UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide...

106
CAMPUS STANDARDS APPENDIX H UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND DETAILS STANDARD December 5, 2014

Transcript of UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide...

Page 1: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

CAMPUS STANDARDS APPENDIX H

UC SANTA CRUZ

STANDARD PLASTER INSTALLATION AND DETAILS

STANDARD

December 5, 2014

Page 2: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Window Installation Sequencing Guide

Pyatok Architects and Allana Buick & Bers Inc.

12/5/2014

NOTES:

1. Any conditions that do not allow the installation to be performed as outlined in

this guide require notification of the Architect.

2. Where elements on details and instruction are noted to be “soldered”, elements

are to be “soldered water-tight”, not just “spot” of “tack” soldered.

Page 3: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 1 of 12

Window Sill Detail (Detail 1/A9.01)

The rough opening is prepared by applying the primer on all sheathing surfaces to receive SAF.

Page 4: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 2 of 12

ALL SAF installed to roll flat with J-Roller.

Sheathing to receive SAF with gaps greater than 1/8” to be treated with sealant to provide backing.

Page 5: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 3 of 12

Sealant being applied in sheathing gap greater than 1/8”

SAF corner pieces installed at bottom corners 4” up jambs.

Page 6: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 4 of 12

GSM angle with 3/4” vertical leg butted up to tapered shim at sill, secured with “S.S. Pan-Head screws” or “hot-dip galvanized ring-shanks nails” into sill framing.

SAF butterfly patches installed at sill GSM angle to jamb intersections. Cut SAF at dotted line to lay flat on wall face. Release paper to remain.

Page 7: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 5 of 12

12” wide SAF installed min. 4” over sheathing face, onto the GSM angle to interior edge of sill R.O. Note: SAF w/ release paper still attached at horizontal surface OR install strip of WRB below all wall openings prior to SAF installation.

SAF butterflies installed at outside framing corners of sill.

Page 8: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 6 of 12

Window Jamb Detail (Detail 2/A9.01)

12” wide SAF installed along jamb over sheathing face 4” and extending 4” beyond rough opening @ top & bottom.

Page 9: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 7 of 12

SAF butterfly patches installed at jamb to head framing outside corners. NOTE: Photo is from Phase 1 Mockup. Ignore SAF type and green Air and Water Barrier.

Window Head Detail (Detail 3/A9.01)

Page 10: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 8 of 12

9” wide SAF installed over window head and extended to outside edge of jamb SAF.

Apply continuous bead of Silicone or Moistop sealant at window head and jamb sides. Sill to be wet set into sealant, between interior face of window frame and GSM angle. Note: Do not apply sealant along sill nailing flange.

Page 11: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 9 of 12

Window installed into rough opening into continuous bead of sealant along head and jambs. Fasten with “S.S. Pan-Head Screws”. Note: Do not nail/screw thru window flange at along head.

1/16 inch plastic shims installed along sill flange, do not extend past window frame width.

Page 12: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 10 of 12

9” wide SAF installed over window flange jambs, extended 6” beyond sill & head rough openings

9” wide SAF installed over window head, extended to outside edge of jamb SAF.

Page 13: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 11 of 12

GSM head flashing installed over window head. Fasten using “hot-dip galvanized ring-shank nails”. Do not penetrate window head fin with fasteners.

12” wide SAF installed over GSM head flashing.

Page 14: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 12 of 12

Install GSM angles along jambs, set in a full-bed of sealant. Also apply sealant between joint of GSM angle and window frame. (Interior Side)

Page 15: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Door Installation Sequencing Guide

Pyatok Architects and Allana Buick & Bers, Inc.

12/5/2014

Notes:

1. Details and photos show an out-swinging door. Sequencing is identical for in-swinging doors.

2. Any conditions that do not allow the installation to be performed as outlined in this guide require immediate notification of the Architect.

3. Where elements on details and instructions are noted to be “soldered”. Elements are to be “soldered water-tight”, not just “spot” or “tack” soldered.

Page 16: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 1 of 8

Exterior Door Threshold @ Landing

(Detail 6/A9.10)

The rough opening is prepared by applying

the primer on all sheathing surfaces to

receive SAF.

Page 17: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 2 of 8

Sealant applied along door sill and wall

flanges for sill pan installation.

Fully soldered GSM sill pan set in full bed of sealant under sill and wall flanges. Slide pan into opening to smear sealant and eliminate air pockets. Apply hot-dip galvanized ring-shank nail fasteners through vertical surfaces only.

Page 18: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 3 of 8

Confirm podium waterproofing installed onto door sill pan and up jambs prior to door frame installation. NOTE: Protection board over hot rubber not shown in this photo.

ALL SAF installed to roll flat with J-Roller.

Page 19: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 4 of 8

12” wide SAF installed into full depth of rough opening extending out over sheathing 4” min.

Exterior Door Jamb (Detail 7/A9.10)

Page 20: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 5 of 8

Remove flange from bottom corners of door frame jambs prior to setting into rough opening.

Door frame set into rough opening and secured to structure with “stainless steel pan-head screws” or “hot-dip galvanized

ring-shank nails.

Page 21: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 6 of 8

24 GA GSM L-Metal installed, with minimum 1/4” contact between L-Metal and Door Frame, set in sealant. Note: UV metal at base of wall at deck to be installed after L-Metal.

L-metal interlocking leg trimmed at base of door jambs to accommodate base flashing waterproofing build-up.

Page 22: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 7 of 8

6” wide SAF installed over L-Metal and under plaster stop.

Exterior Door Head (Detail 8/A9.10)

Page 23: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 8 of 8

GSM head flashing installed, head flashing to overhang over door frame.

9” wide SAF installed over window head flashing.

Page 24: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Landing Waterproofing Installation Sequencing

Guide

Pyatok Architects and Allana Buick & Bers, Inc.

12/5/2014

Notes:

1. Any conditions that do not allow the installation to be performed as outlined in this guide require immediate notification of the Architect.

2. Where elements on details and instructions are noted to be “soldered”. Elements are to be “soldered water-tight”, not just “spot” or “tack” soldered.

Page 25: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 1 of 16

Prior to installation of podium WP confirm

preceding installations complete (i.e. sheet

metal saddles, door sill pans, continuous wall

flashing, etc).

Note: All sheet metal flashings to receive

WP membrane to be set in manufacturer approved sealant.

Clean the substrate(s) to receive podium

waterproofing before proceeding with

application of podium WP system.

NOTE: Photo is from

Phase 1 Mockup. Ignore GSM wall base flashing and green Air

and Water Barrier.

Page 26: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 2 of 16

PRIMER is to be applied using a hand

held sprayer onto ALL surfaces receiving the

podium WP membrane.

Typical Podium WP @ Wall

(Detail 9/A8.22)

Page 27: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 3 of 16

1st Coat of podium waterproofing applied

(approx. 90 mils).

NOTE: Neoprene @ deck edge applied beforehand. Deck

edge waterproofing installation described

on pages 4-7

Uncured neoprene set into 1st coat of WP membrane at wall

base.

Page 28: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 4 of 16

Following the application of 1st coat of the WP membrane

install the uncured neoprene onto the

door sill pan.

NOTE: Neoprene may be replaced w/

Reemay reinforcing fabric on faces of door rough opening to avoid

build-up

Typical Podium WP @ Deck Edge

(Detail 8/A8.22)

Page 29: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 5 of 16

Apply 1st coat of WP onto deck edge

Set 9” wide uncured neoprene onto

horizontal surface of edge allowing min 3”

of neoprene onto vertical surface.

Page 30: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 6 of 16

Apply a bonding adhesive (sealant)

onto the vertical surface of the deck edge to receive the uncured neoprene

Note: Amount and pattern of bonding adhesive sealant

application shown in photo not acceptable.

Alternative uncured neoprene outside corner options in lieu of “pig ear” to be explored. Note: Application as shown in photo not acceptable. Diagram below shows acceptable corner lapping method. Dotted lines are deck edge.

Page 31: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 7 of 16

Apply WP membrane onto uncured neoprene over deck edge.

Set 22 GA S.S. edge metal into WP

membrane, fastened @ 4” o.c., 2-rows

staggered.

Note: Clean and Apply Primer onto S.S. edge metal on surfaces to come in contact with WP membrane (top

and bottom surfaces of horizontal leg).

Page 32: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 8 of 16

Pipe penetration WP @ Deck

(Detail 11/AC8.22)

2-piece S.S. pipe collar, with hemmed top edge secured to

deck w/ fasteners and sealant

Page 33: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 9 of 16

Primer applied onto S.S. pipe collar prior to

WP membrane application.

1st coat of WP membrane applied onto flange of S.S.

pipe collar.

Page 34: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 10 of 16

2-pieces of uncured neoprene

reinforcement with WP membrane between laps applied around

S.S. pipe collar, extending beyond nailing flange onto

horizontal deck.

NOTE: Neoprene may be replaced w/

Reemay reinforcing fabric to avoid build-up

2nd coat of WP membrane applied

onto uncured neoprene around pipe

collar.

Page 35: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 11 of 16

Flashing @ Deck Column

(Detail 6/AP8.22)

Column kerf cut location to be

determined by topping slab height. Existing may be acceptable. Extend cut around entire perimeter of

column.

Page 36: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 12 of 16

Deck edge uncured neoprene turned up

base of column underneath kerf cut.

Note: Neoprene

(including vertical leg) to be set in WP

membrane.

2nd coat of WP membrane applied

onto uncured neoprene.

Page 37: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 13 of 16

Deck Column Flashing Details

Fully soldered deck edge metal flashing

wrapping around deck column.

Fasten along top edge of flashing.

Page 38: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 14 of 16

Full WP membrane system applied over

deck edge metal flashing.

Field application of Podium WP

Following completion of WP detailing (i.e. base flashings, deck edges, saddles, etc.)

Apply 1st Coat of

podium waterproofing (min. 90 mils) with

reinforcing fabric set into membrane.

Page 39: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 15 of 16

2nd Coat of podium waterproofing applied (min. 125 mils) onto

reinforcing fabric

Note: Feather podium WP at door jambs and

sheathing face area for door frame to prevent build-up

Apply protection course over 2nd Coat

of podium WP., including onto the sill of door rough

opening.

Note: For critical build-up areas only provide 1-layer of protection

coarse (i.e. door jambs, lath

accessories, etc)

IMPORTANT: Perform

Manufacturer’s required testing prior

to installations of drain mat & concrete

overburden

Page 40: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 16 of 16

Install UV metal counter flashing with

hemmed edge on bottom of leg and

fasten with “stainless steel pan-head

screws” or “hot-dip galvanized nails”.

Page 41: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Lath & Plaster Installation Sequence Guide

Pyatok Architects and Allana Buick & Bers, Inc.

12/5/2014

Notes:

1. Any conditions that do not allow the installation to be performed as outlined in this guide require immediate notification of the Architect.

2. Where elements on details and instructions are noted to be “soldered”. Elements are to be “soldered water-tight”, not just “spot” or “tack” soldered.

Page 42: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 1 of 30

Base of Wall (Detail 6/A8.02)

Install GSM weep screed at base of wall onto substrate with “S. S. Pan-Head screws” or “hot-dip galvanized

nails”.

Page 43: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 2 of 30

ALL SAF installed to roll flat with J-Roller.

Install 9” wide SAF

lapped over top leg of GSM weep screed.

Note: Lap SAF edges

3” min at seams.

Page 44: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 3 of 30

Install WRB in shingled fashion integrating into opening and

penetration flashings.

Note: Lap WRB seams horizontally 6” min. and vertically 4”

min.

Scaffolding Bolt WP (Detail 3/A8.01)

Page 45: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 4 of 30

Install starter strip of WRB at sill of tie-bolt to allow for shingling

of WRB field installation.

(Step 1)

Note: Tie-back bolt to be proud of sheathing.

Apply SAF “sill” at bolt over WRB starter strip

and sheathing. (Step 2)

Page 46: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 5 of 30

Apply second piece of SAF “head” at bolt,

(Step 3)

Apply sealant all around bolt

(Step 4)

Page 47: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 6 of 30

Electrical Wall Penetration

(Detail 8/A8.02)

Install starter strip of WRB at sill and

secure fully soldered GSM collar around electrical box with “S.S. Pan-Head

screws” or “hot-dip galvanized nails” as

required.

Page 48: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 7 of 30

Install 9” wide SAF along jamb flanges of electrical box flashing

Apply SAF along top flange of electrical box

flashing.

Page 49: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 8 of 30

Fabricated Penetration Flashing

(Detail 13/A8.01)

Install SAF along sill of pipe penetration with release paper

remaining on bottom half of SAF or provide starter strip of WRB

prior to SAF installation.

NOTE: Cut and fit SAF tight around

penetration and seal around penetration,

per detail.

Page 50: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 9 of 30

Install SAF along head of pipe penetration,

overlapping sill SAF 3” min.

Install 2-piece pipe collar flashing, with 4” min. lap set in a full bed of sealant and

secured to substrate with “S.S. Pan-Head screws” or “hot-dip galvanized nails” as

required. Solder together 2-piece collar after

installing around pipe.

Note: Provide 1/2” min. b/w pipe and

collar for backer rod & sealant.

Page 51: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 10 of 30

NO PHOTO

Step 1: Install 6” min. wide SAF along sides of pipe collar flange.

Step 2: Install 6” min. wide SAF along top

flange.

Step 3: Fill joint with backer-rod and

sealant

Wall Opening Flashing Sequence

Diagram (For Openings other than

Windows/Doors)

Page 52: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 11 of 30

Make-Up Air Wall Cap Termination (Detail 7/A9.02)

Install SAF along sill of wall cap opening with release paper

remaining on bottom half of SAF or provide starter strip of WRB

prior to SAF installation.

Page 53: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 12 of 30

Install SAF along sill and wrapped into sill

of wall cap R.O.

Install SAF along jambs and wrapped

into jambs of wall cap R.O.

Note: Lap seams of

SAF 3” min.

Page 54: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 13 of 30

Install SAF along head and wrapped

into jambs of wall cap R.O.

Note: Lap SAF seams

3” min.

Install fully-soldered wall cap with insect

screen into R.O. with “S.S. pan-head

screws” or “hot-dip galvanized nails”.

Note: Secure wall cap within 1.5” of R.O. into

solid blocking.

Page 55: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 14 of 30

Step 1: Install SAF along sides of collar

flange.

Step 2: Install 6” min. wide SAF along top

flange.

Wall Louver 4-Sided Z-Flashing

Page 56: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 15 of 30

Louver Head Detail (Detail 3/A9.02)

Primer applied onto louver R.O. surfaces

to receive SAF.

Page 57: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 16 of 30

Install SAF along sill of wall cap opening with release paper

remaining on bottom half of SAF or provide starter strip of WRB

prior to SAF installation.

Louver Jamb Detail (Detail 2/A9.02)

Page 58: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 17 of 30

Install SAF along jambs and wrapped into jambs of louver

R.O.

Install SAF corners at sill to jamb corners.

Install SAF along head and wrapped into head of louver

R.O.

Page 59: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 18 of 30

Apply sealant between nailing flange

and louver

Secure louver to fully soldered collar (see detail). Securing of louver to collar may be done prior to site

installation.

Page 60: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 19 of 30

Install SAF at jambs of louver nailing flange.

Install casing bead around sill and jambs

of louver opening, Apply sealant

between louver and casing bead.

Page 61: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 20 of 30

Louver Sill Detail (Detail 1/A9.02)

Install GSM head flashing over louver.

Page 62: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 21 of 30

Install SAF over head flashing nailing flange. Pocket where casing bead is covered by head flashing, to be filled with sealant.

Stucco Band (Detail 14/AC8.01)

Page 63: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 22 of 30

Primer applied onto stucco band surfaces

to receive SAF.

2-pieces of SAF installed in shingled

fashion to wrap stucco band.

Note: Lap SAF seams

3” min.

Page 64: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 23 of 30

Set GSM flashing into full bed of sealant on

top shelf of stucco band.

Outside Corner (Detail 5/A8.01)

Page 65: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 24 of 30

Install 18” wide SAF on outside corner over

WRB.

Corner aid installed secured 6” min. o.c.

Page 66: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 25 of 30

Inside Corner (Detail 4/A8.01)

Provide 18” wide SAF at inside corner over

WRB.

Note: Not performed on mockup building

Page 67: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 26 of 30

Horizontal Control Joint

(Detail 7/A8.01)

(No Photo)

Apply SAF onto substrate at horizontal control joint location with release paper

remaining on bottom half of SAF or provide starter strip of WRB

prior to SAF installation.

Page 68: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 27 of 30

(No Photo)

Secure horizontal control joint with

fastener, apply SAF over upper flange, and wire tie bottom flange

to lath.

Note: Lath discontinuous at

control joint locations.

Vertical Control Joint

(Detail 6/A8.01)

Page 69: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 28 of 30

Install SAF in vertical control joint locations

over WRB.

Secure vertical control joint 6” min. o.c

Note: Lath to be discontinuous at

vertical control joints and wire tied 6” min.

o.c.

Page 70: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 29 of 30

Stucco Control Joint Intersection

(Detail 8/A8.01)

Install horizontal control joint intersection

continuous with the vertical control joint discontinuous at the

intersection. Intersection to be set into a bed of sealant over a secured sheet metal backer plate.

Page 71: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

Page 30 of 30

Typical Exterior Wall (Detail 1/A8.01)

Lath to be secured to structure w/furring

nails/screws 16” o.c. horizontally and 6”

o.c. vertically.

Page 72: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

EXTERIORINTERIOR

(E) WOOD STUD

(E) 5/8" GYPSUM BOARD. SEECUT & PATCH SHEETS FOR GYPBRD. REMOVE AND REPLACESCOPE.

PLYWOOD SHEATHING:REPLACE OSB W/ PLYWOOD SHEATHINGWHERE DAMAGED

BATT INSULATION:REPLACE FOIL FACED BATT INSULATION W/UNFACED BATT INSULATION OF EQUAL R-VALUE

(N) CEMENT PLASTER ANDLATH

(N) WRB

NOTES:1. ALL LATHING IS TO BE ATTACHED WITH FURRING NAILS.2. SEE DETAIL #2 FOR TYPICAL CORNER REINFORCEMENT.

REF. DWG:

SCALE:

TITLE: DWG. NO:

ATTACHED TO:

DATE:

3" = 1'-0"

12/5/2014 2:43:36 PM

12/05/14

ASK1004.1

EXT. WOOD STUD WALL - STUCCO

U.C. SANTA CRUZ INFILL APMNTS REPAIRS1/A8.01

Page 73: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

STEP 1:APPLY WRBBELOWBOLT

STEP 2:APPLY SAF"SILL" ATBOLT

STEP 3:APPLY SAF"HEAD" ATBOLT

STEP 4:APPLYSEALANTALL AROUNDBOLT & SAF

REF. DWG:

SCALE:

TITLE: DWG. NO:

ATTACHED TO:

DATE:

3" = 1'-0"

12/5/2014 2:43:36 PM

12/03/14

ASK1004.2

SCAFFOLD BOLT WATERPROOFING

U.C. SANTA CRUZ INFILL APMNTS REPAIRS3/A8.01

Page 74: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

18"W SAF. (CENTERED ON CORNER) OVERW.R.B. AT CORNERS

LATH, BEND AT INSIDE CORNER, ATTACH TIGHT TO INSIDECORNER SUBSTRATE. EXTEND MIN. 24" PAST CORNER. DONOT CUT MEMBRANE WHEN INSTALLING LATH

WRB

LATH FASTENERS @ 6" O.C.INTO SOLID BLOCKING, TYP.

NEW LATHATTACHMENTBLOCKING, TYP.

REF. DWG:

SCALE:

TITLE: DWG. NO:

ATTACHED TO:

DATE:

6" = 1'-0"

12/5/2014 2:43:36 PM

12/03/14

ASK1004.3

CEMENT PLASTER STUCCO

U.C. SANTA CRUZ INFILL APMNTS REPAIRS4/A8.01

INSIDE CORNER

Page 75: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

18" SAF (CENTERED ON CORNER)OVERW.R.B. AT CORNERS

GALVANIZED WIRE EXTERIORCORNER REINFORCING, TYP.WIRE-TIE TO WALL LATH

METAL LATH

FASTENERS FOR CORNERREINFORCING @ 6" O.C. VERT.-TO HIT BLOCKING-NAIL HEADS FLAT, DO NOT BEND& PUNCTURE W.R.B.

W.R.B.

FILL SPACE SOLID W/ BASECOAT CEMENT PLASTER

REF. DWG:

SCALE:

TITLE: DWG. NO:

ATTACHED TO:

DATE:

6" = 1'-0"

12/5/2014 2:43:37 PM

12/05/14

ASK1004.4

CEMENT PLASTER STUCCO

U.C. SANTA CRUZ INFILL APMNTS REPAIRS

OUTSIDE CORNER

5/A8.01

Page 76: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

CEMENT PLASTER STUCCO

METAL LATH

12" W, 40 MIL. S.A.F. STRIP (SOLID LINE)INSTALL OVER W.R.B. ANDCONTINUOUS BEHIND CONTROL JOINT

GSM CONTROL JOINT (XJ-15). UNDER WIRELATH, FASTEN TO STUDS AND BLOCKING

W.R.B. (DASHED LINE) CONT.BEHIND C.J., TYP.

DO NOT PAINT INSIDE

VERIFY EXISTING FRAMING. PROVIDEVERTICAL FLAT BLOCKING (2X4 MIN.)OR DOUBLE STUDS BEHIND C.J, ASREQUIRED.

NOTE:1. VERTICAL CONTROL JOINTS LOCATEDWHERE SHOWN ON ELEVATION.

C.J FASTENER @6" O.C.

WIRE TIE @ 6" O.C.

REF. DWG:

SCALE:

TITLE: DWG. NO:

ATTACHED TO:

DATE:

12" = 1'-0"

12/5/2014 2:43:37 PM

12/05/14

ASK1004.5

STUCCO CONTROL JOINT - VERTICAL

U.C. SANTA CRUZ INFILL APMNTS REPAIRS6/A8.01

Page 77: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

3-COAT CEMENT PLASTER STUCCO

METAL LATH

S.A.F. 12" WIDE

GSM CONTROL JOINT ("#15 SOLID LEG" OREQUAL). UNDER WIRE LATH, FASTEN TOSTUDS AND/OR BLOCKING.

W.R.B.

DO NOT PAINT INSIDE

S.A.F. STRIP IN, 9" WIDE, MIN.

C.J. FASTENERS @ 6" O.C., TYP.

WIRE TIE @ 6" O.C., TYP.

PROVIDE (N) BLOCKING (2x4 MIN.)

NOTES:1.PROVIDE SOLID WOOD BLOCKING (2X4 MIN.) FORFASTENING CONTROL JOINT, TYPICAL2. HORIZ. CONTROL JOINTS ALIGN W/ WINDOW SILLS,AND AT WINDOW HEAD AT TOP FLOOR, SEEELEVATIONS.

(E) FRAMING

REF. DWG:

SCALE:

TITLE: DWG. NO:

ATTACHED TO:

DATE:

12" = 1'-0"

12/5/2014 2:43:37 PM

12/05/14

ASK1004.6

STUCCO CONTROL JOINT - HORIZ.

U.C. SANTA CRUZ INFILL APMNTS REPAIRS7/A8.01

Page 78: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

STEP 7: 12" WIDE SAF

STEP 6: WRB

STEP 8: VERTICAL CONTROL JOINT,DISCONTINUOUS @ CJ INTERSECTION.SEE VERTICAL CJ DETAIL.

STEP 4: CONTINOUS HORIZONTAL CONTROLJOINT. SEE HORIZONTAL CJ DETAIL.

STEP 3: SHEET METAL BACKER PLATETYPICAL AT ALL INTERSECTIONS. JOINTSAND BUILDING CORNERS.

FASTEN BOTH FLANGES OF EACHCONTROL JOINT THROUGH BACKER PLATETO FRAMING. (SOME NOT SHOWN FORCLARITY.)

CUT ENDS OF VERTICAL CONTROL JOINTSTO MATCH ANGLE OF HORIZONTALCONTROL JOINT SURFACE.DO NOT SEAL LOWER END OF VERTICALCONTROL JOINT. LEAVE OPEN TO WEEP.

STEP 5: 9" WIDE SAF (SHOWN IN WHITE)OVER HORIZ. C.J.

STEP 2: 12" WIDE SAF

APPLY SEALANT FILLET AROUND ALL SIDESOF JUNCTURE - UPPER END OF VERTICALJOINT ONLY.

EMBED UPPER END OF VERTICALCONTROL JOINT IN A FULL BED OFSEALANT 2" WIDE. COMPLETELY FILL ALLSPACE BETWEEN CONTROL JOINT ANDBACKER PLATE.

STEP 1: WRB

REF. DWG:

SCALE:

TITLE: DWG. NO:

ATTACHED TO:

DATE:

3" = 1'-0"

12/5/2014 2:43:38 PM

12/05/14

ASK1004.7

STUCCO CONTROL JOINT

U.C. SANTA CRUZ INFILL APMNTS REPAIRS8/A8.01

INTERSECTION

Page 79: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

24 GA GSM BACKPLATE. TYP. ATCORNERS

SET CONTROLJOINTS IN A FULL BEDOF SEALANT 2" WIDE,COMPLETELY FILLINGBACK OF PROFILE

CONTROL JOINT, SEEHORIZONTAL CJ DETAIL.

2".

2". 2".

REMOVE ANY"SQUEEZE-OUT"

CONTROL JOINT

MITER CONTROL JOINTS ANDSET IN A FULL BED OF SEALANT2" WIDE, COMPLETELY FILLINGBACK OF PROFILE.ISOMETRIC VIEW

NOT TO SCALE

PROVIDE (N) SOLIDWOOD BLOCKING (2X4MIN.) FOR FASTENINGCONTROL JOINT,TYPICAL

REF. DWG:

SCALE:

TITLE: DWG. NO:

ATTACHED TO:

DATE:

12" = 1'-0"

12/5/2014 2:43:38 PM

12/05/14

ASK1004.8

STUCCO CONTROL JOINT

U.C. SANTA CRUZ INFILL APMNTS REPAIRS9/A8.01

HORIZONTAL/CORNER

Page 80: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

NOTES:1. SHEET METAL J-MOLD RECEIVER.2. SOLDER TO FORM ONE CONTINUOUS WATERTIGHT PIECE.3. FIELD VERIFY DIMENSIONS AND CONDITIONS.

4"

MIN

. LA

P, P

ER

SM

AC

NA

4" TYP.

SPOT WELD ANDSOLDER WATERTIGHT

26 GA GSM

BACKER ROD ANDSILICONE SEALANTCONTINUOUS AROUNDPENTRATION

SIZE ALL ALLOW 1/2" SEALANTJOINT ON ALL SIDES

OUTLINE OF PENTRATION(DASHED)

FILL IN CORNERS ANDDE-BURR EDGES, TYP.

REF. DWG:

SCALE:

TITLE: DWG. NO:

ATTACHED TO:

DATE:

1 1/2" = 1'-0"

12/5/2014 2:43:39 PM

12/05/14

ASK1004.9

FLANGED PENETRATION FLASHING

U.C. SANTA CRUZ INFILL APMNTS REPAIRS11/A8.01

Page 81: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

CEMENT PLASTER

METAL LATH

SAF

FASTENER

PLYWOOD SHEATHING

FULLY SOLDERED SHEET METALESCUTCHEON FLASHING. TO BE 2-PIECEWHERE PENETRATION IS EXISTING.

ALL S

IDE

S

3/8

" T

YP

.

.SEE NOTE 2

SEALANT FILLETCONTINUOUS

PENETRATION, VARIES, MAYBE ROUND OR SQUARE

HOLD WRB DOWN 3" FROMPENETRATION

NOTES:

WHERE SHEATHING GAP IS GREATER THAN 1/8", INSTALL LOW EXPANSION URETHANE FOAM INACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS. SHAVE CURED FOAM FLUSH WITHSHEATHING.

SHEATHING GAP OF 1/8" OR LESS, TYP. ALL SIDES NO FOAM REQUIRED.

1.

2.

SEE NOTE 1BACKER ROD AND SEALANT.WHERE PENETRATION MUST BEFIRE-RATED, REPLACE BACKERROD W/ FIRE CAULKING.

WRB

SAF, 6" WIDE OVER FLANGE AT TOP AND SIDES

SAF, 6" WIDE CONTINUOUSAROUND ALL SIDES OFPENETRATION. CUT TO FITTIGHT TO PENETRATION

REF. DWG:

SCALE:

TITLE: DWG. NO:

ATTACHED TO:

DATE:

12" = 1'-0"

12/5/2014 2:43:39 PM

12/05/14

ASK1004.10

FABRICATED PENETRATION FLASHING

U.C. SANTA CRUZ INFILL APMNTS REPAIRS13/AC8.01,10/AP8.01

Page 82: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

PLYWOOD SHEATHING, S.S.D.

GSM FLASHING W/ HEMMED END. SET INSEALANT

CEMENT PLASTER STUCCOW/ LATH OVER SAF

USE (N) PLYWOOD BLOCKING TO REPLACE (E)FOAM BELT COURSE TRIM. MATCH EXISTINGLOCATION AND DIMENSIONS.

FASTENERS @ 6" O.C., TYP.

CEMENT PLASTER STUCCO W/ LATH

24 GA GSM DRIP EDGE WITHS.S. FASTENERS

FASTENER

9" SAF, LAP OVER WEEP SCREED

WRB. OVER SAF AND WEEP SCREED

SAF LAP OVER WRB

(E) FRAMING

3/4"

MA

TC

H E

XIS

TIN

G 1

'-0"

BACKER SAF LAPPED OVER BAND PLYWOOD

REF. DWG:

SCALE:

TITLE: DWG. NO:

ATTACHED TO:

DATE:

3" = 1'-0"

12/5/2014 2:43:39 PM

12/05/14

ASK1004.11

STUCCO BAND DETAIL

U.C. SANTA CRUZ INFILL APMNTS REPAIRS14/AC8.01

Page 83: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

CEMENT PLASTER STUCCO W/ LATH

24 GA GSM SILL SCREED WITH S.S.FASTENERS

PLYWOOD SHEATHING, S.S.D.

FASTENER

TY

P.

1/2

".

MIN

.

1".

2" MIN. @ PAVING,6" MIN. @ GRADE

9" SAF, LAP OVER SILL SCREED

WRB. OVER SAF AND SILL SCREED

*REPLACE SILL SCREED AND GSMBASE FLASHING W/ GSM CASINGBEAD AT VERTICAL FOUNDATIONWALL EDGES. TYP.

WHERE REQ'D. 2" CLEARANCE EXPOSESFRAMING, INSTALL 6" STAINLESS STEELWALL FLASHING AGAINST WALL BEHINDTHE STUCCO BASE FLASHING. REMOVESEALANT AND FILLER FROM GAPBETWEEN CONCRETE PAVING AND WALLTO ALLOW METAL FLASHING TO EXTENDMINIMUM 1" BELOW SURFACE OF PAVING.THIS WALL FLASHING SHOULD BE SET INBUTYL SEALANT.SEAL JOINT BETWEEN NEW FLASHING ANDPAVING CONCRETE AFTER FLASHING ISINSTALLED.AT OUTSIDE CORNERS, TURN FLASHINGAROUND CORNER 6".

REF. DWG:

SCALE:

TITLE: DWG. NO:

ATTACHED TO:

DATE:

3" = 1'-0"

12/5/2014 2:43:40 PM

12/05/14

ASK1004.12

BASE OF WALL

U.C. SANTA CRUZ INFILL APMNTS REPAIRS6/AC8.02, 7/AP8.02

Page 84: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

TY

P.

4"

MIN

.4"

MIN

.

SAF, 9" WIDE OVER FLANGE ATTOP AND SIDES

WRB

CEMENT PLASTER

METAL LATH

FULLY SOLDERED GSMCOLLAR FLASHING

(E) ELECTRICAL BOX

INSTALLWEATHERPROOFGASKET TO REPLACE (E)

(E) LIGHT FIXTURE,REMOVE ANDREINSTALL. DETACH,DISCONNECT ANDREATTACH ASREQUIRED.

SEALANT FILLET, ALLSIDES

REF. DWG:

SCALE:

TITLE: DWG. NO:

ATTACHED TO:

DATE:

6" = 1'-0"

12/5/2014 2:43:40 PM

12/05/14

ASK1004.13

ELECTRICAL BOX PENETRATION

U.C. SANTA CRUZ INFILL APMNTS REPAIRS

FLASHING

8/AC8.02, 9/AP8.02

Page 85: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

2.STAINLESS STEEL L-METAL. CONTINUOUSTO EACH END (SHOWNCUT FOR CLARITY).STRIP INTOWATERPROOFMEMBRANE

4"

+/- 4". EXTEND 1"ABOVE SILLSCREED. FOLDOVER CASINGBEAD ON TO SILLSCREED

6"

6"

8"

12"

CASING BEAD.SPOT WELD ANDSOLDER TOSADDLE

STRIP INWITH SAF

4"

4"

6"

1.26 GA STAINLESS STEELSADDLE. APPLIED PRIOR TOWATERPROOFING MEMBRANES,BUT OVER WALL FLASHING(WHERE IT EXISTS)

3.CONFORM STAINLESS STEEL DECKEDGE. CONTINUOUS TO EACH END(SHOWN CUT FOR CLARITY). APPLYOVER WATERPROOFING, ANDUNDER CONC. SLAB

REF. DWG:

SCALE:

TITLE: DWG. NO:

ATTACHED TO:

DATE:

3" = 1'-0"

12/5/2014 2:43:40 PM

12/05/14

ASK1004.14

DECK EDGE SADDLE AT WALL

U.C. SANTA CRUZ INFILL APMNTS REPAIRS6/A8.22

Page 86: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

STAINLES STEEL CON-FORM DECK EDGE METAL

HOT FLUID APPLIED WATERPROOFING MEMBRANE, TYP.(CROSS HATCH)

DRAINAGE COMPOSITE

REMOVE EDGE OF (E) SLAB

PROTECTION BOARD (GREY)

REINFORCING FABRIC (DASHED)

24GA STAINLESS STEEL EDGE METAL. SET IN WPMEMBRANE AND FASTEN @ 4" O.C., 2-ROWSSTAGGERED (PER MANUFACTURER)

NEOPRENEREINFORCING WRAP, DOWN FACE OF WALL,OVER BONDING ADHESIVE

6"

1/2" THICK BUILDUP

1/2

"

STAINLES STEEL CON-FORM DECK EDGE METAL

HOT FLUID APPLIED WATERPROOFING MEMBRANE, TYP.(CROSS HATCH)

DRAINAGE COMPOSITE

CUT BACK EDGE OF (E) PLYWOOD SHEATHING

PROTECTION BOARD (GREY)

REINFORCING FABRIC (DASHED)

24GA STAINLESS STEEL EDGE METAL. SET IN WPMEMBRANE AND FASTEN @ 4" O.C., 2-ROWS STAGGERED(PER MANUFACTURER)

NEOPRENEREINFORCING WRAP, DOWN FACE OF WALL,OVER BONDING ADHESIVE

(E) PLYWOOD DECK

REF. DWG:

SCALE:

TITLE: DWG. NO:

ATTACHED TO:

DATE:

6" = 1'-0"

12/5/2014 2:43:41 PM

12/05/14

ASK1004.15

DECK EDGE AT LANDING

U.C. SANTA CRUZ INFILL APMNTS REPAIRS8/A8.22

PORTER

COWELL

Page 87: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

STD. WEIGHT CONC. TOPPING SLAB, MIN 1-1/2"

HOT FLUID APPLIED WATERPROOFINGMEMBRANE, TYP. (CROSS HATCH)

DRAINAGE MAT

(E) CONC. SLAB ON METAL DECK

HOT FLUID APPLIEDMEMBRANE FILLET

PROTECTION COURSE (GREY)

WIRE REINFORCEMENT

STAINLESS STEEL FLASHING, EXTEND ABOVEDRIP EDGE OF WEEP SCREED 3" MIN. & 1/2"BELOW TOP OF PAVING. HEM BOTTOM @ EDGE

NEOPRENE REINFORCING, RUN UP WALL

REINFORCING FABRIC (DASHED)

BACKER ROD AND SEALANT OVERCOMBRESSIBLE FILLER BOARD

STD. WEIGHT CONC. TOPPING SLAB, MIN 1-1/2"

HOT FLUID APPLIED WATERPROOFINGMEMBRANE, TYP. (CROSS HATCH)

DRAINAGE MAT

(E) DECK STRUCTURE

PROTECTION COURSE (GREY)

WIRE REINFORCEMENT

STAINLESS STEEL FLASHING, EXTEND ABOVEDRIP EDGE OF WEEP SCREED 3" MIN. & 1/2"BELOW TOP OF PAVING. HEM BOTTOM @ EDGE

NEOPRENE REINFORCING, RUN UP WALL

BACKER ROD AND SEALANT OVERCOMBRESSIBLE FILLER BOARD

REINFORCING FABRIC (DASHED)

HOT FLUID APPLIEDMEMBRANE FILLET

REF. DWG:

SCALE:

TITLE: DWG. NO:

ATTACHED TO:

DATE:

6" = 1'-0"

12/5/2014 2:43:41 PM

12/05/14

ASK1004.16

ENLARGED DECK TO WALL DETAIL

U.C. SANTA CRUZ INFILL APMNTS REPAIRS

PORTER

COWELL

9/AC8.22, 7/AP8.22

Page 88: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

(E) SPRINKLER PIPE

(E) METAL DECK W/ STRUCTURALCONC. SLAB

CONC. TOPPING SLAB,1-1/2" MIN. THICKNESS

FILTER FABRIC (DASHED)

HOT RUBBER WATERPROOFING(CROSS HATCH)

PROTECTION BOARD (GREY)

DRAINAGE LAYER

STAINLESS STEEL (2-PIECE) COLLAR. HEMTOP EDGE. 2" HORIZ. LEG ON DECK

SURFACE. SET IN FULL BED OF SEALANTAND FASTEN TO DECK, PER HOT RUBBER

MANUF. REQUIREMENTS.

BACKER ROD & SEALANT

3/8" MIN., TYP.

(E) CLAMP. ADJUST TO ALLOWWATERPROOFING AND POURING

OF TOPPING SLAB

REF. DWG:

SCALE:

TITLE: DWG. NO:

ATTACHED TO:

DATE:

3" = 1'-0"

12/5/2014 2:43:42 PM

12/05/14

ASK1004.17

PIPE PENETRATION

U.C. SANTA CRUZ INFILL APMNTS REPAIRS11/AC8.22

WATERPROOFING AT DECK

Page 89: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

HOT FLUID APPLIED WATERPROOFINGMEMBRANE, TYP. (CROSS HATCH)

DRAINAGE MAT

HOT FLUID APPLIEDMEMBRANE FILLET

PROTECTION COURSE (GREY)

STAINLESS STEEL FLASHING. UPTURN ATBASE COLUMN. HEM BOTTOM @ EDGE. HEM

TO FOLD 'IN'

EXISTING REDWOOD COLUMN

NEOPRENE REINFORCING, RUN UP WALL

REINFORCING FABRIC (DASHED)

BACKER ROD AND SEALANT OVERCOMBRESSIBLE FILLER BOARD

ROUTED GROOVE W/ SEALANT

1/2

"

REF. DWG:

SCALE:

TITLE: DWG. NO:

ATTACHED TO:

DATE:

6" = 1'-0"

12/5/2014 2:43:42 PM

12/05/14

ASK1004.18

DECK COLUMN WATERPROOFING

U.C. SANTA CRUZ INFILL APMNTS REPAIRS6/AP8.22

(PORTER)

Page 90: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

(E) WOOD COLUMN

HOT RUBBERWATERPROOFING

SYSTEM (HATCHED)

(E) WOOD DECK STRUCTURE

AT CORNER, USE FULLYSOLDERED EDGE METAL PIECETO WRAP AROUND OUTSIDECORNER OF COLUMN

(E) WOOD COLUMN

HOT RUBBERWATERPROOFING

SYSTEM (HATCHED)

(E) WOOD DECK STRUCTURE

EDGE METAL

FULLY SOLDEREDSTAINLESS STEELCOUNTERFLASHINGAROUND COLUMN. KEY INTOKERF CUT IN COLUMN ANDSEAL. BOTTOM EDGE OFCOUTER FLASHING TO BEHEMMED IN.

KERF CUT IN COLUMN

1. EDGE METAL @ CORNER (BEFORE COUNTER FLASHING INSTALL)

2. CORNER FLASHING (W/ COUNTER FLASHING)

REF. DWG:

SCALE:

TITLE: DWG. NO:

ATTACHED TO:

DATE:

1 1/2" = 1'-0"

12/5/2014 2:43:43 PM

12/05/14

ASK1004.19

DECK COLUMN FLASHING (PORTER)

U.C. SANTA CRUZ INFILL APMNTS REPAIRS

Page 91: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

SHIM AS REQUIRED BYWINDOW MANUF. FORWINDOW SUPPORT.

W.R.B.

3/4"X3/4" 24 GA GSM ANGLE

1X WD. WINDOW SILL

1/2"

1/2" WD. WINDOW APRON

SHIM

CONT. SLOPED SHIM

1/16" HORSESHOE SHIM ATFASTENERS AT SILL ONLY

ALUMINUM WINDOW, SEESPECIFICATIONS

CONT. SEALANT BEAD

SAF, O/ WRB, WRAPPED UP ONTO ANGLE

BACKER ROD AND SEALANT

(EXISTING STRUCTURE)

ROTO CRANK

SHADE

BASE SAF @ SILL

REF. DWG:

SCALE:

TITLE: DWG. NO:

ATTACHED TO:

DATE:

6" = 1'-0"

12/5/2014 2:43:43 PM

12/05/14

ASK1004.20

WINDOW SILL WATERPROOFING

U.C. SANTA CRUZ INFILL APMNTS REPAIRS1/A9.01

Page 92: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

BACKER ROD ANDSEALANT

W.R.B., LAP OUTER LAYER O/ WINDOW FIN

12" SAF, LAP O/ WINDOW FIN

SAF, RUN INTO ROUGH OPENING

CEMENT PLASTER STUCCO

3/4"X1" (SHORT LENGTH AGAINSTWNDW), 24 GA GSM ANGLE W/HEMMED EDGE. SET IN A FULLBED OF SEALANT O/ SAF ANDFASTEN @ 12" O.C., MIN.

SET HEAD AND JAMB FLANGES IN SEALANT

ALUNIMUM WINDOW, SEESPECIFICATIONS

(N) GYP. BRD. WINDOW WRAP

SHIM TO CREATE EQUAL (+/- 1/4")WINDOW FRAME REVEAL ONJAMB SIDES, TYP.

(EXISTING STRUCTURE)~

1 3

/16"

SHADE OVERLAP PAST JAM, TYP.

2"

SHADE

REF. DWG:

SCALE:

TITLE: DWG. NO:

ATTACHED TO:

DATE:

6" = 1'-0"

12/5/2014 2:43:43 PM

12/05/14

ASK1004.21

WINDOW JAMB WATERPROOFING

U.C. SANTA CRUZ INFILL APMNTS REPAIRS2/A9.01

Page 93: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

W.R.B.LAP OUTER LAYER O/ HEAD FLASHING

12" SAF, EXTEND O/ HEAD FLASHINGS

GSM HEAD FLASHING (PAINT)W/ HEMMED EDGE.EXTEND UP WALL 4" MIN.

ALUMINUM WINDOW, SEESPECIFICATIONS

9" SAF, LAP O/ WINDOW FIN

SEALANT W/ BACKER ROD

L-METAL, TYP.

(N) GYP. BRD. WINDOW WRAP

SAF, RUN INTO ROUGH OPENING

CEMENT PLASTER STUCCO

SET HEAD AND JAMB FLANGES IN SEALANT

(EXISTING STRUCTURE)

SEALANT FILLET

~ 3 9/16"

BLACKOUTWINDOW SHADEUNIT

1-1/8" X 3-1/2"CONTINUOUS PAINTEDBLOCKING

SHADE

1 1/8"

HEAD FLASHING FASTENERS. FASTENERCANNOT PENETRATE WINDOW HEAD FIN.KEEP FASTENER CLEAR OF LEADINGEDGE OF WINDOW FIN.

REF. DWG:

SCALE:

TITLE: DWG. NO:

ATTACHED TO:

DATE:

6" = 1'-0"

12/5/2014 2:43:43 PM

12/05/14

ASK1004.22

WINDOW HEAD WATERPOOFING

U.C. SANTA CRUZ INFILL APMNTS REPAIRS3/A9.01

Page 94: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

NAIL HEADS SET FLUSH WITH FACEOF SHEATHING

STEP B1: 1'-0" WIDE SAF (40MIL); EXTEND 1'-0" BEYONDROUGH OPENING EACH SIDE; ADHERE TOPHALF TO EDGE OF ROUGH OPENING, LEAVEBOTTOM HALF LOOSE (W/ RELEASE PAPERINTACT) ALLOWING FOR BUILDING PAPER ATSTEP H (STAPLE AT LOWER CORNERS TOPREVENT WIND DAMAGE)

STEP A

STEP B

STEP C

STEP D

STEP E

STEP F

STEP G

12" WIDE SAF (25 MIL) COVERING ENTIREROUGH SILL (AND OVER GSM ANGLE ANDSHIM); EXTEND 4" UP JAMB

EXTEND 4" BEYOND ROUGHOPENING

NOTE:REMOVE ALLLABELS FROMWINDOWFLANGE PRIORTOINSTALLATION

NOTE:APPLY SAF WITH LAMINATE ROLLER PERMANUFACTURER INSTRUCTIONS,ELIMINATE ALL WRINKLES AND AIRPOCKETS

STEP D1:SAF (25 MIL) COVERING ENTIRE ROUGHOPENING(AND UNDER GSM ANGLE).CUT AT SILL-TO-JAMB CORNER AND RUNONTO SILL AND FACE OF WALL 4"

STEP B2:PROVIDE 3" DIA SAF CIRCLE PATCHES(25 MIL) TO SEAL ANY PINHOLEOPENINGS AT OUTSIDE FRAMINGCORNERS

INSTALL WINDOW PERMANUFACTURER INSTRUCTIONS. HEADFASTENERS PER DETAIL. SHIM ANDADJUST AS REQUIRED TO SQUARE,PLUMB AND LEVEL WINDOW UNIT

PRIOR TO SETTING WINDOW UNIT APPLYCONTINUOUS BEAD OF SEALANT TO BACKSIDE OF MOUNTING FLANGEEXCEPT AT SILL WHERE PAN OCCURS

SET FASTENER HEADS FLUSH WITHFLANGE; DO NOT BEND FASTENERHEADS OVER

9" WIDE SAF (25 MIL) OVERWINDOW FLANGE AT JAMB;EXTEND 6" BEYOND SILL AND HEADROUGH OPENING

NOTE:HEAD FLASHING TO BECONTINUOUS WITH NOJOINTS WITH MIN. 4"VERTICAL LEG. SLOPETOP TO DRAINOUTWARD. PROVIDECLOSED ENDS WITHALL JOINTSSOLDERED.

NOTE:LAP BUILDINGPAPER OVER HEADFLASHING

LAP 6" MIN. ATVERTICAL SEAMS,4" MIN. ATHORIZONTALSEAMS

AVOID DAMAGE TOPREVIOUSFLASHINGMATERIALS WHENTRIMMING BUILDINGPAPER

TUCKBUILDINGPAPERUNDER SILLFLASHING,SEE STEP B

STEP G1:APPLY 9" WIDE SAF (25 MIL) OVERWINDOW HEAD, EXTEND 3" BEYONDJAMB FLEXIBLE FLASHING

STEP G2:INSTALL GALVANIZED SHEET METAL HEADFLASHING, LAP OVER WINDOW HEAD PERDETAIL. END DAMS TO EXTEND 3/4" ON EACHSIDE OF WINDOW W/ 3" FLANGE ON EACH END,SOLDER RETURNS.

STEP H

WRB

1'-0"

4"

PRIME GYPSUM SHEATHING ANDPLYWOOD SHEATHING. PER SAFSPECS

FILL JOINT GAPS > 1/8" WITHSEALANT

STEP G3:ADD 12" WIDE SAF (25MIL) STRIPOVER GSM HEAD FLASHING

4"

4"

3/4" MIN

STEP H: FLASHING TAPEOVER WRB EDGE, PERDETAIL. @ HEAD AND JAMONLY

STEP D2:SAF (25 MIL) COVERING ENTIRE ROUGHOPENING.CUT AT HEAD-TO-JAMB CORNER ANDRUN ONTO HEAD AND FACE OF JAM 4"

3"

APPLY APPROVED SAF PATCHES TO SEALPIN HOLE OPENINGS AT ANGLE TO JAMBINTERSECTIONS

ROUGH OPENINGS TO BE SHIMMED W/DIMENSIONAL LUMBER, NOT PLYWOOD

REF. DWG:

SCALE:

TITLE: DWG. NO:

ATTACHED TO:

DATE:

1611 Telegraph Avenue, Suite 200Oakland, California 94612

510.465.7010 p | 510.465.8575 fwww.pyatok.com

1/4" = 1'-0"

12/5/2014 2:45:58 PM

12/05/14

ASK 1004.23WINDOW FLASHING SEQUENCE DIAGRAM

U.C. SANTA CRUZ INFILL APMNTS REPAIRS4/A9.01

Page 95: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

STEP A

STEP B

STEP C

STEP D

STEP E

PRIME GYPSUM SHEATHINGAND PLYWOOD SHEATHING.PER SAF SPECS

FILL JOINT GAPS > 1/8"WITH SEALANT

SILL CORNER SAF

SILL SAF

JAMB SAF

HEAD SAF. CONTINUOUSONTO FACE OF R.O.

REF. DWG:

SCALE:

TITLE: DWG. NO:

ATTACHED TO:

DATE:

1/4" = 1'-0"

12/5/2014 2:43:44 PM

12/05/14

ASK1004.24

WALL OPENING FLASHING

U.C. SANTA CRUZ INFILL APMNTS REPAIRS

SEQUENCING DIAGRAM

*THIS INSTALLATION SEQUENCE IS NOTAPPLICABLE TO THE DOOR OR WINDOWOPENINGS

Page 96: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

INSECT SCREEN & FASTENINGPLATE. REMOVE AND REINSTALLOVER NEW CONT. Z-FLASHING

FULLY SOLDERED CONT.GSM Z-FLASHING

(EXISTING STRUCTURE)

W.R.B.

12" S.A.F., WRAP UP INTOFULL DEPTH OF OPENING

SEALANT AND BACKER ROD

FASTENER

CEMENT PLASTER STUCCOW/ METAL LATH

STUCCO CASING BEAD

REPAIR GYP. BD. FINISH

LOUVER

CONT. SEALANT BTWNLOUVER AND Z-FLASHING

REF. DWG:

SCALE:

TITLE: DWG. NO:

ATTACHED TO:

DATE:

6" = 1'-0"

12/5/2014 2:43:45 PM

12/05/14

ASK1004.25

LOUVER SILL WATERPROOFING

U.C. SANTA CRUZ INFILL APMNTS REPAIRS1/A9.02

Page 97: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

CEMENT PLASTER STUCCOW/ METAL LATH

(EXISTING STRUCTURE)

INSECT SCREEN & FASTENINGPLATE. REMOVE AND REINSTALLOVER NEW CONT. Z-FLASHING

FULLY SOLDERED CONT. GSM Z-FLASHING

W.R.B.(ABOVE SAF)

12" S.A.F., WRAP UP INTO FULL DEPTH OFOPENING

SEALANT AND BACKER ROD

FASTENER

STUCCO CASING BEAD

REPAIR GYP. BD. FINISH

LOUVER

CONT. SEALANT BTWN LOUVER AND Z-FLASHING

6" SAF OVER FLASHING

REF. DWG:

SCALE:

TITLE: DWG. NO:

ATTACHED TO:

DATE:

6" = 1'-0"

12/5/2014 2:43:45 PM

12/05/14

ASK1004.26

LOUVER JAMB WATERPROOFING

U.C. SANTA CRUZ INFILL APMNTS REPAIRS2/A9.02

Page 98: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

HEAD DRIP FLASHING TO EXTEND PASTLOUVER TO ALLOW TO COVER OVERSTUCCO CASING BEAD, SET IN CONT.COMPATIBLE SEALANT BED

12" S.A.F., RUN INTO ROUGH OPENING

(EXISTING STRUCTURE)

12" S.A..F, EXTEND O/ Z-FLASHING& HEAD FLASHING

CO

VE

R

1"

MIN

.

INSECT SCREEN & FASTENINGPLATE. REMOVE AND REINSTALLOVER NEW CONT. Z-FLASHING

REPAIR GYP. BD. FINISH

LOUVER

CONT. SEALANT BTWN LOUVER AND Z-FLASHING

REF. DWG:

SCALE:

TITLE: DWG. NO:

ATTACHED TO:

DATE:

6" = 1'-0"

12/5/2014 2:43:45 PM

12/05/14

ASK1004.27

LOUVER HEAD WATERPROOFING

U.C. SANTA CRUZ INFILL APMNTS REPAIRS3/A9.02

Page 99: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

4" LEG, TYP.

DEPTH OF LOUVER - 7/8"

1" BACK DAM

REF. DWG:

SCALE:

TITLE: DWG. NO:

ATTACHED TO:

DATE:

3" = 1'-0"

12/5/2014 2:43:46 PM

12/05/14

ASK1004.28

WALL LOUVER 4-SIDED Z-FLASHING

U.C. SANTA CRUZ INFILL APMNTS REPAIRS

Page 100: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

5/8

"

4"

VERIF

Y

1/4

"10° SLOPE

24 GA. G.S.M. ENDCLOSURE

END DAM EXTENDS 1/4"ABOVE AS SHOWN

3"

4"

5/8

"

VERIFY

10° SLOPE

KICK OUT

1/4" KICK OUT

END DAM

REF. DWG:

SCALE:

TITLE: DWG. NO:

ATTACHED TO:

DATE:

6" = 1'-0"

12/5/2014 2:43:46 PM

12/05/14

ASK1004.29

Z-METAL HEAD FLASHING DETAIL

U.C. SANTA CRUZ INFILL APMNTS REPAIRS5/A9.01, 4/A9.10

Page 101: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

5/8" GYP. BD. SOFFIT

SOLDERED WALL CAP W/INTEGRAL COLLAR

FLASHING, SEE DETAIL 9

INTEGRAL COLLAR FLASHINGBEYOND

S.A.F. , WRAP INTO ROUGH OPENING

PLYWOOD SHEATHING, S.S.D.

W.R.B.

S.A.F., EXTEND OVER COLLARFLASHING

(N) DUCT, S.M.D.

NEW BLOCKING ASREQUIRED

(EXISTING FRAMING)

INSECT SCREEN

W.R.B.

METAL LATH

S.A.F., RUN INTO ROUGHOPENING

CEMENT PLASTER

REF. DWG:

SCALE:

TITLE: DWG. NO:

ATTACHED TO:

DATE:

3" = 1'-0"

12/5/2014 2:43:46 PM

12/05/14

ASK1004.30

MAKEUP AIR WALL CAP TERMINATION

U.C. SANTA CRUZ INFILL APMNTS REPAIRS7/AC9.02, 6/AP9.02

Page 102: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

8"

4"

4" 8"

R 0' - 3 1/2"

INSECT SCREEN (AT INTAKE),OR 1/4" STAINLESS STEELMESH (AT EXHAUST)

DUCT, S.M.D.

STUCCO DEPTH

4 1/2" 4"

8"

1/4

" R

ET

UR

N

SOLDERED WALLCAP W/ INTEGRALCOLLAR FLASHING

INSECT SCREEN (ATINTAKE) OR 1/4"STAINLESS STEEL MESH(AT EXHAUST), BEYOND

SECTION FRONT ELEVATION BACK SIDE

NOTE:WALL CAPHOOD NOTSHOWN

DUCT RECEIVER,BEYOND

WALL ASSEMBLY

REF. DWG:

SCALE:

TITLE: DWG. NO:

ATTACHED TO:

DATE:

1 1/2" = 1'-0"

12/5/2014 2:43:47 PM

12/05/14

ASK1004.31

WALL CAP AT VENT TERMINATION

U.C. SANTA CRUZ INFILL APMNTS REPAIRS9/A9.02

Page 103: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

NOTE:1. TYP. EXT. DOOR FLASHING2. FABRICATE PAN FLASHING OF 24GAUGE GALVANIZED SHEET METAL.FOLD UP VERTICAL EDGE BELOWTHRESHOLD. DO NOT NAIL ATHORIZONTAL SURFACE.

SOLDER ALL JOINTS, TYP.

3/4” HIGH END DAM. HEM EDGE.SEE DETAIL.

4"

4"

5-1/2”

MA

TCH

RO

UG

H O

PE

NIN

G W

IDT

H

TO TOP OFSTRUCTURAL

SLAB. FIELDVERIFY

4"

REF. DWG:

SCALE:

TITLE: DWG. NO:

ATTACHED TO:

DATE:

3" = 1'-0"

12/5/2014 2:43:47 PM

12/05/14

ASK1004.32

SILL PAN FLASHING

U.C. SANTA CRUZ INFILL APMNTS REPAIRS3/A9.10

Page 104: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

INSWING DOOR: SEE DOOR SCHEDULE

WEATHERSTRIPPING/ SMOKESEAL:SEE SPECS.

NEW CONCRETE TOPPING SLAB

DRAINAGE MAT

HOT FLUID APPLIED WATERPROOFING MEMBRANE, TYP.(CROSS HATCH). RUN UP ONTO SILL PAN

SEALANT & BACKER ROD

GSM SILL PAN WITH INTEGRAL END CAPS AT JAMS, SET IN FULL BED OFSEALANT APPLIED UNDER SILL & END CAPS. MAINTAIN VERTICAL SHAPEOF END DAM (DO NOT CRIMP DOWN ONTO MEMBRANE). SEE DETAIL 3.SAF OVER UPPER EDGE ALONG JAMS

ALUMINUM SADDLE THRESHOLD, SET INMASTIC SEALANT @ EACH END. INSTALLW/ SCREWS SET IN SEALANT.

SEAL DOOR FRAME TO CONCRETE SLAB(FOAM & SEALANT).

(EXISTING STRUCTURE)

PROTECTION BOARD. DO NOT OVERLAPLAYERS TO AVOID EXCESSIVE BUILD-UP

CANT

FLOORING

NEOPRENE REINFORCING (THICK LINE),RUN UP ONTO SILL PAN

REINFORCING FABRIC (DASHED)

2 LAYERS 1/2" CDX PLYWD

1-1/4" GYPCRETESUB-FLOOR

ACOUSTICAL MAT

1-1/2"FACTORY-PROVIDEDSCREWFASTENER.SET INSEALANT ANDSEAL HEAD.

8 3/4" STEEL DOOR FRAME

DOOR SHOE(PEMKO 216_FG)

.SLOPE

MA

X.

1/2

"

5 1/2"

- 1/8”T.O. TOPPING SLAB

0”T.O. GYPCRETE

REF. DWG:

SCALE:

TITLE: DWG. NO:

ATTACHED TO:

DATE:

6" = 1'-0"

12/5/2014 2:45:33 PM

12/05/14

ASK

1004.33

EXTERIOR DOOR THRESHOLD AT LANDING

U.C. SANTA CRUZ INFILL APMNTS REPAIRS6/A9.10

Page 105: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

CEMENT PLASTER STUCCO

(E) GYPSUM BOARD: 5/8"TYPE 'X'

BACKER ROD AND SEALANT

PLYWOOD SHEATHING, S.S.D.

W.R.B.

GSM STUCCO STOP/J-MOLD, TYP.

SEALANT

24 GA GSM L-METAL, SETIN SEALANT

SAF, 9" WIDE

SAF, 6" WIDE

@ (N) DOOR: FRAME ANCHORPER MANUF. MIN. 3 PER JAMB,TYP.

EXTERIOR DOOR. SIM. FOROUTSWING DOOR

STEEL DOOR FRAME. (E) TOREMAIN @ GRADE. (N) AT 2FDECK LANDING

WEATHERSTRIPPING/SMOKESEAL

REF. DWG:

SCALE:

TITLE: DWG. NO:

ATTACHED TO:

DATE:

3" = 1'-0"

12/5/2014 2:43:48 PM

12/05/14

ASK1004.34

EXTERIOR DOOR JAMB AT STUCCO

U.C. SANTA CRUZ INFILL APMNTS REPAIRS7/A9.10

Page 106: UC SANTA CRUZ STANDARD PLASTER INSTALLATION AND …...Lath & Plaster Installation Sequence Guide Pyatok Architects and Allana Buick & Bers, Inc. 12/5/2014 Notes: 1. Any conditions

CEMENT PLASTER STUCCO

(E) GYPSUM BOARD

LAP S.A.F. INTO DOOR R.O. AND UP WALLAS SHOWN.

PLYWOOD SHEATHING, S.S.D.

W.R.B., LAP OVER S.A.F. & HEADFLASHING, TYP.

(E) HEADER

GSM HEAD FLASHING WITH 30DEG. HEMMED EDGEAND INTEGRAL END CAPS. SEAL TO DOOR FRAME.EXTEND PAST DOOR FRAME MAX 3/8" ON EACH SIDE.SEE DETAIL 4

SEALANT

@ (N) DOOR: DOOR FRAME ANCHOR PER MANUF.

.OVERHANG OVER DOOR FRAME

9" SAF, OVER HEAD FLASHING, UNDER WRB

EXTERIOR DOOR. SIM. FOR OUTSWING DOOR

STEEL DOOR FRAME. (E) TO REMAIN @GRADE. (N) AT 2F DECK LANDINGS

WEATHERSTRIPPING/ SMOKESEAL

1/4

"

REF. DWG:

SCALE:

TITLE: DWG. NO:

ATTACHED TO:

DATE:

3" = 1'-0"

12/5/2014 2:43:48 PM

12/05/14

ASK1004.35

EXTERIOR DOOR HEAD AT STUCCO

U.C. SANTA CRUZ INFILL APMNTS REPAIRS8/A9.10