Seismic Calculations for UBC 1997 Static Process for Regular Buildings Dear ETABS users, this is coolest bliss and in this tutorial we will solve an example by UBC method and then we’ll compare it with ETABS. Remember, it is a very simple example, just to clear the concepts of ETABS new users. In the following pages, you will see some pictures and notes. Want more? Join CIVILEA group! & visit my blog To understand this example, you will need at hand following things:- 1- UBC Seismic Calculation Sheet; CB Seis Ver 2.0 Download it. Excel-2007 Format or Excel-2003 Format If you want Visual Basic .EXE file download it from here. 2- UBC-97 Code (Chapter 16) 3- ETABS (Version 9.5.0) And of course, A GOOD BRAIN….:-)
  • Upload

    -
  • Category

    Documents

  • view

    183
  • download

    11

description

This document explains how to specify UBC 1997 seismic load in ETABS.

Transcript of Ubc Eq Etabs

Page 1: Ubc Eq Etabs

Seismic Calculations for UBC 1997 Static Process for Regular Buildings

Dear ETABS users, this is coolest bliss and in this tutorial we will solve an example by UBC method and then we’ll compare it with ETABS. Remember, it is a very simple example, just to clear the concepts of ETABS new users.

In the following pages, you will see some pictures and notes.

Want more? Join CIVILEA group! & visit my blog

To understand this example, you will need at hand following things:-

1- UBC Seismic Calculation Sheet; CB Seis Ver 2.0 Download it. Excel-2007 Format or Excel-2003 Format If you want Visual Basic .EXE file download it from here.

2- UBC-97 Code (Chapter 16) 3- ETABS (Version 9.5.0)

And of course, A GOOD BRAIN….:-)

Page 2: Ubc Eq Etabs

We will make a modelwith these parameters.

*2D model in XZ*24ft wide bay*12ft high four storeys

Page 3: Ubc Eq Etabs

*Start a new model.*Units kip-ft*4 Storeys*Each storey 12ft high*Grid Only

Page 4: Ubc Eq Etabs

24x24Bays

Page 5: Ubc Eq Etabs

2-Selectbeamoption

1-Change thisto ALLSTORIES3-Draw beam from

grid B to grid C asshown

4-Selectdrawcolumnoption

5-Draw 2columnshere.

Page 6: Ubc Eq Etabs

1-Selectelevationshortcut. 2-Goto

Elevation 3

Page 7: Ubc Eq Etabs

Selectthis lineanddelete.

Page 8: Ubc Eq Etabs
Page 9: Ubc Eq Etabs

Goto thisoption

Page 10: Ubc Eq Etabs

Make self weight multiplier "ZERO" toneglect self weights.

Page 11: Ubc Eq Etabs

Select MASS SOURCEOPTION

Page 12: Ubc Eq Etabs

1-Select "FROM LOADS" because we will notput any additional mass in this example andno self weight...We will only put DL and LL soselect this option.

2-Enter these valuesbecause we want ourseismic weight W = 100%DL + 25% LL(See UBC code)

Page 13: Ubc Eq Etabs

Select all 4 lines to apply load

"4 LINESSELECTED"

Page 14: Ubc Eq Etabs

we willput UDL

Page 15: Ubc Eq Etabs

Put 2 kip/ft as DL towardsGRAVITY. Other values shouldbe as shown.

Page 16: Ubc Eq Etabs

GET PREVIOUSSELECTION

Dead Load =2kip/ft

Page 17: Ubc Eq Etabs

Keep all otheroptions same asthat of DL inprevious step andput 1 kip/ft as LIVELOAD

Page 18: Ubc Eq Etabs

Goto DEFINE>STATIC LOAD CASESand define two new cases as1-EQX as QUAKE according to UBC 97and2-EQY as QUAKE according to UBC 97

Page 19: Ubc Eq Etabs

For EQX put allvalues as shown inform

Page 20: Ubc Eq Etabs

Similarly for EQY...everything same,except the direction....(YOU CAN EVEN OMIT THIS EQYLOAD CASE because we will runour model as 2D only in XZdirection.

Our model coordinates...XY...as 2D

Page 21: Ubc Eq Etabs

Click set analysis option

Page 22: Ubc Eq Etabs

UNCHECKDYNAMIC &PDELTAOPTIONS..

SelectXZ Plane

Page 23: Ubc Eq Etabs

SAVEYOURMODEL

Page 24: Ubc Eq Etabs

RUNANALYSIS

Page 25: Ubc Eq Etabs

DEFLECTED SHAPE INEQX

2-Clickshowtables

1-UNITSshouldbe Kip-ft

Page 26: Ubc Eq Etabs

SelectSTORYSHEARS

Page 27: Ubc Eq Etabs

12 ft

For each storeyDL = 2x24 = 48 KIPandLL = 1x24 = 24 KIP

Before going to next step. Fill all the datain this sheet

Notethesetwovalues

Notestoreyshears

Page 28: Ubc Eq Etabs

Check DL and LLis same as youput in excelsheet.

Forgetabout TOP& BOTTOMlocation..they aresame in thisexample

On the bottomstorey(Storey-1, seeDL=192 andLL=96) sameas in excelsheet.

compare THICK RED CIRCLE storeyshears with excel sheet...storeyshear...they are same!

Page 29: Ubc Eq Etabs

Compare!

Display>Story Response Plots

Page 30: Ubc Eq Etabs

Check story shear this time

Page 31: Ubc Eq Etabs

Display>ShowLoads>Joint/Points>select EQx....compare with previouspage

Show reactionsfor EQX

Page 32: Ubc Eq Etabs

This time...checkstorey moment withEXCEL SHEET

Page 33: Ubc Eq Etabs

1-Rightclick onjoint

Value of DELTA S.you have to put thisvalue in excel sheet

Story drift ratio = Storydrift / Story Height

Page 34: Ubc Eq Etabs

This is thevalue of deltaS.

Page 35: Ubc Eq Etabs

This isthe valueof storydrift ratio

Page 36: Ubc Eq Etabs

Building Location: Pasrur, District Sialkot, Pakistan

Seismic Zone: II-B Soil Profile Type: SD

Seismic Zone Factor Z: 0.2

Seismic Coefficients

Ca: 0.28 Na: 0

Cv: 0.4 Nv: 0

No. of Storeys: 4 Importance Factor: 1

Building Height: 48 Ct : 0.02

Building Period: 0.36 Response Factor: 5.5

Building Dead Load: 192 Building Live Load: 96

Seismic Weight, W = 1 x DL + 0.25 x LL = 216

Eq 30-4: 43 Design Base Shear: 27

Eq 30-5: 27 Ft: 0

Eq 30-6: 7

Example-1

30-Sep-10

UBC Seismic CalculationsPrepared By: coolest bliss Job:

SITE�DATA

BUILDING�DATA

LOADING

BASE�SHEAR

Checked By: - Date:

CB Seis. Ver 1.0

Input data printed from excel sheet

Page 37: Ubc Eq Etabs

CB Seis. Ver 1.0

Building / Frame DataHeight

h

Dead Load DL

Live Load LL

Seismic Weight

wx

Total Height

hxwx.hx

Lateral Force

Fx

Storey Shear

Vx�s Overturning

MomentStorey Drift

Drift Limit

ft kip kip kip ft kip-ft kip kip in kip-ft in in

� 48.00 192 96 216 6480 27.49 82

Storey 1 12.00 48 24 54 12.00 648 2.75 27 0.40396 660 0.40396 3.60 OK 0.00281

Storey 2 12.00 48 24 54 24.00 1296 5.50 25 0.62030 363 0.21635 3.60 OK 0.00150

Storey 3 12.00 48 24 54 36.00 1944 8.25 19 0.76972 132 0.14942 3.60 OK 0.00104

Storey 4 12.00 48 24 54 48.00 2592 11.00 11 0.85990 0 0.09018 3.60 OK 0.00063

Storey Drift Ratio

UBC Seismic Calculationscoolest bliss

-

Example-1

30-Sep-10

Job:

Date:

Prepared By:

Checked By:

LevelDrift

Check

Calculate

Page 38: Ubc Eq Etabs

PRINT SUMMARYREPORT

Page 39: Ubc Eq Etabs

file:///C|/Documents%20and%20Settings/waseem.sarwar/Desktop/New%20Folder/Static.txt

ETABS v9.5.0 File:STATIC Units:Kip-ft September 30, 2010 9:21 PAGE 1

PROJECT INFORMATION

Company Name = Omrania & Associates

ETABS v9.5.0 File:STATIC Units:Kip-ft September 30, 2010 9:21 PAGE 2

S T O R Y D A T A

STORY SIMILAR TO HEIGHT ELEVATION

STORY4 None 12.000 48.000 STORY3 STORY4 12.000 36.000 STORY2 STORY4 12.000 24.000 STORY1 STORY4 12.000 12.000 BASE None 0.000

ETABS v9.5.0 File:STATIC Units:Kip-ft September 30, 2010 9:21 PAGE 3

S T A T I C L O A D C A S E S

STATIC CASE AUTO LAT SELF WT NOTIONAL NOTIONAL CASE TYPE LOAD MULTIPLIER FACTOR DIRECTION

DEAD DEAD N/A 0.0000 LIVE LIVE N/A 0.0000 EQX QUAKE UBC97 0.0000 EQY QUAKE UBC97 0.0000

ETABS v9.5.0 File:STATIC Units:Kip-ft September 30, 2010 9:21 PAGE 4

A U T O S E I S M I C U B C 9 7 Case: EQX

AUTO SEISMIC INPUT DATA

Direction: X Typical Eccentricity = 5%

file:///C|/Documents%20and%20Settings/waseem.sarwar/Desktop/New%20Folder/Static.txt (1 of 6) [9/30/2010 11:12:36 AM]

Page 40: Ubc Eq Etabs

file:///C|/Documents%20and%20Settings/waseem.sarwar/Desktop/New%20Folder/Static.txt

Eccentricity Overrides: No

Period Calculation: Program Calculated Ct = 0.02 (in feet units)

Top Story: STORY4 Bottom Story: BASE

R = 5.5 I = 1 hn = 48.000 (Building Height)

Soil Profile Type = SD Z = 0.2 Ca = 0.2800 Cv = 0.4000

AUTO SEISMIC CALCULATION FORMULAS

Ta = Ct (hn^(3/4))

If Z >= 0.35 (Zone 4) then: If Tetabs <= 1.30 Ta then T = Tetabs, else T = 1.30 Ta If Z < 0.35 (Zone 1, 2 or 3) then: If Tetabs <= 1.40 Ta then T = Tetabs, else T = 1.40 Ta

V = (Cv I W) / (R T) (Eqn. 1) V <= 2.5 Ca I W / R (Eqn. 2) V >= 0.11 Ca I W (Eqn. 3)

If T <= 0.7 sec, then Ft = 0 If T > 0.7 sec, then Ft = 0.07 T V <= 0.25 V

AUTO SEISMIC CALCULATION RESULTS

Ta = 0.3647 sec T Used = 0.5106 sec W Used = 216.00

V (Eqn 1) = 0.1424W V (Eqn 2) = 0.1273W V (Eqn 3) = 0.0308W

file:///C|/Documents%20and%20Settings/waseem.sarwar/Desktop/New%20Folder/Static.txt (2 of 6) [9/30/2010 11:12:36 AM]

Check withexcelsheet

Page 41: Ubc Eq Etabs

file:///C|/Documents%20and%20Settings/waseem.sarwar/Desktop/New%20Folder/Static.txt

V (Eqn 4) = 0.0465W

V Used = 0.1273W = 27.49

Ft Used = 0.00

AUTO SEISMIC STORY FORCES

STORY FX FY FZ MX MY MZ

STORY4 11.00 0.00 0.00 0.000 0.000 -527.825 STORY3 8.25 0.00 0.00 0.000 0.000 -395.869 STORY2 5.50 0.00 0.00 0.000 0.000 -263.913 STORY1 2.75 0.00 0.00 0.000 0.000 -131.956

ETABS v9.5.0 File:STATIC Units:Kip-ft September 30, 2010 9:21 PAGE 5

A U T O S E I S M I C U B C 9 7 Case: EQY

AUTO SEISMIC INPUT DATA

Direction: Y Typical Eccentricity = 5% Eccentricity Overrides: No

Period Calculation: Program Calculated Ct = 0.02 (in feet units)

Top Story: STORY4 Bottom Story: BASE

R = 5.5 I = 1 hn = 48.000 (Building Height)

Soil Profile Type = SD Z = 0.2 Ca = 0.2800 Cv = 0.4000

file:///C|/Documents%20and%20Settings/waseem.sarwar/Desktop/New%20Folder/Static.txt (3 of 6) [9/30/2010 11:12:36 AM]

Page 42: Ubc Eq Etabs

file:///C|/Documents%20and%20Settings/waseem.sarwar/Desktop/New%20Folder/Static.txt

AUTO SEISMIC CALCULATION FORMULAS

Ta = Ct (hn^(3/4))

If Z >= 0.35 (Zone 4) then: If Tetabs <= 1.30 Ta then T = Tetabs, else T = 1.30 Ta If Z < 0.35 (Zone 1, 2 or 3) then: If Tetabs <= 1.40 Ta then T = Tetabs, else T = 1.40 Ta

V = (Cv I W) / (R T) (Eqn. 1) V <= 2.5 Ca I W / R (Eqn. 2) V >= 0.11 Ca I W (Eqn. 3)

If T <= 0.7 sec, then Ft = 0 If T > 0.7 sec, then Ft = 0.07 T V <= 0.25 V

AUTO SEISMIC CALCULATION RESULTS

Ta = 0.3647 sec T Used = 0.5106 sec W Used = 216.00

V (Eqn 1) = 0.1424W V (Eqn 2) = 0.1273W V (Eqn 3) = 0.0308W V (Eqn 4) = 0.0465W

V Used = 0.1273W = 27.49

Ft Used = 0.00

AUTO SEISMIC STORY FORCES

STORY FX FY FZ MX MY MZ

STORY4 0.00 11.00 0.00 0.000 0.000 395.869 STORY3 0.00 8.25 0.00 0.000 0.000 296.902 STORY2 0.00 5.50 0.00 0.000 0.000 197.935 STORY1 0.00 2.75 0.00 0.000 0.000 98.967

file:///C|/Documents%20and%20Settings/waseem.sarwar/Desktop/New%20Folder/Static.txt (4 of 6) [9/30/2010 11:12:36 AM]

Page 43: Ubc Eq Etabs

file:///C|/Documents%20and%20Settings/waseem.sarwar/Desktop/New%20Folder/Static.txt

ETABS v9.5.0 File:STATIC Units:Kip-ft September 30, 2010 9:21 PAGE 6

M A S S S O U R C E D A T A

MASS LATERAL LUMP MASS FROM MASS ONLY AT STORIES

Loads Yes Yes

M A S S S O U R C E L O A D S

LOAD MULTIPLIER

DEAD 1.0000 LIVE 0.2500

ETABS v9.5.0 File:STATIC Units:Kip-ft September 30, 2010 9:21 PAGE 7

A S S E M B L E D P O I N T M A S S E S

STORY UX UY UZ RX RY RZ

STORY4 1.678E+00 1.678E+00 0.000E+00 0.000E+00 0.000E+00 0.000E+00 STORY3 1.678E+00 1.678E+00 0.000E+00 0.000E+00 0.000E+00 0.000E+00 STORY2 1.678E+00 1.678E+00 0.000E+00 0.000E+00 0.000E+00 0.000E+00 STORY1 1.678E+00 1.678E+00 0.000E+00 0.000E+00 0.000E+00 0.000E+00 BASE 0.000E+00 0.000E+00 0.000E+00 0.000E+00 0.000E+00 0.000E+00 Totals 6.713E+00 6.713E+00 0.000E+00 0.000E+00 0.000E+00 0.000E+00

ETABS v9.5.0 File:STATIC Units:Kip-ft September 30, 2010 9:21 PAGE 8

MODAL INFORMATION

Modal Analysis not done.

ETABS v9.5.0 File:STATIC Units:Kip-ft September 30, 2010 9:21 PAGE 9

TOTAL REACTIVE FORCES (RECOVERED LOADS) AT ORIGIN

LOAD FX FY FZ MX MY MZ

file:///C|/Documents%20and%20Settings/waseem.sarwar/Desktop/New%20Folder/Static.txt (5 of 6) [9/30/2010 11:12:36 AM]

Page 44: Ubc Eq Etabs

file:///C|/Documents%20and%20Settings/waseem.sarwar/Desktop/New%20Folder/Static.txt

DEAD 4.441E-16 0.000E+00 1.920E+02 9.216E+03 -6.912E+03 -1.421E-14 LIVE 2.220E-16 0.000E+00 9.600E+01 4.608E+03 -3.456E+03 -7.105E-15 EQX -2.749E+01 0.000E+00 0.000E+00 0.000E+00 -9.897E+02 1.320E+03 EQY 0.000E+00 0.000E+00 0.000E+00 0.000E+00 0.000E+00 0.000E+00

ETABS v9.5.0 File:STATIC Units:Kip-ft September 30, 2010 9:21 PAGE 10

S T O R Y F O R C E S

STORY LOAD P VX VY T MX MY

STORY4 EQX 1.776E-15 -1.100E+01 0.000E+00 5.278E+02 5.684E-14 -1.320E+02 STORY3 EQX 3.020E-14 -1.924E+01 0.000E+00 9.237E+02 1.478E-12 -3.629E+02 STORY2 EQX 2.132E-14 -2.474E+01 0.000E+00 1.188E+03 9.095E-13 -6.598E+02 STORY1 EQX 0.000E+00 -2.749E+01 0.000E+00 1.320E+03 0.000E+00 -9.897E+02 STORY4 EQY 0.000E+00 0.000E+00 0.000E+00 0.000E+00 0.000E+00 0.000E+00 STORY3 EQY 0.000E+00 0.000E+00 0.000E+00 0.000E+00 0.000E+00 0.000E+00 STORY2 EQY 0.000E+00 0.000E+00 0.000E+00 0.000E+00 0.000E+00 0.000E+00 STORY1 EQY 0.000E+00 0.000E+00 0.000E+00 0.000E+00 0.000E+00 0.000E+00

ETABS v9.5.0 File:STATIC Units:Kip-ft September 30, 2010 9:21 PAGE 11

STORY DRIFTS

STORY DIRECTION LOAD MAX DRIFT

STORY4 X EQX 1/1597 STORY3 X EQX 1/964 STORY2 X EQX 1/666 STORY1 X EQX 1/356