Site Verification U3435
Measurement Team Team 3
Mobile 1 Huawei Modem
Mobile 2 Sony Ericsson W995
Service Downlink
HSDPA / HSUPA 5000kbps
R99 DL 403kbps
CS Voice 12,2kbps
Static CS Conversational 64kbps
Static Multi RAB (CS + PS) CS + HSxPA
Performances QoS PS (Avg Throughput kbps) Downlink DL Throughput R99 382.80 kbps
HSDPA/HSUPA Throughputs Sector 1 7100.00 kbps
HSDPA/HSUPA Throughputs Sector 2 6400.00 kbps
HSDPA/HSUPA Throughputs Sector 3 6700.00 kbps
HSDPA Throughputs 7100.00 kbps
Performances QoS CS Result
CS Long Call Mobilty Call Success
CS Short Call S1 Call Success
CS Short Call S2 Call Success
CS Short Call S3 Call Success
STATUT SITE VERIFICATION
SSV Status: <Approved/Not Approved>
Approved By: <Name>
Global Observation
DT Team Team 3
10/24/2015
Report Delivery Date 10/28/2015
UE_EcIo FTP
UE_RSCP FTP
HSDPA Thpt
Drive test Route
UE Active Dominant PSC - FTP
UE Active Set - FTP
RSCP of Best Pilot - FTP
EcIo of Best Pilot - FTP
CQI of HSDPA - FTP
Site Verification U3435
Team 3 SITE NAME
Huawei Modem CLUSTER Asaba
Sony Ericsson W995 RNC ASRL214
Scrambling Codes 1 2 6
Uplink Call Type Coordinate
1800kbps FTP download/upload Long: 6.74065
378kbps FTP download/upload
12,2kbps AMR
64kbps Conversational Azimuth: 0,120,240
CS + HSxPA Multi RAB
Uplink Criteria ResultsSrambling codes OK
1800.00 kbps Softer HO OK
1800.00 kbps Mode PS OK
1800.00 kbps Radio Quality (Ec/Io, RSCP) OK
OK Antenna Check
OK Feeders OK
OK Antenna orientation OK
OK
STATUT SITE VERIFICATION
<Approved/Not Approved> Date of SSV Approval: <Date>
Sign: <Sign>
Global Observation
Optimisation Engineer Ogundele Ayobami
Contact number
U0332_Philco_Steel_Company_OD_A
Lat: 6.17967
UE_EcIo Voice
UE_RSCP Voice
R99 Thpt
Call Events
UE Active Dominant PSC - Voice
UE Active Set - Voice
RSCP of Best Pilot - Voice
EcIo of Best Pilot - Voice
RRC Setup SummaryRRC Setup Count
RRC Setup Suc CountRRC Setup Suc Ratio
Average setup time delay (ms)
4.1 Number of Downlink ASU
EventEvent 1a - Cell AdditionEvent 1b - Cell Removal
Event 1c - Cell Replacement
4.3 Soft HO Success Rate
EventEvent 1a - Cell AdditionEvent 1b - Cell Removal
Event 1c - Cell Replacement
Call TypeCSCSCSCS
CS
CSCSCSCSPSPSPSPSPSPSPSPS
MultiRAB
1. Coverage Statistics
2. RRC Setup Statistics
RRC Setup Summary1515
100.0%2114
3. Soft HO Summary
4.1 Number of Downlink ASU 4.2 Number of Uplink ASU complete
Count Event32 Event 1a - Cell Addition23 Event 1b - Cell Removal
Event 1c - Cell Replacement
4.3 Soft HO Success Rate
Count100.0%100.0%
4. Call Events Summary
Event Count Rate (%)Call attempts 15Call setups 15 100
Call establishments 15 100Normal terminations 15 100
Access failures 0 0
Setup failures 0 0No connections 0 0Dropped calls 0 0Unclassified 0Call attempts 15Call setups 15 100
Call establishments 15 100Normal terminations 15 100
Access failures 0 0Setup failures 0 0Dropped calls 0 0Unclassified 0
Establishment 1 100
4.2 Number of Uplink ASU complete
Count3223
Comments
No. Activity/Process Checked Remarks
Idle
Mod
e
1 Frequency and Scrambling Code correctly defined
2 Cell selection and reselection parameters are as planned ( SIB 3 )
3 The LAC/RAC is correctly defined ( SIB 1 )
4 The neighbor list and parameters are as planned ( SIB 11 )
5 LA update proceduce is checked
6 Cell reselection from 3G to 2G is checked
7 Cell reselection from 2G to 3G is checked
8 MO-SMS and MT-SMS
Con
nect
ion
Mod
e
9 CPICH_RSCP > -85 dBm near site
10 CPICH_EcIo > -8 dB near site
11 Mobile terminating calls and mobile originating calls for voice service is checked
12 The voice service quality is good by the engineer feeling
13 Mobile terminating calls and mobile originating calls for VP service is checked
14 The VP service quality is good by the engineer feeling
PS
15 PS attach is checked
16 PS detach is checked
17 PS PDP activation and deactivation is checked
18 RA update proceduce is checked
Han
dove
r 19 Softer handover for voice service to and from the 3G cells checked OK
20 Softer handover for VP service to and from the 3G cells checked OK
21 Softer handover for PS service to and from the 3G cells checked OK
22 Inter-system handover for voice service to the 2G cells checked OK
23 Overall performance and coverage area as expected by a brief drive test
24 Antenna Swapping Test
2nd
carr
ier 25 DRD to 2nd Carrier Frequency upon HSDPA session initialization checked OK
26 After HSDPA session termination the UE reselection to 1st carrier
27 PS+CS call (MultiRAB)