UNIFORM BUILDING BY-LAW
![Page 2: uBBl 19 Feb 2012](https://reader033.fdocuments.in/reader033/viewer/2022050706/549dac94b37959af618b457b/html5/thumbnails/2.jpg)
ROLES & RESPONSIBILITIES OF THE ARCHITECT UNDER THE UBBL
The UBBL 1984 hold the qualified person – The Architect in this case – for the building for which the person has submitted the plans.
![Page 3: uBBl 19 Feb 2012](https://reader033.fdocuments.in/reader033/viewer/2022050706/549dac94b37959af618b457b/html5/thumbnails/3.jpg)
PARLIAMENT
Street & Drainage Act Act X Act Y Act Z
Roads
Drainage
Services
Building
UNIFORM BUILDING BY-LAW
SUBMISSION FOR APPROVAL
DESIGN CONTROL
FIRE SAFETY
1
2
3
UNIFORM BUILDING BY-LAW – AN OVERVIEW
![Page 4: uBBl 19 Feb 2012](https://reader033.fdocuments.in/reader033/viewer/2022050706/549dac94b37959af618b457b/html5/thumbnails/4.jpg)
Federal Government(Prime Minister)
State Government
Local Authority/Government
State Government State Government
Local Authority/Government Local Authority/Government
![Page 5: uBBl 19 Feb 2012](https://reader033.fdocuments.in/reader033/viewer/2022050706/549dac94b37959af618b457b/html5/thumbnails/5.jpg)
ROLES & RESPONSIBILITIES OF THE ARCHITECT UNDER THE UBBL
B R I E F L Y :By-law section Responsibility ------------------------------------------------------------------------------------------------------------------------3(1)(c) Bear the certification of the qualified person………….by-laws for which
they are respectively responsible
5 ……qualified person or any person authorized by him undertakes the supervision of the erection and the setting out, where
applicable of the building
7(1) The qualified person submitting the plans shall be responsible for the proper execution of the works………
25(1)(a) ….they have supervised the erection of the building……constructed in accordance with the bylaws….they accept full responsibility
for those portions for portions which they are respectively concerned with….
Borang-A,C,D,E I certify and accept full responsibility………
![Page 6: uBBl 19 Feb 2012](https://reader033.fdocuments.in/reader033/viewer/2022050706/549dac94b37959af618b457b/html5/thumbnails/6.jpg)
2 DBKL/MPPJ/MPSA/MPSJ/MPM/ etc…
JBA
JPP
JPS
JBM
JKP
technical support
Building Plan Approval etc
![Page 7: uBBl 19 Feb 2012](https://reader033.fdocuments.in/reader033/viewer/2022050706/549dac94b37959af618b457b/html5/thumbnails/7.jpg)
Submission for APPROVAL
General submission requirements: • submission FEES
• plans (drawings)
• endorsed by a qualified and registered Architect and Client
• planning Approval.
![Page 8: uBBl 19 Feb 2012](https://reader033.fdocuments.in/reader033/viewer/2022050706/549dac94b37959af618b457b/html5/thumbnails/8.jpg)
architectural input
Building Plans (New buildings/ renovation)
a. Key Plan 1 : 1000b. Location Plan 1 : 1000c. Site Plan 1 : 500d. Floor Plans/Roof plans 1 : 100e. Sections 1 : 100f. Elevations 1 : 100g. Borang A
![Page 9: uBBl 19 Feb 2012](https://reader033.fdocuments.in/reader033/viewer/2022050706/549dac94b37959af618b457b/html5/thumbnails/9.jpg)
• Special permission to commence works before building plan approval;
• Qualified/registered Structural engineer to submit engineering drawings/calculation before building plan approval;
• Interior designer;
• Borang B, C, D, & E
![Page 10: uBBl 19 Feb 2012](https://reader033.fdocuments.in/reader033/viewer/2022050706/549dac94b37959af618b457b/html5/thumbnails/10.jpg)
Upon the completion of all works on site, Consultant applies for a building inspection conducted by local Authorities and upon ALL clearance issues the CCC (Certificate of Completion & Compliance;
![Page 11: uBBl 19 Feb 2012](https://reader033.fdocuments.in/reader033/viewer/2022050706/549dac94b37959af618b457b/html5/thumbnails/11.jpg)
PART II - SUBMISSION OF BUILDING PLANS
- plans to be signed
- withdrawal or change of qualifies person
- scale of plans
- specifications
- details and calculation of structural plans
- certificate of completion & compliance
- submission fees
![Page 12: uBBl 19 Feb 2012](https://reader033.fdocuments.in/reader033/viewer/2022050706/549dac94b37959af618b457b/html5/thumbnails/12.jpg)
PART III - SPACE, LIGHTS & VENTILATION
- open space to be provided
- projection over street
- natural lighting & ventilation
- airwell
- mechanical ventilation & air conditioning
- min areas of rooms
- min dimension of toilets
- heights of rooms
-
![Page 13: uBBl 19 Feb 2012](https://reader033.fdocuments.in/reader033/viewer/2022050706/549dac94b37959af618b457b/html5/thumbnails/13.jpg)
PART III - STRUCTURAL REQUIREMENTS
PART IV - CONSTRUCTIONAL REQUIREMENTS
PART V - FIRE REQUIREMENTS
![Page 14: uBBl 19 Feb 2012](https://reader033.fdocuments.in/reader033/viewer/2022050706/549dac94b37959af618b457b/html5/thumbnails/14.jpg)
![Page 15: uBBl 19 Feb 2012](https://reader033.fdocuments.in/reader033/viewer/2022050706/549dac94b37959af618b457b/html5/thumbnails/15.jpg)
![Page 16: uBBl 19 Feb 2012](https://reader033.fdocuments.in/reader033/viewer/2022050706/549dac94b37959af618b457b/html5/thumbnails/16.jpg)
SUMMARY :
1. AS A STANDARD GUIDELINE AND TO REGULATE DESIGN;
2. TO ENSURE MINIMUM SAFETY AND COMFORT;
3. TO ENSURE UNIFORMED STANDARD FOR ALL THE STATES.
![Page 17: uBBl 19 Feb 2012](https://reader033.fdocuments.in/reader033/viewer/2022050706/549dac94b37959af618b457b/html5/thumbnails/17.jpg)
![Page 18: uBBl 19 Feb 2012](https://reader033.fdocuments.in/reader033/viewer/2022050706/549dac94b37959af618b457b/html5/thumbnails/18.jpg)
![Page 19: uBBl 19 Feb 2012](https://reader033.fdocuments.in/reader033/viewer/2022050706/549dac94b37959af618b457b/html5/thumbnails/19.jpg)
![Page 20: uBBl 19 Feb 2012](https://reader033.fdocuments.in/reader033/viewer/2022050706/549dac94b37959af618b457b/html5/thumbnails/20.jpg)