UCPath Implementation Update
description
Transcript of UCPath Implementation Update
UCPath ImplementationUpdate
June 2013
UCPath Implementation Planning
UCPath UCOP Project Structure
UCPath UCOP Production Support Workstreams in Progress
• Vendor Management – Bob Baum• UCPC Support Integration – Carrie Gatlin Juna LaMay• Incident Management – Gary Keith• Release Management – Wayne Templeton• Change Management – Pamela Sampson-Smith• Technical Access Management – Carrie Gatlin• Service Design – Tara Brant• Staffing – ITS Sr. Management Team
Wave 2 Implementation Planning
• Formal wave 2/3 implementation kick-off took place May 15th 2013
• Local UCD planning and resourcing has started for campus and UCDHS
• All locations have requested UCOP for UCPath sandbox to help with local process analysis and implementation planning
Workstream
Interface Development
Data Conversion and Cleanup
ODS, Local Reporting, Tier n
Business Process Alignment
Application Security and UCPath Access
Identity Management (IDM)
TAM & E-Per
Change Management
Communications
Training
Testing
The work in front of us…
Interface Development
LocationTier1
UCPathLocation
ODS
Inbound flow
Outbound flow
Nightly Incremental
Interface groups– General– Time and Attendance– Parking– SIS/Work study
– Commitment Accounting– Base– IDM– 3rd Party
Interface Development
Workstream Kickoff
Workstream Kickoff
Local Workstream effort begins
Local Workstream effort begins
Site Specific Q&A
Sessions
Site Specific Q&A
Sessions
On-going Mentoring &
Support
On-going Mentoring &
Support
Attendees
Functional and Technical Owners
Detail Interface
Walkthrough
Detail Interface
WalkthroughLocal PrepLocal Prep
Multi-Site Webinar
Multi-Site Webinar
Local workLocal work
1-on-1 UCPath/Locatio
n
1-on-1 UCPath/Locatio
n
Color Key:
Site Specific Interface
Walkthrough
Site Specific Interface
Walkthrough
Follow-up Interface
Walkthrough
Follow-up Interface
Walkthrough
Common Challenges
Update
Common Challenges
Update
Interface Development Activites
– Step 1: Identify Interface Functional and Technical Owners
– Step 2: Assemble Local Interface Inventory and Data Dependencies
– Step 3: Assess Applicability/Availability of Reusable Code
– Step 4: Evaluate ODS vs. Tier-1 Outbound Interface Options
• Tier-1 Interface Files
• ODS/Local Data Warehouse
– Step 5: Review UCPath Functional and Technical Designs
– Step 6: Attend the Tier-1 Interface Design Walkthroughs
– Step 7: Create Schedule for Interface Development
Interface Development
UCPath Implementation Timeline
Application Design & Dev & Location Dev Support (Incl TAM)
Apr-13 Jul-13 Oct-13 Jan-14 Apr-14 Jul-14 Oct-14 Jan-15 Apr-15 Jul-15
Go Live
Support
Application Design & Dev & Location Dev Support Go Live
Support
Wave 2
Wave 3
UCD Interface Development Team
Design, develop & unit test inbound/outbound interfaces and existing applications
Lead: Anantha KadurUCDHS: Mangesh Kamble Team Members:Jeremy Dalbeck, Nancy Wilson, Cindy Jones, Debra Henn, Jonathan Keller, Susan M Moore, Irene Horgan-Thompson, Linda Durst, Penny Knutson, Jacqueline Velasquez Marion Randall, Curtis Bray, Tom Poage, Jamila Sahakian, Henry Xiang, Alex Alfieri, Pari Velji, Brian Waechter, Tim Olesen Brad Harding, Eric Rothgarn, Nathan Affleck, Luci M. SchmidlUCDHS Team: Fanny Tung, Michael Marchant, Jonathan OpieJoAnna Askew-Hill, Cecilia Labrado, Sharon Huckfeldt, Drew Pokorney, Ann Steele, Elisabeth Lippuner, Wanda Brown, Carol Shimada, Susana Lee
Data Conversion and Cleansing
Location
Data Conversion and Cleansing
Workstream Kickoff
Workstream Kickoff
Local Workstream effort begins
Local Workstream effort begins
Site Specific Q&A
Sessions
Site Specific Q&A
Sessions
On-going Mentoring &
Support
On-going Mentoring &
Support
Attendees
Functional and Technical Owners
Detail ActivityWalkthrough*Detail ActivityWalkthrough*Local PrepLocal Prep
Multi-Site WebinarMulti-Site Webinar
Local workLocal work
1-on-1 UCPath/Location
1-on-1 UCPath/Location
Color Key:
Site Specific Activity (non-PPS
data) Walkthrough
Site Specific Activity (non-PPS
data) Walkthrough
Follow-up Activity
Walkthrough
Follow-up Activity
Walkthrough
Common Challenges
Update
Common Challenges
Update
Data Conversion and Cleansing
• Activities– Step 1: Local Preparation- Identify Data
Conversion/Cleanup Contacts– Step 2: PPS Data Cleanup Activities– Step 3: Gather Non-PPS Data– Step 4: Perform GAP Analysis on Existing Staging Table
Layouts– Step 5: Define and Review Key Data Sets Required for
UCPath– Step 6: Copy Local PPS Instance– Step 7: Identify Test/Validation Population– Step 8: Validation Activities
Step 2: Data Cleanup Requirements
Data Cleansing Includes:•Eliminating unnecessary data records •Merging duplicated data •Identifying and correcting inaccurate or missing data •Reformatting and standardizing data so that it can be converted •Gathering information that does not exist in any legacy system but is required in UCPath
Step 3: Gathering Non-PPS Data
• Absence Mgt Balances • Department Budget * • Direct Deposit Bank * • Direct Deposit * • Emergency Contacts • Encumbrance * • Garnishment * • Garnishment Vendor * • Reports To* • IDM • Profile Degrees • Profile Licenses • AD&D Dependents * These data elements are more complex to complete
Step 5: Define & Review Key Data Sets
• Provide Department Tree Information
• Provide and Review “Reports To” Information
• Review Pay Groups
• Review DOS Code Mapping
• Review Salary Plans
Data Conversion and Cleansing
UCD Data Conversion Team
Work closely with UCOP PMO to plan, execute and test the conversion and migration of campus data to from PPS to UCPath.
Lead: Anantha KadurUCDHS: Drew PokorneyTeam Members: Elizabeth Ehnat, Mary Ann Beall, Cindy Jones, Kathy Stuhr, Theresa Schumacher, Bobbie Lasky, Gee Lee, Linda DurstUCDHS Team: Misti Lang , Sharon Huckfeldt, Janette Manuel, JoAnna Askew-Hill, Cecilia Labrado, Terri Maddera, Fanny Tung, Mangesh Kamble
ODS, Local Reporting and Tier n
Operational Reports
Audit Reports
UCPath Inquiry Screens
HR Analytical Reporting
Location Data Warehouse
Location ODS
Location Reporting Data
Oracle HCM
HR Analytics
UCPath System
Location
Tier nanalysis
ODS Development and Local Reporting
ODS, Local Reporting and Tier n
• Activities– Step 1: Prepare Local ODS Team– Step 2: Identify Local Reporting and Tier-n Data
Requirements– Step 3: Review ODS Design Documentation– Step 4: Schedule Site Specific Q&A Sessions– Step 5: Determine ODS Report Development
Approach
UCD expects to collaborate with other locations to reduce any duplication of efforts.
Identity Management (IDM)
• Activities– Step 1: Upgrade and Configure Shibboleth– Step 2: Provide Test Accounts – Step 3: Accept/Generate Test Messages and
Responses– Step 4: Modify Internal Systems– Step 5: Support Two-Way SSL-protected SOA
Endpoints for Message Receipt and Sending– Step 6: Provide Conversion Data to UCPath– Step 7: Perform Local Data Conversion– Step 8: Testing
Workstream Started
Interface Development Wave 2 kick-off June 6th; UCD: In Planning
Data Conversion and Cleanup Wave 2 kick-off June 4th; UCD: In Planning
ODS, Local Reporting, Tier n UCD: In Planning UCD: Recruiting for lead/analyst
Business Process Alignment UCOP kick-off Sept ‘13
Application Security and UCPath Access UCOP Status: In Planning
Identity Management (IDM) UCD: In Planning; Recruiting
TAM & E-Per UCOP Status: In PlanningUCD: Recruiting for lead/analyst
Change Management & Communication UCOP kick-off July/August ’13UCD: Recruiting for lead
Training UCOP kick-off Sept ‘13
Testing UCOP Status: In Planning
The work in front of us…