Two Lift Paving
Contractors Perspective
Two Lift Paving Workshop
Austin, Texas
May 23, 2013
Tim Gerhardt
Koss Construction Company
![Page 2: Two-Lift Paving - Contractor's Viewpoints](https://reader034.fdocuments.in/reader034/viewer/2022051400/54be74314a79591e7f8b4574/html5/thumbnails/2.jpg)
Overview
• Concept
• Planning
• Scheduling
– Delays– Delays
• Test Section
– Lessons Learned
• I-70 Paving
![Page 3: Two-Lift Paving - Contractor's Viewpoints](https://reader034.fdocuments.in/reader034/viewer/2022051400/54be74314a79591e7f8b4574/html5/thumbnails/3.jpg)
Concept
• European Scan Tour
– KDOT Representative
• Market Need
– Air Void Problems– Air Void Problems
– Aggregate Quality of local market
– Extended Pavement Life
• Appropriate Project / Location
• Exposed Aggregate Surface
![Page 4: Two-Lift Paving - Contractor's Viewpoints](https://reader034.fdocuments.in/reader034/viewer/2022051400/54be74314a79591e7f8b4574/html5/thumbnails/4.jpg)
Concept – Market Need
![Page 5: Two-Lift Paving - Contractor's Viewpoints](https://reader034.fdocuments.in/reader034/viewer/2022051400/54be74314a79591e7f8b4574/html5/thumbnails/5.jpg)
Concept - Project
• I-70 in Saline County, Kansas
– 2 year pavement reconstruction project
• WBL in 2007
• EBL in 2008• EBL in 2008
– Rest Area on each side
• Ideal for test sections
– Revised Typical Section Required 24’ Paving
• Uniform Shoulders on Variable Granular Base
![Page 6: Two-Lift Paving - Contractor's Viewpoints](https://reader034.fdocuments.in/reader034/viewer/2022051400/54be74314a79591e7f8b4574/html5/thumbnails/6.jpg)
Planning
• Preliminary Discussion
– April 2007 – Manhattan, KS
• KDOT, FHWA, CP Tech Center, KSU, Koss
• Highways for Life
• Workshop • Workshop
– June 2007 – Abilene, KS
• Dr. Hermann Sommer (Austrian Engineer)
• CP Tech Center
• Dr. Rob Rasmussen
![Page 7: Two-Lift Paving - Contractor's Viewpoints](https://reader034.fdocuments.in/reader034/viewer/2022051400/54be74314a79591e7f8b4574/html5/thumbnails/7.jpg)
Planning
• Mix Designs
– Stiffness of Bottom Lift
– Durability of Top Lift
• Equipment and Logistics
– Delivery and placement of bottom lift – Delivery and placement of bottom lift
• Stiffness
• Haul Road v. Front of Paver
– Delivery and placement of top lift
• Minimize deformation of bottom lift
– Production and Delivery of Two Mixes
![Page 8: Two-Lift Paving - Contractor's Viewpoints](https://reader034.fdocuments.in/reader034/viewer/2022051400/54be74314a79591e7f8b4574/html5/thumbnails/8.jpg)
Planning
• Test Section
– Expectations
– Location
– Complexity– Complexity
![Page 9: Two-Lift Paving - Contractor's Viewpoints](https://reader034.fdocuments.in/reader034/viewer/2022051400/54be74314a79591e7f8b4574/html5/thumbnails/9.jpg)
Scheduling
• Test Section
– Late Summer / Fall 2007
• 2007 Season – Extremely Wet
– Paving Crew Unavailable
– Spring 2008
• More economical to re-schedule to location where a paving • More economical to re-schedule to location where a paving crew was already working
– US-69 Side Road
» Minimal risk
» District IV
• 2008 Season – Extremely Wet
– Paving completed in June 2008
![Page 10: Two-Lift Paving - Contractor's Viewpoints](https://reader034.fdocuments.in/reader034/viewer/2022051400/54be74314a79591e7f8b4574/html5/thumbnails/10.jpg)
Test Section
![Page 11: Two-Lift Paving - Contractor's Viewpoints](https://reader034.fdocuments.in/reader034/viewer/2022051400/54be74314a79591e7f8b4574/html5/thumbnails/11.jpg)
Test Section
![Page 12: Two-Lift Paving - Contractor's Viewpoints](https://reader034.fdocuments.in/reader034/viewer/2022051400/54be74314a79591e7f8b4574/html5/thumbnails/12.jpg)
Test Section
![Page 13: Two-Lift Paving - Contractor's Viewpoints](https://reader034.fdocuments.in/reader034/viewer/2022051400/54be74314a79591e7f8b4574/html5/thumbnails/13.jpg)
Test Section
![Page 14: Two-Lift Paving - Contractor's Viewpoints](https://reader034.fdocuments.in/reader034/viewer/2022051400/54be74314a79591e7f8b4574/html5/thumbnails/14.jpg)
Test Section
![Page 15: Two-Lift Paving - Contractor's Viewpoints](https://reader034.fdocuments.in/reader034/viewer/2022051400/54be74314a79591e7f8b4574/html5/thumbnails/15.jpg)
Test Section
![Page 16: Two-Lift Paving - Contractor's Viewpoints](https://reader034.fdocuments.in/reader034/viewer/2022051400/54be74314a79591e7f8b4574/html5/thumbnails/16.jpg)
I-70
• Plant
– Dual Drum
– Two Silos
• Split• Split
– Aggregate Bins
• Four
![Page 17: Two-Lift Paving - Contractor's Viewpoints](https://reader034.fdocuments.in/reader034/viewer/2022051400/54be74314a79591e7f8b4574/html5/thumbnails/17.jpg)
I-70
• Delivery
– Product from either drum
– Truck could delivery either
– Color Coded Cards– Color Coded Cards
![Page 18: Two-Lift Paving - Contractor's Viewpoints](https://reader034.fdocuments.in/reader034/viewer/2022051400/54be74314a79591e7f8b4574/html5/thumbnails/18.jpg)
I-70
• Delivery
![Page 19: Two-Lift Paving - Contractor's Viewpoints](https://reader034.fdocuments.in/reader034/viewer/2022051400/54be74314a79591e7f8b4574/html5/thumbnails/19.jpg)
I-70
• Placement
– Haul Road
– Spreaders
![Page 20: Two-Lift Paving - Contractor's Viewpoints](https://reader034.fdocuments.in/reader034/viewer/2022051400/54be74314a79591e7f8b4574/html5/thumbnails/20.jpg)
I-70
• Placement
– Top Lift
• Distance
![Page 21: Two-Lift Paving - Contractor's Viewpoints](https://reader034.fdocuments.in/reader034/viewer/2022051400/54be74314a79591e7f8b4574/html5/thumbnails/21.jpg)
I-70
![Page 22: Two-Lift Paving - Contractor's Viewpoints](https://reader034.fdocuments.in/reader034/viewer/2022051400/54be74314a79591e7f8b4574/html5/thumbnails/22.jpg)
I-70
![Page 23: Two-Lift Paving - Contractor's Viewpoints](https://reader034.fdocuments.in/reader034/viewer/2022051400/54be74314a79591e7f8b4574/html5/thumbnails/23.jpg)
I-70
![Page 24: Two-Lift Paving - Contractor's Viewpoints](https://reader034.fdocuments.in/reader034/viewer/2022051400/54be74314a79591e7f8b4574/html5/thumbnails/24.jpg)
I-70
![Page 25: Two-Lift Paving - Contractor's Viewpoints](https://reader034.fdocuments.in/reader034/viewer/2022051400/54be74314a79591e7f8b4574/html5/thumbnails/25.jpg)
I-70
![Page 26: Two-Lift Paving - Contractor's Viewpoints](https://reader034.fdocuments.in/reader034/viewer/2022051400/54be74314a79591e7f8b4574/html5/thumbnails/26.jpg)
![Page 27: Two-Lift Paving - Contractor's Viewpoints](https://reader034.fdocuments.in/reader034/viewer/2022051400/54be74314a79591e7f8b4574/html5/thumbnails/27.jpg)
![Page 28: Two-Lift Paving - Contractor's Viewpoints](https://reader034.fdocuments.in/reader034/viewer/2022051400/54be74314a79591e7f8b4574/html5/thumbnails/28.jpg)
Jointing
![Page 29: Two-Lift Paving - Contractor's Viewpoints](https://reader034.fdocuments.in/reader034/viewer/2022051400/54be74314a79591e7f8b4574/html5/thumbnails/29.jpg)
Jointing
![Page 30: Two-Lift Paving - Contractor's Viewpoints](https://reader034.fdocuments.in/reader034/viewer/2022051400/54be74314a79591e7f8b4574/html5/thumbnails/30.jpg)
Jointing
![Page 31: Two-Lift Paving - Contractor's Viewpoints](https://reader034.fdocuments.in/reader034/viewer/2022051400/54be74314a79591e7f8b4574/html5/thumbnails/31.jpg)
Results
250
300
350
400
Total Length
Top Length
0
50
100
150
200
Millim
ete
rs
Top Length
4 per. Mov. Avg. (Top Length)
![Page 32: Two-Lift Paving - Contractor's Viewpoints](https://reader034.fdocuments.in/reader034/viewer/2022051400/54be74314a79591e7f8b4574/html5/thumbnails/32.jpg)
Conclusion
• Practical Application
• Limited Production Impact
• Economical
– Economize bottom lift– Economize bottom lift
– Extended Pavement Life
• No Problem
• Team Effort