20/02/2019 1 DWMP Communications David Martin, Sewerage Planning Manager Lorraine Isgar, Drainage Strategy Coordinator 19 February 2019 DWMP Communication - contents Journey Journey Wessex Water Website Wessex Water Website Where next Where next Q&A Q&A David Martin, Sewerage Planning Manager Lorraine Isgar, Drainage Strategy Coordinator

Transcript of UDG DWMP communication v05 - printable2 - Compatibility Mode · •Flood regulations 2009 Long term...

Page 1: UDG DWMP communication v05 - printable2 - Compatibility Mode · •Flood regulations 2009 Long term wastewater planning ... •Level 1 –National / Regional •Level 2 –River basin

20/02/2019

1

DWMP Communications

David Martin, Sewerage Planning Manager

Lorraine Isgar, Drainage Strategy Coordinator

19 February 2019

DWMP Communication - contents

JourneyJourneyWessex Water

Website

Wessex Water

Website

Where next

Where next Q&AQ&A

David Martin, Sewerage Planning Manager

Lorraine Isgar, Drainage Strategy Coordinator

Page 2: UDG DWMP communication v05 - printable2 - Compatibility Mode · •Flood regulations 2009 Long term wastewater planning ... •Level 1 –National / Regional •Level 2 –River basin

20/02/2019

2

Long term wastewater planning

1980s1980s 1990s1990s 2000s2000s 20102010 20152015 20182018 20222022

• Sewer Rehabilitation ManualDrainage area plansHolistic plans WaSC reports Collecting dust Not consistent Not visible

Investigation Implementation

Assessment Developing the Plan

UK been undertaking wastewater long term planning for decades

Long term wastewater planning

1980s1980s 1990s1990s 2000s2000s 20102010 20152015 20182018 20222022

• WaPUG Code of Practice 1990s• UDG update in 2017

• Consistent high quality modelling to provide the tools for long term planning

Page 3: UDG DWMP communication v05 - printable2 - Compatibility Mode · •Flood regulations 2009 Long term wastewater planning ... •Level 1 –National / Regional •Level 2 –River basin

20/02/2019

3

Long term wastewater planning

1980s1980s 1990s1990s 2000s2000s 2010s2010s 20152015 20182018 20222022

• UPM

• SAGIS

• IUDM

• SWMP

• Flood regulations 2009

Long term wastewater planning

1980s1980s 1990s1990s 2000s2000s 2010s2010s 20162016 20182018 20222022

• FWMA 2010

• Drainage strategy framework 2013

Page 4: UDG DWMP communication v05 - printable2 - Compatibility Mode · •Flood regulations 2009 Long term wastewater planning ... •Level 1 –National / Regional •Level 2 –River basin

20/02/2019

4

Communicating drainage strategies

• Wessex Water started producing detailed technical reports (as did some other WaSCs)

• Once written they are out of date – not ‘live’

• So we started in 2016 developing an on-line summary version to communicate our short, medium and long term plans

1980s1980s 1990s1990s 2000s2000s 2010s2010s 20162016 20182018 20222022

Long term wastewater planning

1980s1980s 1990s1990s 2000s2000s 2010s2010s 20162016 20182018 20222022

• 21st Century Drainage Programme initiative 2016-18

Communication Capacity assessment framework

Storm overflow assessment framework

Sewer misuse

(wetwipes)

Page 5: UDG DWMP communication v05 - printable2 - Compatibility Mode · •Flood regulations 2009 Long term wastewater planning ... •Level 1 –National / Regional •Level 2 –River basin

20/02/2019

5

Long term wastewater planning

1980s1980s 1990s1990s 2000s2000s 2010s2010s 20162016 20182018 20222022

• Drainage and wastewater management plan framework 2018

• Over-arching framework

• Water UK and DWMP Stakeholder group commissioned Atkins to develop framework in less than a year

• DWMPs are the wastewater equivalent to the Water resources management plans

DWMP Framework

Drainage StrategiesInfiltration reduction plans

DWMP

Working in Partnership

• Address existing and future challenges• Builds on best practice and embed

consistency of approach• Provides greater transparency and visibility

to customers and stakeholders• Facilitate partnership working to improve

transparency, opportunities and allow for influence

• DWMP Framework dissemination workshop held on May 2018

• DWMP Framework issued September 2018

Page 6: UDG DWMP communication v05 - printable2 - Compatibility Mode · •Flood regulations 2009 Long term wastewater planning ... •Level 1 –National / Regional •Level 2 –River basin

20/02/2019

6

High influence

Low influence

Low interest

High interest

Keep in mind Keep happy

Need to be closely aligned with the project

Important people, keep informed but not overburdened

Benefit from generic messages

Stakeholder Group

Coastal Districts

Blueprint

LPAs

LAs

EA National

ADEPT

MPs

CIWEM, ICE

RFCCs

Ofwat

WaterUK

Defra

Level 1&2 Stakeholders

DWMP consultation and reporting

Drainage StrategiesInfiltration reduction plans

DWMP

Working in Partnership

• Consultation and Reporting at many levels:• Level 1 – National / Regional

• Level 2 – River basin catchment partnerships

• Level 3 – Drainage Strategy summary reports and/or infiltration reduction summaries for high risk treatment works catchments

Page 7: UDG DWMP communication v05 - printable2 - Compatibility Mode · •Flood regulations 2009 Long term wastewater planning ... •Level 1 –National / Regional •Level 2 –River basin

20/02/2019

7

DWMP Communication – WWW

JourneyWessex Water

Website

Where next Q&A

How to provide visibility?

Print - DocumentsDigital options

WebsiteGIS systems

14

Page 8: UDG DWMP communication v05 - printable2 - Compatibility Mode · •Flood regulations 2009 Long term wastewater planning ... •Level 1 –National / Regional •Level 2 –River basin

20/02/2019

8

Considerations

15

Audience

Usability

Legal

Data sharing

Updating

Culture

Message

The Website

16

Page 9: UDG DWMP communication v05 - printable2 - Compatibility Mode · •Flood regulations 2009 Long term wastewater planning ... •Level 1 –National / Regional •Level 2 –River basin

20/02/2019

9

17

18

Page 10: UDG DWMP communication v05 - printable2 - Compatibility Mode · •Flood regulations 2009 Long term wastewater planning ... •Level 1 –National / Regional •Level 2 –River basin

20/02/2019

10

19

20

Page 11: UDG DWMP communication v05 - printable2 - Compatibility Mode · •Flood regulations 2009 Long term wastewater planning ... •Level 1 –National / Regional •Level 2 –River basin

20/02/2019

11

21

22

Page 12: UDG DWMP communication v05 - printable2 - Compatibility Mode · •Flood regulations 2009 Long term wastewater planning ... •Level 1 –National / Regional •Level 2 –River basin

20/02/2019

12

23

The Portal

24

Page 13: UDG DWMP communication v05 - printable2 - Compatibility Mode · •Flood regulations 2009 Long term wastewater planning ... •Level 1 –National / Regional •Level 2 –River basin

20/02/2019

13

25

26

Page 14: UDG DWMP communication v05 - printable2 - Compatibility Mode · •Flood regulations 2009 Long term wastewater planning ... •Level 1 –National / Regional •Level 2 –River basin

20/02/2019

14

27

28

Page 15: UDG DWMP communication v05 - printable2 - Compatibility Mode · •Flood regulations 2009 Long term wastewater planning ... •Level 1 –National / Regional •Level 2 –River basin

20/02/2019

15

29

30

Page 16: UDG DWMP communication v05 - printable2 - Compatibility Mode · •Flood regulations 2009 Long term wastewater planning ... •Level 1 –National / Regional •Level 2 –River basin

20/02/2019

16

31

32

Page 17: UDG DWMP communication v05 - printable2 - Compatibility Mode · •Flood regulations 2009 Long term wastewater planning ... •Level 1 –National / Regional •Level 2 –River basin

20/02/2019

17

33

34

Page 18: UDG DWMP communication v05 - printable2 - Compatibility Mode · •Flood regulations 2009 Long term wastewater planning ... •Level 1 –National / Regional •Level 2 –River basin

20/02/2019

18

35

The Portal – Visibility so far

36

Level one and two areas

Drainage strategies

Infiltration Reduction

plans

Overflows Schemes

Page 19: UDG DWMP communication v05 - printable2 - Compatibility Mode · •Flood regulations 2009 Long term wastewater planning ... •Level 1 –National / Regional •Level 2 –River basin

20/02/2019

19

WWW Summary

Portal provides visibilityEnables engagementRight level of dataManageable maintenanceExpandable Limitations

37

DWMP Communication – where next

JourneyJourneyWessex Water

Website

Wessex Water

Website

Where next

Where next Q&AQ&A

• DWMP Programme

• Communicating our plans

Page 20: UDG DWMP communication v05 - printable2 - Compatibility Mode · •Flood regulations 2009 Long term wastewater planning ... •Level 1 –National / Regional •Level 2 –River basin

20/02/2019

20

DWMP programme (all WaSCs) May18

39

20182018 20192019 20202020 20212021 20222022 20232023 20242024

EstablishmentStrategic context

Risk based catchment screening

Baseline risk and vulnerability assessment

Problem characterisationOption development and appraisal

Programme appraisalDocumentation/assurance

DWMP programme

• Challenging timescale for production of DWMPs by December 2022

• Especially where modelling needed

• Ofwat has accelerated the programme (in their recent Assessment of Plans) by stating that DWMP will be reported and consulted by summer 2022

• It is recognised (hopefully) that not all partnership schemes will be included in the first iteration – but the start of the DWMP journey

40

Page 21: UDG DWMP communication v05 - printable2 - Compatibility Mode · •Flood regulations 2009 Long term wastewater planning ... •Level 1 –National / Regional •Level 2 –River basin

20/02/2019

21

Level 2&3 Stakeholders

Low influence

Low interest

Wildlife Trusts

Coastal

Rivers Trust

LPAs

LLFAs

Agricultural 

Developers

IDBs

Catchment Partnerships

Ports 

HAs

Highways England

RFCCs High  interest

High influence

Parish Councils

Natural England 

Environment Agency 

Fisheries

LEPs

LNPs

Consultants

CIWEM UDG

Communicating our plans further

42

WRFCC

LLFA

Catchment Partnerships

Strategies

1 4

10 Top 200of our 400

• Wessex Water has already presented DWMP framework to key stakeholders, including:

• Wessex Regional Floods & Coastal Committee• EA Partnership Strategic Overview leaders • All 4 Catchment Partnerships• 9 of 10 Lead Local Flood Authorities• Local Environment Agency staff

• As local strategies are written and published, we expect to disseminate at more local meetings (eg parish councils)

• Significant consultation anticipated to agree the overarching DWMP report and level 2 partnership engagement

Page 22: UDG DWMP communication v05 - printable2 - Compatibility Mode · •Flood regulations 2009 Long term wastewater planning ... •Level 1 –National / Regional •Level 2 –River basin

20/02/2019

22

Consistent comms needed

• DWMPIG to encourage WaSCs to be consistent• RBCS / BRAVA / Resilience outputs

43

More detailed RMA version of portal

• To communicate even more effectively, Wessex Water are developing a Risk Management Authority version of the portal:

44

• More transparent sharing of known issues, including more sensitive data:

• sewer records • flooding risks / reports

• Layer control• Log-in access

Page 23: UDG DWMP communication v05 - printable2 - Compatibility Mode · •Flood regulations 2009 Long term wastewater planning ... •Level 1 –National / Regional •Level 2 –River basin

20/02/2019

23

DWMP Communication – Q&A

JourneyJourneyWessex Water

Website

Wessex Water

Website

Where next

Where next Q&AQ&A

Thank you for listening