Click To Edit Master Title Style Turning Building Lifecycle Milestones into Energy Efficiency Opportunities Moderated by: Elizabeth Stuart LBNL

Transcript of Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy...

Page 1: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

Click To Edit Master

Title Style

Turning Building

Lifecycle

Milestones into

Energy Efficiency

Opportunities

Moderated by:

Elizabeth Stuart

LBNL

Page 2: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

Building Lifecycle Milestones

into EE Opportunities

Peter Brandom

City of Hillsboro, OR

Page 3: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

Energy Efficiency with Building Milestones

Better Buildings Conference May 28, 2015

Page 4: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

Hillsboro, Oregon

Page 5: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

City Portfolio

• 13 departments

• 800 employees

• 60 facilities

• 400 vehicles

• 4,000 streetlights

• 30 City-maintained traffic intersections

• Water treatment and distribution system

565,722 total sq ft

475,000 sq ft in BBC

200+ kW on-site renewables

35 City-installed electric vehicle charging stations

Page 6: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

2030 Sustainability Goals – City Operations

Policy:

• 100% of City development investments meet a standard

set for sustainable development, and City promotes and

encourages sustainable development by others

• 100% of applicable City policies incorporate the

principles of sustainability

• All city facilities constructed or renovated shall meet

current Leadership in Energy and Environmental Design

(LEED) standards or equivalent, unless cost prohibitive

based on Return on Investment (ROI) or cost/benefit

Energy and air quality:

• 60% reduced City facility energy consumption per

square foot (2007 baseline)

• 100% of electricity and natural gas sourced from

renewable sources for City facilities and exterior

lighting infrastructure

• 80% reduction in greenhouse gas emissions; 100%

of remaining emissions offset (2007 baseline)

• 80% production of energy for City facilities from

renewable energy sources

• 100% fossil fuel-free staff vehicles and 40% reduction

for other exempt vehicles (non-passenger emergency

response, etc.) [Based on available technologies and

cost effectiveness] (2007 baseline)

• All City facilities zero net energy consumption, if

feasible based on Return on Investment (ROI) or

cost/benefit analysis

Materials management:

• Achieve a rate of construction material consumption that

meets internal standards for sustainability

• 100% of all inputs purchased by the City are sourced

from sustainable sources or meet internally established

criteria (e.g., zero waste, zero toxins) where

technologically and financially feasible

• Zero toxic emissions

• 100% recycling of waste from City operations

• Zero construction and maintenance waste (no waste

from construction and maintenance activities is sent to

landfill). May be accomplished via public/private

partnerships

Natural Resources:

• 25% reduction in water consumption by City

facilities against established baseline (including

re-use and other measures) (2007 baseline)

Page 7: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

Building Milestones

• New construction & renovation

• Operations & Maintenance

• Related Policy Opportunities

Page 8: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

Milestone – New Construction & Renovation

• Policy

– LEED useful for design, but…

– Energy modeling

– 3rd party commissioning

Page 9: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

Milestone – New Construction & Renovation

• Design

– Must marry designers with operators

Page 10: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

Milestone – New Construction & Renovation

• Renovations (ren-uh-veyt)

– “to restore to good condition; make new or as if new again; repair”

– “to reinvigorate; refresh, revive”

• Shute Park Library BBC Showcase Project

Before

Page 11: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

Milestone – New Construction & Renovation

• Shute Park Library BBC Showcase Project

After

Page 12: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

Milestone – New Construction & Renovation

• Shute Park Library BBC Showcase Project

Pre- and post-remodel:

Page 13: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

Milestone – Operations & Maintenance

• Policy

– 3rd party commissioning

– How buildings are maintained –focus on energy management, occupant behavior

• Operations

– EMP prescribes process, calendar

– Controls

– Data, facility energy use tracking, reporting

Page 14: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

Milestone – Operations & Maintenance

• Seasonal maintenance opportunities

• Shute Park Aquatic Center

Page 15: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

Milestone – Related Policy Opportunities

• Dark sky and energy efficient lighting

Page 16: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

Thank You“The City of Hillsboro envisions a sustainable future, in which the City responsibly satisfies the needs of its citizens, provides a healthy and satisfying work environment for its employees and minimizes its impact on the physical environment of the community”

[email protected]

hillsboro-oregon.gov/sustainability

Page 17: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

Building Lifecycle Milestones

into EE Opportunities

Darien Crimmin

Winn Companies

Page 18: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

WinnCompaniesSeize the Day: Turning Building Lifecycle Milestones Into Energy Efficiency Opportunities

Page 19: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

19

WinnCompanies

Over 3,000 employees span 3 divisions:

• WinnDevelopment

• WinnResidential

• WinnResidential Military Housing Services

Develops, acquires, and manages a diverse portfolio of properties across the United States.

Largest manager of affordable housing in the country

Over 3,000 employees span 3 divisions:

• WinnDevelopment

• WinnResidential

• WinnResidentialMilitary Housing Services

Page 20: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

20

64 unit elderly community in Framingham, MA

2010 – refinancing planned to reduce loan rate and replace kitchens and baths

Energy Audit identified:

Poor insulation

Drafty windows

Atmospheric boilers

Inefficient interior lighting

High maintenance site lighting

High water and sewer charges

Saxonville Village

Voluntary energy audit informed owner of tangible value-add opportunities that could be funded from refinancing proceeds.

03/15/13 Corporate Overview

Page 21: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

21

Saxonville Village

Page 22: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

22

Saxonville Village

Page 23: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

23

Reserve Accounts

Bank Controlled Replacement Reserve Account

$576,000

In general, this account can be used to help defray the costs of replacing the project’s capital items in accordance with the Regulatory Agreement.

Winn Controlled Replacement Reserve Account

$424,000

The PCNA outlines the replacement cost of certain capital items; but not energy efficient improvements. Winn saw the opportunity to achieve utility savings by voluntarily replacing certain capital items with more efficient alternatives.

Page 24: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

24

Dedicated Reserves for Energy Efficiency

Apartment Interiors. Replace kitchen and bathroom faucet aerators, shower heads,and toilets, saving of approximately $13,000 per year

Building Envelope. Save approximately $18,000 per year by installing new energy star windows and sliders; and insulting and air sealing the attic.

Heating and Plumbing. Replace the heating boilers with new high efficiency equipmentand replace the unit controls and thermostats with electronic control valves for baseboardzones, saving approximately $12,000 per year.

Electrical. Replace exterior ground lighting with compact fluorescent lighting,replace the exterior pole lighting with LED pole lighting, yielding $6,500 per year of savings.

$424,000 invested yields $50,000 in annual savings = 8.5 year simple payback

Page 25: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

25

Saxonville Village

Page 26: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

26

Saxonville Village

Page 27: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

27

Deep Energy Retrofits

Over 3,000 employees span 3 divisions:

• WinnDevelopment

• WinnResidential

• WinnResidential Military Housing Services

Stand alone façade work has extremely long paybacks

Windows

RoofsExterior insulation

Expanding opportunities for Deep Energy Retrofits by leveraging other necessary work

Page 28: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

28

Exterior Insulated Façade

14,000

12,000

10,000

8,000

6,000

4,000

2,000

Total Existing Building Energy

Use (Before Renovation)

Total Energy Use (After Super

Insulated Shell & Air Sealing)

Total Energy Use (After New Boilers

& Indirect Hot Water Heaters)

Total Energy Use (After Ventilation

Renovation)

Total Energy Use (After Solar

Thermal)

Total Energy Use (After New Lights and Refrigerators)

0

72%Energy Savings

Lighting, Refrigerators & Plug Load Hot Water

Air Conditioners Heating

14,000

12,000

10,000

8,000

6,000

4,000

2,000

Total Existing Building Energy

Use (Before Renovation)

Total Energy Use (After Super

Insulated Shell & Air Sealing)

Total Energy Use (After New Boilers

& Indirect Hot Water Heaters)

Total Energy Use (After Ventilation

Renovation)

Total Energy Use (After Solar

Thermal)

Total Energy Use (After New Lights and Refrigerators)

0

72%Energy Savings

Lighting, Refrigerators & Plug Load Hot Water

Air Conditioners Heating

Page 29: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

29

Exterior Insulated Façade

Page 30: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

Thank you

Darien CrimminVice President of Energy & [email protected]

Page 31: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

Building Lifecycle Milestones

into EE Opportunities

Jesse Warren

University of Virginia

Page 32: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

Turning Building Lifecycle Milestones Into Energy Efficiency Opportunities Jesse Warren, Sustainability Program Manager – Buildings & Operations

Better Buildings SummitMay 28, 2015

Image: Perkins & Will

Page 33: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

Office For Sustainability

Page 34: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones
Page 35: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

Bryan Hall

Image: Perkins & Will

Page 36: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

Bryan HallRelamping

Page 37: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

Bryan HallRepair Insulation and Add Insulating Jackets

Page 38: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

Bryan HallUpgrade to Digital Controls

Page 39: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

Bryan HallUpgrade to Digital Controls

Page 40: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

Bryan Hall Funding

$145K$215K

DDC UPGRADE

FIRST $180K REMAININGSAVINGS

Page 41: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

Chilled Water Use

BASE YEARRELAMPING &

SCHEDULINGDDC UPGRADE

& RCX

Page 42: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

Chilled Water UseOver 75% Reduction Last Year

DDC UPGRADE & RCX

Page 43: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

Electricity Use14% Reduction Last Year

BASE YEARRELAMPING &

SCHEDULINGDDC UPGRADE

& RCX

Page 44: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

Heating Hot Water Use150% Increase Last Year

BASE YEAR RELAMPING & SCHEDULING

DDC UPGRADE & RCX

Page 45: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

Energy Cost$38k (34%) Reduction Last Year

BASE YEARRELAMPING &

SCHEDULINGDDC UPGRADE

& RCX

Page 46: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

Newcomb Hall

Image: Perkins & Will

Page 47: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

Newcomb Hall Funding

$600K

FIRST $750K REMAININGSAVINGS

Page 48: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

Clark Hall

Image: Perkins & Will

Page 49: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

Clark Hall Funding

$300K$150K

DDC UPGRADE

FIRST $375K REMAININGSAVINGS

Page 50: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

Building Sustainability

Image: USGBC

Image: Harvard Office for Sustainability

B.O.T.

Page 51: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones
Page 52: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

Gilmer Hall and Chemistry Renovation

Image: Perkins & Will

Page 53: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

Gilmer Hall Renovation

Page 54: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

Gilmer Hall Renovation

Page 55: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

Gilmer Hall Renovation

Image: Perkins & Will

Page 56: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

ALUMINUM

SCREEN WALL

STRUCTURALLY

SEALED GLAZED

CURTAIN WALL

Image: Perkins & Will

Gilmer Hall Renovation

Page 57: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

Gilmer Hall Renovation

Image: Perkins & Will

Page 58: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

High Efficiency Systems

Energy Recovery Wheels

Chilled Beams

Healthy and Responsible

Materials

Nox Testing Over SF-6

Energy Responsive Facade

Insulated Low-e Glazing

Exterior Shading

Improved Building Envelope

Low Albedo Roof

Water Efficiency

Low Flow Fixtures

Water Efficient Landscaping

Indoor Environmental Quality

Daylight Harvesting

Dual Occupancy Sensing

Advanced Lighting Controls

Design Innovation

Green Labs Certification

Air Quality Sensing with HVAC

Response

Advanced Energy Monitoring &

Metering

Gilmer Hall Renovation

Page 59: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

Contact: University of Virginia – Facilities ManagementOffice for Sustainabilityhttp://www.virginia.edu/sustainability/

Jesse Warren, PE, CEM, LEED AP BD+C, O+MSustainability Program Manager – Buildings & Operations(434) [email protected]

Questions

Page 60: Turning Building Lifecycle Click To Edit Master Title ... · Saxonville Village Voluntary energy audit informed owner of tangible value-add ... Turning Building Lifecycle Milestones

Questions & Discussion