Operations CentreMonday March 22nd 20003

Last Optimum Run: 07:00:00 CET Well Performance Split per Platform In-Field Distribution Process Transport Ekofisk Mimic

Performance per Platform

2/4 A

Trend Production Performance per Well

Quit New CancelClose Graphics

2/4 B

2/4 C

2/4 X

62 000 BOE

64 500 BOE

72 000 BOE

155 000 BOE

Production PotentialEKOFISK

2/7 A

2/7 B

Embla

Tor

13 500 BOE

18 000 BOE

25 000 BOE

5 000 BOE

ELDFISK

57 485 BOE

61 480 BOE

70 090 BOE

141 520 BOE

Actual Production

12 200 BOE

16 000 BOE

22 800 BOE

4 550 BOE

Platform 2/4 A

WellNo

STATUSProduction Potential Actual Production

Oil Flow Gas Flow Gas FlowOil Flow

PRODUCES

GAS-LIFT

GAS-LIFT

GAS-LIFT

GAS-LIFT

PRODUCES

PRODUCES

PRODUCES

PRODUCES

GAS-LIFT

A - 1

A - 11

A - 10

A - 9

A - 8

A - 7

A - 6

A - 5

A - 4

A - 3

A - 2

A - 18

A - 17

A - 16

A - 15

A - 14

A - 13

A - 12

1 510 5.10 1 474 4.67

Select Platform

Onshore Operations CentreMonday March 22nd 20003

Last Optimum Run: 07:00:00 CET Well Performance Split per Platform In-Field Distribution Process Transport Ekofisk Mimic

In-Field Distribution

24" LP Sep

Pipeline Distribution

C3

2/4 XPlatformC2

C1

61 480 MMscf/D

61 480 MMscf/D

61 480 MMscf/D

61 480 MMscf/D

61 480 Bbl/D

30" HP Sep

24" Oil2/7 B

Platform

30" Gas

24" Oil

61 480 MMscf/D

61 480 Bbl/D

61 480 MMscf/D

61 480 bbl/D

30" Gas

Pipeline Distribution

Quit New Cancel

Network software

Eg. ReO, Prodman

GAP

HYSYS Assett

PipeSim

Prosper

ABB

Siemens

Honeywell

etc

PI or

Alternative

Optimum

Online

Offline

Online

Optimum

Online

Other

3

Page 4: UK/Norway mentoring 16-17 th March Geir Helgesen Sales –Director 1.

Visualization Collaboration Decision support

Reporting

Pressure & temperature Differential pressure Multi-phase flow rates

Measuring

Proven and patented solutions for continuous well surveillance

4

Analyzing

Analysis of production data Verification of models Validation of allocation scheme

Data processing &analytic modeling

Field proven solutions for continuous well surveillance

Page 5: UK/Norway mentoring 16-17 th March Geir Helgesen Sales –Director 1.

Status –Business challenges

5

• Where are we now & where are we going?

• Nov-09 March-2010

Page 6: UK/Norway mentoring 16-17 th March Geir Helgesen Sales –Director 1.

Status –Business challenges

6

• Where are we now? Summary

• Spent time internally to define the value of the company

• Meetings with contractors who have a frame agreement with the operators

• Examples: ABB, Siemens,Halliburton, etc..• Discussed how to cooperate with one of them

• Meetings with operators on the UK side• Have been invited for a 2nd meetings

• Probing the market for an industrial partner/owner• See a need for a WW distribution network

• One meeting with the Mentor - March

Page 7: UK/Norway mentoring 16-17 th March Geir Helgesen Sales –Director 1.

Status –Business challenges

7

• Where are we going? Focus

• Contractors with frame agreements – Complementary• Operators – gain more info about the offshore fields • Be invited to present Abbon’s products in events where

enhanced recovery per well is one of the main topics• Competitor analysis – Differentiator • Products

• Optimum Online and Optimum Installation are commercial• Optimum metering – measurement per well

• To be taken one step further