Type of funding scheme: STREP Work programme topics addressed: PHC 30 – 2015 Digital...
-
Upload
giles-lambert -
Category
Documents
-
view
219 -
download
0
description
Transcript of Type of funding scheme: STREP Work programme topics addressed: PHC 30 – 2015 Digital...
FP7 : Radiology Assistant Type of funding scheme: STREP
Work programme topics addressed:PHC 30 – 2015 Digital representation of
health data to improve disease diagnosis
and treatment
Name of the coordinating person:Ivana Ribić, Aleksandra Karadžić
Faculty of MathematicsUniversity of Belgrade
Ivana Ribić[email protected] Aleksandra Karadžić[email protected]
1/19
STREPRadiology Assistant
Table of Contents
▸ Project partners▸ Proposal abstract ▸ Concept and objectives▸ Work packages - Gantt chart▸ Work package list▸ List of Deliverables▸ Milestones ▸ Summary of effort ▸ Ethical Issues
2/19
STREPRadiology Assistant
Ivana RibićAleksandra Karadžić
3/19
Participant no. Participant organisation name Part. short name Country
1 (Coordinator) Faculty of Mathematics,University of Belgrade,http://www.matf.bg.ac.rs
MATF Serbia
2 Faculty of Electrical Engineering,University of Belgrade,http://www.eft.bg.ac.rs
ETF Serbia
3 Harvard Medical School,http://hms.harvard.edu
HMS United States
4 MediPro, www.medipro.com
MPRO United States
5 National Institute of Medical Statistics,http://nims-icmr.nic.in
NIMS India
List of Participants
STREPRadiology Assistant
Ivana RibićAleksandra Karadžić
MAPSMATF
& ETF
4/19
HMS
NIMS
MPRO
STREPRadiology Assistant
Ivana RibićAleksandra Karadžić
▸ Quick diagnosis▸ Accurate diagnosis▸ Using the precision of the
computers▸ Great impact on the field of
medicine▸ Gives chance to choose the best
solution for patient’s rehabilitation
5/19
Project abstractSTREPRadiology Assistant
Ivana RibićAleksandra Karadžić
6/19
Concept and objectives
▸ Designing an algorithm
▸ Developing a practical input / output system adjusted to standards of every hospital
▸ Testing with positive results
▸ Complete X-rays database
STREPRadiology Assistant
Ivana RibićAleksandra Karadžić
The overall strategy of the work plan
The project is organized in 6 work packages as follows:
▸ WP0 Project management
▸ WP1 Designing an algorithm
▸ WP2 Definition of the input / output ▸ WP3 Testing of the Proof of Concept in real-life
scenario ▸ WP4 Informing the scientific and technical environment
▸ WP5 Impact on the environment
7/19
STREPRadiology Assistant
Ivana RibićAleksandra Karadžić
GANTT CHART
8/19
STREPRadiology Assistant
Ivana RibićAleksandra Karadžić
9/19
Work package list
RTD = Research and technological development
DEM = Demonstration
MGT = Management
Work package
No
Work package title
Type of activity
Lead partic
no.
Lead partic. short name
Person-months
Start month
End month
WP0 Project management
MGT 1 MATF 35 M1 M12
WP1 Designing an algorithm
RTD 2 ETF 50 M1 M6
WP2 Definition of the input / output
RTD 5 NIMS 25 M7 M8
WP3 Testing of the Proof of Concept in real-life scenario
RTD 3 HMS 120 M9 M11
WP4 Informing the scientific and technical environment
DEM 1 MATF 20 M4 M11
WP5 Impact on the environment
DEM 4 MPRO 20 M1 M12
TOTAL 270
STREPRadiology Assistant
Ivana RibićAleksandra Karadžić
10/19
Del. no.
Deliverable name WP no.
Nature Dissemination level
Delivery date(proj.month)
D0.1 Progress report for the six months of work
WP0 R PU M6
D0.2 Progress report for the six months of work
WP0 R PU M12
D0.3 Progress report of whole project WP0 R PU M12
D1.1 Documented code WP1 R CO M3
D1.2 Documented testing procedures and final code documented
WP1 R CO M6
D2.1 List containing information about every possible platform and operating system
WP2 R PU M7
List of Deliverables1/2
R = ReportP = PrototypeD = DemonstratorO = Other PU = PublicPP = Restricted to other programme participants (including the Commission Services)RE = Restricted to a group specified by consortium CO = Confidential, only for members of the consortium
STREPRadiology Assistant
Ivana RibićAleksandra Karadžić
11/19
D2.2 Report on code optimization for all platforms and operating system
WP2 R CO M7
D2.3 Final version of software implementation
WP2 R CO M7
D3.1 Report on testing results in Serbia
WP3 R PU M11
D3.2 Proposal for product development for mass market
WP3 R PU M11
D4.1 Set of Rs by partners on planned activities
WP4 R PU M1
D4.2 Number of papers (Ps) written for the workshop
WP4 R PU M4
D4.3 Number of papers (Ps) written for the first symposium
WP4 R PU M11
D5.1 List of public appearances for dissemination purposes and content there-offs
WP5 R PU M12
D5.2 List of investor contact and presentation made
WP5 R PU M12
D5.3 List of brainstorming meetings, and contents there-offs
WP5 R PU M12
D5.4 List of in-house talks and brainstorming meetings, ad contents there-offs
WP5 R PU M12
List of Deliverables2/2
R = ReportP = PrototypeD = DemonstratorO = Other PU = PublicPP = Restricted to other programme participants (including the Commission Services)RE = Restricted to a group specified by consortium CO = Confidential, only for members of the consortium
STREPRadiology Assistant
Ivana RibićAleksandra Karadžić
12/19
Milestone number
Milestone name Work package(s)
involved
Expected date
Means of verification
M0.1 Checking on optimization of the reporting processes involved in the project (deadlines)
WP0 M6
M0.2 Checking on optimization of the control processes involved in the project
WP0 M12
M0.3 Checking on optimizing finances of the project
WP0 M12
M1.1 Checking implementation without bugs WP1 M6
M2.1 Checking on specification of hardware and software throughout the target market
WP2 M7
M2.2 Checking implementation on of algorithm for all possible platforms and operating systems without bugs, whether the installation plan covers all possible troubleshooting regarding the installation
WP2 M8
M2.3 Checking whether the maintenance plan covers all possible troubleshooting regarding the possible hardware and software problems
WP2 M8
Milestones1/2
STREPRadiology Assistant
Ivana RibićAleksandra Karadžić
13/19
M3.1 Checking on test cases developed according to the needs of the beneficiary industry
WP3 M11 Web site accessible on Internet
M3.2 Checking on specification of issuesto compare which takes countryspecifics into consideration
WP3 M11 Exploitation workshop held with industry participation
M3.3 Checking on details of the requirements for industrial prototype to follow.
WP3 M11
M4.1 Checking on number of papers presented at internal workshopsand the number of papers with potentials to get accepted forpublication in SCI journals
WP4 M11
M4.2 Checking on number of participants at workshops (min 20 participantsper workshop)
WP4 M11
M4.3 Checking on number of participants at scientific symposia (minimal 40 per symposium)
WP4 M11
M4.4 Checking on number of publicpresentations in media (one per months), with potential partners andrepresentatives of future spin-offcompanies
WP4 M11
M5.1 Checking the techno economic impact of the final product in the market environment
WP5 M12
Milestones2/2
STREPRadiology Assistant
Ivana RibićAleksandra Karadžić
Summary Effort Table
14/19
Partic. no.
Partic. short name
WP0 WP1 WP2 WP3 WP4 WP5 Total person months
1 MATF 25 25 5 50 15 5 125
2 ETF 10 15 5 30 5 0 65
3 HMS 0 0 20 0 0 0 20
4 MPRO 0 5 0 20 0 10 35
5 NIMS 0 5 15 0 0 5 25Total 35 50 45 100 20 20 270
STREPRadiology Assistant
Ivana RibićAleksandra Karadžić
15/19
Summary Effort Pie
MATF ETF HMS MPRO NIMS
STREPRadiology Assistant
Ivana RibićAleksandra Karadžić
“Ethical is the new black”
16/19
STREPRadiology Assistant
Ivana RibićAleksandra Karadžić
Ethical Issues
17/19
• No direct ethical, legal, social and safety issues
STREPRadiology Assistant
Ivana RibićAleksandra Karadžić
Questions?18/19
STREPRadiology Assistant
Ivana RibićAleksandra Karadžić
Thanks!
19/19
Any questions?You can find us at
[email protected] [email protected]
STREPRadiology Assistant
Ivana RibićAleksandra Karadžić