Two-Stage Ditch DesignHelping Nature Improve the
Function of Agricultural Drainage Ditches
![Page 3: Two-Stage Ditch Design - EPA's Web Archive](https://reader031.fdocuments.in/reader031/viewer/2022020707/61ff02bb9dbc5d3266045a66/html5/thumbnails/3.jpg)
![Page 4: Two-Stage Ditch Design - EPA's Web Archive](https://reader031.fdocuments.in/reader031/viewer/2022020707/61ff02bb9dbc5d3266045a66/html5/thumbnails/4.jpg)
Is there something better?
![Page 5: Two-Stage Ditch Design - EPA's Web Archive](https://reader031.fdocuments.in/reader031/viewer/2022020707/61ff02bb9dbc5d3266045a66/html5/thumbnails/5.jpg)
Channel Evolution
![Page 6: Two-Stage Ditch Design - EPA's Web Archive](https://reader031.fdocuments.in/reader031/viewer/2022020707/61ff02bb9dbc5d3266045a66/html5/thumbnails/6.jpg)
Two-Stage Ditch Design
96.0
98.0
100.0
102.0
104.0
106.0
108.0
-25.0 -20.0 -15.0 -10.0 -5.0 0.0 5.0 10.0 15.0 20.0 25.0 Width Left to Right (ft)
Elevation (ft)
Low Grassed Bench
Main Channel
Additional Filters Next To Fields
96.0
98.0
100.0
102.0
104.0
106.0
108.0
-25.0 -20.0 -15.0 -10.0 -5.0 0.0 5.0 10.0 15.0 20.0 25.0 Width Left to Right (ft)
Elevation (ft)
Low Grassed Bench
Main Channel 96
98
100
102
104
106
108
-25 -20 -15 -10 -5 0 5 10 15 20 25.0 Width Left to Right (ft)
Elev
atio
n (ft
) Low Grassed Bench
Main Channel
Additional Filters Next To Fields
![Page 7: Two-Stage Ditch Design - EPA's Web Archive](https://reader031.fdocuments.in/reader031/viewer/2022020707/61ff02bb9dbc5d3266045a66/html5/thumbnails/7.jpg)
![Page 8: Two-Stage Ditch Design - EPA's Web Archive](https://reader031.fdocuments.in/reader031/viewer/2022020707/61ff02bb9dbc5d3266045a66/html5/thumbnails/8.jpg)
![Page 9: Two-Stage Ditch Design - EPA's Web Archive](https://reader031.fdocuments.in/reader031/viewer/2022020707/61ff02bb9dbc5d3266045a66/html5/thumbnails/9.jpg)
![Page 10: Two-Stage Ditch Design - EPA's Web Archive](https://reader031.fdocuments.in/reader031/viewer/2022020707/61ff02bb9dbc5d3266045a66/html5/thumbnails/10.jpg)
![Page 11: Two-Stage Ditch Design - EPA's Web Archive](https://reader031.fdocuments.in/reader031/viewer/2022020707/61ff02bb9dbc5d3266045a66/html5/thumbnails/11.jpg)
![Page 12: Two-Stage Ditch Design - EPA's Web Archive](https://reader031.fdocuments.in/reader031/viewer/2022020707/61ff02bb9dbc5d3266045a66/html5/thumbnails/12.jpg)
![Page 13: Two-Stage Ditch Design - EPA's Web Archive](https://reader031.fdocuments.in/reader031/viewer/2022020707/61ff02bb9dbc5d3266045a66/html5/thumbnails/13.jpg)
Potential Benefits of 2-Stage Drainage Channel ModificationsDecreased bank erosion and sedimentation, resulting in a reduced need for drain maintenanceDecreased suspended solids and fluctuations in dissolved oxygenProcessing and capture of nitrogen and phosphorusRestore pool and riffle habitatsContinue to provide the required drainage capacity for agricultural production
![Page 14: Two-Stage Ditch Design - EPA's Web Archive](https://reader031.fdocuments.in/reader031/viewer/2022020707/61ff02bb9dbc5d3266045a66/html5/thumbnails/14.jpg)
Implementing Two Stage beyond a Demonstration
Key Steps:• OSU worked with USDA to draft language for National
NRCS Engineering Manual.• IN STC a venue to share the performance data from
NDU/OSU on initial demonstration sites. • Combination of Eng. Manual (allowed NRCS to C/S)
and performance data helped convince STC to make it a cost-sharable practice within EQIP.
• CCPI – tool to conduct technology transfer with NRCS staff – teach the technical staff.
![Page 15: Two-Stage Ditch Design - EPA's Web Archive](https://reader031.fdocuments.in/reader031/viewer/2022020707/61ff02bb9dbc5d3266045a66/html5/thumbnails/15.jpg)
Progress as of2010.
![Page 16: Two-Stage Ditch Design - EPA's Web Archive](https://reader031.fdocuments.in/reader031/viewer/2022020707/61ff02bb9dbc5d3266045a66/html5/thumbnails/16.jpg)
Barriers/Challenges
Cost $9.00/ft on average for 2-stage; conventional cleanout - <$2.00/ft. (payoff takes place over a few decades)Extra land – 1 acre/.5 mi. Compatibility with FSA – CRP Filter StripsTechnology TransferChange fatigue
![Page 17: Two-Stage Ditch Design - EPA's Web Archive](https://reader031.fdocuments.in/reader031/viewer/2022020707/61ff02bb9dbc5d3266045a66/html5/thumbnails/17.jpg)
Resource Needs
Initial funding at local level to help with the transition and installation.Broader acceptance by landowners –outreach and education.Technology transfer – “digging a better ditch”Boots on the ground.
![Page 18: Two-Stage Ditch Design - EPA's Web Archive](https://reader031.fdocuments.in/reader031/viewer/2022020707/61ff02bb9dbc5d3266045a66/html5/thumbnails/18.jpg)
Ohio I llinois
M ississippi Ohio
Ohio Michigan
South Africa
Minnesota
Ohio