UK FFA

download UK FFA

of 2

Transcript of UK FFA

  • 8/2/2019 UK FFA

    1/2

    ITEMSPortable extinguishers

    Ins ection/servicinIns ection to be done b

    Hyd Pr. Testing Intervals

    Testing Pressure

    Fixed FFA systemsFixed Foam

    Analysis Requirement.

    Fixed CO2

    Inspection conducted by

    Testing Pressure

    Fixed Halon

    InspectionInspection conducted byServicin /Level Checks

    Fixed Dry PowderAnnual Inspection

    Two Yearly Inspection

    Inspection/servicing

    Testing Pressure

    Breathin A aratus

    Pr. Testing IntervalsSCBA

    Pr. Testing IntervalsTesting Pressure

    SCBA Com ressor

    Maintenance interval of

  • 8/2/2019 UK FFA

    2/2

    REQUIREMENTS

    AnnualCompetant Authority

    Annual Inspection carried out in accordance with IMO resolution A.602(15)

    Hydraulically tested in accordance with the recognized standard or the

    manufacturer's instruction at an Interval not exceeding 10 YrsIn accordance with Manufacturers instructions.

    100% for first 10 extinguisher & 50% for the remaining upto the maximum of 60.For Ext which cannot be charged on board, Spare portable fire extinguisher of same type, capacity & Quantity shall be provided in lieu of spare charges.

    At each Intermediate, Periodical or Renewal Survey, All high pressure cylinder &Pilot Cylinder should be weighed or have their contents verified by other reliablemeans to confirm the available charge in each is above 90% of the nominal charge.

    Monthly Inspection :- may be performed by Competent crew member. AnnualInspection :- Should be performed by the manufacturer OR recognised servicecompany.

    High pressure cylinder are subjected to Periodical test at an Interval not exceeding10 years. At least 10% of cylinder are subjected to Internal inspection & Hyd test.

    In accordance with Manufacturers instructions.

    HALON fixed firefighting system decommisioned from 31st-Dec-2003 in accordancewith the EU regulation 2037/200. The UK will accept use of FM200 & NOVEC 1230gases

    Should be undertaken by accredited service stationInpection by Approved Shore Station.

    1)-Blow through with Nitrogen. 2)-Operational test of remote controls & sectionvalve. 3)-Testing of dry powder charge for moisture absorption. 4)-Powder

    Containment vessels safety valve & discharge hoses should be subjected to a fullworking pressure test.

    In accordance with Manufacturers instructions.Not Exceeding 10 Years.

    Maintenance as per Manufacturers InstructionAtleast one Spare set

    In accordance with Manufacturers instructions.

    5 YearsIn accordance with Manufacturers instructions.

    200%Annual

    Fire Fighting equipment - UK FLAG STATE