U. S. Coast GuardAircraft Repair
and Supply Center
![Page 2: U. S. Coast Guard Aircraft Repair and Supply Center.](https://reader034.fdocuments.in/reader034/viewer/2022042822/56649e365503460f94b25c2d/html5/thumbnails/2.jpg)
Our Mission
We provide Air Stations with depot level maintenance, engineering, supply and
information services to support Coast Guard missions.
![Page 3: U. S. Coast Guard Aircraft Repair and Supply Center.](https://reader034.fdocuments.in/reader034/viewer/2022042822/56649e365503460f94b25c2d/html5/thumbnails/3.jpg)
“We keep ‘em flying” by providing:
the Right Stuff
at the Right Place
at the Right Time
at the Right Cost
Every time.
Our Vision
![Page 4: U. S. Coast Guard Aircraft Repair and Supply Center.](https://reader034.fdocuments.in/reader034/viewer/2022042822/56649e365503460f94b25c2d/html5/thumbnails/4.jpg)
HH-65
XOXO
HU-25
Safety
HH-60 C-130HC-144
COCO
Organization
ALD ISD IOD PRD OPSEISDISD EISD IOD PRD OPS
![Page 5: U. S. Coast Guard Aircraft Repair and Supply Center.](https://reader034.fdocuments.in/reader034/viewer/2022042822/56649e365503460f94b25c2d/html5/thumbnails/5.jpg)
• Military: 159–55 Officers
–104 Enlisted
• Civilian: 552 –218 GS
–334 WG
• Contractor: 700+• HS Apprentice: 32
• Total: 1400+
Staffing
![Page 6: U. S. Coast Guard Aircraft Repair and Supply Center.](https://reader034.fdocuments.in/reader034/viewer/2022042822/56649e365503460f94b25c2d/html5/thumbnails/6.jpg)
TOTAL OE: $250M
PARTS, PRODUCTION & PROJECTS: $193M
OPERATING BUDGET: $57 MComponent Repair, IT Systems, Industrial Infrastructure, Pub Maintenance, Logistics Support, etc.
Budget
![Page 7: U. S. Coast Guard Aircraft Repair and Supply Center.](https://reader034.fdocuments.in/reader034/viewer/2022042822/56649e365503460f94b25c2d/html5/thumbnails/7.jpg)
Facilities
Total: 14 buildings 508,500 sq ft
![Page 8: U. S. Coast Guard Aircraft Repair and Supply Center.](https://reader034.fdocuments.in/reader034/viewer/2022042822/56649e365503460f94b25c2d/html5/thumbnails/8.jpg)
2 Production Hangars
Facilities
![Page 9: U. S. Coast Guard Aircraft Repair and Supply Center.](https://reader034.fdocuments.in/reader034/viewer/2022042822/56649e365503460f94b25c2d/html5/thumbnails/9.jpg)
Stripping Hangar
Paint Hangar
Facilities
![Page 10: U. S. Coast Guard Aircraft Repair and Supply Center.](https://reader034.fdocuments.in/reader034/viewer/2022042822/56649e365503460f94b25c2d/html5/thumbnails/10.jpg)
Facilities
3 Acre Warehouse
![Page 11: U. S. Coast Guard Aircraft Repair and Supply Center.](https://reader034.fdocuments.in/reader034/viewer/2022042822/56649e365503460f94b25c2d/html5/thumbnails/11.jpg)
Engine Shop
Facilities
Gear Box Shop
![Page 12: U. S. Coast Guard Aircraft Repair and Supply Center.](https://reader034.fdocuments.in/reader034/viewer/2022042822/56649e365503460f94b25c2d/html5/thumbnails/12.jpg)
Facilities
Machine Shop
![Page 13: U. S. Coast Guard Aircraft Repair and Supply Center.](https://reader034.fdocuments.in/reader034/viewer/2022042822/56649e365503460f94b25c2d/html5/thumbnails/13.jpg)
Facilities
Avionics Repair Facility
![Page 14: U. S. Coast Guard Aircraft Repair and Supply Center.](https://reader034.fdocuments.in/reader034/viewer/2022042822/56649e365503460f94b25c2d/html5/thumbnails/14.jpg)
Depot Maintenance
23 - HH65/year 9 - HH60/year 4 - HU25/year3 – C130/yr @ EC
![Page 15: U. S. Coast Guard Aircraft Repair and Supply Center.](https://reader034.fdocuments.in/reader034/viewer/2022042822/56649e365503460f94b25c2d/html5/thumbnails/15.jpg)
Depot Maintenance
Aircraft Modifications– HC130 DF-430, HSI Replacements, ASIP Inspections, Selex
Radar, Wing Rewire– HH65 C Re-Engining– HU25 Avionics Upgrade– HH60 T Conversion, AUF, Avionics, Rewire
![Page 16: U. S. Coast Guard Aircraft Repair and Supply Center.](https://reader034.fdocuments.in/reader034/viewer/2022042822/56649e365503460f94b25c2d/html5/thumbnails/16.jpg)
Depot Maintenance
Component Repair
– 90 Jet Engines
– 400+ components (wheels, doors, actuators, servos, avionics, etc.)
![Page 17: U. S. Coast Guard Aircraft Repair and Supply Center.](https://reader034.fdocuments.in/reader034/viewer/2022042822/56649e365503460f94b25c2d/html5/thumbnails/17.jpg)
EngineeringTechnical Center
Set Coast Guard aeronautical maintenance policy and direction
Define/refine/field ALL proposed aircraft changes
![Page 18: U. S. Coast Guard Aircraft Repair and Supply Center.](https://reader034.fdocuments.in/reader034/viewer/2022042822/56649e365503460f94b25c2d/html5/thumbnails/18.jpg)
EngineeringTechnical Center
8000 publications & 450,000 technical drawings
2775 Pubs Owned By ARSC
Web-Based
![Page 19: U. S. Coast Guard Aircraft Repair and Supply Center.](https://reader034.fdocuments.in/reader034/viewer/2022042822/56649e365503460f94b25c2d/html5/thumbnails/19.jpg)
Aviation Inventory Control point
$930M parts (ARSC warehouse and 26 air stations)
33,000 line items
5.5M parts
Supply Services
![Page 20: U. S. Coast Guard Aircraft Repair and Supply Center.](https://reader034.fdocuments.in/reader034/viewer/2022042822/56649e365503460f94b25c2d/html5/thumbnails/20.jpg)
IT Services
Data Center
Fully Deployed
Contractor Sites
DHS Prototype Sites
![Page 21: U. S. Coast Guard Aircraft Repair and Supply Center.](https://reader034.fdocuments.in/reader034/viewer/2022042822/56649e365503460f94b25c2d/html5/thumbnails/21.jpg)
Current Initiatives
Lean Manufacturing Unique Identification (UID) C130 Organic PDM USAF JDLM Logistics Transformation Initiatives
![Page 22: U. S. Coast Guard Aircraft Repair and Supply Center.](https://reader034.fdocuments.in/reader034/viewer/2022042822/56649e365503460f94b25c2d/html5/thumbnails/22.jpg)
World Class Quality
ISO 9001:2000 Certification
ISO 14001:2004 Certification
Commandant’s Quality Awards
2 Silver and Gold
2006 White House CTC Env Award
2005/2006 CG Industrial Maintenance Innovation Awards
![Page 23: U. S. Coast Guard Aircraft Repair and Supply Center.](https://reader034.fdocuments.in/reader034/viewer/2022042822/56649e365503460f94b25c2d/html5/thumbnails/23.jpg)
Performance Based Logistics
Prior to PBL with Rockwell Collins Equipment repaired via firm fixed price orders. All Non-RFI physically flowed thru ICP – ARSC. ICP would fund and issue an order and ship material to Rockwell repair
center. QDR/UR issued if quality was bad and unit was returned on no-cost
delivery order. Numerous repair orders and modifications increased the administrative
burden on the government and the contractor. Vendor essentially received more profit for more failures. “Throw back over the fence” repair quality. Inefficient shipping pathways. Repairs were only done as necessary. Test equipment was problematic, resulting in more questionable repair
actions...$$.
![Page 24: U. S. Coast Guard Aircraft Repair and Supply Center.](https://reader034.fdocuments.in/reader034/viewer/2022042822/56649e365503460f94b25c2d/html5/thumbnails/24.jpg)
Current PBL Process
Description of Scope Mission Readiness Requirement Of 85% Contractor Management of Customer Assets, including test equipment. Guaranteed Reliability baseline with incentives (MTBUR not MTBF) Provides onsite training to field users
Platforms Supported All Rockwell Collins content on the HU-25 and HH-65 aircraft Supports 74 different LRU’s Supports 113 Aircraft at 25 CONUS locations
Availability to Support the Fleet 85% Availability Guaranteed 24 Hr OST (Order Ship Time) For Class 1 Requisitions 5 Day OST for Class 2 Requisitions Average Ship Times Reduced to less then 3 Days for all requisitions
![Page 25: U. S. Coast Guard Aircraft Repair and Supply Center.](https://reader034.fdocuments.in/reader034/viewer/2022042822/56649e365503460f94b25c2d/html5/thumbnails/25.jpg)
Current PBL process,cont’d
One order placed against the contract @ the beginning of the year.
Failed boxes are shipped directly to and from the repair center at Rockwell Collins.
Rockwell must have access to CG inventory database.
QDR/UR are practically unnecessary and are “For Information Only”
![Page 26: U. S. Coast Guard Aircraft Repair and Supply Center.](https://reader034.fdocuments.in/reader034/viewer/2022042822/56649e365503460f94b25c2d/html5/thumbnails/26.jpg)
Incentivized PerformanceSupply Metrics
Ability to fill CG requisition in a timely manner
Priority 02 within 24 hours
Priority 05 within 5 work days
Priority 12 within 15 work days
Ability to meet these requirements counts for two thirds of the total incentive $
Vendor issues a monthly report on their own performance, which is then verified by the Coast Guard.
![Page 27: U. S. Coast Guard Aircraft Repair and Supply Center.](https://reader034.fdocuments.in/reader034/viewer/2022042822/56649e365503460f94b25c2d/html5/thumbnails/27.jpg)
Incentivized PerformanceQuality Metrics
Ability to make repairs that last on-wing.
MTBUR as measured against a established baseline MTBUR.
Counts as one third of total incentive.
Rockwell issues a quarterly report on their own performance.
![Page 28: U. S. Coast Guard Aircraft Repair and Supply Center.](https://reader034.fdocuments.in/reader034/viewer/2022042822/56649e365503460f94b25c2d/html5/thumbnails/28.jpg)
Then and Now
Comparison
PastPastPastPast TodayTodayTodayToday
Failure ResponseFailure Response Operational AvailabilityOperational Availability
ReactiveReactive ProactiveProactive
InconsistentInconsistent Zero VariabilityZero Variability
Rigid, InflexibleRigid, Inflexible Agile, Reconfigurable, CustomizedAgile, Reconfigurable, Customized
Unresponsive, UnavailableUnresponsive, Unavailable Responsive, Customer-CenteredResponsive, Customer-Centered
PricePrice ValueValue
![Page 29: U. S. Coast Guard Aircraft Repair and Supply Center.](https://reader034.fdocuments.in/reader034/viewer/2022042822/56649e365503460f94b25c2d/html5/thumbnails/29.jpg)
Advantages of PBL
The cost is contained (number of flight hours versus number of repairs).
The administrative costs of issuing numerous orders is eliminated.
More efficient shipping path from CG units to repair center.
Rockwell’s incentive for doing quick marginal repairs is eliminated and replaced with an incentive for doing improved repairs.
Rockwell manages assets in order to maximize availability.
Test equipment and training for covered assets is partnered with vendor.
![Page 30: U. S. Coast Guard Aircraft Repair and Supply Center.](https://reader034.fdocuments.in/reader034/viewer/2022042822/56649e365503460f94b25c2d/html5/thumbnails/30.jpg)
PRODUCT LINE DRIVEN ORGANIZATION
Single belly button Ownership Teamwork Synergy Flexibility
![Page 31: U. S. Coast Guard Aircraft Repair and Supply Center.](https://reader034.fdocuments.in/reader034/viewer/2022042822/56649e365503460f94b25c2d/html5/thumbnails/31.jpg)
CHALLENGES
Adequate, Qualified Staffing Adequate Budgeting Timely identification of requirements Adequate definition of requirements and roles
and responsibilities