Type Testing According to VDE-AR-N 4105 Background The installed capacity of decentralized power generation generation systems (especially PV systems) has increased significantly in recent years. The VDE- AR-N 4105 regulation is meant to improve the connection to and parallel operation of generation systems with low voltage networks. The Challenge Up to now, regulations and standards did not sufficiently account for the growing systemic relevance of these generation systems. In order to ensure stability in the system, VDE FNN has prepared a regula- tion (technical note in the form of a recom- mendation) which includes a cutoff in critical phases. Starting on 01/01/2012 the VDE-AR-N 4105 application rule will apply for new PV systems on low voltage net- works; it will become binding for all other generation systems on low voltage net- works on 07/01/2012. Among other things, this standard formulates requirements for conditional provision of reactive power, voltage compensation and the support of frequency within the electricity network. These requirements are intended to ensure that the system remains stable and provide a consistent quality of electric power. TÜV SÜD Group We test and certify your energy generation systems for VDE-AR-N 4105 conformity INVERTER VDE 4105

Transcript of Type Testing According to VDE-AR-N 4105 - tuev-sued.de · Type Testing According to VDE-AR-N 4105...

Type Testing According to VDE-AR-N 4105

BackgroundThe installed capacity of decentralized power generation generation systems (especially PV systems) has increased significantly in recent years. The VDE-AR-N 4105 regulation is meant to improve the connection to and parallel operation of generation systems with low voltage networks.

The ChallengeUp to now, regulations and standards did not sufficiently account for the growing systemic relevance of these generation systems. In order to ensure stability in the system, VDE FNN has prepared a regula-

tion (technical note in the form of a recom- mendation) which includes a cutoff in critical phases. Starting on 01/01/2012 the VDE-AR-N 4105 application rule will apply for new PV systems on low voltage net- works; it will become binding for all other generation systems on low voltage net- works on 07/01/2012. Among other things, this standard formulates requirements for conditional provision of reactive power, voltage compensation and the support of frequency within the electricity network. These requirements are intended to ensure that the system remains stable and provide a consistent quality of electric power.

TÜV SÜD Group

We test and certify your energy generation systems for VDE-AR-N 4105 conformity

iNVE

RTER

VDE 4105

Benefits for manufacturers• Guarantee of compliance with VDE-AR-

N 4105 and VDEV 0124-100• Improved certainty of action through

compliance with current technical stan-dards

• You are prepared for the new requirements

• You can provide proof of VDE 4105 conformity to your customers with a TÜV SÜD certificate

• You can acquire new customers more easily

Contact us today – our experts will be happy to assist you with detailed advice:

Your contact:Christian Dirmeier, Product ManagerTÜV SÜD AG Embedded Systems+49 89 5791-1026Barthstr. 16D-80339 Mü[email protected]

www.tuev-sued.com/embedded

TÜV SÜD Embedded Systems – inverter Testing for PV SystemsWe at TÜV SÜD Embedded Systems offer support as a competent partner in the testing and certification of inverters and power generators according to VDE-AR-N 4105.

A summary of our services:• Testing admissible system reaction• Interface switch testing (power generation

system / network and system protection)• Various operation types testing• Test of correction of the power factor• Proof of electrical property (conformity) • Test of reaction to frequency changes in

the grid