Turboden company profile geothermal application

33
Turboden company profile geothermal application Update January 2016

Transcript of Turboden company profile geothermal application

Page 1: Turboden company profile geothermal application

Turboden company profile geothermal application

Update January 2016

Page 2: Turboden company profile geothermal application

Cop

yrig

ht ©

– T

urbo

den

S.r.

l. A

ll rig

hts

rese

rved

The Company

2

Page 3: Turboden company profile geothermal application

Cop

yrig

ht ©

– T

urbo

den

S.r.

l. A

ll rig

hts

rese

rved

3

Strong technical and strategic support to Turboden on-going activities and future

development

• Focus on the energy/power business • Oriented to research and development • ORC technology complementary technical

solution for several MHI business (e.g. geothermal plants, gas turbines, etc.)

Turboden medium term business plan: larger sizes and

enhanced solutions

Turboden Board of Directors is composed of 5 members, 3 MHI senior representatives appointed members – direct and strong support to Turboden management

MHI engineering support added to Turboden engineering department for new/special solutions/projects (e.g. development of the direct exchange solution)

Worldwide presence of MHI to support Turboden activities Company development in foreign countries (e.g. after sales in Germany)

Improvement of Turboden organization [new company structure] and improvement of Turboden production capability [new warehouse] to support expected volume increase

Turboden – a Group Company of MHI

Page 4: Turboden company profile geothermal application

Cop

yrig

ht ©

– T

urbo

den

S.r.

l. A

ll rig

hts

rese

rved

Mitsubishi Heavy Industries is a global leader in geothermal power plant…

4

> 300 ORC plants globally, 0.5 GW ORC power

The largest segment of MHI over $16 billion (in fiscal 2014)

over $40 billion (in fiscal 2014)

23 % market share

>100 units globally, >3 GW power

Presenter
Presentation Notes
3 GW installed 100+ units MHPS
Page 5: Turboden company profile geothermal application

Cop

yrig

ht ©

– T

urbo

den

S.r.

l. A

ll rig

hts

rese

rved

500+ Turboden ORC MW worldwide Turboden’s global and proven experience

Application Plant in

Operation Under

Construction Total

no. MW no. MW no. MW Wood Biomass 226 266,6 42 82,2 268 348,8 Geothermal 6 22,7 7 62,3 13 85 Solar thermal power 0 0 4 3,7 4 3,7 Heat Recovery: Reciprocating Engines, Oil&Gas, Cement and Refractories, Metallurgy, Float Glass, Waste to Energy

28 53,4 5 11,6 33 65

Total Turboden Plants 260 342,7 58 159,8 318 502,5

Last Update: October 2015

Turboden is a leading company in the ORC field with 260 plants in operation and more than 7 million hours of operation cumulated.

Page 6: Turboden company profile geothermal application

Cop

yrig

ht ©

– T

urbo

den

S.r.

l. A

ll rig

hts

rese

rved

6

electricity

heat

Biomass

Waste-heat

Geothermal

Solar

What We Do: Organic Rankine Cycle systems

Turboden designs and develops turbogenerators based on the Organic Rankine Cycle (ORC), a technology for the combined generation of heat and electrical power from various renewable sources, particularly suitable for distributed generation.

200 kW – 20 MW per single shaft Waste to Energy

Page 7: Turboden company profile geothermal application

Cop

yrig

ht ©

– T

urbo

den

S.r.

l. A

ll rig

hts

rese

rved

Turboden capabilities

7

• Participation in national & EU research programs

• Cooperation with EU Universities and Research Centres

• Thermodynamic cycle optimization

• Working fluid selection & testing

• Thermo-fluid-dynamic design and validation

• Implementation & testing of control/supervision software

• Many patents obtained

• Pre-feasibility studies: evaluation of technical & economical feasibility of ORC power plants

• Customized proposals to maximize economic & environmental targets

• Complete in-house mechanical design

• Proprietary design and own manufacturing of ORC optimized turbine

• Tools - Thermo-fluid-

dynamic programs - FEA - 3D CAD-CAM - Vibration analysis

• Start-up and commissioning

• Maintenance, technical assistance to operation and spare parts service

• Remote monitoring & optimization of plant operation

• Outsourced components from highly qualified suppliers

• Quality assurance & project management

• In-house skid mounting to minimize site activities

R&D Sales/marketing Design Operations &

manufacturing Aftermarket

service

EPC capability

Full Power Plant EPC

Single point responsibility

Page 8: Turboden company profile geothermal application

Cop

yrig

ht ©

– T

urbo

den

S.r.

l. A

ll rig

hts

rese

rved

1980 - Founded by Mario Gaia, professor at Politecnico di Milano

1998 – First ORC biomass plant in Switzerland (300 kW)

1990’s – First ORC projects in solar, geothermal and heat recovery applications

2000‘s - ORC biomass plants in Europe

2009 - United Technologies Corp. (UTC) acquires the majority of Turboden’s quotas. PW Power Systems supports Turboden in new markets beyond Europe 100 plants sold

Today - Over 300 plants in the world, 260 in operation, 200 employees, ∼80 M€ turnover (2013)

2013 - MHI acquires the majority of Turboden. Italian shareholders stay in charge of management

35 years of ORC

27

Page 9: Turboden company profile geothermal application

Cop

yrig

ht ©

– T

urbo

den

S.r.

l. A

ll rig

hts

rese

rved

9

Average availability is 98+% on 260 plants with about 7 millions cumulative operation working hours so far

35 years of ORC

Page 10: Turboden company profile geothermal application

Cop

yrig

ht ©

– T

urbo

den

S.r.

l. A

ll rig

hts

rese

rved

Selected References

10

Page 11: Turboden company profile geothermal application

Cop

yrig

ht ©

– T

urbo

den

S.r.

l. A

ll rig

hts

rese

rved

Plant type: brine + steam ORC geothermal unit

Location: Japan

Status: in operation since June 2015

Heat source: geothermal brine/steam 140°C

Cooling device: air condensers

Total electric power: 5+ MW

Working fluid: n-pentane

Recent projects: Sugawara geothermal plant in Japan

Page 12: Turboden company profile geothermal application

Cop

yrig

ht ©

– T

urbo

den

S.r.

l. A

ll rig

hts

rese

rved

Plant under construction: 16,5 MW Velika Ciglena (Croatia) for MB Holding

Plant type: ORC geothermal unit

Customer: MB Holding

Site: Croatia

Start up: Q4 2016

Heat source: geothermal brine and steam @170°C

Cooling device: Air Cooled Condenser

Total power: 16,5 MW on a single turbine (including a 1.5 MW NCG expansion turbine)

Working fluid: Isobutane

Scope of supply: Engineering, procurement and Construction of the full ORC powerplant,

including civil and steam-field engineering

12

Page 13: Turboden company profile geothermal application

Cop

yrig

ht ©

– T

urbo

den

S.r.

l. A

ll rig

hts

rese

rved

Plant type: 4 X Turboden 10 MW ORC units

Customer: Emerging Power Inc

Site: Mindoro Island, The Philippines

Start-up: under construction (first 10 MW foreseen for Q3/Q4 2017)

Heat source: geothermal fluid at 159°C

Cooling device: air condensers

Total power: 40 MWel net

Working fluid: Isopentane

Scope of supply: Turboden in consortium with TSK will provide the turnkey plant

Plant under construction: Montelago geothermal (Philippines) for Emerging Power

Page 14: Turboden company profile geothermal application

Cop

yrig

ht ©

– T

urbo

den

S.r.

l. A

ll rig

hts

rese

rved

Turboden Geothermal Plants in operation in Bavaria since 2011 with 98% availability

14

1 km

Kirchstockach: 5,6 MWel

Dürrnhaar: 5,6 MWel

Sauerlach: 5 MWel + 4 MWth

Traunreut: 4 MWel + 12 MWth

Presenter
Presentation Notes
Attrazione più grande dopo october fest sono i ns impianti. Cenni a differenza tra progetti geo in germania e turchia
Page 15: Turboden company profile geothermal application

Cop

yrig

ht ©

– T

urbo

den

S.r.

l. A

ll rig

hts

rese

rved

15

Plant type: Two level cycle geothermal unit

Customer: SWM - StadtWerke München (public utilities company) Location: Bavaria, Germany

Started-up: February 2013

Heat source: geothermal fluid at 140°C

Cooling device: air condensers

Total electric power: 5+ MWel plus 4 MWth decoupling for district heating

Working fluid: refrigerant 245fa (non flammable)

Reference Plant - Sauerlach

Off grid mode capable

Page 16: Turboden company profile geothermal application

Cop

yrig

ht ©

– T

urbo

den

S.r.

l. A

ll rig

hts

rese

rved

16

Reference Plant - Traunreut

Plant type: ORC geothermal unit

Customer: Geothermische Kraftwerksgesellschaft Traunreut GmbH

Location: Traunreut (Germany)

Status: started up in January 2016

Heat source: geothermal fluid at 118°C

Cooling device: air condensers

Total electric power: 4.1 MW

Total thermal power: 12 MW (to the district heating)

Scope of supply: Turboden in consortium with TH Arens will provide turnkey plant

Page 17: Turboden company profile geothermal application

Cop

yrig

ht ©

– T

urbo

den

S.r.

l. A

ll rig

hts

rese

rved

17

Reference Plant – SOULTZ – New unit revamping

Plant type: geothermal, 1st EU operating plant on EGS (Enhanced Geothermal System)

Site: Soultz-sous-Forêts, Alsace, France

Status: Under construction

Start-up: April 2016

Heat source: hot water at 170°C

Cooling source: air condenser

Total electric power: 1.7 MW

Scope: EPC, as consortium with TH ARENS

Page 18: Turboden company profile geothermal application

Cop

yrig

ht ©

– T

urbo

den

S.r.

l. A

ll rig

hts

rese

rved

Other Geothermal References

18

Page 19: Turboden company profile geothermal application

Cop

yrig

ht ©

– T

urbo

den

S.r.

l. A

ll rig

hts

rese

rved

Plant type: geothermal – experimental for Enel

Site: Castelnuovo di Val di Cecina, Italy

Year: 1992

Heat source: Geothermal fluid at 114°C (return at 102°C)

Cooling source: water/air

Total electric power: 1.3 MW

Net electric efficiency: 9%

Early Demonstration Projects

Site: Kapisha, Zambia

Year: 1988

Heat source: Geothermal fluid at 88°C

Total electric power: 2 x 100 kW

19

Page 20: Turboden company profile geothermal application

Cop

yrig

ht ©

– T

urbo

den

S.r.

l. A

ll rig

hts

rese

rved

EU Funded Demonstration Projects

20

Plant type: geothermal low enthalpy, coupled with a geothermal district heating system

Site: Marktgemeinde, Altheim, Austria

Start-up : March 2001

Heat source: hot water at 106°C

Cooling source: cold water from a nearby river (cooling temperature 10/18°C)

Design electric power: 1 MW (normally operated by the owner at ~ 500 kW)

Plant type: geothermal, 1st EU operating plant on EGS (Enhanced Geothermal System)

Site: Soultz-sous-Forêts, Alsace, France

Start-up: June 2008

Heat source: hot water at 180°C

Cooling source: air condenser

Total electric power: 1.7 MW

Net electric efficiency: 11.5%

Plant type: geothermal low enthalpy, coupled with a geothermal district heating system

Site: Simbach – Braunau, German-Austrian border

Start-up: August 2009

Heat Source: hot water at 106°

Cooling source: air/water

Design electric power: 200 kW

Page 21: Turboden company profile geothermal application

Cop

yrig

ht ©

– T

urbo

den

S.r.

l. A

ll rig

hts

rese

rved

21

Plant type: geothermal Customer: AFJET (Afyon Jeotermal) Delivery date: 2016 Heat source: geothermal brine @110°C Coupled to Geothermal District Heating Cooling device: Cooling Towers Total electric power: 3 MWel Working fluid: refrigerant

Geothermal project in Afyon, Turkey

FIRST TURBINE MADE IN TURKEY

Page 22: Turboden company profile geothermal application

Cop

yrig

ht ©

– T

urbo

den

S.r.

l. A

ll rig

hts

rese

rved

Reference Plant - Enel Supercritical

22

Plant type: geothermal prototype with supercritical cycle

Customer: Enel Green Power

Site: Livorno, Italy

Start-up: March 2012

Heat source: hot water at 150°C nominal

Cooling device: ‘dry & spray’ condenser

Total electric power: 500 kW

Working fluid: refrigerant (non flammable)

Page 23: Turboden company profile geothermal application

Cop

yrig

ht ©

– T

urbo

den

S.r.

l. A

ll rig

hts

rese

rved

Technical slides

23

Page 24: Turboden company profile geothermal application

Cop

yrig

ht ©

– T

urbo

den

S.r.

l. A

ll rig

hts

rese

rved

ORC Cycle is an highly convenient and versatile power generation means

Generator Turbine

Condenser CO

OLI

NG

C

IRC

UIT

Evaporator

Pump

Preheater GE

OFL

UID

C

IRC

UIT

24

0

20

40

60

80

100

120

140

160 Te

mpe

ratu

re °

C

ORC FLUID

1

2

3 4

5

ADVANTAGES Superheated expansion, no liquid drops hit the blades Free positioning of the cycle with respect to critical point of fluid good matching to heat source High efficiency over the seasonal temperature variation Low O&M requirements because the rotating parts are not in contact with corrosive fluids Unattended operation

Page 25: Turboden company profile geothermal application

Cop

yrig

ht ©

– T

urbo

den

S.r.

l. A

ll rig

hts

rese

rved

Proven Experience in the Design of Axial Turbines

Turboden designs and manufactures

its own axial turbines

Turboden axial turbine

Page 26: Turboden company profile geothermal application

Cop

yrig

ht ©

– T

urbo

den

S.r.

l. A

ll rig

hts

rese

rved

15 years of Turbines experience: a careful and continuous size growth driven by geothermal market

26

Turboden’s Single shaft turbines power output over time kW

Units in operation / under construction

Maximum shaft power output available

0

2000

4000

6000

8000

10000

12000

14000

16000

18000

20000

1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2015

318 ORC Turbines, 0,5 GW ORC power, 7 Mio operation hrs @ availability > 98%

MB Holding

Mindoro

Presenter
Presentation Notes
Approccio graduale e basto sulle esperienze precedenti
Page 27: Turboden company profile geothermal application

Cop

yrig

ht ©

– T

urbo

den

S.r.

l. A

ll rig

hts

rese

rved

Technical Advantages of Turboden proprietary turbine

27

A MORE EFFICIENT CHOICE • Average turbine isentropic efficiency: 85 to 90 % • Multi stage (4- 5 stages) axial turbines are less sensitive than

radial ones to discharge pressure variations, showing nearly constant efficiency over wide range of operating conditions

A RELIABLE TURBINE • Average plant availability > 98% on all the Turboden fleet • Operating speed: From 1500 rpm to 3000 rpm • Robust design, low rpm, and strict quality tests by Mitsubishi • Patented seals & bearing replacing system: short maintenance

procedures • Specialized local staff for maintenance

A PROVEN SOLUTION • The design of the turbine is carried out by Turboden representing the core know-how since 1980 • 318 Turboden ORC turbines successfully implemented with sizes from 200 kW to 20 MW • Proven experience with 9 different ORC fluids • Axial geometry is a traditional configuration, the most widely adopted in turbomachinery design, proven

with millions of working hours worldwide

Page 28: Turboden company profile geothermal application

Cop

yrig

ht ©

– T

urbo

den

S.r.

l. A

ll rig

hts

rese

rved

Turboden technology

28

• Geothermal resource-based organic fluid selection (proven operation experience with 9 different fluids; cooperation with research centres for fluids testing)

• In-house thermo-dynamic cycle definition and optimized design of the turbine (axial multi-stages)

• Tailored design of the full ORC package based on a consolidated supply chain and proven solutions

• Customized project-based mechanical design of the plants

• Continuous design review based on information coming from field tests on working plants

Presenter
Presentation Notes
Sinergie: tecniche, commerciali, finanza per progetti MHI, MC, Japanese overseas finacing
Page 29: Turboden company profile geothermal application

Cop

yrig

ht ©

– T

urbo

den

S.r.

l. A

ll rig

hts

rese

rved

• Exploitation of resources from 90°C

• Unit size up to 20 MW per single turbine (40 MW on a single generator)

• Slow rotating turbines (1500 rpm)

• Multi stages axial overhung turbine

• Off grid capability

• Air or Water cooling

• Cogeneration Heat & Power solutions

• Wide selection of working fluids (also non-flammable)

• Patented seals & bearing replacing system ensures short maintenance procedures

29

Turboden technology

Page 30: Turboden company profile geothermal application

Cop

yrig

ht ©

– T

urbo

den

S.r.

l. A

ll rig

hts

rese

rved

After Sales

30

Page 31: Turboden company profile geothermal application

Cop

yrig

ht ©

– T

urbo

den

S.r.

l. A

ll rig

hts

rese

rved

Turboden After Sales Service organization

31

AR Remote support

MS

Scheduled maintenance

TOS

Turboden online service

U

Replacement of wear parts

F

Replenishment of organic fluid

AV_gar

Guarantee of Availability

PG

Extension of the

Guarantee on the main

components

GS

Standard Guarantee

R_min

Mini kit of spare parts

The team: 5 Commissioning Engineers 14 Service Engineers 13 Service Technicians + 4 partners company with field Service Technicians

The Customers: 260 Plant in operation Worldwide 28 plants to be started up in 2015

1 Service Office in Germany opened in 2014 with 3 Field Engineers 1 Service Office in Ankara with 3 Field Engineers

Typical Service scheme used for EU Customers

After Sale Service

Page 32: Turboden company profile geothermal application

Cop

yrig

ht ©

– T

urbo

den

S.r.

l. A

ll rig

hts

rese

rved

32

Assistance with remote supervisor PC

The turbogenerator supervisor PC is connected to Turboden headquarters in Brescia via ADSL and through Teamviewer Manager Software.

The Service staff can control the ORC working parameters, make remotely adjustments, remove defects, optimize the ORC's performance and give technical support to customer operators.

Historical trend analysis

Ideas comparison and discussion

Shared Diagnosis and Reaction Plan

customer

ORC Operation and Maintenance – Operational logs + remote monitoring

After Sale Service

Remote control