TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT ... · nhp rg 466 ad rg 457 ad rg 492 ad rg...

40
ROUTE/CITY COUNTY ID LOCATION / DESCRIPTION (THOU) (THOU) NUMBER PRIOR YEARS COST TOTAL PROJ COST LENGTH TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS FUNDS UNFUNDED FUTURE YEARS FY 2019 FY 2018 FY 2020 STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027 INTERSTATE PROJECTS I-2304 302258 259195 INCLUDES B-3833; GARVEE BOND FUNDING: $14.3 MILLION FOR RIGHT OF WAY, SECTIONS AC & AD, PAYBACK FY 2009-2021; $111.7 MILLION FOR CONSTRUCTION, SECTIONS AC, PAYBACK FY 2010-2021; TIGER AWARD / INTERSTATE MAINTENANCE DISCRETIONARY FUNDING $11.7 MILLION NORTH OF SR 2120 (LONG FERRY ROAD) IN ROWAN COUNTY TO US 29 / US 52 / US 70 / BUSINESS 85 IN DAVIDSON COUNTY. ADDITIONAL LANES AND YADKIN RIVER BRIDGE RECONSTRUCTION. (PROJECT INCLUDES B-3833). 6.8 TRN NHP RG 505 AC RG 495 AC RG 533 AC 533 RG AC NHP CG 16198 AC CG 14672 AC CG 4110 AC 4110 CG AC NHP RG 466 AD RG 457 AD RG 492 AD 492 RG AD DAVIDSON ROWAN I-85 AC NORTH OF SR 2120 (LONG FERRY ROAD) IN ROWAN COUNTY TO NORTH OF NC 150 IN DAVIDSON COUNTY, INCLUDING YADKIN RIVER BRIDGE - COMPLETE EX AD NORTH OF NC 150 TO US 29-70-52/BUSINESS 85 IN DAVIDSON COUNTY - COMPLETE TRN AE NORTH CAROLINA RAILROAD MP 327.4 - CURVE REALIGNMENT - COMPLETE AF IMPLEMENTATION OF INTELLIGENT TRANSPORTATION SYSTEM (ITS) - COMPLETE TRN I-5858 15218 75 PLANNING / DESIGN IN PROGRESS US 29 / US 601 IN CHINA GROVE TO US 601 (JAKE ALEXANDER BOULEVARD) IN SALISBURY AND FROM SOUTH OF US 52 IN SALISBURY TO NORTH OF SR 2120 (LONG FERRY ROAD) IN SPENCER. PAVEMENT REHABILITATION. 11.2 SW NHPIM C 15143 ROWAN I-85 I-4718 7595 7264 PROJECT COMPLETE - GARVEE BOND FUNDING $3.4 MILLION; PAYBACK FY 2007 - FY 2018 CABARRUS COUNTY LINE TO NC 152. REPAIR PAVEMENT AND OVERLAY. 5.0 TRN NHP CG 331 ROWAN I-85 I-3802 416189 414289 PART B INCLUDES B-5365 AND I-3610 NC 73 IN CABARRUS COUNTY (EXIT 55) TO US 29 / US 601 CONNECTOR (EXIT 68) IN ROWAN COUNTY. WIDEN TO EIGHT LANES. 13.6 CMAQ C 1900 AA CABARRUS ROWAN I-85 A NC 73 IN CABARRUS COUNTY (EXIT 55) TO SR 2180 (LANE STREET) IN CABARRUS COUNTY. - UNDER CONSTRUCTION TRN AA ITS FOR I-3802 A TRN B SR 2180 (LANE STREET) IN CABARRUS COUNTY TO US 29 / US 601 CONNECTOR IN ROWAN COUNTY - UNDER CONSTRUCTION - DESIGN-BUILD PROJECT SW I-3803 317995 272811 SECTION B, GARVEE BOND FUNDING $103 MILLION; CONSTRUCTION - PAYBACK FY 2010 - FY 2021 US 29/NC 49 CONNECTOR, MECKLENBURG COUNTY TO NC 73 IN CABARRUS COUNTY. ADD ADDITIONAL LANES. (COORDINATE WITH U-3415). 12.8 NHP CG 11296 B CG 11296 B CG 11296 B 11296 CG B CABARRUS MECKLENBURG I-85 A SOUTH OF US 29/NC 49 CONNECTOR TO SR 2894 (CONCORD MILLS - BRUTON SMITH BOULEVARD) - COMPLETE B SOUTH OF SR 2894 (CONCORD MILLS - BRUTON SMITH BOULEVARD) TO NC 73 IN CABARRUS COUNTY - COMPLETE TRN BA ITS FOR I-3803 B - COMPLETE TRN I-3804 INCLUDED IN I-3802B - DESIGN-BUILD PROJECT SR 1221 (OLD BEATTY FORD ROAD) NEAR LANDIS. CONVERT GRADE SEPARATION TO INTERCHANGE. DIV ROWAN I-85 I-5505 300 300 CONSTRUCTION INCLUDED WITH I-5741 US 52 (INNES STREET) AND US 601 (JAKE ALEXANDER BOULEVARD) INTERCHANGES. STABILIZE SLOPES, REPLACE EMERGENCY LANE / SHOULDER , AND RESEAL JOINTS. ROWAN I-85 I-3610 INCLUDED IN I-3802 - UNDER CONSTRUCTION WEST OF US 29 / US 601 TO EAST OF I-85 IN CHINA GROVE. REVISE INTERCHANGES WITH US 29 / US 601 AND WITH I-85, AND IMPROVE CORRIDOR. ROWAN NC 152 RURAL PROJECTS R-5860 42314 PROPOSED MISENHEIMER BYPASS TO PROPOSED ROCKWELL BYPASS. WIDEN TO MULTILANES. 4.6 DIV T R 4989 T U 599 T 24484 C C 12242 ROWAN US 52 Page 1 of 7 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE Tuesday, July 25, 2017 DIV - Division Category EX - Exempt Category HF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Transcript of TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT ... · nhp rg 466 ad rg 457 ad rg 492 ad rg...

Page 1: TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT ... · nhp rg 466 ad rg 457 ad rg 492 ad rg 492 ad davidson rowan i-85 ex ac north of sr 2120 (long ferry road) in rowan county

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS

UNFUNDEDFUTURE YEARSFY 2019FY 2018 FY 2020

STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027INTERSTATE PROJECTS

I-2304 302258 259195

INCLUDES B-3833; GARVEE BOND FUNDING: $14.3 MILLION FOR RIGHT OF WAY, SECTIONS AC & AD, PAYBACK FY 2009-2021; $111.7 MILLION FOR CONSTRUCTION, SECTIONS AC, PAYBACK FY 2010-2021; TIGER AWARD / INTERSTATE MAINTENANCE DISCRETIONARY FUNDING $11.7 MILLION

NORTH OF SR 2120 (LONG FERRY ROAD) IN ROWAN COUNTY TO US 29 / US 52 / US 70 / BUSINESS 85 IN DAVIDSON COUNTY. ADDITIONAL LANES AND YADKIN RIVER BRIDGE RECONSTRUCTION. (PROJECT INCLUDES B-3833).

6.8

TRN

NHP RG 505 AC RG 495 AC RG 533 AC 533RG AC NHP CG 16198 AC CG 14672 AC CG 4110 AC 4110CG AC NHP RG 466 AD RG 457 AD RG 492 AD 492RG AD

DAVIDSONROWAN

I-85

AC NORTH OF SR 2120 (LONG FERRY ROAD) IN ROWAN COUNTY TO NORTH OF NC 150 IN DAVIDSON COUNTY, INCLUDING YADKIN RIVER BRIDGE - COMPLETEEXAD NORTH OF NC 150 TO US 29-70-52/BUSINESS 85 IN DAVIDSON COUNTY - COMPLETETRNAE NORTH CAROLINA RAILROAD MP 327.4 - CURVE REALIGNMENT - COMPLETEAF IMPLEMENTATION OF INTELLIGENT TRANSPORTATION SYSTEM (ITS) - COMPLETETRN

I-5858 15218 75

PLANNING / DESIGN IN PROGRESS

US 29 / US 601 IN CHINA GROVE TO US 601 (JAKE ALEXANDER BOULEVARD) IN SALISBURY AND FROM SOUTH OF US 52 IN SALISBURY TO NORTH OF SR 2120 (LONG FERRY ROAD) IN SPENCER. PAVEMENT REHABILITATION.

11.2SW

NHPIM C 15143 ROWAN I-85

I-4718 7595 7264

PROJECT COMPLETE - GARVEE BOND FUNDING $3.4 MILLION; PAYBACK FY 2007 - FY 2018

CABARRUS COUNTY LINE TO NC 152. REPAIR PAVEMENT AND OVERLAY.

5.0TRN

NHP CG 331 ROWAN I-85

I-3802 416189 414289

PART B INCLUDES B-5365 AND I-3610

NC 73 IN CABARRUS COUNTY (EXIT 55) TO US 29 / US 601 CONNECTOR (EXIT 68) IN ROWAN COUNTY. WIDEN TO EIGHT LANES.

13.6 CMAQ C 1900 AA CABARRUSROWAN

I-85

A NC 73 IN CABARRUS COUNTY (EXIT 55) TO SR 2180 (LANE STREET) IN CABARRUS COUNTY. - UNDER CONSTRUCTIONTRNAA ITS FOR I-3802 ATRNB SR 2180 (LANE STREET) IN CABARRUS COUNTY TO US 29 / US 601 CONNECTOR IN ROWAN COUNTY - UNDER CONSTRUCTION - DESIGN-BUILD PROJECTSW

I-3803 317995 272811

SECTION B, GARVEE BOND FUNDING $103 MILLION; CONSTRUCTION - PAYBACK FY 2010 - FY 2021

US 29/NC 49 CONNECTOR, MECKLENBURG COUNTY TO NC 73 IN CABARRUS COUNTY. ADD ADDITIONAL LANES. (COORDINATE WITH U-3415).

12.8 NHP CG 11296 B CG 11296 B CG 11296 B 11296CG B CABARRUSMECKLENBURG

I-85

A SOUTH OF US 29/NC 49 CONNECTOR TO SR 2894 (CONCORD MILLS - BRUTON SMITH BOULEVARD) - COMPLETEB SOUTH OF SR 2894 (CONCORD MILLS - BRUTON SMITH BOULEVARD) TO NC 73 IN CABARRUS COUNTY - COMPLETETRNBA ITS FOR I-3803 B - COMPLETETRN

I-3804

INCLUDED IN I-3802B - DESIGN-BUILD PROJECT

SR 1221 (OLD BEATTY FORD ROAD) NEAR LANDIS. CONVERT GRADE SEPARATION TO INTERCHANGE.DIV

ROWAN I-85

I-5505 300 300

CONSTRUCTION INCLUDED WITH I-5741

US 52 (INNES STREET) AND US 601 (JAKE ALEXANDER BOULEVARD) INTERCHANGES. STABILIZE SLOPES, REPLACE EMERGENCY LANE / SHOULDER , AND RESEAL JOINTS.

ROWAN I-85

I-3610

INCLUDED IN I-3802 - UNDER CONSTRUCTION

WEST OF US 29 / US 601 TO EAST OF I-85 IN CHINA GROVE. REVISE INTERCHANGES WITH US 29 / US 601 AND WITH I-85, AND IMPROVE CORRIDOR.

ROWAN NC 152

RURAL PROJECTSR-5860 42314PROPOSED MISENHEIMER BYPASS TO

PROPOSED ROCKWELL BYPASS. WIDEN TO MULTILANES.

4.6

DIV

T R 4989 T U 599 T 24484C C 12242

ROWAN US 52

Page 1 of 7 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE

Tuesday, July 25, 2017

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 2: TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT ... · nhp rg 466 ad rg 457 ad rg 492 ad rg 492 ad davidson rowan i-85 ex ac north of sr 2120 (long ferry road) in rowan county

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS

UNFUNDEDFUTURE YEARSFY 2019FY 2018 FY 2020

STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027RURAL PROJECTS

R-5706 141750 750

PLANNING/DESIGN IN PROGRESS.

SR 2693 (DAVIDSON-CONCORD ROAD) TO US 29. WIDEN TO MULTI-LANES.

10.9 T R 2900 A T U 500 A T 5675C A5675C A C 5675 A C 5675 A T R 17700 B T U 2100 B T 23775C B23775C B C 23775 B C 23775 B

CABARRUSMECKLENBURG

NC 73 (DAVIDSONHIGHWAY)

A SR 2693 (DAVIDSON-CONCORD ROAD) TO SR 1394 (POPLAR TENT ROAD).REGB SR 1394 (POPLAR TENT ROAD) TO US 29.REG

R-5790 745 745

UNDER CONSTRUCTION

DIVISION 10 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.

DIV

ANSONCABARRUSMECKLENBURGSTANLYUNION

VARIOUS

R-5789 350 350

UNDER CONSTRUCTION

DIVISION 9 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.

DIV

DAVIDSONDAVIEFORSYTHROWANSTOKES

VARIOUS

R-5778 840 840

UNDER CONSTRUCTION

SR 1119 (WALLACE ROAD) TO PROPOSED INDUSTRIAL SITE. IMPROVE EXISTING ROAD AND EXTEND TO PROPOSED INDUSTRIAL SITE.

0.5DIV

CABARRUS BILL MCGEE ROAD

R-2246 93026 76026NC 49 TO SOUTH OF I-85. WIDEN TO FOUR LANES DIVIDED, SOME NEW LOCATION.

6.5 STBG 4400R A STBG 12600C A

CABARRUS GEORGE LILESPARKWAY

A NC 49 TO SR 1304 (ROBERTA ROAD)B SR 1304 (ROBERTA ROAD) TO SR 1431 (WEDDINGTON ROAD) - UNDER CONSTRUCTIONC SR 1431 (WEDDINGTON ROAD) TO SOUTH OF I-85 - COMPLETE

URBAN PROJECTSU-5956 4500REALIGN UNION CEMETERY ROAD TO

INTERSECT US 29 AT ROCK HILL CHURCH ROAD.

REG

T R 1000 T U 500 T C 3000

CABARRUS US 29

U-6075 78867GRANITE QUARRY BYPASS. CONSTRUCT MULTILANE FACILITY ON NEW LOCATION.

4.6

REG

T R 12962 T U 1555 T 48262C C 16088

ROWAN US 52

U-3440 43190 43190

UNDER CONSTRUCTION

PROPOSED WEST SIDE BYPASS (U-2009) TO SR 1691 (LOOP ROAD) IN KANNAPOLIS. WIDEN TO A FOUR-LANE DIVIDED FACILITY.

2.5TRN

CABARRUS NC 3

Page 2 of 7 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE

Tuesday, July 25, 2017

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 3: TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT ... · nhp rg 466 ad rg 457 ad rg 492 ad rg 492 ad davidson rowan i-85 ex ac north of sr 2120 (long ferry road) in rowan county

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS

UNFUNDEDFUTURE YEARSFY 2019FY 2018 FY 2020

STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027URBAN PROJECTS

U-5773 98450DALE EARNHARDT BOULEVARD TO US 601. WIDEN TO MULTI-LANES.

8.0 T 12450R A T 1500U A T C 27400 A C 27400 A T 1700R B T 500U B T C 27500 B

CABARRUS NC 3 (CONCORD LAKERD/BRANCHVIEW DRIVE)

A DALE EARNHARDT BOULEVARD TO NC 73. WIDEN TO MULTI-LANES.REGB NC 73 TO US 601. WIDEN TO MULTI-LANES.REG

U-5761 1030 100INTERSECTION OF NC 3 (DALE EARNHARDT BOULEVARD) AND US 29/601 (CANNON BOULEVARD). CONSTRUCT INTERSECTION IMPROVEMENTS.REG

T R 180 T C 750

CABARRUS NC 3 (DALE EARNHARDTBOULEVARD)

U-5900 58639 750

PLANNING / DESIGN IN PROGRESS

SR 1514 (AIRPORT ROAD) TO WEST OF GRANT'S CREEK IN SALISBURY. WIDEN TO MULTILANES.

REG

T R 13832 R 13832 T U 1660 U 1660 T 13452C C 13453

ROWAN NC 150

U-3415 62000SR 1445 (DERITA ROAD) TO US 29/601 BYPASS. WIDEN TO MULTI-LANES.

6.1 T 4400R A T 600U A T 16200C A T 9900R B T 1200U B T 29700C B

CABARRUS SR 1394 (POPLARTENT ROAD)

A SR 1445 (DERITA ROAD) TO GEORGE LILES PARKWAYDIVB GEORGE LILES PARKWAY TO US 29/601

U-4910 21593 21593

SEGMENTS A AND B LET TOGETHER

SR 2894 (CONCORD MILLS BOULEVARD) TO SR 1394 (POPLAR TENT ROAD) IN CONCORD. WIDEN TO MULTI-LANES.

2.6CABARRUS SR 1445 (DERITAROAD)

A SR 2894 (CONCORD MILLS BOULEVARD) TO AVIATION BOULEVARD. WIDEN TO MULTI-LANES. - UNDER CONSTRUCTIONDIVB AVIATION BOULEVARD TO SR 1394 (POPLAR TENT ROAD). WIDEN TO MULTI-LANES. - UNDER CONSTRUCTIONTRN

U-6032 13400I-485 TO CONCORD MILLS BOULEVARD. WIDEN TO FOUR-LANES DIVIDED.

0.9

DIV

T R 2400 T U 500 T 3500C3500C3500C

CABARRUSMECKLENBURG

SR 2464 (ODELLSCHOOL ROAD)

U-5738 12614 1100

PLANNING / DESIGN IN PROGRESS

US 601 (JAKE ALEXANDER BOULEVARD) TO SR 2667 (SUMMIT PARK DRIVE) IN SALISBURY. WIDEN TO MULTILANES.

1.3

DIV

T R 814 T U 98 T C 10602

ROWAN SR 2528(JULIAN ROAD)

U-6062 5960

COORDINATE WITH EB-5921

SR 2000 (JACKSON PARK ROAD) / NORTH LOOP ROAD IN KANNAPOLIS TO SR 1211 (KIMBALL ROAD) IN CHINA GROVE. UPGRADE ROADWAY INCORPORATING BICYCLE LANES AND SIDEWALKS.

4.3

DIV

T R 100 T U 100 T C 5760

CABARRUSROWAN

SR 2739(NORTH MAINSTREET / SOUTHMAIN STREET)

Page 3 of 7 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE

Tuesday, July 25, 2017

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 4: TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT ... · nhp rg 466 ad rg 457 ad rg 492 ad rg 492 ad davidson rowan i-85 ex ac north of sr 2120 (long ferry road) in rowan county

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS

UNFUNDEDFUTURE YEARSFY 2019FY 2018 FY 2020

STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027URBAN PROJECTS

U-5806 8500 1100

RIGHT OF WAY IN PROGRESS. $1,500,000 BY CITY OF CONCORD

INTERSECTION OF SR 2894 (CONCORD MILLS BOULEVARD) AND ENTRANCE #1 - KINGS GRANT PAVILION. CONSTRUCT 2-LANE GRADE SEPARATED DIRECTIONAL LEFT FLYOVER.

DIV

T C 5900 L C 1500

CABARRUS SR 2894 (CONCORDMILLS BOULEVARD)

U-5820 6175 3175

PLANNING / DESIGN IN PROGRESS - FUNDING FOR PART B REFLECTS REIMBURSEMENT TO CITY OF SALISBURY

SR 2576 (BENDIX DRIVE) TO US 52 (EAST INNES STREET) AT NEWSOME ROAD IN SALISBURY. CONSTRUCT A NEW MULTILANE ROADWAY.

0.6 T C 1900 A T C 1100 B

ROWAN NEW ROUTE

A SR 2576 (BENDIX DRIVE) TO SR 1006 (FAITH ROAD) IN SALISBURY. - RIGHT OF WAY IN PROGRESSDIVB SR 1006 (FAITH ROAD) TO US 52 (EAST INNES STREET) IN SALISBURY.DIV

U-5901 34425 1000

PLANNING / DESIGN IN PROGRESS

AIRPORT PARKWAY, SR 1710 (HARRISON ROAD) NEAR US 70 / US 601 (JAKE ALEXANDER BOULEVARD) TO SR 2539 (PEACH ORCHARD ROAD) AT US 29 IN SALISBURY. CONSTRUCT 2-LANE ROADWAY ON MULTILANE RIGHT OF WAY.

DIV

T 2880R T 500U T C 10015 C 10015 C 10015

ROWAN NEW ROUTE

U-5608 7725 4525

RIGHT OF WAY IN PROGRESS

SR 1211 (KIMBALL ROAD) EXTENSION, NORTH CHAPEL STREET TO SR 1221 (BOSTIAN ROAD) IN LANDIS. CONSTRUCT TWO-LANE CONNECTOR ON NEW LOCATION.

0.6

DIV

STBGDA C 2560 S(M) C 640

ROWAN NEW ROUTE

U-5614 23200STBG-DA IN THE CABARRUS-ROWAN METROPOLITAN PLANNING ORGANIZATION (MPO) AREA.DIV

STBGDA 2800C2800C1736C C 2800 C 2800 C 2800 C 2800L 700C700C464C C 700 C 700 C 700 C 700

CABARRUSROWAN

VARIOUS

U-5522 2200 2200

UNDER CONSTRUCTION - FY 2012 TRANSPORTATION, COMMUNITY, AND SYSTEM PRESERVATION PROGRAM (TCSP) GRANT

CONCORD TRAFFIC MANAGEMENT SYSTEMTRN

CABARRUS CONCORD

U-6029 52800DERITA ROAD TO NC 73. WIDEN TO FOUR-LANES.

4.2

DIV

T 8200R T 1000U T 10900C C 10900 C 10900 C 10900

CABARRUSMECKLENBURG

POPLAR TENT ROAD

HIGHWAY SAFETY PROJECTSW-5316 2930 2930

UNDER CONSTRUCTION

SR 2342 (GOLD KNOB ROAD), SR 2319 (CRESCENT ROAD), AND SR 2382 (ANTHONY ROAD). INTERSECTION IMPROVEMENTS.SW

ROWAN US 52

W-5314 3123 1123

RIGHT OF WAY IN PROGRESS

NC 801 AT SR 2048 (COOL SPRINGS ROAD / WOODLEAF ROAD), SR 1951 (PARKS ROAD) AT SR 2048 (WOODLEAF ROAD) AND NC 801 AT SR 2004 (WOODLEAF BARBER ROAD / QUARRY ROAD). WIDENING, INTERSECTION REALIGNMENT, TURN LANES AND GEOMETRIC IMPROVEMENTS.

DIV

HSIP C 500 STBG C 1500

ROWAN NC 801;SR 1951(PARKS ROAD)

W-5303 230 230

UNDER CONSTRUCTION - LET WITH B-4257

SR 2380 (ODDIE ROAD). INTERSECTION IMPROVEMENTS.

ROWAN SR 1004(STOKES FERRYROAD)

Page 4 of 7 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE

Tuesday, July 25, 2017

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 5: TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT ... · nhp rg 466 ad rg 457 ad rg 492 ad rg 492 ad davidson rowan i-85 ex ac north of sr 2120 (long ferry road) in rowan county

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS

UNFUNDEDFUTURE YEARSFY 2019FY 2018 FY 2020

STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027HIGHWAY SAFETY PROJECTS

W-5516 17693 17693

UNDER CONSTRUCTION

SR 1210 (OLD BEATTY FORD ROAD) / SR1221 (BOSTIAN ROAD) TO SR 1337 (LENTZ ROAD). RELOCATE EXISTINGROAD WITH GRADE SEPARATION OVER I-85.

2.9

DIV

ROWAN SR 1221(OLD BEATTY FORDROAD)

W-5313 18327 18327

UNDER CONSTRUCTION

SR 2335 (LOWER STONE CHURCH ROAD) TO SR 1337 (LENTZ ROAD). WIDEN AND INSTALL RUMBLE STRIPS.

7.4

DIV

ROWAN SR 1221(OLD BEATTYFORD ROAD)

W-5710 1678 278SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 10.

HSIP R 30 DIV R 30 DIV HSIP C 180 DIV C 180 DIV HSIP R 30 RE R 30 RE HSIP C 180 RE C 180 RE HSIP R 40 SW R 40 SW HSIP C 240 SW C 240 SW

ANSONCABARRUSMECKLENBURGSTANLYUNION

VARIOUS

DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW

W-5709 895 195SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 9.

HSIP R 30 DIV HSIP C 180 DIV HSIP R 30 RE HSIP C 180 RE HSIP R 40 SW HSIP C 240 SW

DAVIDSONDAVIEFORSYTHROWANSTOKES

VARIOUS

DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW

W-5209 5068 5068

IN PROGRESS

DIVISION 9 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

DAVIDSONDAVIEFORSYTHROWANSTOKES

VARIOUS

W-5210 11865 11865

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

DIVISION 10 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

ANSONCABARRUSMECKLENBURGSTANLYUNION

VARIOUS

DIV DIVISION 10 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN DIVISION CATEGORY.DIVREG DIVISION 10 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN REGIONAL CATEGORY.REGSW DIVISION 10 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN STATEWIDE CATEGORY.SW

CONGESTION MITIGATION PROJECTSC-5160 1657 151

PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY CITY OF SALISBURY - IN PROGRESS

CITY OF SALISBURY - CONSTRUCT BIKE LANES.

EX

CMAQ C 1205 C C 301

ROWAN NEWSOME ROAD

Page 5 of 7 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE

Tuesday, July 25, 2017

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 6: TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT ... · nhp rg 466 ad rg 457 ad rg 492 ad rg 492 ad davidson rowan i-85 ex ac north of sr 2120 (long ferry road) in rowan county

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS

UNFUNDEDFUTURE YEARSFY 2019FY 2018 FY 2020

STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027CONGESTION MITIGATION PROJECTS

C-5603 4141PROJECTS TO IMPROVE CONGESTION AND AIR QUALITY IN THE CABARRUS-ROWAN MPO.

EX

CMAQ PE 164 PE 167 L PE 41 PE 42 CMAQ R 164 R 167 L R 41 R 42 CMAQ C 985 C 1003 L C 246 C 251 CMAQ O 164 O 167 L O 41 O 42 CMAQ I 164 I 167 L I 41 I 42

CABARRUSROWAN

VARIOUS

C-5158 50 50

PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY TOWN OF GRANITE QUARRY - IN PROGRESS

CONSTRUCT SIDEWALKS ON KERN STREET, SALISBURY AVENUE, CROOK STREET, OAK STREET AND BALFOUR QUARRY ROAD IN GRANITE QUARRY.

EXROWAN VARIOUS

C-4908 536 536

PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY CITY OF SALISBURY

CONSTRUCT SIDEWALKS AT SELECTED LOCATIONS IN SALISBURY.EX

ROWAN VARIOUS

A BRENNER AVENUE TO PARTEE STREET - PROJECT DELETED AT MPO REQUESTEXB SPORTS COMPLEX, RYAN STREET TO CELEBRATION DRIVE AND SOUTH BOUNDARY STREET, HILLBORO STREET TO HILLS STREET - COMPLETEEXC SALISBURY HIGH SCHOOL, ON VARIOUS STREETS AROUND HIGH SCHOOL - COMPLETEEXD ARLINGTON AVENUE TO WALMART PARKING LOT - COMPLETEEXE LONG STREET TO NEWSOME ROAD - PLANNING / DESIGN IN PROGRESSEXF SR 1002 (BRINGLE FERRY ROAD) TO SR 1004 (STOKES FERRY ROAD) - PROJECT DELETED AT MPO REQUESTEXG US 601 (JAKE ALEXANDER BOULEVARD) - RIGHT OF WAY IN PROGRESSEXH "D" AVENUE TO SUNSET DRIVE - IN PROGRESSEX

C-4916 1168 1168

PLANNING / DESIGN / RIGHT OF WAY / CONSTRUCTION BY CITY OF KANNAPOLIS

CONSTRUCT SIDEWALKS AT SELECTED LOCATIONS IN KANNAPOLIS.EX

CABARRUS VARIOUS

A HUDSON STREET TO SOUTH CANNON BOULEVARD - UNDER CONSTRUCTIONEXB FUNDS TRANSFERRED TO C-4918BEXC WINDSOR DRIVE TO ROGERS LAKE ROAD - UNDER CONSTRUCTIONEX

C-4918 2478 2478INTERSECTION IMPROVEMENTS AND ADDITIONAL TURN LANES AT SELECTED LOCATIONS IN CONCORD.EX

CABARRUS VARIOUS

A SR 1394 (POPLAR TENT ROAD) - INTERSECTION IMPROVEMENTS - UNDER CONSTRUCTIONEXB NC 3 - ADDITIONAL TURN LANES - UNDER CONSTRUCTIONEX

C-5536 624 624

IN PROGRESS

MECKLENBURG COUNTY AIR QUALITY -GRADE (GRANTS TO REPLACE AGING DIESEL ENGINS). REPLACE, REPOWER OR RETROFIT AGING DIESEL VEHICLES AND EQUIPMENT.

EX

CABARRUSGASTONIREDELLLINCOLNMECKLENBURGROWANUNION

CHARLOTTE

C-5557 420 420

UNDER CONSTRUCTION

CITY OF CONCORD'S NE SUBSET SIDEWALKS. INSTALL SIDEWALKS AT VARIOUS LOCATIONS.EX

CABARRUS CONCORD

Page 6 of 7 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE

Tuesday, July 25, 2017

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 7: TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT ... · nhp rg 466 ad rg 457 ad rg 492 ad rg 492 ad davidson rowan i-85 ex ac north of sr 2120 (long ferry road) in rowan county

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS

UNFUNDEDFUTURE YEARSFY 2019FY 2018 FY 2020

STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027CONGESTION MITIGATION PROJECTS

C-5157 451 451

UNDER CONSTRUCTION

CONSTRUCT SIDEWALKS ON TOM QUERY ROAD, ROBINSON CHURCH ROAD AND STALLINGS ROAD IN HARRISBURG.EX

CABARRUS HARRISBURG

C-5161 2787 263IRISH BUFFALO CREEK GREENWAY IN KANNAPOLIS. CONSTRUCT GREENWAY.

EX

CMAQ C 2019 L C 505

CABARRUS KANNAPOLIS

C-5159 540 540

UNDER CONSTRUCTION

ROXIE STREET, NC 3 AND DALE EARNHARDT BOULEVARD IN KANNAPOLIS. STREET IMPROVEMENTS.EX

CABARRUS KANNAPOLIS

C-5502 206 30LITTLE TEXAS ROAD IN KANNAPOLIS, FOREST PARK DRIVE TO EXISTING SIDEWALK SOUTH OF MISSION TRIPP STREET. CONSTRUCT 800 FEET OF SIDEWALK.

EX

CMAQ C 132 L C 44

CABARRUS LITTLE TEXAS ROAD

Page 7 of 7 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE

Tuesday, July 25, 2017

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 8: TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT ... · nhp rg 466 ad rg 457 ad rg 492 ad rg 492 ad davidson rowan i-85 ex ac north of sr 2120 (long ferry road) in rowan county

CHARLOTTE REGIONAL TRANSPORTATION PLANNING ORGANIZATION

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS

UNFUNDEDFUTURE YEARSFY 2019FY 2018 FY 2020

STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027INTERSTATE PROJECTS

I-5003 38988 34664

COMPLETE - GARVEE BOND FUNDING $19.71 MILLION; CONSTRUCTION - PAYBACK FY 2008 - FY 2019

EXIT 119 IN BURKE COUNTY TO SR 1753 (MILE MARKER 146) IN IREDELL COUNTY. PAVEMENT REHABILITATION.

27.0

TRN

NHP CG 2162 CG 2162 BURKECATAWBAIREDELL

I-40

I-5917 4600MILEMARKER 139.3 TO US 64. PAVEMENT REHABILITATION.

8.6SW

NHPIM C 4600 IREDELL I-40

I-5804 3500SR 1639 (MEACHAM ROAD) TO 0.3 MILE EAST OF US 21. PAVEMENT REHABILITATION.

3.0SW

NHPIM 3500C IREDELL I-40

I-3819 364125 153943

GARVEE BOND FUNDING $10 MILLION; CONSTRUCTION - PAYBACK FY 2012 - FY 2023

STATESVILLE, MODIFICATION OF I-40/I-77 INTERCHANGE AREA.

NHP CG 1097 A CG 1097 A CG 1097 A 1097CG A1097CG A1097CG A NHP R 100 B NHP C 50875 B C 50875 B C 50875 B 50875C B

IREDELL I-40/I-77

A INITIAL I-40/I-77 INTERCHANGE IMPROVEMENTS - UNDER CONSTRUCTIONTRNB FINAL I-40/I-77 INTERCHANGE IMPROVEMENTSSW

I-5772 102501.4 MILES EAST OF I-77 TO SR 2167 (WARD ROAD). PAVEMENT REHABILITATION.

4.6SW

NHPIM C 10250 IREDELL I-40

I-5805 6400SR 2167 (WARD ROAD) TO DAVIE COUNTY LINE. PAVEMENT REHABILITATION.

4.0SW

NHPIM C 6400 IREDELL I-40

I-5768 13166 7066

UNDER CONSTRUCTION

SOUTH CAROLINA LINE TO SR 1577 (WEST TYVOLA ROAD). PAVEMENT REHABILITATION.

4.8SW

NHPIM C 6100 MECKLENBURG I-77

I-5714 12400 600

RIGHT OF WAY IN PROGRESS

SR 2136 (GILEAD ROAD) INTERCHANGE. UPGRADE EXISTING INTERCHANGE.SW

NHP C 11800 MECKLENBURG I-77

I-5715 18050 500NC 73 INTERCHANGE. UPGRADE EXISTING INTERCHANGE TO SPLIT DIAMOND CONFIGURATION.SW

NHP R 1550 NHP C 16000

MECKLENBURG I-77

I-5717 11850 1650

RIGHT OF WAY IN PROGRESS - COORDINATE WITH PROJECT R-2307

NC 150 INTERCHANGE. CONSTRUCT INTERCHANGE IMPROVEMENTS.SW

NHP C 10200 IREDELL I-77

I-5962 27300

OTHER FUNDS PROVIDED BY TOWN OF MOORESVILLE

I-77 AT SR 1302 (CORNELIUS ROAD). CONVERT GRADE SEPARATION TO INTERCHANGE.

SW

NHP 1900R NHP 500U NHP 7554C7553C C 7553 O 2240C

IREDELL I-77

I-5961 2370 2370

UNDER CONSTRUCTION

WEST TRADE STREET TO IREDELL COUNTY LINE. PAVEMENT REHABILITATION.

19.9SW

MECKLENBURG I-77

Page 1 of 18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE

Tuesday, July 25, 2017

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 9: TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT ... · nhp rg 466 ad rg 457 ad rg 492 ad rg 492 ad davidson rowan i-85 ex ac north of sr 2120 (long ferry road) in rowan county

CHARLOTTE REGIONAL TRANSPORTATION PLANNING ORGANIZATION

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS

UNFUNDEDFUTURE YEARSFY 2019FY 2018 FY 2020

STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027INTERSTATE PROJECTS

I-5920 5300MILEMARKER 58.9 TO YADKIN COUNTY LINE. PAVEMENT REHABILITATION.

9.9SW

NHPIM 5300C IREDELL I-77

I-5919 1100SR 1892 (JENNINGS ROAD) TO MILEMARKER 56.8. PAVEMENT REHABILITATION.

2.0SW

NHPIM 1100C IREDELL I-77

I-5918 800MILEMARKER 39.2 TO MILEMARKER 40.8. PAVEMENT REHABILITATION.

1.5SW

NHPIM 800C IREDELL I-77

I-5718 1230300I-485 (EXIT 1) TO I-277/NC 16 (BROOKSHIRE FREEWAY) (EXIT 11). WIDEN EXISTING FREEWAY TO TEN LANES BY CONSTRUCTING MANAGED LANES.

9.6 NHP R 72900 A R 72900 A NHP U 500 A BOND R 84000C A C 28000 ANHP 135000C A C 45000 ANHP R 37900 B R 37900 B NHP U 500 B BOND R 84000C B C 28000 BNHP 16500C B C 5500 BNHP 60000R C NHP 500U C BOND R 14400C C NHP 275600C C NHP 22200R D NHP 100U D NHP 107300C D NHP R 17400 E NHP U 100 E NHP 63075C E C 21025 E

MECKLENBURG I-77

A I-485 (EXIT 1) TO WOODLAWN ROAD (EXIT 6). WIDEN EXISTING FREEWAY TO TEN LANES BY CONSTRUCTING MANAGED LANES.SWB WOODLAWN ROAD (EXIT 6) TO I-277/US 74 (BELK FREEWAY (EXIT 9). WIDEN EXISTING FREEWAY TO TEN LANES BY CONSTRUCTING MANAGED LANES.SWC I-277/US 74 (BELK FREEWAY) (EXIT 9) TO I-277/NC 16 (BROOKSHIRE FREEWAY) (EXIT 11). WIDEN EXISTING FREEWAY TO TEN LANES BY CONSTRUCTING MANAGED LANES.D I-277/US 74/NC 27 INTERCHANGE. CONSTRUCT INTERCHANGE IMPROVEMENTS.E I-277/NC 16 (BROOKSHIRE FREEWAY), US 21 INTERCHANGE. CONSTRUCT INTERCHANGE IMPROVEMENTS.SW

I-5769 3500 3500

UNDER CONSTRUCTION

I-277 TO 0.7 MILE NORTH OF NC 27. PAVEMENT REHABILITATION.

1.0SW

MECKLENBURG I-77

I-5106 6476 5159

COMPLETE - GARVEE BOND FUNDING $4 MILLION; CONSTRUCTION - PAYBACK FY 2009-2020

MILE MARKER 57.83 TO MILE POST 61.74. PAVEMENT REHABILITATION.

3.9TRN

NHP CG 439 CG 439 CG 439 IREDELL I-77

I-3311 155839 108739

PLANNING/DESIGN IN PROGRESS - FUNDING FOR I-3311 C INCLUDED IN I-5405

I-277 (BROOKSHIRE FREEWAY) IN CHARLOTTE TO SR 5544 (WEST CATAWBA AVENUE - EXIT 28). ADDITIONAL LANES.

17.4 NHP 100R B NHP 47000C B

MECKLENBURG I-77

A I-85 TO NORTH OF I-485 (CHARLOTTE OUTER LOOP) - COMPLETEAA NC 73 (SAM FURR ROAD), WEST OF I-77 TO EAST OF I-77; SR 2136 (GILEAD ROAD), WEST OF I-77 TO EAST OF I-77 - COMPLETEB I-485 (CHARLOTTE OUTER LOOP) TO SR 5544 (WEST CATAWBA AVENUE) EXIT 28.C I-277 TO NORTH OF I-85. CONSTRUCT HIGH OCCUPANCY TOLL (HOT) LANES AND CONVERT EXISTING HIGH OCCUPANCY VEHICLE (HOV) LANES TO HOT LANES. I-277 (BROOKSHIRE

FREEWAY), I-77 TO NORTH BREVARD STREET. CONSTRUCT HOT LANES. - UNDER CONSTRUCTION WITH PROJECT I-5405D I-485 (CHARLOTTE OUTER LOOP) TO SR 2136 (GILEAD ROAD) - COMPLETEE NORTH OF I-277/NC 16 (BROOKSHIRE FREEWAY) TO NORTH OF I-85. WORK TO BE ACCOMPLISHED IN I-3311 C.

Page 2 of 18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE

Tuesday, July 25, 2017

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 10: TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT ... · nhp rg 466 ad rg 457 ad rg 492 ad rg 492 ad davidson rowan i-85 ex ac north of sr 2120 (long ferry road) in rowan county

CHARLOTTE REGIONAL TRANSPORTATION PLANNING ORGANIZATION

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS

UNFUNDEDFUTURE YEARSFY 2019FY 2018 FY 2020

STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027INTERSTATE PROJECTS

I-4750 507256 8681

PLANNING/DESIGN IN PROGRESS - FUNDING FOR I-4750 AA INCLUDED IN I-5405

SR 5544 (WEST CATAWBA AVENUE - EXIT 28) TO I-40. WIDEN AND RECONSTRUCT ROADWAY.

23.0 NHP 10500R AB NHP 675U AB NHP 133000C AB NHP 11700R B NHP 105200C B NHP 17500R C NHP 220000C C

IREDELLMECKLENBURG

I-77

AA SR 5544 (WEST CATAWBA AVENUE - EXIT 28) TO NC 150 (EXIT 36). CONSTRUCT HIGH OCCUPANCY/TOLL (HOT) LANES. - UNDER CONSTRUCTION WITH PROJECT I-5405AB SR 5544 (WEST CATAWBA AVENUE - EXIT 28) TO NC 150 (EXIT 36). CONSTRUCT ONE ADDITIONAL LANE IN EACH DIRECTION.AC I-77/EXIT 30 (GRIFFITH STREET) INTERCHANGE. CONSTRUCT ROUNDABOUTS AT NORTHBOUND AND SOUTHBOUND RAMP TERMINI. - UNDER CONSTRUCTIONEXB NC 150 (EXIT 36) TO NC 115/US 21 (EXIT 42)C NC 115/US 21 (EXIT 42) TO I-40

I-5405 731678 683265

UNDER CONSTRUCTION - INCLUDES FUNDING FOR I-3311 C AND I-4750 AA

I-277 (BROOKSHIRE FREEWAY) TO WEST CATAWBA AVENUE (EXIT 28). CONSTRUCT HIGH OCCUPANCY TOLL (HOT) LANES AND CONVERT EXISTING HIGH OCCUPANCY VEHICLE (HOV) LANES TO HIGH OCCUPANCY TOLL (HOT) LANES.

17.0 NHPBA C 12334 A C 12333 A NHPBA C 11334 B C 11333 B STBG I 531 C I 548 C

IREDELLMECKLENBURG

I-77

A I-77/LAKEVIEW ROAD INTERCHANGE. CONVERT GRADE SEPARATION TO HOT LANE DIRECT CONNECTION INTERCHANGE. - UNDER CONSTRUCTIONEXB I-77/HAMBRIGHT ROAD INTERCHANGE. CONVERT GRADE SEPARATION TO HOT LANE DIRECT CONNECTION INTERCHANGE. - UNDER CONSTRUCTIONEXC PROVIDE ADDITIONAL EXPRESS BUS SERVICE TO MITIGATE TRAFFIC CONGESTION DURING CONSTRUCTION. - IN PROGRESSEX

I-4723 15329 14259

PROJECT COMPLETE - GARVEE BOND FUNDING $9.76 MILLION; PAYBACK FY 2007 - FY 2018

MECKLENBURG COUNTY LINE TO EXIT 45. MILL AND RESURFACE.

15.1TRN

NHP CG 1070 IREDELL I-77

I-5825 6800SR 1577 (TYVOLA ROAD) TO I-277 IN CHARLOTTE. PAVEMENT REHABILITATION.

4.7SW

NHPIM C 6800 MECKLENBURG I-77 / US 21

I-5606 10077 10077

UNDER CONSTRUCTION

EXIT 45 TO EXIT 54, EXCLUDING PROJECT AREA FOR I-3819 A. PAVEMENT REHABILITATION.

9.0IREDELL I-77

I-4720 3673 3397

PROJECT COMPLETE - GARVEE BOND FUNDING $2.52 MILLION; PAYBACK FY 2007 - FY 2018

I-277 (EXIT 9) TO THE SOUTH CAROLINA STATE LINE. RESURFACE WITH NOVACHIP.

9.3TRN

NHP CG 276 MECKLENBURG I-77

I-5813 19000.3 MILE NORTH OF SR 2321 (EAST BROAD STREET) TO SR 1892 (JENNINGS ROAD). PAVEMENT REHABILITATION.

5.2SW

NHPIM C 1900 IREDELL I-77

I-5860 5500SR 2472 (W. MALLARD CREEK CHURCH RD) TO 0.8 MILE NORTH OF SR 2467 (MALLARD CREEK RD). PAVEMENT REHABILITATION.

2.5SW

NHPIM C 5500 MECKLENBURG I-85

I-5826 5000MILEMARKER 42.1 TO MILEMARKER 46.3. PAVEMENT REHABILITATION.

4.2SW

NHPIM C 5000 MECKLENBURG I-85

I-5797 350I-77 TO MILEMARKER 42.1. PAVEMENT REHABILITATION.

3.8SW

NHPIM C 350 MECKLENBURG I-85

I-5796 5625 5625

UNDER CONSTRUCTION

0.1 MILE NORTH OF SR 5901 (BILLY GRAHAM PKWY) TO 0.3 MILE NORTH OF NC 16. PAVEMENT REHABILITATION.

3.2SW

MECKLENBURG I-85

Page 3 of 18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE

Tuesday, July 25, 2017

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 11: TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT ... · nhp rg 466 ad rg 457 ad rg 492 ad rg 492 ad davidson rowan i-85 ex ac north of sr 2120 (long ferry road) in rowan county

CHARLOTTE REGIONAL TRANSPORTATION PLANNING ORGANIZATION

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS

UNFUNDEDFUTURE YEARSFY 2019FY 2018 FY 2020

STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027INTERSTATE PROJECTS

I-3803 317995 272811

SECTION B, GARVEE BOND FUNDING $103 MILLION; CONSTRUCTION - PAYBACK FY 2010 - FY 2021

US 29/NC 49 CONNECTOR, MECKLENBURG COUNTY TO NC 73 IN CABARRUS COUNTY. ADD ADDITIONAL LANES. (COORDINATE WITH U-3415).

12.8 NHP CG 11296 B CG 11296 B CG 11296 B 11296CG B CABARRUSMECKLENBURG

I-85

A SOUTH OF US 29/NC 49 CONNECTOR TO SR 2894 (CONCORD MILLS - BRUTON SMITH BOULEVARD) - COMPLETEB SOUTH OF SR 2894 (CONCORD MILLS - BRUTON SMITH BOULEVARD) TO NC 73 IN CABARRUS COUNTY - COMPLETETRNBA ITS FOR I-3803 B - COMPLETETRN

I-5006 1602 1488

PROJECT COMPLETE - GARVEE BOND FUNDING $1.04 MILLION; PAYBACK FY 2007 - FY 2018

GASTON COUNTY LINE TO CONCRETE PAVEMENT IN MECKLENBURG COUNTY NEAR SR 1601. PAVEMENT REHABILITATION.

0.7TRN

NHP CG 114 MECKLENBURG I-85

I-5770 64000.7 MILE NORTH OF GASTON COUNTY LINE TO 0.1 MILE NORTH OF SR 5901 (BILLY GRAHAM PARKWAY). PAVEMENT REHABILITATION.

5.0SW

NHPIM C 6400 MECKLENBURG I-85

I-5906 6150I-77 TO US 29/49 CONNECTOR. PAVEMENT REHABILITATION.

3.7SW

NHPIM 3075C3075C MECKLENBURG I-85

I-5837 500GASTON COUNTY LINE TO 0.7 MILES NORTH OF GASTON COUNTY LINE. PAVEMENT REHABILITATION.

0.7SW

NHPIM C 500 MECKLENBURG I-85

I-5905 40000.2 MILE WEST OF NC 16 (BROOKSHIRE BOULEVARD) TO I-77. PAVEMENT REHABILITATION.

2.4SW

NHPIM 4000C MECKLENBURG I-85

FS-1610A

FEASIBILITY STUDY IN PROGRESS

I-277/US 74 (BELK FREEWAY) - EXIT 9 TO I-277/NC 16 (BROOKSHIRE FREEWAY) - EXIT 11. UPGRADE FACILITY.

MECKLENBURG I-277

I-5746 33490 5930

SEGMENTS A AND BE LET TOGETHER AND FUNDED UNDER I-5746B

I-77 TO EAST 10TH STREET. RESURFACING AND BRIDGE REHABILITATION.

3.5 NHPIM C 10490 C NHPIM C 7070 D NHPIM C 10000 E

MECKLENBURG I-277 (BROOKSHIREFRWY)

A I-77 TO EAST STONEWALL STREET. BRIDGE REHABILITATION. - UNDER CONSTRUCTIONSWB EAST STONEWALL STREET TO EAST 10TH STREET. BRIDGE REHABILITATION. - UNDER CONSTRUCTIONSWC EAST 10TH STREET TO NORTH GRAHAM STREET. BRIDGE REHABILITATION.SWD NORTH GRAHAM STREET TO NORTH OF JOHNSON STREET. BRIDGE REHABILITATION.SWE I-77 TO EAST 10TH STREET. RESURFACE ROADWAY.SW

I-5828 3000I-77 TO 1.1 MILES NORTH OF I-77 / US 21. PAVEMENT REHABILITATION.

1.1SW

NHPIM C 3000 MECKLENBURG I-485

I-5871 20 20

UNDER CONSTRUCTION - PROJECT LET WITH I-5748

IDLEWILD RD TO NC 51. PAVEMENT REHABILITATION

5.6SW

MECKLENBURG I-485

I-5963 41300I-485 AND NC 16 (PROVIDENCE ROAD). CONSTRUCT INTERCHANGE IMPROVEMENTS.

SW

NHP 5550R5550R NHP 1300U NHP 14450C C 14450

MECKLENBURG I-485

Page 4 of 18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE

Tuesday, July 25, 2017

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 12: TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT ... · nhp rg 466 ad rg 457 ad rg 492 ad rg 492 ad davidson rowan i-85 ex ac north of sr 2120 (long ferry road) in rowan county

CHARLOTTE REGIONAL TRANSPORTATION PLANNING ORGANIZATION

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS

UNFUNDEDFUTURE YEARSFY 2019FY 2018 FY 2020

STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027INTERSTATE PROJECTS

I-5747 1090 1090

UNDER CONSTRUCTION

I-85 TO SR 2808 (CAMP STEWART ROAD). PAVEMENT REHABILITATION.

9.3SW

MECKLENBURG I-485

I-5748 1275 1275

UNDER CONSTRUCTION - PROJECT LET WITH I-5871

IDELWILD ROAD TO US 74. PAVEMENT REHABILITATION.

2.2SW

MECKLENBURG I-485

I-5861 70000.3 MILE EAST OF SR 2042 (OAKDALE RD) TO 0.2 MILE EAST OF NC 115. PAVEMENT REHABILITATION.

5.4SW

NHPIM C 7000 MECKLENBURG I-485

I-5800 5001.9 MILES WEST OF SR 3649 (ELM LANE) TO SR 1126 (NATIONS FORD ROAD). BRIDGE REHABILITATION.

5.0SW

NHPIM C 500 MECKLENBURG I-485

I-5798 8300I-85 TO ROCKY RIVER ROAD. PAVEMENT REHABILITATION.

4.8SW

NHPIM C 8300 MECKLENBURG I-485

I-5507 289500 2000

DESIGN-BUILD PROJECT

I-485, I-77 SOUTH OF CHARLOTTE TO US 74 (INDEPENDENCE BOULEVARD). ADD ONE EXPRESS LANE IN EACH DIRECTION.

16.7

SW

T R 1600 T C 71475 C 71475 C 71475 71475C

MECKLENBURG I-485

I-5827 3000IDLEWILD ROAD TO US 74. PAVEMENT REHABILITATION.

2.2SW

NHPIM C 3000 MECKLENBURG I-485

I-5904 4500MILEMARKER 43 TO MILEMARKER 49. PAVEMENT REHABILITATION.

6.0SW

NHPIM 4500C MECKLENBURG I-485

I-5318 7069 7069

UNDER CONSTRUCTION

MILE MARKER 51 TO MILE MARKER 59. PAVEMENT REHABILITATION.

8.0SW

MECKLENBURG I-485

I-5903 1400SR 1601 TO 1 MILE NORTH OF SR 1601. PAVEMENT REHABILITATION.

1.0SW

NHPIM 1400C MECKLENBURG I-485

I-5902 900SR 1786 TO NC 27. PAVEMENT REHABILITATION.

0.7SW

NHPIM 900C MECKLENBURG I-485

I-5960 4250 4250

UNDER CONSTRUCTION

MILEMARKER 35.8 TO MILEMARKER 39.7. PAVEMENT REHABILITATION.

3.9SW

MECKLENBURG I-485

I-5973 14200I-485/NC 16 (BROOKSHIRE BOULEVARD). CONSTRUCT INTERCHANGE IMPROVEMENTS.

REG

NHP 2800R NHP 500U NHP 3633C C 3634 C 3633

MECKLENBURG I-485

Page 5 of 18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE

Tuesday, July 25, 2017

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 13: TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT ... · nhp rg 466 ad rg 457 ad rg 492 ad rg 492 ad davidson rowan i-85 ex ac north of sr 2120 (long ferry road) in rowan county

CHARLOTTE REGIONAL TRANSPORTATION PLANNING ORGANIZATION

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS

UNFUNDEDFUTURE YEARSFY 2019FY 2018 FY 2020

STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027RURAL PROJECTS

R-0211 280729 256629

COORDINATE WITH PROJECT I-5507

WEST OF I-77 TO US 74. MULTI-LANE FREEWAY ON NEW LOCATION.

16.6 T R 6100 EC T C 9000 EC C 9000 EC

MECKLENBURG I-485 (CHARLOTTESOUTHERN OUTERLOOP)

EC SR 3468 (WEDDINGTON ROAD). CONSTRUCT INTERCHANGE.DIV

R-2123 350747 328811

PART COMPLETE - GARVEE BOND FUNDING $50 MILLION; CONSTRUCTION - PAYBACK FY 2010 - FY 2021

US 74 EAST (INDEPENDENCE BOULEVARD) TO I-85 NORTH. CONSTRUCT FREEWAY ON NEW LOCATION.

18.8 NHP CG 5484 CE CG 5484 CE CG 5484 CE 5484CG CE MECKLENBURG I-485 (CHARLOTTEEASTERN OUTERLOOP)

CE AT I-85 INTERCHANGE. RE-CONSTRUCT INTERCHANGE. - COMPLETETRNCG SEPARATE ITS CONTRACT FOR R-2123 CE - COMPLETETRN

R-2248 790629 768693

GARVEE BOND FUNDING $50 MILLION; CONSTRUCTION - PAYBACK FY 2010 - FY 2021

WEST OF I-77 TO I-85 NORTH. FREEWAY ON NEW LOCATION.

28.0 NHP CG 5484 E CG 5484 E CG 5484 E 5484CG E MECKLENBURG I-485(CHARLOTTEWESTERN OUTERLOOP)

A WEST OF I-77 SOUTH TO US 29-74 - COMPLETEBA NORTH OF US 29/US 74 (WILKINSON BOULEVARD) TO NORTH OF I-85 - COMPLETEBB NORTH OF I-85 TO NORTH OF NC 27 - COMPLETEC NORTH OF NC 27 (MOUNT HOLLY ROAD) TO EAST OF SR 2042 (OAKDALE ROAD) - COMPLETED EAST OF SR 2042 (OAKDALE ROAD) TO EAST OF NC 115 (OLD STATESVILLE ROAD) - COMPLETEE EAST OF NC 115 (OLD STATESVILLE ROAD) TO I-85 NORTH - COMPLETETRNEA ITS FOR R-2248 E - UNDER CONSTRUCTIONTRNEB EDINMEADOW DRIVE NEPA STUDYF I-485, WEST OF I-77 TO ARROWOOD ROAD-BROWN GRIER ROAD - COMPLETEG I-485 INTERCHANGE WITH SR 2042 (OAKDALE ROAD) - UNDER CONSTRUCTIONTRNH I-485 INTERCHANGE WITH SR 1148 (GARRISON ROAD) - COMPLETE

R-5711 1875 375INTERSECTION OF US 21 AND SR 2375 (HOUSTON ROAD)/SR 1312 (FLOWER HOUSE ROAD). REALIGN AND SIGNALIZE.

REG

T R 250 T U 250 T C 1000

IREDELL US 21

R-2522 35300 500CEDAR LANE IN TROUTMAN TO BARIUM LANE IN BARIUM SPRINGS. WIDEN TO MULTI-LANES.

2.2

REG

T 11850R11850R T 2900U T 8200C

IREDELL US 21 - NC 115

R-2559 29663 29663

NORTH CAROLINA TURNPIKE AUTHORITY PROJECT - SEE R-3329 FOR ADDITIONAL FUNDING

FOUR LANES DIVIDED ON NEW LOCATION. 9.2UNION US 74MONROE BYPASS

R-3329 814000 814000

UNDER CONSTRUCTION - NC TURNPIKE AUTHORITY PROJECT

I-485 (CHARLOTTE OUTER LOOP) TO PROJECT R-2559 (US 74 MONROE BYPASS). MULTI-LANE FREEWAY ON NEW LOCATION.

10.5

TRN

MECKLENBURGUNION

US 74 BYPASS

R-2632 50268 30468US 21 TO SR 2693 (DAVIDSON-CONCORD ROAD). WIDEN TO MULTI-LANES.

4.3 STBG R 1100 AB STBG U 500 AB STBG 4550C AB4550C AB C 4550 AB C 4550 AB

MECKLENBURG NC 73

AA US 21 TO NC 115. - COMPLETEAB NC 115 TO SR 2693 (DAVIDSON-CONCORD ROAD).REGAC NC 73 AT NC 115. CONVERT RIGHT TURN LANE ON NC 115 SOUTHBOUND TO A THROUGH LANE AND WIDEN FOR MERGING TAPER. - COMPLETETRN

Page 6 of 18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE

Tuesday, July 25, 2017

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 14: TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT ... · nhp rg 466 ad rg 457 ad rg 492 ad rg 492 ad davidson rowan i-85 ex ac north of sr 2120 (long ferry road) in rowan county

CHARLOTTE REGIONAL TRANSPORTATION PLANNING ORGANIZATION

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS

UNFUNDEDFUTURE YEARSFY 2019FY 2018 FY 2020

STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027RURAL PROJECTS

R-5706 141750 750

PLANNING/DESIGN IN PROGRESS.

SR 2693 (DAVIDSON-CONCORD ROAD) TO US 29. WIDEN TO MULTI-LANES.

10.9 T R 2900 A T U 500 A T 5675C A5675C A C 5675 A C 5675 A T R 17700 B T U 2100 B T 23775C B23775C B C 23775 B C 23775 B

CABARRUSMECKLENBURG

NC 73 (DAVIDSONHIGHWAY)

A SR 2693 (DAVIDSON-CONCORD ROAD) TO SR 1394 (POPLAR TENT ROAD).REGB SR 1394 (POPLAR TENT ROAD) TO US 29.REG

R-5721 151900 500

PLANNING/DESIGN IN PROGRESS.

NC 16 BUSINESS IN LINCOLN COUNTY TO SR 5544 (WEST CATAWBA AVENUE) IN MECKLENBURG COUNTY. WIDEN TO MULTI-LANES.

9.1 T R 30000 A T U 6000 A T 14500C A14500C A C 14500 A C 14500 A T R 45000 B T U 1000 B T 2850C B2850C B C 2850 B C 2850 B

LINCOLNMECKLENBURG

NC 73

A NC 16 BUSINESS TO VANCE ROAD EXTENSION/BEATTIES FORD ROAD.REGB VANCE ROAD EXTENSION/BEATTIES FORD ROAD TO SR 5544 (WEST CATAWBA AVENUE).REG

R-2307 257620 2220

PLANNING/DESIGN IN PROGRESS - COORDINATE WITH PROJECT I-5717

RELOCATED NC 16 (TIP PROJECT R-2206) TO US 21. WIDEN TO MULTI-LANES.

15.0 STBG 25000R A R 25000 A STBG 3400U A STBG 22000C A C 22000 A C 22000 A C 22000 ASTBG C 27250 B C 27250 B 27250C B27250C B STBGBA C 5000 B

CATAWBAIREDELLLINCOLN

NC 150

A RELOCATED NC 16 (TIP PROJECT R-2206) TO EAST OF SR 1840 (GREENWOOD ROAD)REGB EAST OF SR 1840 (GREENWOOD ROAD) IN CATAWBA COUNTY TO US 21 IN IREDELL COUNTY - RIGHT OF WAY IN PROGRESSREG

R-3833 132295 120895

$890,000 CONTRIBUTION FROM TOWN OF MOORESVILLE

SR 1177 (CHUCKWOOD ROAD) TO US 21. WIDEN TO MULTI-LANES WITH INTERCHANGE AT I-77.

5.9 T R 5200 C T C 5310 C L C 890 C

IREDELL SR 1100BRAWLEY SCHOOLROAD

A SR 1177 (CHUCKWOOD ROAD) TO SR 1109 (CENTRE CHURCH ROAD) - COMPLETEB SR 1109 (CENTRE CHURCH ROAD) TO I-77 - COMPLETEC I-77 TO US 21DIV

R-5100 50076 1076

COORDINATE WITH U-5817

I-77 TO NC 150. WIDEN TO MULTI-LANES. 3.2 T R 8000 A T U 1000 A T 15200C A15200C A T R 3000 B T U 1500 B T C 5100 B

IREDELL SR 1109(WILLIAMSON ROAD)

A I-77 TO SR 1100 (BRAWLEY SCHOOL ROAD). WIDEN TO MULTI-LANES.DIVB SR 1100 (BRAWLEY SCHOOL ROAD) TO NC 150. WIDEN TO MULTI-LANES.DIV

R-4757 745 745

PROGRAMMED FOR PLANNING AND ENVIRONMENTAL STUDY ONLY - PLANNING BY TOWN OF MOORESVILLE

RELOCATION OF ROADWAY IN MOORESVILLE.

IREDELL SR 1206ALCOVE ROAD

R-2555 51482 19282NC 73 (SAM FURR ROAD) TO EAST OF SR 2195 (TORRENCE CHAPEL ROAD). WIDEN TO FOUR-LANES DIVIDED.

3.4 T R 18000 B T U 3500 B T C 9500 B L C 1200 B

MECKLENBURG SR 5544WEST CATAWBAAVENUE

A SR 2151 (JETTON ROAD) TO SR 2195 (TORRENCE CHAPEL ROAD) - COMPLETEB NC 73 (SAM FURR ROAD) TO SR 2151 (JETTON ROAD)DIV

Page 7 of 18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE

Tuesday, July 25, 2017

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 15: TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT ... · nhp rg 466 ad rg 457 ad rg 492 ad rg 492 ad davidson rowan i-85 ex ac north of sr 2120 (long ferry road) in rowan county

CHARLOTTE REGIONAL TRANSPORTATION PLANNING ORGANIZATION

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS

UNFUNDEDFUTURE YEARSFY 2019FY 2018 FY 2020

STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027RURAL PROJECTS

R-5790 745 745

UNDER CONSTRUCTION

DIVISION 10 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.

DIV

ANSONCABARRUSMECKLENBURGSTANLYUNION

VARIOUS

R-5792 663 663

UNDER CONSTRUCTION

DIVISION 12 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.

DIV

ALEXANDERCATAWBACLEVELANDGASTONIREDELLLINCOLN

VARIOUS

URBAN PROJECTSU-5904 1000

PROGRAMMED FOR PLANNING AND ENVIRONMENTAL STUDY ONLY

SUNSET ROAD TO NC 24 (W.T. HARRIS BOULEVARD). WIDEN ROADWAY.

1.9

EX

BA PE 1000 MECKLENBURG US 21 (STATESVILLEROAD)

U-6037 35100NC 150 (PLAZA DRIVE) TO SR 1245 (MEDICAL PARK ROAD). WIDEN TO 4-LANES DIVIDED.

2.7

DIV

T 6500R T 800U T C 27800

IREDELL US 21 (CHARLOTTEHIGHWAY)

U-5767 23800 600

PLANNING/DESIGN IN PROGRESS

NORTHCROSS CENTER COURT TO SR 2147 (WESTMORELAND ROAD). WIDEN TO MULTI-LANES.

1.2

REG

T R 800 T U 1400 T 5250C5250C5250C C 5250

MECKLENBURG US 21 (STATESVILLEROAD)

U-6069 57500NC 24 (HARRIS BOULEVARD) TO SR 2136 (GILEAD ROAD). WIDEN TO MULTI-LANES.

5.6

REG

T R 1000 T U 500 T 18667C C 18667 C 18666

MECKLENBURG US 21 (STATESVILLEROAD)

U-5771 20000 500

PLANNING/DESIGN IN PROGRESS.

SR 2136 (GILEAD ROAD) TO HOLLY POINT DRIVE. WIDEN TO MULTI-LANES.

2.2

REG

T R 2700 T U 300 T 5500C5500C5500C

MECKLENBURG US 21

U-5799 17200 500SR 1933 TO FORT DOBBS ROAD. WIDEN TO MULTI-LANES AND REALIGN OFFSET INTERSECTIONS OF SR 1922 AND SR 2171.

0.8

REG

T R 3200 T U 400 T 6550C6550C

IREDELL US 21

U-5964 1100US 64 (DAVIE AVENUE) AND US 21 (SULLIVAN ROAD). CONVERT 5-APPROACH INTERSECTION TO A SINGLE LANE ROUNDABOUT.REG

T R 200 T U 100 T C 800

IREDELL US 64 (DAVIEAVENUE)

Page 8 of 18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE

Tuesday, July 25, 2017

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 16: TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT ... · nhp rg 466 ad rg 457 ad rg 492 ad rg 492 ad davidson rowan i-85 ex ac north of sr 2120 (long ferry road) in rowan county

CHARLOTTE REGIONAL TRANSPORTATION PLANNING ORGANIZATION

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS

UNFUNDEDFUTURE YEARSFY 2019FY 2018 FY 2020

STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027URBAN PROJECTS

U-5931 4500

LET WITH U-5764

INTERSECTION OF US 74 AND SECREST SHORTCUT ROAD. CONSTRUCT IMPROVEMENTS.

SW

T R 1200 T U 300 T 3000C

UNION US 74

U-0209 341567 318196

PART COMPLETE - GARVEE BOND FUNDING $50 MILLION FOR RIGHT OF WAY - PAYBACK FY 2010 - FY 2021; GARVEE BOND FUNDING $2 MILLION FOR CONSTRUCTION - PAYBACK FY 2013 - FY 2024

BROOKSHIRE FREEWAY TO IDLEWILD ROAD IN CHARLOTTE. ADD ADDITIONAL LANES AND CONSTRUCT INTERCHANGES WITH SHARON AMITY ROAD AND IDLEWILD ROAD AND SAFETY IMPROVEMENTS.

1.4 NHP RG 5484 B RG 5484 B RG 5484 B 5484RG B NHP CG 205 B CG 205 B CG 205 B 205CG B205CG B205CG B CG 205 B

MECKLENBURG US 74(INDEPENDENCEBOULEVARD)

B NC 24/NC 27 (ALBEMARLE ROAD) TO IDLEWILD ROAD - UNDER CONSTRUCTIONTRNBA SEPARATE ITS CONTRACT FOR U-209 B - WORK TO BE CONSTRUCTED BY PROJECT U-5526ATRN

U-2509 507745 745

PLANNING/DESIGN IN PROGRESS. DESIGN-BUILD PROJECT

CHARLOTTE OUTER LOOP TO WEST OF IDLEWILD ROAD IN CHARLOTTE. CONSTRUCT MANAGED LANES.

6.4

SW

NHP R 85000 NHP U 10000 NHP C 20600 97850C97850C97850C C 97850

MECKLENBURG US 74(INDEPENDENCEBOULEVARD)

U-5526 26877 2977

PLANNING/DESIGN IN PROGRESS - IMPROVEMENTS FROM WALLACE LANE TO I-485 TO BE COMPLETED BY PROJECT U-2509

I-277 TO I-485. CONVERT EXISTING AND PROPOSED BUSWAY TO MANAGED LANES FROM I-277 TO WALLACE LANE AND CONSTRUCT NEW MANAGED LANES FROM WALLACE LANE TO I-485.

12.0 NHP C 19500 A CMAQ C 1400 A T O 3000 A

MECKLENBURG US 74INDEPENDENCE BLVD

A I-277 TO WALLACE LANE. CONVERT EXISTING AND PROPOSED BUSWAY TO MANAGED LANES. INCLUDES WORK PROPOSED UNDER PROJECT U-209 BA. - RIGHT OF WAY IN PROGRESSSW

U-5764 16800 300

LET WITH U-5931

HANOVER DRIVE TO SR 1007 (ROCKY RIVER ROAD). WIDEN EXISTING ROADWAY.

2.8

REG

T R 500 T U 500 T 5167C5166C5167C

UNION US 74

U-5703 2350 200SR 1514 (ROCKY RIVER ROAD) INTERSECTION. RECONFIGURE TO SUPERSTREET.SW

T R 400 T C 1750

UNION US 74 (ROOSEVELTBLVD)

U-4024 14250

COORDINATE WITH U-5723

EXISTING US 74 TO THE MONROE BYPASS. WIDEN TO MULTI-LANES.

0.9

REG

T R 500 T U 750 T C 13000

UNION US 601

FS-1510A

FEASIBILITY STUDY IN PROGRESS

I-77 TO I-85. UPGRADE TO FREEWAY. 2.2MECKLENBURG NC 16(BROOKSHIREBOULEVARD)

U-6084 6000NC 16 (BROOKSHIRE BOULEVARD) AT SR 2004 (MOUNT HOLLY HUNTERSVILLE ROAD). CONSTRUCT INTERSECTION IMPROVEMENTS.REG

T C 3000 C 3000 MECKLENBURG NC 16 BROOKSHIREBOULEVARD)

Page 9 of 18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE

Tuesday, July 25, 2017

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 17: TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT ... · nhp rg 466 ad rg 457 ad rg 492 ad rg 492 ad davidson rowan i-85 ex ac north of sr 2120 (long ferry road) in rowan county

CHARLOTTE REGIONAL TRANSPORTATION PLANNING ORGANIZATION

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS

UNFUNDEDFUTURE YEARSFY 2019FY 2018 FY 2020

STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027URBAN PROJECTS

U-5769 82500SR 1316 (REA ROAD EXTENSION) TO SR 3530 (WAXHAW PARKWAY) IN WAXHAW. WIDEN TO MULTI-LANES.

5.7 T 5800R A5800R A T 1400U A T 19600C A C 19600 A T 4800R B4800R B T 1200U B T 19500C B

UNION NC 16 (PROVIDENCEROAD SOUTH)

A SR 1316 (REA ROAD EXTENSION) TO SR 1321 (CUTHBERTSON ROAD) IN WEDDINGTON. WIDEN TO MULTI-LANES.REGB SR 1321 (CUTHBERTSON ROAD) IN WEDDINGTON TO SR 3530 (WAXHAW PARKWAY) IN WAXHAW. WIDEN TO MULTI-LANES.REG

U-5955 9500I-85 TO IDAHO DRIVE. ADD WESTBOUND THROUGH LANE ON NC 16 BETWEEN A POINT WEST OF IDAHO DR AND I-85. IMPROVE I-85 NORTHBOUND RAMP TO EASTBOUND NC 16.REG

T 1900R T 300U T 7300C

MECKLENBURG NC 16 (BROOKSHIREBOULEVARD)

U-5957 17100SR 1644 (TODDVILLE ROAD) TO SR 1600 (MOORES CHAPEL ROAD). WIDEN TO 4-LANES.

1.3

REG

T 3800R T 500U T 12800C

MECKLENBURG NC 27 (FREEDOMDRIVE)

U-5768 41825 2000NC 49, JOHN KIRK DRIVE TO I-485. WIDEN EXISTING ROADWAY. REALIGN BACK CREEK CHURCH ROAD ON NEW LOCATION TO THE NC 49 AND MALLARD CREEK CHURCH ROAD INTERSECTION. CLOSE EXISTING AT GRADE RAIL CROSSING AT NC 49 AND BACK CREEK CHURCH ROAD.

1.2

REG

T R 100 L R 1200 T U 1300 L M 925 T 6000C6000C6000C C 6000 L 12300C

MECKLENBURG NC 49 &BACK CREEK CHURCHRD

U-5007 43850 600MATTHEWS TOWNSHIP PARKWAY TO SR 3128 (LAWYERS ROAD). WIDEN TO MULTI-LANES.

4.0

REG

T 4125R4125R T 2250U2250U T 15250C C 15250

MECKLENBURG NC 51

U-5763 4100 200SR 3356 (SARDIS ROAD) TO SR 1010 (EAST JOHN STREET/ MONROE ROAD). WIDEN EXISTING ROADWAY.

0.7

REG

T R 1600 T U 200 T 2100C

MECKLENBURG NC 51 (MATTHEWSTOWNSHIP PARKWAY

U-5765 11400SR 5544 (WEST CATAWBA AVENUE) TO SR 2316 (NORTHCROSS AVENUE). WIDEN EXISTING ROADWAY.

1.1

REG

T R 3900 T U 500 T 3500C3500C

MECKLENBURG NC 73 (SAM FURR ROAD)

U-3467 49875 1325NC 16 TO SR 1008 (WAXHAW-INDIAN TRAIL ROAD) IN WESLEY CHAPEL. CONSTRUCT FOUR LANE ROADWAY, PART ON NEW LOCATION.

4.3

REG

STBG R 15250 STBG U 800 STBG C 10833 C 10834 10833C

UNION NC 84

Page 10 of 18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE

Tuesday, July 25, 2017

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 18: TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT ... · nhp rg 466 ad rg 457 ad rg 492 ad rg 492 ad davidson rowan i-85 ex ac north of sr 2120 (long ferry road) in rowan county

CHARLOTTE REGIONAL TRANSPORTATION PLANNING ORGANIZATION

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS

UNFUNDEDFUTURE YEARSFY 2019FY 2018 FY 2020

STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027URBAN PROJECTS

U-5779 14200 500SR 1645 (OLD WILKESBORO ROAD) TO HARTNESS ROAD. WIDEN TO MULTI LANES.

0.9

REG

T R 2500 T U 300 T 3634C3633C C 3633

IREDELL NC 115

U-5963 480SR 1135 (WATERLYNN ROAD) TO YELLOW WOOD DRIVE. INSTALL CLOSED LOOP SIGNAL SYSTEM.

REG

T U 50 T C 430

IREDELL NC 115 (MECKLENBURGHIGHWAY)

U-5772 34800 500NC 24 (HARRIS BOULEVARD) TO I-485. WIDEN TO MULTI-LANES.

2.2

REG

T 4500R4500R T 1100U T 12100C C 12100

MECKLENBURG NC 115 (OLD STATESVILLEROAD)

U-5780 1055 125INTERSECTION OF NC 150 AND SR 2399 (WIGGINS ROAD). REALIGN INTERSECTION.

REG

T R 180 T C 750

IREDELL NC 150

U-5960 28700NC 115 TO NC 801 (PARK AVENUE). WIDEN TO 4-LANES.

2.6

REG

T 1700R T 500U T C 13250 C 13250

IREDELL NC 150 (OAK RIDGEFARM HIGHWAY)

U-5766 60200 600SOUTH CAROLINA LINE TO I-485. WIDEN TO MULTI-LANES.

6.8 T R 2600 A T U 500 A T 4375C A4375C A4375C A C 4375 A T R 3100 B T U 4600 B T 7825C B7825C B7825C B C 7825 B

MECKLENBURG NC 160

A SOUTH CAROLINA LINE TO NC 49 (SOUTH TRYON ROAD). WIDEN TO MULTI-LANES.REGB NC 49 (SOUTH TRYON ROAD) TO I-485. WIDEN TO MULTI-LANES.REG

U-5762 1550 250

RIGHT OF WAY IN PROGRESS

INTERSECTION OF NC 160 (STEELE CREEK ROAD) AND SR 1106 (HAMILTON ROAD). INTERSECTION IMPROVEMENTS.REG

T C 1300 MECKLENBURG NC 160 (STEELECREEK ROAD)

U-5805 3910 510INTERSECTION OF SR 1009 (MONROE ROAD) AND RAMA ROAD/IDLEWILD ROAD. CONSTRUCT INTERSECTION IMPROVEMENTS.DIV

T R 750 T 2650C

MECKLENBURG SR 1009 (MONROEROAD)

Page 11 of 18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE

Tuesday, July 25, 2017

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 19: TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT ... · nhp rg 466 ad rg 457 ad rg 492 ad rg 492 ad davidson rowan i-85 ex ac north of sr 2120 (long ferry road) in rowan county

CHARLOTTE REGIONAL TRANSPORTATION PLANNING ORGANIZATION

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS

UNFUNDEDFUTURE YEARSFY 2019FY 2018 FY 2020

STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027URBAN PROJECTS

U-4714 107500 1000SR 3448-SR 3474 (TRADE STREET) TO SR 1377 (WESLEY CHAPEL-STOUTS ROAD). WIDEN TO MULTI-LANES.

6.5 STBGDA R 9500 A S(M) R 2400 A STBG R 9700 A STBGDA 1925C A1925C A1925C A C 1925 A S(M) 481C A481C A481C A C 482 A STBG 1925C A1925C A1925C A C 1925 A T R 1000 AB T C 19000 AB STBGDA R 14540 B S(M) R 1860 B L R 10000 B STBGDA 4235C B4235C B4235C B C 4235 B S(M) 1059C B1059C B1059C B C 1058 B

MECKLENBURGUNION

SR 1009 (JOHNSTREET-OLDMONROE ROAD)

A SR 3448-SR 3474 (TRADE STREET) TO WEST OF MORNINGSIDE MEADOW LANE. (EXCLUDING I-485 INTERCHANGE)DIVAB I-485. IMPROVE INTERCHANGE - TO BE LET WITH I-5507DIVB WEST OF MORNINGSIDE MEADOW LANE TO EAST OF SR 1377 (WESLEY CHAPEL-STOUTS ROAD).DIV

U-6031 6800SEYMOUR STREET TO NC 200 (DICKERSON BOULEVARD). WIDEN TO FOUR-LANES DIVIDED.

0.4

DIV

T 950R950R T 500U T C 4400

UNION SR 1009 (CHARLOTTEAVENUE)

U-5817 14500 400

COORDINATE WITH R-5100

EXTEND SR 1246 (FAIRVIEW ROAD) OVER I-77 TO CONNECT WITH SR 1206 (ALCOVE ROAD) AND CONSTRUCT PARALLEL NORTH-SOUTH CONNECTOR ROADS TO SR 1109 (WILLIAMSON ROAD).

0.1

DIV

T R 1100 BA R 8000 T U 200 T 4800C

IREDELL SR 1246 (FAIRVIEWROAD)

U-5816 10100 500US 21 (CHARLOTTE HIGHWAY) TO SR 1474 (BLUEFIELD ROAD). WIDEN TO THREE-LANES WITH OVERPASS OVER I-77.

1.5

DIV

T R 1500 T U 1000 T 7100C

IREDELL SR 1305 (OATES ROAD- MIDNIGHT LANE)

U-5808 4790 1050SR 1367 (MATTHEWS INDIAN TRAIL ROAD) TO SR 1368 (GRIBBLE ROAD). CONSTRUCT ROAD ON NEW LOCATION.

0.4

DIV

T R 300 T U 40 T 3400C

UNION SR 1362 (CHESTNUTLANE CONNECTOR)

U-5905 7400 400REAMES ROAD TO NC 115. UPGRADE ROADWAY.

2.1

EX

BA R 1000 BA U 500 BA C 5500

MECKLENBURG SR 2112 (LAKEVIEWROAD)

U-5807 15600 300US 21 (STATESVILLE ROAD) TO NC 115. WIDEN TO MULTI-LANES.

0.7

DIV

T 3750R3750R T 450U450U T C 6900

MECKLENBURG SR 2136(GILEAD ROAD)

U-6039 13400VINE STREET TO SR 2422 (SIGNAL HILL DRIVE). UPGRADE ROADWAY AND IMPLEMENT ACCESS MANAGEMENT SOLUTIONS.

0.7

DIV

T 2200R T 500U T C 10700

IREDELL SR 2321 (EAST BROADSTREET)

Page 12 of 18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE

Tuesday, July 25, 2017

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 20: TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT ... · nhp rg 466 ad rg 457 ad rg 492 ad rg 492 ad davidson rowan i-85 ex ac north of sr 2120 (long ferry road) in rowan county

CHARLOTTE REGIONAL TRANSPORTATION PLANNING ORGANIZATION

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS

UNFUNDEDFUTURE YEARSFY 2019FY 2018 FY 2020

STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027URBAN PROJECTS

U-6032 13400I-485 TO CONCORD MILLS BOULEVARD. WIDEN TO FOUR-LANES DIVIDED.

0.9

DIV

T R 2400 T U 500 T 3500C3500C3500C

CABARRUSMECKLENBURG

SR 2464 (ODELLSCHOOL ROAD)

U-2507 63147 63147

PLANNING/DESIGN IN PROGRESS

SR 2480 (SUGAR CREEK ROAD) TO SR 2472 (MALLARD CREEK CHURCH ROAD) IN CHARLOTTE. WIDEN TO MULTI-LANES, PART ON NEW LOCATION.

4.1MECKLENBURG SR 2467 (MALLARDCREEK ROAD)

A SR 2480 (SUGAR CREEK ROAD) TO SR 2665 (HARRIS BOULEVARD) - UNDER CONSTRUCTIONTRNAA SR 2467 (MALLARD CREEK ROAD) TO IBM DRIVE. CONSTRUCT NEW CONNECTOR ROAD AND MULTI-USE PATH. - IMPROVEMENTS CONSTRUCTED UNDER U-2507ATRNB SR 2665 (W.T. HARRIS BOULEVARD) TO SR 2472 (MALLARD CREEK CHURCH ROAD) - COMPLETE

U-6028 20100SR 2833 (MALLARD CREEK CHURCH ROAD) TO BREEZEWOOD DRIVE. WIDEN TO FOUR-LANES.

1.5

DIV

T 2000R2000R T 250U250U T C 15600

MECKLENBURG SR 2472 (MALLARDCREEK ROAD)

U-5008 45060 45060

UNDER CONSTRUCTION

CONSTRUCT GRADE SEPARATION OVER NORTH CAROLINA RAILROAD/NORFOLK SOUTHERN RAILWAY CROSSING 715 352H AND THE CLOSURE OF CRAIGHEAD ROAD CROSSING 715 355D.

TRN

MECKLENBURG SR 2975 (SUGARCREEK ROAD)

U-5804 2734 234FULLWOOD LANE TO WEDDINGTON ROAD. WIDEN TO MULTI-LANES.

0.5 T C 2500 B MECKLENBURG SR 3448 (SOUTHTRADE STREET)

A FULLWOOD LANE TO FOUR MILE CREEK - UNDER CONSTRUCTION BY TOWN OF MATTHEWS USING TOWN FUNDS.B FOUR MILE CREEK TO WEDDINGTON ROAD. - RIGHT OF WAY IN PROGRESS.DIV

U-6030 31100ANNALEXA LANE TO WILLIAMS POND LANE. WIDEN TO FOUR-LANES.

1.7

DIV

T 6700R T 800U T 5900C C 5900 C 5900 C 5900

MECKLENBURG SR 4979 (BALLANTYNECOMMONS PKWY)

U-4713 11706 2506SR 3457 (CAMPUS RIDGE ROAD) TO SR 3448 (PLEASANT PLAINS ROAD) IN MATTHEWS. CONSTRUCT TWO LANE ROADWAY ON NEW LOCATION.

1.1 STBG R 2600 A STBG U 500 A STBG C 4100 A L C 2000 A

MECKLENBURG NEW ROUTE

A SR 3448 (PLEASANT PLAINS ROAD) TO SR 1009 (JOHN STREET)DIVB SR 1009 (JOHN STREET) TO SR 3457 (CAMPUS RIDGE ROAD) - COMPLETETRN

U-4950 10000

FORMERLY U-9999C - IN PROGRESS

CHARLOTTE REGIONAL TRANSPORTATION PLANNING ORGANIZATION (CRTPO) PLANNING (PL) SUPPLEMENT.

DIV

STBGDA PE 800 PE 800 PE 800 800PE800PE800PE PE 800 PE 800 PE 800 PE 800L PE 200 PE 200 PE 200 200PE200PE200PE PE 200 PE 200 PE 200 PE 200

IREDELLMECKLENBURGUNION

VARIOUS

U-4744 150501STBG-DA IN CHARLOTTE REGIONAL TRANSPORTATION PLANNING ORGANIZATION (CRTPO).

DIV

STBGDA 15400C15400C28001C C 15400 C 15400 C 15400 C 15400L 3850C3850C7000C C 3850 C 3850 C 3850 C 3850

IREDELLMECKLENBURGUNION

VARIOUS

Page 13 of 18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE

Tuesday, July 25, 2017

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 21: TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT ... · nhp rg 466 ad rg 457 ad rg 492 ad rg 492 ad davidson rowan i-85 ex ac north of sr 2120 (long ferry road) in rowan county

CHARLOTTE REGIONAL TRANSPORTATION PLANNING ORGANIZATION

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS

UNFUNDEDFUTURE YEARSFY 2019FY 2018 FY 2020

STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027URBAN PROJECTS

U-5803 13000

LOCAL CONTRIBUTION OF $5 M BY CITY OF CHARLOTTE

SR 2940 (EASTWAY DRIVE) AND SHAMROCK DRIVE. CONSTRUCT INTERSECTION IMPROVEMENTS.

DIV

T R 3000 T U 300 T 2350C2350C L 2500C2500C

MECKLENBURG CHARLOTTE

U-5107 624 624

UNDER CONSTRUCTION BY OTHERS

CONSTRUCT TRANSPORTATION IMPROVEMENTS AT THE MARION DIEHL CENTER (QUEENS UNIVERSITY) IN CHARLOTTE.

TRNMECKLENBURG CHARLOTTE

U-5873 6900 900INTERSECTION OF NC 115 AND POTTS STREET. CONSTRUCT IMPROVEMENTS.

EX

BA R 1200 BA C 4800

MECKLENBURG CORNELIUS

U-5906 5500 500SR 2195 (TORRENCE CHAPEL ROAD) AND SR 5544 (WEST CATAWBA AVENUE). INTERSECTION IMPROVEMENTS.EX

BA R 2000 BA C 3000

MECKLENBURG CORNELIUS

U-5907 2200 150

FUNDING IS SUBJECT TO ROADS BEING ADDED TO STATE MAINTAINED SYSTEM

POTTS-SLOAN-BEATTY CONNECTOR. CONSTRUCT ROADWAY ON NEW LOCATION.

0.9

EX

BA R 530 BA C 1520

MECKLENBURG DAVIDSON

U-5723 8000 200

COORDINATE WITH U-4024

US 601 INTERCHANGE. CONSTRUCT IMPROVEMENTS.

SW

T R 300 T C 7500

UNION EXISTING US 74

U-5908 9050 1050

RIGHT OF WAY IN PROGRESS

MAIN STREET, NC 115 (OLD STATESVILLE ROAD)/SR 2004 (MOUNT HOLLY-HUNTERSVILLE ROAD) TO SOUTH OF RAMAH CHURCH ROAD. WIDEN AND REALIGN.

1.0

EX

STBGBA C 4000 L C 4000

MECKLENBURG HUNTERSVILLE

U-5114 14725 4225

RIGHT OF WAY ACQUISITION IN PROGRESS

INTERSECTION OF US 21 AND GILEAD ROAD IN HUNTERSVILLE. CONSTRUCT INTERSECTION IMPROVEMENTS, INCLUDING BICYCLE AND PEDESTRIAN ACCOMMODATIONS.

TRN

BA C 3850 T C 6650

MECKLENBURG HUNTERSVILLE

U-4913 8595 1545I-485 TO SR 1524 (STEVENS MILL ROAD). WIDEN EXISTING ROADWAY.

0.8

DIV

T R 150 T U 900 T 2000C2000C2000C

MECKLENBURGUNION

IDLEWILD ROAD

U-5987 2510 270

RIGHT OF WAY IN PROGRESS

UNIONVILLE-INDIAN TRAIL ROAD AND SARDIS ROAD. CONSTRUCT INTERSECTION IMPROVEMENTS.DIV

STBGDA C 1680 L C 560

UNION INDIAN TRAIL

U-5115 1785 1785

UNDER CONSTRUCTION

INTERSECTION OF NC 51 AND IDLEWILD ROAD. CONSTRUCT INTERSECTION IMPROVEMENTS.TRN

MECKLENBURG MATTHEWSMINT HILL

Page 14 of 18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE

Tuesday, July 25, 2017

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 22: TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT ... · nhp rg 466 ad rg 457 ad rg 492 ad rg 492 ad davidson rowan i-85 ex ac north of sr 2120 (long ferry road) in rowan county

CHARLOTTE REGIONAL TRANSPORTATION PLANNING ORGANIZATION

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS

UNFUNDEDFUTURE YEARSFY 2019FY 2018 FY 2020

STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027URBAN PROJECTS

U-5874 9325 75

PRELIMINARY ENGINEERING AND RIGHT-OF-WAY FUNDED BY CITY OF CHARLOTTE

SR 2722 (LOUIS ROSE PLACE) TO DOUG MAYES PLACE. CONSTRUCT NEW ROUTE.

0.4

DIV

STBGDA C 7400 L C 1850

MECKLENBURG NORTH UNIVERSITYRESEARCH PARKI-85 OVERPASS

U-5108 10232 500

FUNDING IS SUBJECT TO ROADS BEING FUNCTIONALLY CLASSIFIED AT A LEVEL THAT MAKES THEM ELIGIBLE FOR FEDERAL AID FUNDING

END OF NORTHCROSS DRIVE TO WESTMORELAND ROAD IN CORNELIUS. CONSTRUCT ROAD ON NEW LOCATION.

1.2

TRN

STBGDA R 955 BA R 500 L R 489 STBGDA C 4765 BA C 1000 L C 2023

MECKLENBURG NORTHCROSS DRIVEEXTENSION

U-6029 52800DERITA ROAD TO NC 73. WIDEN TO FOUR-LANES.

4.2

DIV

T 8200R T 1000U T 10900C C 10900 C 10900 C 10900

CABARRUSMECKLENBURG

POPLAR TENT ROAD

U-5112 2825 325

RIGHT OF WAY IN PROGRESS - PROJECT TO BE ADMINISTERED BY THE TOWN OF STALLINGS

SR 1364 (PLEASANT PLAINS ROAD) AT SR 1357 (POTTERS ROAD) IN STALLINGS. CONSTRUCT INTERSECTION IMPROVEMENTS INCLUDING LEFT TURN LANES AND MODIFICATION OF TRAFFIC SIGNAL.

TRN

STBGDA C 1600 L C 400 HSIP C 500

UNION STALLINGS

U-6054 2728CONSTRUCT BROOKDALE DRIVE-US 21 CONNECTOR.

DIV

STBGDA R 1063 L R 477 STBGDA C 820 L C 368

IREDELL STATESVILLE

HIGHWAY SAFETY PROJECTSW-5520 7755 7755

UNDER CONSTRUCTION

FAIRVIEW ROAD TO WESLEY CHAPEL STOUTS ROAD IN INDIAN TRAIL. CONVERT EXISTING FULL MOVEMENT SIGNALIZED INTERSECTIONS TO SIGNALIZED SUPERSTREET DESIGN.

REGUNION US 74

W-5210 11865 11865

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

DIVISION 10 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

ANSONCABARRUSMECKLENBURGSTANLYUNION

VARIOUS

DIV DIVISION 10 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN DIVISION CATEGORY.DIVREG DIVISION 10 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN REGIONAL CATEGORY.REGSW DIVISION 10 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN STATEWIDE CATEGORY.SW

Page 15 of 18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE

Tuesday, July 25, 2017

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 23: TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT ... · nhp rg 466 ad rg 457 ad rg 492 ad rg 492 ad davidson rowan i-85 ex ac north of sr 2120 (long ferry road) in rowan county

CHARLOTTE REGIONAL TRANSPORTATION PLANNING ORGANIZATION

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS

UNFUNDEDFUTURE YEARSFY 2019FY 2018 FY 2020

STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027HIGHWAY SAFETY PROJECTS

W-5710 1678 278SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 10.

HSIP R 30 DIV R 30 DIV HSIP C 180 DIV C 180 DIV HSIP R 30 RE R 30 RE HSIP C 180 RE C 180 RE HSIP R 40 SW R 40 SW HSIP C 240 SW C 240 SW

ANSONCABARRUSMECKLENBURGSTANLYUNION

VARIOUS

DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW

W-5712 2930 1530

IN PROGRESS

SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 12.

HSIP R 30 DIV R 30 DIV HSIP C 180 DIV C 180 DIV HSIP R 30 RE R 30 RE HSIP C 180 RE C 180 RE HSIP R 40 SW R 40 SW HSIP C 240 SW C 240 SW

ALEXANDERCATAWBACLEVELANDGASTONIREDELLLINCOLN

VARIOUS

DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW

W-5212 5973 5348

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

DIVISION 12 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

HSIP R 50 DIV HSIP C 575 DIV

ALEXANDERCATAWBACLEVELANDGASTONIREDELLLINCOLN

VARIOUS

DIV DIVISION 12 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN THE DIVISION CATEGORY.DIVREG DIVISION 12 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN THE REGIONAL CATEGORY.REG

CONGESTION MITIGATION PROJECTSC-5613 20901PROJECTS TO IMPROVE CONGESTION AND

AIR QUALITY IN THE CHARLOTTE REGIONAL TRANSPORTATION PLANNING ORGANIZATION (CRTPO) AREA.

EX

CMAQ PE 828 PE 844 L PE 207 PE 211 CMAQ R 828 R 844 L R 207 R 211 CMAQ C 4971 C 5062 L C 1243 C 1265 CMAQ O 828 O 844 L O 207 O 211 CMAQ I 828 I 844 L I 207 I 211

IREDELLMECKLENBURGUNION

VARIOUS

C-5536 624 624

IN PROGRESS

MECKLENBURG COUNTY AIR QUALITY -GRADE (GRANTS TO REPLACE AGING DIESEL ENGINS). REPLACE, REPOWER OR RETROFIT AGING DIESEL VEHICLES AND EQUIPMENT.

EX

CABARRUSGASTONIREDELLLINCOLNMECKLENBURGROWANUNION

CHARLOTTE

Page 16 of 18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE

Tuesday, July 25, 2017

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 24: TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT ... · nhp rg 466 ad rg 457 ad rg 492 ad rg 492 ad davidson rowan i-85 ex ac north of sr 2120 (long ferry road) in rowan county

CHARLOTTE REGIONAL TRANSPORTATION PLANNING ORGANIZATION

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS

UNFUNDEDFUTURE YEARSFY 2019FY 2018 FY 2020

STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027CONGESTION MITIGATION PROJECTS

C-5225 3348 2148TOBY CREEK GREENWAY (PHASE II). CONNECT UNCC TO NEARBY RETAIL AND RESIDENTIAL DEVELOPMENT.

1.3 CMAQ C 840 B L C 360 B

MECKLENBURG CHARLOTTE

A TOBY CREEK GREENWAY, UNIVERSTIY CITY BOULEVARD TO ROCKLAND DRIVE. - UNDER CONSTRUCTIONEXB TOBY CREEK GREENWAY, ROCKLAND DRIVE TO BLUE ROCK DRIVE.EX

C-5534 1494SR 4979 (BALLANTYNE COMMONS PARKWAY-MCKEE ROAD) AND NC 16 (PROVIDENCE ROAD) IN CHARLOTTE. CONSTRUCT AN ADDITIONAL LEFT TURN LANE ON SR 4979 AND A SECOND LEFT TURN LANE ON SOUTHBOUND NC 16.

EX

CMAQ C 1113 L C 381

MECKLENBURG CHARLOTTE

C-5537 882 882

UNDER CONSTRUCTION

BARTON CREEK GREENWAY IN CHARLOTTE. CONSTRUCT A CONNECTOR BETWEEN CLARK'S CREEK AND MALLARD CREEK GREENWAYS.

EXMECKLENBURG CHARLOTTE

C-5538 3976 300

RIGHT OF WAY IN PROGRESS

INTERSECTION OF TUCKASEEGEE-BERRYHILL-THRIFT ROADS IN CHARLOTTE. CONSTRUCT A TRAFFIC CIRCLE.

DIV

CMAQ C 1797 L C 563 STBGDA C 1053 L C 263

MECKLENBURG CHARLOTTE

C-5540 819 819

UNDER CONSTRUCTION

NAVIN ROAD, ALPINE DRIVE TO GIBBON ROAD. CONSTRUCT SIDEWALK ON NORTH SIDE. GIBBON ROAD, NEVIN ROAD TO SUGAR CREEK ROAD. CONSTRUCT SIDEWALK ON SOUTH SIDE.WEST SUGAR ROAD, BISANER STREET AND MALLARD CREEK ROAD. FILL GAPS IN SIDEWALK NETWORK ON EAST SIDE.

EXMECKLENBURG CHARLOTTE

C-5533 2008 258

RIGHT OF WAY IN PROGRESS

SR 5469 (SHOPTON ROAD) AND SR 1156 (BEAM ROAD) IN CHARLOTTE. CONSTRUCT ROUNDABOUT.

DIV

CMAQ C 867 L C 403 STBGDA C 384 L C 96

MECKLENBURG CHARLOTTE

C-5621 9208 250US 21 AND CATAWBA AVENUE. RELOCATE INTERSECTION OF US 21 AND CATAWBA AVENUE TO THE EAST AND CONSTRUCT ROUNDABOUT.

EX

CMAQ R 1000 L R 250 BA R 3000 CMAQ C 806 L C 202 BA C 3700

MECKLENBURG CORNELIUS

C-4957 1049 1049CONSTRUCT SIDEWALKS AT SELECTED LOCATIONS IN INDIAN TRAIL.EX

UNION INDIAN TRAIL

A SUN VALLEY HIGH SCHOOL AND MIDDLE SCHOOL - UNDER CONSTRUCTIONEXB SOUTH SIDE OF UNION-INDIAN TRAIL ROAD AND ON THE NORTH SIDE OF SARDIS ROAD - COMPLETEEX

C-5531 802 802

UNDER CONSTRUCTION

KISTLER FARM-BRIARCLIFF-BELLINGHAM-WHITE OAK SIDEWALK NETWORK IN MOORESVILLE. CONSTRUCT SIDEWALKS IN VARIOUS LOCATIONS.

EXIREDELL MOORESVILLE

Page 17 of 18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE

Tuesday, July 25, 2017

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 25: TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT ... · nhp rg 466 ad rg 457 ad rg 492 ad rg 492 ad davidson rowan i-85 ex ac north of sr 2120 (long ferry road) in rowan county

CHARLOTTE REGIONAL TRANSPORTATION PLANNING ORGANIZATION

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS

UNFUNDEDFUTURE YEARSFY 2019FY 2018 FY 2020

STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027CONGESTION MITIGATION PROJECTS

C-5529 3446 552

RIGHT OF WAY IN PROGRESS; STBGDA FUNDS SPENT ON REGIONAL PROJECT ARE EXEMPT

INTERSECTION OF NC 115 AND FAITH ROAD-CAMPUS LANE IN MOORESVILLE. REALIGN FAITH ROAD TO TIE INTO EXISTING NC 115/CAMPUS LANE INTERSECTION AND CONSTRUCT DEDICATED TURN LANES ON FAITH ROAD AND CAMPUS LANE APPROACHES TO THE INTERSECTION.

EX

CMAQ C 996 L C 332 STBGDA C 750 L C 816

IREDELL MOORESVILLE

C-5200 1283 1283

UNDER CONSTRUCTION

NC 115 AND NC 150 IN MOORESVILLE. CONSTRUCT SOUTHBOUND NC 115 RIGHT TURN LANE AT NC 150 AND WESTBOUND NC 150 SHARED THROUGH-RIGHT LANE AT NC 115.

EXIREDELL MOORESVILLE

C-5701 396 396

UNDER CONSTRUCTION

INTERSECTION OF NC 801 AND NC 150. CONSTRUCT INTERSECTION IMPROVEMENTS.EX

IREDELL MOORESVILLE

C-5541 788 350

RIGHT OF WAY IN PROGRESS

PROVIDENCE ROAD IN CHARLOTTE. CONSTRUCT A SIDEWALK ON SOUTHWEST SIDE.EX

CMAQ C 350 L C 88

MECKLENBURG PROVIDENCE ROAD

C-5542 685 685

UNDER CONSTRUCTION

SOUTH TRYON STREET, QUEEN ANNE DRIVE TO NATIONS FORD ROAD IN CHARLOTTE. CONSTRUCT SIDEWALK ON SOUTHEAST SIDE.EX

MECKLENBURG SOUTH TRYONSTREET

C-5543 1386 1386

UNDER CONSTRUCTION

SUNSET ROAD, I-77 TO STATESVILLE ROAD IN CHARLOTTE. CONSTRUCT SIDEWALKS ON SOUTH SIDE AND INSTALL SIDEWALK ON THE I-77 OVERPASS.

EXMECKLENBURG SUNSET ROAD

Page 18 of 18 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE

Tuesday, July 25, 2017

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 26: TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT ... · nhp rg 466 ad rg 457 ad rg 492 ad rg 492 ad davidson rowan i-85 ex ac north of sr 2120 (long ferry road) in rowan county

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS

UNFUNDEDFUTURE YEARSFY 2019FY 2018 FY 2020

STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027INTERSTATE PROJECTS

I-5000 22847 15574

UNDER CONSTRUCTION

I-85/US 321. GEOMETRIC SAFETY IMPROVEMENTS TO INTERCHANGE.SW

NHP C 7273 GASTON I-85

I-5719 257509 2009

DESIGN-BUILD

US 321 TO NC 273. WIDEN TO EIGHT LANES. (COORDINATE WITH I-5713)

9.8

SW

NHP 18800R18800R NHP 2900U NHP 51063C51062C10750C C 51063 C 51062

GASTON I-85

I-5713 1360 200SR 2200 (COX ROAD) INTERCHANGE. CONSTRUCT INTERCHANGE IMPROVEMENTS. (COORDINATE WITH I-5719)SW

NHP R 160 NHP C 1000

GASTON I-85

I-4928 35826 35826

UNDER CONSTRUCTION

CONSTRUCT NEW I-85 NBL WEIGH STATION FROM SR 1302 (CROWDERS MOUNTAIN ROAD) TO SR 1307 (EDGEWOOD ROAD).TRN

GASTON I-85

I-5893 9118 9118

UNDER CONSTRUCTION

MILE MARKER 14 TO MILE MARKER 22. PAVEMENT REHABILITATION.

8.0SW

GASTON I-85

I-5894 7000 3500

UNDER CONSTRUCTION

MILE MARKER 22 TO MECKLENBURG COUNTY LINE. PAVEMENT REHABILITATION.

5.5SW

NHPIM C 3500 GASTON I-85

I-5916 4200SOUTH CAROLINA LINE TO GASTON COUNTY LINE. PAVEMENT REHABILITATION.

8.2SW

NHPIM 4200C CLEVELAND I-85

I-5921 4200CLEVELAND COUNTY LINE TO MILEMARKER 14. PAVEMENT REHABILITATION.

5.9SW

NHPIM 4200C GASTON I-85

I-5985 143400US 74 TO SOUTH CAROLINA LINE. WIDEN TO SIX LANES.

10.2

SW

NHP R 9700 NHP U 700 NHP 66500C C 33250 C 33250

CLEVELANDGASTON

I-85

I-5007 6506 6172

PROJECT COMPLETE - GARVEE BOND FUNDING $3.05 MILLION; PAYBACK FY 2007 - FY 2018

SOUTH FORK RIVER BRIDGE TO EXIT 27. PAVEMENT REHABILITATION.

3.1TRN

NHP CG 334 GASTON I-85

RURAL PROJECTSR-5713 3680 480US 74 BUSINESS TO NC 226. CONSTRUCT

ACCESS MANAGEMENT IMPROVEMENTS.6.0

REG

T R 100 T U 100 T C 3000

CLEVELAND US 74

Page 1 of 7 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE

Tuesday, July 25, 2017

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 27: TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT ... · nhp rg 466 ad rg 457 ad rg 492 ad rg 492 ad davidson rowan i-85 ex ac north of sr 2120 (long ferry road) in rowan county

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS

UNFUNDEDFUTURE YEARSFY 2019FY 2018 FY 2020

STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027RURAL PROJECTS

R-2707 381230 211280FOUR LANE DIVIDED FREEWAY ON NEW LOCATION.

18.6 T G 32000 C T R 5900 D T U 650 D T 9800C D9800C D9800C D C 9800 D T R 10400 E T U 700 E T 11000C E11000C E11000C E C 11000 E T P 18600 F T P 18500 G

CLEVELAND US 74 SHELBYBYPASS

A WEST OF SR 1162 (PEACHTREE ROAD) TO EAST OF SR 1315 (PLATO LEE ROAD). RIGHT-OF-WAY ONLY. - COMPLETEAA WEST OF SR 1162 (PEACHTREE ROAD) TO EAST OF SR 1318 (KIMBRELL ROAD). GRADING, STRUCTURES, PAVING - UNDER CONSTRUCTIONAB EAST OF SR 1318 (KIMBRELL ROAD) TO EAST OF SR 1315 (PLATO LEE ROAD). GRADING AND STRUCTURES - UNDER CONSTRUCTIONTRNB EAST OF SR 1315 (PLATO LEE ROAD) TO EAST OF NC 226. GRADING AND STRUCTURES - UNDER CONSTRUCTIONTRNC EAST OF NC 226 TO EAST OF NC 150. GRADING AND STRUCTURES - UNDER CONSTRUCTIONREGD EAST OF NC 150 TO EXISTING US 74 WEST OF SR 2238 (LONG BRANCH ROAD). GRADING, STRUCTURE, PAVING.REGE US 74 WEST OF SR 2238 TO WEST OF SR 1001 (STONEY POINT ROAD). GRADING, STRUCTURES, PAVING.REGF EAST OF SR 1318 (KIMBRELL ROAD) TO EAST OF NC 226. PAVINGTRNG WEST OF NC 226 TO WEST OF NC 150. PAVINGREG

R-5859 51800NC 73 TO SR 1389 (FAIRFIELD FOREST ROAD). WIDEN TO MULTI-LANES.

3.8

DIV

T 13000R T 1600U T 12400C C 12400 C 12400

LINCOLN NC 16 BUSINESS

R-5712 1163 233INTERSECTION OF NC 16 BUSINESS AND SR 1439 (UNITY CHURCH ROAD)/SR 1387 (TRIANGLE CIRCLE). ADD TURN LANES.REG

T R 180 T C 750

LINCOLN NC 16 BUSINESS

R-5710 1230

PLANNING/ENVIRONMENTAL DOCUMENT TO BE COMPLETED UNDER PROJECT R-5721

INTERSECTION OF NC 73 AND NC 16 BUSINESS. INTERSECTION IMPROVEMENTS.

REG

T R 180 T U 100 T 950C

LINCOLN NC 73

R-5721 151900 500

PLANNING/DESIGN IN PROGRESS.

NC 16 BUSINESS IN LINCOLN COUNTY TO SR 5544 (WEST CATAWBA AVENUE) IN MECKLENBURG COUNTY. WIDEN TO MULTI-LANES.

9.1 T R 30000 A T U 6000 A T 14500C A14500C A C 14500 A C 14500 A T R 45000 B T U 1000 B T 2850C B2850C B C 2850 B C 2850 B

LINCOLNMECKLENBURG

NC 73

A NC 16 BUSINESS TO VANCE ROAD EXTENSION/BEATTIES FORD ROAD.REGB VANCE ROAD EXTENSION/BEATTIES FORD ROAD TO SR 5544 (WEST CATAWBA AVENUE).REG

R-2307 257620 2220

PLANNING/DESIGN IN PROGRESS - COORDINATE WITH PROJECT I-5717

RELOCATED NC 16 (TIP PROJECT R-2206) TO US 21. WIDEN TO MULTI-LANES.

15.0 STBG 25000R A R 25000 A STBG 3400U A STBG 22000C A C 22000 A C 22000 A C 22000 ASTBG C 27250 B C 27250 B 27250C B27250C B STBGBA C 5000 B

CATAWBAIREDELLLINCOLN

NC 150

A RELOCATED NC 16 (TIP PROJECT R-2206) TO EAST OF SR 1840 (GREENWOOD ROAD)REGB EAST OF SR 1840 (GREENWOOD ROAD) IN CATAWBA COUNTY TO US 21 IN IREDELL COUNTY - RIGHT OF WAY IN PROGRESSREG

Page 2 of 7 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE

Tuesday, July 25, 2017

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 28: TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT ... · nhp rg 466 ad rg 457 ad rg 492 ad rg 492 ad davidson rowan i-85 ex ac north of sr 2120 (long ferry road) in rowan county

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS

UNFUNDEDFUTURE YEARSFY 2019FY 2018 FY 2020

STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027RURAL PROJECTS

R-0617 69201 35801NC 279 AT CHERRYVILLE TO RELOCATED US 321. WIDEN TO MULTI-LANES, PART ON NEW LOCATION.

10.6 T 5300R BB T 1600U BB T C 13250 BB C 13250 BB

GASTONLINCOLN

NC 150

A NC 279 AT CHERRYVILLE TO THE LINCOLN COUNTY LINE. - COMPLETEBA GASTON COUNTY LINE TO WEST OF INDIAN CREEK. - COMPLETEBB WEST OF INDIAN CREEK TO US 321 AT LINCOLNTON.REGC US 321 AT LINCOLNTON TO US 321 BYPASS.

R-5849 1875CONSTRUCT IMPROVEMENTS TO SR 1313 (WASHBURN SWITCH ROAD) AND A NEW 3-LANE ROAD OFF SR 1313 (WASHBURN SWITCH ROAD) FOR ACCESS TO NEW INDUSTRIAL SITES.

DIV

S C 1875 CLEVELAND NEW ROUTE

R-5792 663 663

UNDER CONSTRUCTION

DIVISION 12 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.

DIV

ALEXANDERCATAWBACLEVELANDGASTONIREDELLLINCOLN

VARIOUS

URBAN PROJECTSU-6043 9200SR 2200 (COX ROAD) TO 400 FEET EAST OF

LINEBERGER ROAD. ADD LANE IN THE EASTBOUND DIRECTION.

1.1

DIV

T 2400R T 500U T 6300C

GASTON US 29 (FRANKLINBOULEVARD), US 74

U-5965 3000US 29 (FRANKLIN BOULEVARD) AND NC 274. CONSTRUCT INTERSECTION IMPROVEMENTS.

REG

T R 500 T U 100 T 2400C

GASTON US 29 (FRANKLINBOULEVARD)

U-5929 17000INTERSECTION OF US 74 (DIXON BOULEVARD) AND NC 226 (EARL ROAD). CONSTRUCT IMPROVEMENTS.

SW

T 5300R T 700U T 11000C

CLEVELAND US 74 (DIXONBOULEVARD)

U-2567 13200 1500NC 150 (DEKALB STREET) INTERSECTION. CONSTRUCT INTERCHANGE.

SW

T 2200R T 500U T 9000C

CLEVELAND US 74 (DIXON BLVD)

U-5775 2010 150

$300,000 FROM CITY OF SHELBY

INTERSECTION OF US 74 BUSINESS (MARION STREET) AND NC 150 (CHERRYVILLE ROAD). REALIGN INTERSECTION.

REG

T R 360 T C 1200 L C 300

CLEVELAND US 74 BUSINESS(MARION STREET)

U-5959 700US 74 (WILKINSON BOULEVARD) AT NC 273 (PARK STREET). CONSTRUCT INTERSECTION IMPROVEMENTS.

REG

T R 100 T U 100 T 500C

GASTON US 74 (WILKINSONBOULEVARD)

Page 3 of 7 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE

Tuesday, July 25, 2017

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 29: TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT ... · nhp rg 466 ad rg 457 ad rg 492 ad rg 492 ad davidson rowan i-85 ex ac north of sr 2120 (long ferry road) in rowan county

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS

UNFUNDEDFUTURE YEARSFY 2019FY 2018 FY 2020

STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027URBAN PROJECTS

U-6038 715NC 7 (CATAWBA STREET) TO SR 2209 (WESLEYAN DRIVE). IMPLEMENT ADAPTIVE SIGNAL SYSTEM.

3.9

DIV

T U 40 T C 675

GASTON US 74 (WILKINSONBOULEVARD)

U-5970 460019TH AVENUE TO CLYDE. CONSTRUCT ACCESS MANAGEMENT IMPROVEMENTS.

REG

T 1300R T 500U T C 2800

GASTON US 321 (SOUTHYORK ROAD)

U-5800 565 100INTERSECTION OF NC 7/US 74 AND NC 7/US 29. CONSTRUCT NORTHBOUND THROUGH LANE AND INTERSECTION IMPROVEMENTS.REG

T R 90 T 375C

GASTON NC 7

U-3608 4715 500I-85 TO US 29/74. WIDEN TO MULTI-LANES. 0.3

DIV

T R 460 T U 55 T 3700C

GASTON NC 7

U-5962 4750

"L" REPRESENTS FUNDS FROM LINCOLN COUNTY

NC 16 BUSINESS, SR 1373 (CAMPGROUND ROAD), SR 1386 (WILL PROCTOR ROAD). REALIGN OFFSET INTERSECTIONS.

REG

T 900R T 100U L 288C T 3462C

LINCOLN NC 16 BUSINESS

U-5819 2550 200INTERSECTION OF NC 27 (WEST CHARLOTTE AVENUE) AND SR 2534 (HAWTHORNE STREET). CONSTRUCT INTERSECTION IMPROVEMENTS.DIV

T R 450 T C 1900

GASTON NC 27 (WESTCHARLOTTE AVENUE)

U-2221 41589 16189NC 226 TO NC 150. WIDEN TO MULTI-LANES. 4.9 T 1200R A T 6100C A T 7600R C T 900U C T C 9600 C

CLEVELAND NC 180

A NC 226 TO SR 2200.B SR 2200 TO SR 2052. - COMPLETEC SR 2052 TO NC 150.REG

U-3633 19904 12805

UNDER CONSTRUCTION

TUCKASEEGEE ROAD (AT BEATTY DRIVE) TO HIGHLAND STREET (AT A & E DRIVE) IN MOUNT HOLLY. WIDEN TO FOUR-LANES DIVIDED.

1.3

REG

NHP C 7099 GASTON NC 273 (SOUTH MAINSTREET)

U-5961 11600

"L" FUNDS ARE FROM CITY OF GASTONIA

OSCEOLA STREET TO NIBLICK DRIVE. UPGRADE ROADWAY.

1.0

REG

T 1750R1750R T 500U L C 5000 T C 2600

GASTON NC 274 (UNION ROAD)

Page 4 of 7 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE

Tuesday, July 25, 2017

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 30: TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT ... · nhp rg 466 ad rg 457 ad rg 492 ad rg 492 ad davidson rowan i-85 ex ac north of sr 2120 (long ferry road) in rowan county

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS

UNFUNDEDFUTURE YEARSFY 2019FY 2018 FY 2020

STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027URBAN PROJECTS

U-6078 900INTERSECTION OF NC 275 AND NC 274, INTERSECTION OF NC 275 AND SR 1327 (FAIRVIEW ROAD), AND INTERSECTION OF SR 1456 (WHITE JENKINS ROAD) AND SR 1327 (FAIRVIEW ROAD). IMPROVE INTERSECTIONS AND CLOSE INTERSECTION OF NC 275 AND SR 1456 (WHITE JENKINS ROAD)

DIV

T 150R T 100U T 650C

GASTON NC 275

U-5821 28730 600SR 2478 (TITMAN ROAD) TO SR 2435 (UNION-NEW HOPE ROAD). WIDEN TO 3-LANES.

3.8

DIV

T R 1100 T U 130 T 13450C13450C

GASTON NC 279 (NEWHOPE ROAD)

U-2523 31623 17423NC 7 TO WEST OF NC 275 IN DALLAS. WIDEN TO MULTI-LANES.

3.6 T R 3700 B T U 500 B T 3333C B3334C B3333C B

GASTON NC 279

A NC 7 (OZARK AVENUE) TO NORTH OF SR 2275 (ROBINSON-CLEMMER ROAD). - COMPLETEB NORTH OF SR 2275 (ROBINSON-CLEMMER ROAD) TO WEST OF NC 275 IN DALLAS. - COORDINATE WITH U-5778REG

U-5778 3150 150

COORDINATE WITH PROJECT U-2523B

INTERSECTION OF NC 279 (LOWER DALLAS HIGHWAY) AND NC 275 (DALLAS STANLEY HIGHWAY). INTERSECTION IMPROVEMENTS

REG

T R 500 T U 100 T 2400C

GASTON NC 279 (LOWERDALLAS HIGHWAY)

U-6044 31700I-85 TO US 29/74. SELECTIVE WIDENING AND OPERATIONAL IMPROVEMENTS.

0.3

DIV

T R 4900 T U 600 T 8733C C 8733 C 8734

GASTON SR 2200 (COXROAD)

HIGHWAY SAFETY PROJECTSW-5311 1338 1338

UNDER CONSTRUCTION

US 321 AT SR 2416 (ROBINSON ROAD), AND US 321 JUST NORTH OF SR 2416. REPLACE OVERHEAD RAILROAD BRIDGE TO ALLOW FOR CONSTRUCTION OF TWO-LANE, TWO-WAY ROAD FOR SR 2416, CONSTRUCT RIGHT TURN LANE FOR US 321 NORTHBOUND APPROACH AND CONSTRUCT TWO LIMITED MOVEMENT CROSSOVERS, AND REVISE EXISTING FLASHER.

SWGASTON US 321

W-5712 2930 1530

IN PROGRESS

SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 12.

HSIP R 30 DIV R 30 DIV HSIP C 180 DIV C 180 DIV HSIP R 30 RE R 30 RE HSIP C 180 RE C 180 RE HSIP R 40 SW R 40 SW HSIP C 240 SW C 240 SW

ALEXANDERCATAWBACLEVELANDGASTONIREDELLLINCOLN

VARIOUS

DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW

Page 5 of 7 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE

Tuesday, July 25, 2017

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 31: TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT ... · nhp rg 466 ad rg 457 ad rg 492 ad rg 492 ad davidson rowan i-85 ex ac north of sr 2120 (long ferry road) in rowan county

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS

UNFUNDEDFUTURE YEARSFY 2019FY 2018 FY 2020

STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027HIGHWAY SAFETY PROJECTS

W-5212 5973 5348

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

DIVISION 12 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

HSIP R 50 DIV HSIP C 575 DIV

ALEXANDERCATAWBACLEVELANDGASTONIREDELLLINCOLN

VARIOUS

DIV DIVISION 12 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN THE DIVISION CATEGORY.DIVREG DIVISION 12 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN THE REGIONAL CATEGORY.REG

CONGESTION MITIGATION PROJECTSC-4934 2764 2764

UNDER CONSTRUCTION

NC 279 (NEW HOPE ROAD), BURTONWOOD DRIVE TO SR 2466 (GARRISON BOULEVARD) IN GASTONIA. ADD TURN LANE.

0.5

EX

GASTON NC 279 (NEW HOPEROAD)

C-5606 3804 116

IN PROGRESS

PROJECTS TO IMPROVE CONGESTION AND AIR QUALITY IN THE GASTON-CLEVELAND-LINCOLN MPO.

EX

CMAQ PE 146 PE 149 L PE 37 PE 37 CMAQ R 146 R 149 L R 37 R 37 CMAQ C 877 C 893 L C 219 C 223 CMAQ O 146 O 149 L O 37 O 37 CMAQ I 146 I 149 L I 37 I 37

CLEVELANDGASTONLINCOLN

VARIOUS

C-5505 1040 1040

UNDER CONSTRUCTION

RAIL TRAIL, WOODLAWN AVENUE TO BELMONT ABBEY COLLEGE AND DOWNTOWN. CONVERT ABANDONED NCDOT RAILROAD LINE TO A PEDESTRIAN TRAIL.

EXGASTON BELMONT

C-5536 624 624

IN PROGRESS

MECKLENBURG COUNTY AIR QUALITY -GRADE (GRANTS TO REPLACE AGING DIESEL ENGINS). REPLACE, REPOWER OR RETROFIT AGING DIESEL VEHICLES AND EQUIPMENT.

EX

CABARRUSGASTONIREDELLLINCOLNMECKLENBURGROWANUNION

CHARLOTTE

C-5623 527 57

RIGHT OF WAY IN PROGRESS

BALTIMORE DRIVE TO SOUTH NEW HOPE ROAD. CONSTRUCT SIDEWALK.

EX

CMAQ C 360 L C 110

GASTON CRAMER MOUNTAINROAD

C-5508 190 190

UNDER CONSTRUCTION

DALLAS-HIGH SHOALS ROAD (OLD US 321), DALLAS CHERRYVILLE HIGHWAY TO PARK ROAD AND EAST ON PARK ROAD TO SAM RHYME COURT. CONSTRUCT SIDEWALKS.

EXGASTON DALLAS

C-5622 420 420

UNDER CONSTRUCTION

HIGHLAND BRANCH GREENWAY, PHASE I. CONSTRUCT GREENWAYEX

GASTON GASTON COUNTY

Page 6 of 7 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE

Tuesday, July 25, 2017

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 32: TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT ... · nhp rg 466 ad rg 457 ad rg 492 ad rg 492 ad davidson rowan i-85 ex ac north of sr 2120 (long ferry road) in rowan county

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS

UNFUNDEDFUTURE YEARSFY 2019FY 2018 FY 2020

STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027CONGESTION MITIGATION PROJECTS

C-5186 78 78

IN PROGRESS

GASTONIA CCTV CAMERAS. INSTALL 6 CCTV CAMERAS TO THE EXISTING COMPURIZED TRAFFIC SIGNAL SYSTEM ON I-85 AT NC 7 (OZARK AVENUE); US 29/US 74 AT FRANKLIN SQUARE II; NC 279 (NEW HOPE ROAD) AT OZARK AVENUE; US 321 (CHESTER STREET) AT TULIP DRIVE-BULB AVENUE; NC 274 (BESSEMER CITY ROAD) AT NC 275 (DALLAS-BESSEMER CITY ROAD AND US 274 (UNION ROAD) AT SR 1255 (HUDSON BOULEVARD).

EXGASTON GASTONIA

C-5562 595 595

UNDER CONSTRUCTION

BIKE AND PEDESTRIAN IMPROVEMENTS BETWEEN DOWNTOWN AND LINEBERGER PARK.EX

GASTON GASTONIA

C-5566 256 256

IN PROGRESS

GPS AUTHOMATIC VEHICLE LOCATOR PROGRAM FOR FLEET VEHICLES.EX

GASTON GASTONIA

C-5532 527 58

RIGHT OF WAY IN PROGRESS

GENERAL BOULEVARD-MAIN STREET PEDESTRIAN IMPROVEMENTS IN LINCOLNTON. CONSTRUCT HIGH VISIBILITY CROSSWALKS, PEDESTRIAN REFUGE ISLANDS AND INSTALL COUNTDOWN TIMERS.

EX

CMAQ C 375 L C 94

LINCOLN LINCOLNTON

Page 7 of 7 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE

Tuesday, July 25, 2017

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 33: TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT ... · nhp rg 466 ad rg 457 ad rg 492 ad rg 492 ad davidson rowan i-85 ex ac north of sr 2120 (long ferry road) in rowan county

COUNTY: UNION

HIGHWAY PROGRAM

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS

UNFUNDEDFUTURE YEARSFY 2019FY 2018 FY 2020

STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027RURAL PROJECTS

R-3329 814000 814000

UNDER CONSTRUCTION - NC TURNPIKE AUTHORITY PROJECT

I-485 (CHARLOTTE OUTER LOOP) TO PROJECT R-2559 (US 74 MONROE BYPASS). MULTI-LANE FREEWAY ON NEW LOCATION.

10.5

TRN

MECKLENBURGUNION

US 74 BYPASS

R-2559 29663 29663

NORTH CAROLINA TURNPIKE AUTHORITY PROJECT - SEE R-3329 FOR ADDITIONAL FUNDING

FOUR LANES DIVIDED ON NEW LOCATION. 9.2UNION US 74MONROE BYPASS

R-5790 745 745

UNDER CONSTRUCTION

DIVISION 10 PROGRAM TO UPGRADE INTERSECTIONS TO COMPLY WITH THE AMERICANS WITH DISABILITIES ACT (ADA) USING TRANSPORTATION ALTERNATIVES (TA) FUNDS.

DIV

ANSONCABARRUSMECKLENBURGSTANLYUNION

VARIOUS

URBAN PROJECTSU-5764 16800 300

LET WITH U-5931

HANOVER DRIVE TO SR 1007 (ROCKY RIVER ROAD). WIDEN EXISTING ROADWAY.

2.8

REG

T R 500 T U 500 T 5167C5166C5167C

UNION US 74

U-5931 4500

LET WITH U-5764

INTERSECTION OF US 74 AND SECREST SHORTCUT ROAD. CONSTRUCT IMPROVEMENTS.

SW

T R 1200 T U 300 T 3000C

UNION US 74

U-5703 2350 200SR 1514 (ROCKY RIVER ROAD) INTERSECTION. RECONFIGURE TO SUPERSTREET.SW

T R 400 T C 1750

UNION US 74 (ROOSEVELTBLVD)

U-4024 14250

COORDINATE WITH U-5723

EXISTING US 74 TO THE MONROE BYPASS. WIDEN TO MULTI-LANES.

0.9

REG

T R 500 T U 750 T C 13000

UNION US 601

U-5769 82500SR 1316 (REA ROAD EXTENSION) TO SR 3530 (WAXHAW PARKWAY) IN WAXHAW. WIDEN TO MULTI-LANES.

5.7 T 5800R A5800R A T 1400U A T 19600C A C 19600 A T 4800R B4800R B T 1200U B T 19500C B

UNION NC 16 (PROVIDENCEROAD SOUTH)

A SR 1316 (REA ROAD EXTENSION) TO SR 1321 (CUTHBERTSON ROAD) IN WEDDINGTON. WIDEN TO MULTI-LANES.REGB SR 1321 (CUTHBERTSON ROAD) IN WEDDINGTON TO SR 3530 (WAXHAW PARKWAY) IN WAXHAW. WIDEN TO MULTI-LANES.REG

Page 1 of 4 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE

Tuesday, July 25, 2017

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 34: TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT ... · nhp rg 466 ad rg 457 ad rg 492 ad rg 492 ad davidson rowan i-85 ex ac north of sr 2120 (long ferry road) in rowan county
Page 35: TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT ... · nhp rg 466 ad rg 457 ad rg 492 ad rg 492 ad davidson rowan i-85 ex ac north of sr 2120 (long ferry road) in rowan county

COUNTY: UNION

HIGHWAY PROGRAM

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS

UNFUNDEDFUTURE YEARSFY 2019FY 2018 FY 2020

STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027URBAN PROJECTS

U-3467 49875 1325NC 16 TO SR 1008 (WAXHAW-INDIAN TRAIL ROAD) IN WESLEY CHAPEL. CONSTRUCT FOUR LANE ROADWAY, PART ON NEW LOCATION.

4.3

REG

STBG R 15250 STBG U 800 STBG C 10833 C 10834 10833C

UNION NC 84

U-4714 107500 1000SR 3448-SR 3474 (TRADE STREET) TO SR 1377 (WESLEY CHAPEL-STOUTS ROAD). WIDEN TO MULTI-LANES.

6.5 STBGDA R 9500 A S(M) R 2400 A STBG R 9700 A STBGDA 1925C A1925C A1925C A C 1925 A S(M) 481C A481C A481C A C 482 A STBG 1925C A1925C A1925C A C 1925 A T R 1000 AB T C 19000 AB STBGDA R 14540 B S(M) R 1860 B L R 10000 B STBGDA 4235C B4235C B4235C B C 4235 B S(M) 1059C B1059C B1059C B C 1058 B

MECKLENBURGUNION

SR 1009 (JOHNSTREET-OLDMONROE ROAD)

A SR 3448-SR 3474 (TRADE STREET) TO WEST OF MORNINGSIDE MEADOW LANE. (EXCLUDING I-485 INTERCHANGE)DIVAB I-485. IMPROVE INTERCHANGE - TO BE LET WITH I-5507DIVB WEST OF MORNINGSIDE MEADOW LANE TO EAST OF SR 1377 (WESLEY CHAPEL-STOUTS ROAD).DIV

U-6031 6800SEYMOUR STREET TO NC 200 (DICKERSON BOULEVARD). WIDEN TO FOUR-LANES DIVIDED.

0.4

DIV

T 950R950R T 500U T C 4400

UNION SR 1009 (CHARLOTTEAVENUE)

U-5808 4790 1050SR 1367 (MATTHEWS INDIAN TRAIL ROAD) TO SR 1368 (GRIBBLE ROAD). CONSTRUCT ROAD ON NEW LOCATION.

0.4

DIV

T R 300 T U 40 T 3400C

UNION SR 1362 (CHESTNUTLANE CONNECTOR)

U-4950 10000

FORMERLY U-9999C - IN PROGRESS

CHARLOTTE REGIONAL TRANSPORTATION PLANNING ORGANIZATION (CRTPO) PLANNING (PL) SUPPLEMENT.

DIV

STBGDA PE 800 PE 800 PE 800 800PE800PE800PE PE 800 PE 800 PE 800 PE 800L PE 200 PE 200 PE 200 200PE200PE200PE PE 200 PE 200 PE 200 PE 200

IREDELLMECKLENBURGUNION

VARIOUS

U-4744 150501STBG-DA IN CHARLOTTE REGIONAL TRANSPORTATION PLANNING ORGANIZATION (CRTPO).

DIV

STBGDA 15400C15400C28001C C 15400 C 15400 C 15400 C 15400L 3850C3850C7000C C 3850 C 3850 C 3850 C 3850

IREDELLMECKLENBURGUNION

VARIOUS

U-5723 8000 200

COORDINATE WITH U-4024

US 601 INTERCHANGE. CONSTRUCT IMPROVEMENTS.

SW

T R 300 T C 7500

UNION EXISTING US 74

Page 2 of 4 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE

Tuesday, July 25, 2017

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 36: TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT ... · nhp rg 466 ad rg 457 ad rg 492 ad rg 492 ad davidson rowan i-85 ex ac north of sr 2120 (long ferry road) in rowan county
Page 37: TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT ... · nhp rg 466 ad rg 457 ad rg 492 ad rg 492 ad davidson rowan i-85 ex ac north of sr 2120 (long ferry road) in rowan county

COUNTY: UNION

HIGHWAY PROGRAM

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS

UNFUNDEDFUTURE YEARSFY 2019FY 2018 FY 2020

STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027URBAN PROJECTS

U-4913 8595 1545I-485 TO SR 1524 (STEVENS MILL ROAD). WIDEN EXISTING ROADWAY.

0.8

DIV

T R 150 T U 900 T 2000C2000C2000C

MECKLENBURGUNION

IDLEWILD ROAD

U-5987 2510 270

RIGHT OF WAY IN PROGRESS

UNIONVILLE-INDIAN TRAIL ROAD AND SARDIS ROAD. CONSTRUCT INTERSECTION IMPROVEMENTS.DIV

STBGDA C 1680 L C 560

UNION INDIAN TRAIL

U-5112 2825 325

RIGHT OF WAY IN PROGRESS - PROJECT TO BE ADMINISTERED BY THE TOWN OF STALLINGS

SR 1364 (PLEASANT PLAINS ROAD) AT SR 1357 (POTTERS ROAD) IN STALLINGS. CONSTRUCT INTERSECTION IMPROVEMENTS INCLUDING LEFT TURN LANES AND MODIFICATION OF TRAFFIC SIGNAL.

TRN

STBGDA C 1600 L C 400 HSIP C 500

UNION STALLINGS

HIGHWAY SAFETY PROJECTSW-5520 7755 7755

UNDER CONSTRUCTION

FAIRVIEW ROAD TO WESLEY CHAPEL STOUTS ROAD IN INDIAN TRAIL. CONVERT EXISTING FULL MOVEMENT SIGNALIZED INTERSECTIONS TO SIGNALIZED SUPERSTREET DESIGN.

REGUNION US 74

W-5210 11865 11865

DIVISION PURCHASE ORDER CONTRACT (DPOC) - IN PROGRESS

DIVISION 10 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS.

ANSONCABARRUSMECKLENBURGSTANLYUNION

VARIOUS

DIV DIVISION 10 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN DIVISION CATEGORY.DIVREG DIVISION 10 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN REGIONAL CATEGORY.REGSW DIVISION 10 RUMBLE STRIPS, GUARDRAIL, SAFETY AND LIGHTING IMPROVEMENTS AT SELECTED LOCATIONS IN STATEWIDE CATEGORY.SW

W-5710 1678 278SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS IN DIVISION 10.

HSIP R 30 DIV R 30 DIV HSIP C 180 DIV C 180 DIV HSIP R 30 RE R 30 RE HSIP C 180 RE C 180 RE HSIP R 40 SW R 40 SW HSIP C 240 SW C 240 SW

ANSONCABARRUSMECKLENBURGSTANLYUNION

VARIOUS

DIV SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.DIVREG SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.REGSW SAFETY IMPROVEMENTS AT VARIOUS LOCATIONS.SW

Page 3 of 4 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE

Tuesday, July 25, 2017

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 38: TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT ... · nhp rg 466 ad rg 457 ad rg 492 ad rg 492 ad davidson rowan i-85 ex ac north of sr 2120 (long ferry road) in rowan county
Page 39: TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT ... · nhp rg 466 ad rg 457 ad rg 492 ad rg 492 ad davidson rowan i-85 ex ac north of sr 2120 (long ferry road) in rowan county

COUNTY: UNION

HIGHWAY PROGRAM

ROUTE/CITYCOUNTYID

LOCATION / DESCRIPTION (THOU) (THOU)NUMBER

PRIORYEARSCOST

TOTALPROJCOST

LENGTH

TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAKS

FUNDS

UNFUNDEDFUTURE YEARSFY 2019FY 2018 FY 2020

STATE TRANSPORTATION IMPROVEMENT PROGRAM DEVELOPMENTAL PROGRAM

FY 2021 FY 2022 FY 2023 FY 2024 FY 2025 FY 2026 FY 2027CONGESTION MITIGATION PROJECTS

C-5617 249PROJECTS TO IMPROVE CONGESTION AND AIR QUALITY IN THE ROCKY RIVER RPO.

EX

CMAQ PE 10 PE 10 L PE 2 PE 3 CMAQ R 10 R 10 L R 2 R 3 CMAQ C 59 C 60 L C 15 C 15 CMAQ O 10 O 10 L O 2 O 3 CMAQ I 10 I 10 L I 2 I 3

UNION VARIOUS

C-5613 20901PROJECTS TO IMPROVE CONGESTION AND AIR QUALITY IN THE CHARLOTTE REGIONAL TRANSPORTATION PLANNING ORGANIZATION (CRTPO) AREA.

EX

CMAQ PE 828 PE 844 L PE 207 PE 211 CMAQ R 828 R 844 L R 207 R 211 CMAQ C 4971 C 5062 L C 1243 C 1265 CMAQ O 828 O 844 L O 207 O 211 CMAQ I 828 I 844 L I 207 I 211

IREDELLMECKLENBURGUNION

VARIOUS

C-5536 624 624

IN PROGRESS

MECKLENBURG COUNTY AIR QUALITY -GRADE (GRANTS TO REPLACE AGING DIESEL ENGINS). REPLACE, REPOWER OR RETROFIT AGING DIESEL VEHICLES AND EQUIPMENT.

EX

CABARRUSGASTONIREDELLLINCOLNMECKLENBURGROWANUNION

CHARLOTTE

C-4957 1049 1049CONSTRUCT SIDEWALKS AT SELECTED LOCATIONS IN INDIAN TRAIL.EX

UNION INDIAN TRAIL

A SUN VALLEY HIGH SCHOOL AND MIDDLE SCHOOL - UNDER CONSTRUCTIONEXB SOUTH SIDE OF UNION-INDIAN TRAIL ROAD AND ON THE NORTH SIDE OF SARDIS ROAD - COMPLETEEX

Page 4 of 4 COST AND SCHEDULES ARE PRELIMINARY AND SUBJECT TO SIGNIFICANT CHANGE AS MORE INFORMATION BECOMES AVAILABLE

Tuesday, July 25, 2017

DIV - Division Category EX - Exempt CategoryHF - State Dollars (Non STI) REG - Regional Category SW - Statewide Category TRN - Transition Project

Page 40: TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT ... · nhp rg 466 ad rg 457 ad rg 492 ad rg 492 ad davidson rowan i-85 ex ac north of sr 2120 (long ferry road) in rowan county