Chicago Tunnel & Reservoir and Underflow Plans
Lieutenant Colonel Kevin LovellUS Army Corps of Engineers,
Chicago District
Global Infrastructure Leadership Conference
![Page 2: Tunnel_and_Reservoir_Plan_Great_Lakes_Infrastructure_Forum](https://reader034.fdocuments.in/reader034/viewer/2022051520/58e98dab1a28ab287d8b4865/html5/thumbnails/2.jpg)
BUILDING STRONG®
Agenda Chicagoland drainage history before TARP Development TARP Phase I Development TARP Phase II Current Progress Questions
![Page 3: Tunnel_and_Reservoir_Plan_Great_Lakes_Infrastructure_Forum](https://reader034.fdocuments.in/reader034/viewer/2022051520/58e98dab1a28ab287d8b4865/html5/thumbnails/3.jpg)
Mission: Provide valued, world class leadership, engineering services, and managementfor diverse stakeholders and partners in the Chicago-land metropolitan area.
US Army Corps of Engineers Chicago District
5,000 Sq. Mi.; 9.1 Million people
3
Great Lakes andOhio River Division
McHenry Lake
Kane
CookDuPage
Will Lake Port
er
LaPorte
![Page 4: Tunnel_and_Reservoir_Plan_Great_Lakes_Infrastructure_Forum](https://reader034.fdocuments.in/reader034/viewer/2022051520/58e98dab1a28ab287d8b4865/html5/thumbnails/4.jpg)
Before Canal Excavation(1900)
![Page 5: Tunnel_and_Reservoir_Plan_Great_Lakes_Infrastructure_Forum](https://reader034.fdocuments.in/reader034/viewer/2022051520/58e98dab1a28ab287d8b4865/html5/thumbnails/5.jpg)
AfterCanal Excavation(1922)
![Page 6: Tunnel_and_Reservoir_Plan_Great_Lakes_Infrastructure_Forum](https://reader034.fdocuments.in/reader034/viewer/2022051520/58e98dab1a28ab287d8b4865/html5/thumbnails/6.jpg)
![Page 7: Tunnel_and_Reservoir_Plan_Great_Lakes_Infrastructure_Forum](https://reader034.fdocuments.in/reader034/viewer/2022051520/58e98dab1a28ab287d8b4865/html5/thumbnails/7.jpg)
![Page 8: Tunnel_and_Reservoir_Plan_Great_Lakes_Infrastructure_Forum](https://reader034.fdocuments.in/reader034/viewer/2022051520/58e98dab1a28ab287d8b4865/html5/thumbnails/8.jpg)
![Page 9: Tunnel_and_Reservoir_Plan_Great_Lakes_Infrastructure_Forum](https://reader034.fdocuments.in/reader034/viewer/2022051520/58e98dab1a28ab287d8b4865/html5/thumbnails/9.jpg)
US Army Corps of Engineers
Phase ITunnels
US Army Corps of Engineers
![Page 10: Tunnel_and_Reservoir_Plan_Great_Lakes_Infrastructure_Forum](https://reader034.fdocuments.in/reader034/viewer/2022051520/58e98dab1a28ab287d8b4865/html5/thumbnails/10.jpg)
TARP Goals
• Protect ……… Lake Michigan from River Backflows
• Eliminate …… Waterway Pollution Caused by CSO
• Provide ……... An Outlet for Flood Waters to Reduce Basement Sewage Backups
• Comply ……... With Federal and State Environmental Laws
• Accomplish ... The Above Results in the Most Cost Effective Manner
![Page 11: Tunnel_and_Reservoir_Plan_Great_Lakes_Infrastructure_Forum](https://reader034.fdocuments.in/reader034/viewer/2022051520/58e98dab1a28ab287d8b4865/html5/thumbnails/11.jpg)
Local Sewer
TARP Tunnel
MWRDGCInterceptorSewer
![Page 12: Tunnel_and_Reservoir_Plan_Great_Lakes_Infrastructure_Forum](https://reader034.fdocuments.in/reader034/viewer/2022051520/58e98dab1a28ab287d8b4865/html5/thumbnails/12.jpg)
![Page 13: Tunnel_and_Reservoir_Plan_Great_Lakes_Infrastructure_Forum](https://reader034.fdocuments.in/reader034/viewer/2022051520/58e98dab1a28ab287d8b4865/html5/thumbnails/13.jpg)
![Page 14: Tunnel_and_Reservoir_Plan_Great_Lakes_Infrastructure_Forum](https://reader034.fdocuments.in/reader034/viewer/2022051520/58e98dab1a28ab287d8b4865/html5/thumbnails/14.jpg)
• Phase I (Pollution Control)109 miles of deep tunnels 250 drop shafts600 Surface Connecting
StructuresCompleted in March 2006
• Phase II (Flood Control)3 large reservoirs
• Gloria Alitto Majewski• Thornton Composite• McCook
TARP
![Page 15: Tunnel_and_Reservoir_Plan_Great_Lakes_Infrastructure_Forum](https://reader034.fdocuments.in/reader034/viewer/2022051520/58e98dab1a28ab287d8b4865/html5/thumbnails/15.jpg)
US Army Corps of Engineers
Phase II Reservoirs
US Army Corps of Engineers
![Page 16: Tunnel_and_Reservoir_Plan_Great_Lakes_Infrastructure_Forum](https://reader034.fdocuments.in/reader034/viewer/2022051520/58e98dab1a28ab287d8b4865/html5/thumbnails/16.jpg)
TARP Reservoir
![Page 17: Tunnel_and_Reservoir_Plan_Great_Lakes_Infrastructure_Forum](https://reader034.fdocuments.in/reader034/viewer/2022051520/58e98dab1a28ab287d8b4865/html5/thumbnails/17.jpg)
Planned TARP CSO Storage Volume
*1972 - Clean Water Act enacted. TARP program adopted by MWRDGC.
**1975 - TARP tunnel construction initiated
TARP Reservoir Storage
TARP Tunnel Storage
0.07 BG
17.5 BG
11.0 BG
7.5 BG
2.7 BG2.5 BG1.6 BG1.3 BG
01
23456789
10111213141516
1718
Year
TAR
P St
orag
e Vo
lum
e (B
illio
n G
allo
ns)
![Page 18: Tunnel_and_Reservoir_Plan_Great_Lakes_Infrastructure_Forum](https://reader034.fdocuments.in/reader034/viewer/2022051520/58e98dab1a28ab287d8b4865/html5/thumbnails/18.jpg)
Gloria Alitto Majewski ReservoirCompleted 1998
Volume = 350 Million Gallons
![Page 19: Tunnel_and_Reservoir_Plan_Great_Lakes_Infrastructure_Forum](https://reader034.fdocuments.in/reader034/viewer/2022051520/58e98dab1a28ab287d8b4865/html5/thumbnails/19.jpg)
Thornton Composite ReservoirCompleted 2015
Volume = 7.9 Billion Gallons
![Page 20: Tunnel_and_Reservoir_Plan_Great_Lakes_Infrastructure_Forum](https://reader034.fdocuments.in/reader034/viewer/2022051520/58e98dab1a28ab287d8b4865/html5/thumbnails/20.jpg)
McCook ReservoirUnder Construction
Stage 1 online 2017 (3.5 Billion Gallons)Stage 2 online 2029 (6.5 Billion Gallons)
![Page 21: Tunnel_and_Reservoir_Plan_Great_Lakes_Infrastructure_Forum](https://reader034.fdocuments.in/reader034/viewer/2022051520/58e98dab1a28ab287d8b4865/html5/thumbnails/21.jpg)
HOW BIG IS THE McCOOK RESERVOIR?Large enough to house 11 Soldier Field’s within the
perimeter.
![Page 22: Tunnel_and_Reservoir_Plan_Great_Lakes_Infrastructure_Forum](https://reader034.fdocuments.in/reader034/viewer/2022051520/58e98dab1a28ab287d8b4865/html5/thumbnails/22.jpg)
![Page 23: Tunnel_and_Reservoir_Plan_Great_Lakes_Infrastructure_Forum](https://reader034.fdocuments.in/reader034/viewer/2022051520/58e98dab1a28ab287d8b4865/html5/thumbnails/23.jpg)
![Page 24: Tunnel_and_Reservoir_Plan_Great_Lakes_Infrastructure_Forum](https://reader034.fdocuments.in/reader034/viewer/2022051520/58e98dab1a28ab287d8b4865/html5/thumbnails/24.jpg)
Description Status Cost EstimateGrout Test Complete $5,418,000
Groundwater Cut-Off Wall, Stage 1 Complete $10,959,000
Addition of Pumps and Motors Complete *$11,700,000
Distribution Tunnel System Under Construction $59,400,000
Groundwater Cut-Off Wall, Stage 2 Complete *$9,300,000
Grout Curtain, Stage 1 Complete *$39,106,000
Grout Curtain, Stage 2 Complete *$53,200,000
Misc. Surface Features, Stages 1 & 2 Future $17,040,000
Main Tunnels Under Construction *$55,865,000
Inlet Structure Under Design $8,765,000
Misc. Floor Features, Stages 1 & 2 Future $8,831,000
Aeration, Stages 1 & 2 Future $9,000,000
Rockwall Stability, Stages 1 Advertised $5,097,000
Rockwall Stability, Stage 2 Future $5,287,000
Expanded Stage 2 Incremental Costs Future $41,600,000
Engineering and Management In-Progress $82,850,000
TOTAL = $423,418,000
Note: All Army Corps Contracts are Subject to Their Disadvantaged Business Program
ARMY CORPS RESPONSIBILITIES
![Page 25: Tunnel_and_Reservoir_Plan_Great_Lakes_Infrastructure_Forum](https://reader034.fdocuments.in/reader034/viewer/2022051520/58e98dab1a28ab287d8b4865/html5/thumbnails/25.jpg)
Description Status Cost EstimateLand - Decommissioning Lagoons Complete $8,250,000Conveyance Tunnel Complete $5,591,000Site Preparation Complete $889,000Willow Springs Berm Complete $3,274,00073rd Street Tunnel Relocation Complete $15,132,000
Overburden RemovalUnder
Construction $59,847,000Vulcan Conveyance System and Maintenance Facilities
Under Construction $31,441,000
Furnish and Deliver Mining Equipment In-progress $18,931,000Stages 1 and 2 Mining Future $54,696,000Expanded Stage 2 Overburden Removal Complete *$27,000,000
Expanded Stage 2 Mining Future $8,200,000TOTAL = $233,251,000
METROPOLITAN WATER RECLAMATION DISTRICT RESPONSIBILITIES
![Page 26: Tunnel_and_Reservoir_Plan_Great_Lakes_Infrastructure_Forum](https://reader034.fdocuments.in/reader034/viewer/2022051520/58e98dab1a28ab287d8b4865/html5/thumbnails/26.jpg)
BUILDING STRONG®
• Des Plaines Inflow Tunnel ($100M) Tunnel Shaft, Gates & Connection
• McCook Reservoir PH 1 Completion
• McCook Stage 2 Congressional Funding• Wall Stabilization, Tunnel to connect Stage 1 & 2
TARP Next Steps