Technical highlights
Turin, 18.10.2018
-
2
ProjectOrganization
District1-Health,ResearchandInnovationPark:District2-HeadquartersofthePiedmontRegionandactivitiesofgeneralinterestDistrict3-ComplementaryactivitiestotheTRH(RailwayareaUrbanSystems)District4-AreaFieraOval
Masterplan
«Ambito12.32ParcodellaSaluteesedeRegionePiemonte»
withtotallandarea(ST)ofapproximately313.725mq.
-Lot1:HealthandClinicalTrainingCenter+ResearchCenter-Lot2:DidacticCenter+ResidentialCenter
-
3
Lot1-HealthandClinicalTrainingCenter+ResearchCenterHealthcare and clinical training center,with an area of 127,000squaremeters,ofwhich5,000squaremetersdedicatedtoclinicaltraining,andatotalcapacityofbedsequalto1,040(ofwhich70technicalpostsdedicatedtoshortobservations,dialysis,firstaid,etc)
Researchcenter,withanareaof10,000squaremeters,sizedforauser of about 1,000 people including teaching staff, assistants,doctoralstudentsandauxiliarystaff
Area (SLP) mq
Parking mq
Beds (Pl) n
Students n
Users n
Lotto 1
Pole of health and clinical
training 127.000
44.100 1.040
Research pole 10.000 3.400 5.000
Lotto 2 Educational pole 31.000 10.700 1.000
Residential residency pole 8.000 2.800
Total 176.000 61.000*
Total mq 237.000
Connections:
§ Newroad(surface&underground)definedbytheZ.U.T;§ Pedestrian promenade along the East-West axis (connection
betweenthetrainstationandthemetropolitanstation)
§ NewbridgeLingottostation(District3)§ Connectionwithexistingorunderconstruction
-
4
FeasibilityTechnicalandEconomicalStudy
§ GeneralReport§ Feasibilitystudy(updateJuly2018)withthecostbenefitanalysis§ Book1:Aspectsrelatedtourbanmorphology§ Book2:Aspectsrelatedtothetransportandtrafficmobilitysystem,logistics,
accessibility
§ Book3:AspectsrelatedtoEnergySustainability
§ Book4:FunctionalOrganizationoftheHospital§ Actualstatuswiththeroadconditionsunderconstruction
-
5
MainObjectivesoftheCompetitiveDialogue
§ MasterplanforurbantransformationLot1andLot2§ Functionaloptimisationandrationalisationofhospitalroutes§ Humanisationoftheplacesoftreatment§ Safetyandreliability§ Maintainability,inspectionability,substitutability§ Automationsolutionsforplantsandbuildings
§ Structuralandplantflexibility§ Reductionofenvironmentalimpact§ BuildingInformationModeling(BIM)
-
6
ServicesincludedinthePPPContract
§ Themaintenanceserviceofbuildingandplantengineeringworks§ Themaintenanceandmanagementofinternaltransportsystems§ Themaintenance,operationandmanagementofelectricalandlightingsystemsand
therelatedelectricalsupply§ Themaintenance,managementandmanagementofwaterandsanitarysystemsand
drainsandwatersupply§ Themaintenance,managementandmanagementofair-conditioningsystems(bothin
winterandinsummer)andsupplyofenergycarriers§ Themaintenanceserviceofcommunicationandinformationnetworks(excluding