  • Kssler Kssler Kssler Kssler turns Water into Power.turns Water into Power.turns Water into Power.turns Water into Power.

    Kssler GmbH & Co KG Firmenbuch Nr. FN381450g Persnlich haftende Gesellschafterin Bankverbindung St. Georgener Hauptstrae 122 Landesgericht St. Plten Kssler GmbH UniCredit Bank Austria AG 3151 St. Georgen am Steinfeld USt.-Id Nr. ATU67277136 Firmenbuch Nr. FN380081v BLZ 11000 sterreich Steuer Nr. Lilienfeld/St. Plten Landesgericht St. Plten Kto. 00974 384 000 114/1372 IBAN AT24 1100 000 974 384 000 SWIFT Code BKAUATWW

    REQUIRED PROJECT DATAREQUIRED PROJECT DATAREQUIRED PROJECT DATAREQUIRED PROJECT DATA FORFORFORFOR

    HYDROPOWER PLANTSHYDROPOWER PLANTSHYDROPOWER PLANTSHYDROPOWER PLANTS

    Date,

    Date of call for bid (yyyy/mm/dd): __________________________

    Bid due date: __________________________

    Planned date of award: __________________________

    New ProjectNew ProjectNew ProjectNew Project Name of original equipment supplier Name of original equipment supplier Name of original equipment supplier Name of original equipment supplier

    (OEM):(OEM):(OEM):(OEM):

    Modernization project

    __________________________

    Budget offer (non-binding) Firm offer

    Financial solution available Yes No

    Financing planned through: __________________________

    PPPProject Nameroject Nameroject Nameroject Name:::: __________________________ [-]

    Name of client: __________________________ [-]

    Country/State: __________________________ [-]

    Waterway/name of river: __________________________ [-]

    Number of Units: __________________________ [-]

    Gross Head rated: __________________________ [m]

    Gross Head max.: __________________________ [m]

    Net Head: __________________________ [m]

    Discharge rated: __________________________ [m3/s]

  • Kssler Kssler Kssler Kssler turns Water into Power.turns Water into Power.turns Water into Power.turns Water into Power.

    Kssler GmbH & Co KG Firmenbuch Nr. FN381450g Persnlich haftende Gesellschafterin Bankverbindung St. Georgener Hauptstrae 122 Landesgericht St. Plten Kssler GmbH UniCredit Bank Austria AG 3151 St. Georgen am Steinfeld USt.-Id Nr. ATU67277136 Firmenbuch Nr. FN380081v BLZ 11000 sterreich Steuer Nr. Lilienfeld/St. Plten Landesgericht St. Plten Kto. 00974 384 000 114/1372 IBAN AT24 1100 000 974 384 000 SWIFT Code BKAUATWW

    REQUIRED PROJECT DATAREQUIRED PROJECT DATAREQUIRED PROJECT DATAREQUIRED PROJECT DATA FORFORFORFOR

    HYDROPOWER PLANTSHYDROPOWER PLANTSHYDROPOWER PLANTSHYDROPOWER PLANTS

    Discharge max.: __________________________ [m3/s]

    Discharge min.: __________________________ [m3/s]

    Speed: __________________________ [rpm]

    Altitude of power house: __________________________ [masl]

    Length of penstock: __________________________ [m]

    Diameter of penstock: __________________________ [m]

    Material of penstock : __________________________ [-]

    Generator Voltage: __________________________ [kV]

    Grid Frequency: __________________________ [Hz]

    Power Factor: __________________________ [-]

    Synchronous A-Synchronous

    Grid Voltage: __________________________ [kV]

    Parallel Operation Isolated Operation

    Max. speed of Generator: __________________________ [rpm]

    Max. Pressure: __________________________ [MPa]

    Required Inertia: __________________________ [tm2]

  • Kssler Kssler Kssler Kssler turns Water into Power.turns Water into Power.turns Water into Power.turns Water into Power.

    Kssler GmbH & Co KG Firmenbuch Nr. FN381450g Persnlich haftende Gesellschafterin Bankverbindung St. Georgener Hauptstrae 122 Landesgericht St. Plten Kssler GmbH UniCredit Bank Austria AG 3151 St. Georgen am Steinfeld USt.-Id Nr. ATU67277136 Firmenbuch Nr. FN380081v BLZ 11000 sterreich Steuer Nr. Lilienfeld/St. Plten Landesgericht St. Plten Kto. 00974 384 000 114/1372 IBAN AT24 1100 000 974 384 000 SWIFT Code BKAUATWW

    REQUIRED PROJECT DATE FORREQUIRED PROJECT DATE FORREQUIRED PROJECT DATE FORREQUIRED PROJECT DATE FOR

    HYDROPOWER PLANTSHYDROPOWER PLANTSHYDROPOWER PLANTSHYDROPOWER PLANTS

    Required scope of supplyRequired scope of supplyRequired scope of supplyRequired scope of supply YESYESYESYES NNNNOOOO

    Turbine

    Inlet valve

    Hydraulic governor

    Digital governor

    Generator

    Flywheel

    Electrical equipment

    Control system

    SCADA

    Remote control

    Transformer

    Substation

    Spare parts

    Shipment according Incoterm

    Erection complete

    Erection supervision

    Commissioning

    Commissioning supervision

    Training