WELCOME YOU TO PIRPANJAL RAILWAY TUNNEL SITE THE LONGEST TRANSPORTATION TUNNEL IN INDIA

description

The Presentation Covers the General Technical Features of Tunnel T 80 across Pir Panjal Mountain Range, for Kashmir Rail Link. This presentation was made at Civil Engineering Society, IIT Kanpur on 30th September 2013.

Transcript of Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

Page 1: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

WELCOME YOU TO

PIRPANJAL RAILWAY TUNNEL

SITE THE LONGEST TRANSPORTATION

TUNNEL IN INDIA

Page 2: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

2

• Location Overview

• Salient Features of The Tunnel

• Construction Approach

• Pre-construction Planning

• Usage Of NATM in T-80

• Construction Activities

• Quality Assurance

• Environment Issues

• Social Impact

PRESENTATION COVERS

Page 3: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

LOCATION OVERVIEW

Page 4: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

4

ALIGNMENT PLAN

JAMMU-UDHAMPUR-SRINAGAR-BARAMULLA RAIL

LINK

QAZIGUN

D

SADUR

A

ANANTNAG

BIJBEHARA PUNZGA

M

AWANTIPORA

KAKPORA

PAMPOR

E

SRINAGA

R

BUDGA

M

RAJWANSHE

R

PATTAN

HAMRE

SOPORE BARAMULLA

BANIHA

L ARPINCHALA

BHATTA

LOALE

KOHLI SANGALDAN

BARALA BASAND

A--DHAR

REASI

KATRA

CHAKARWAH

UDHAMPUR

SALAL

RAMNAGAR

ROAD

MANWA

L

SANGAR

BAJALT

A JAMM

U

SURUKOT

PIR PANJAL RAIL TUNNEL

Length 11100 mts.

South portal photo

SOUTH PORTAL

Page 5: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

5

Page 6: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

6

SALIENT FEATURES OF T-80

• Total length – 11 Km

• Adit – 774 m (58 m2 exc. Area)

• Shaft : 55 m depth , 12 m dia

• Maximum overburden - 1.10 Km

• Tunnelling method :NATM (New Austrian Tunneling Method)

• Completed Cost – 1150 Crores

• Approx. 440 m below existing Jawahar Road Tunnel(2.75km)

• Underground excavation : 10 lac cubic meter

• Cross section Area : Excavation : 67 to 78 m2 ,

Finished Tunnel : 48 m2

• Investigation Bore Holes depth upto 640 m

Page 7: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

7

SALIENT FEATURES OF T-80

(Contd.)

• 3 m wide road in tunnel for maintenance, emergency rescue & relief.

• High mid point & sloping in both directions for drainage.

• Provision of system for ventilation, fire fighting & safety monitoring.

• Adit & shaft for parallel working, to be used for ventilation, maintenance & emergency relief during service.

• Extensive instrumentation for monitoring during tunneling

• Consultants : M/s Geoconsult-RITES JV

Page 8: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

8

MANY FIRSTS • The Longest Transport Tunnel In The Country

(11Km)

• Highest ‘Over- burden’ of 1100M

• Deepest ‘Drill holes’ for Geotechnical Investigations 640M

• First Large Scale Use of ‘New Austrian Tunneling Method (NATM)’ in India

• First Use of ‘Road header’ for ‘Tunnel Excavation’ in Railway Tunneling

Page 9: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

CONSTRUCTION

APPROACH

Page 10: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

10

APPROACH TO CONSTRUCTION

NO ADIT

Page 11: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

11

Vertcal Shaft

55m deep,

12m dia

Cross Passage 55 m

Adit 788 m

APPROACH TO CONSTRUCTION

WITH SHAFT AND ADIT

Page 12: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

12

Tunnel

Cross

Section:

STRUCTURAL GAUGE

Page 13: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

13

TUNNELS SECTIONS USED ON KONKAN TRACK

Page 14: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

14

TYPICAL RAILWAY TUNNEL SECTION USED ON JAMMU-

UDHAMPUR RAIL LINK

SHOTCRETE(25mm+WIRE MESH +50mm)

OR 50mm SFRS

300 TH. C.C. LINING

ISHB 150 @ 500 C/C

50mm TH. R.C.C. LAGGING

Min. EXCAVATION LINE

75Ø @ 2000 C/C

MS PLATE 12mm THICKISHB150-2NOS.

INVERT STRUT ISHB150 @ 500mm

ISHB200 @ 750 C/C

1676

R26

00

43

70

13

12

150

150

Max.

150(max)

50M20

1 in 40

RAIL LEVEL

FINISH LINE

PAY LINE 150 TH. FROM Min. EXCAVATION

25 mm Ø 3 to 5m ROCK BOLTS

AS PER SITE REQUIREMENT

ISHB 150 @ 750 c/c

PRESSURE RELIEF HOLES 5m DEEP @

3m c/c LONGITUDINALLY AS PER SITE

REQUIREMENT

150

PAY LINEMIN. EXCAV. LINE

BASE PLATE

12mm THICK

R3000

ISH

B 1

50

@ 5

00 c

/c

SH

OT

CR

ET

E25m

m +

WIR

EM

ES

H+

50m

m O

R 5

0m

m S

FR

S

50

TH

. R

.C.C

. LA

GG

ING

150

PR

ES

SU

RE

RE

LIE

F H

OLE

S 5

m

DE

EP

@ 3

m c

/c L

ON

GIT

UD

INA

LLY

AR

AS

PE

R S

ITE

RE

QU

IRE

ME

NT

BA

CK

FIL

LIN

G M

-10

50

FIN

ISH

LIN

E

30

0 T

H.

CO

NC

. LIN

ING

M-2

0

150

100

900

BLOWER

8Ø @ 150 C/C

50 675 150

100

65

675

25

mm

Ø 3

mto

5m

RO

CK

BO

LT

AS

PE

R S

ITE

RE

QU

IRE

ME

NT

SE

C. A

T A

-A

75

Page 15: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

15

LOADING DIAGRAM FOR TUNNEL TOP PRESSURE-15000KG/M

AND SIDE PRESSURE-5000KG/M

Page 16: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

16

BENDING MOMENTS DIAGRAM FOR

D-SHAPE TUNNEL TOP PRESSURE-15000KG/M AND SIDE PRESSURE-5000KG/M

MAX BENDING MOMENT = 137KN-M

Page 17: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

17

BENDING MOMENT DIAGRAM FOR ELLIPITCAL TUNNEL

TOP PRESSURE 15000KG/M AND SIDE PRESSURE 5000KG/M

MAX. BENDING MOMENT = 35.80KN-M

Page 18: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

COMPARISION BETWEEN D-SHAPED AND ELLIPTICAL TUNNEL

DESCRIPTION MAX.

AXIAL

FORCE

MAX.

BENDING

MOMENT

MAX.

SHEAR

FORCE

MAX.

DISPLACEMENT

WITH TOP PRESSURE 15000 KG/M & SIDE PRESSURE

5000 KG/M

D-SHAPED

TUNNEL

412.5KN 137KN-M 15129 KG 0.083 M

ELLIPTICAL

TUNNEL

567 KN 35.80KN-M 9025 KG 0.024 M

WITH TOP PRESSURE 15000 KG/M

D-SHAPED

TUNNEL

412.5KN 48.10 KN-M 8565 KG 0.03 M

ELLIPTICAL

TUNNEL

639 KN 35.65 KN-M 9635 KG 0.028 M

Page 19: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

19

CONSTRUCTION METHOD

SELECTION

• DRILL AND BLAST

• ROAD HEADER

• TUNNEL BORING MACHINE (TBM)

Page 20: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

20

DRILL AND BLAST

• CONVENTIONAL, ART

WHICH COMES WITH

EXPERIENCE

• GOOD IN HARD ROCKY

STRATA

• WITH EXPERIENCE, CAN

DELIVER GOOD PROGRESS

• NON CONTINUOUS- CYCLE

INVOLVES VARIOUS

ACTIVITIES IN SEQUENCE

• MAY SPRING SUDDEN

SURPRISES

Page 21: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

21

ROAD HEADER • CONTINUOUS ADVANCE-

LESS SURPRISES

• MORE CONTROLLED

EXCAVATION- LESS

OVERBREAK/CAVITY

FORMATION

• SUITABLE FOR MEDIUM

HARD ROCK

• CAN BE WITHDRAWN

MID WAY TO GIVE WAY

FOR OTHER METHODS

Page 22: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

22

TUNNEL BORING MACHINE

• CONTINUOUS ADVANCE

• CIRCULAR SECTION

• NOT SUITABLE UNDER SQUEEZING CONDITIONS

• CANNOT BE WITHDRAWN MIDWAY TO GIVE WAY TO OTHER METHODS

Page 23: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

23

WHY NO TBM

• Likelihood of Mixed Geology

• Heavily Faulted Areas and/or Wide Fault Zones

• High Squeezing Anticipated in middle with High Overburden (1100 mts.)

• Heavy Water Flow in Lime Stone Zone with High overburden

• TBM may be Trapped by Ground Movement Behind the Face

Page 24: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

PRE-CONSTRUCTION

PLANNING

Page 25: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

25

PRE-CONSTRUCTION

PLANNING • Engagement of Consultant

– QCB System Of tendering

• Survey and Investigation

• Head start by Taking up ADIT and shaft

works in advance

• Tender Planning

– Key dates

– Multi Method Approach

• Road Header/ D&B

Page 26: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India
Page 27: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

27

USAGE OF NATM IN T-80 • Suitable for poor and Varying Geology of

Himalayan Region

• X-Section designed to develop Maximum Self Supporting Capacity

• Face Mapping, Probe Hole & Instrumentation data input for Initial Support Design – RESS – Primary Support System

• Resilient enough to Accept the deformations and readjustment of stresses and Strong enough to take the loads

• Deformation Monitoring to assess the stress redistribution, and stabilization before final lining

Page 28: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

28

INSTRUMENTATION To provide early information about tunnel behaviour in order to optimize

excavation & support activities during construction and to recognize the requisite remedial measures.

Instrumentation data is basic input of the NATM, the observational approach.

Instrumentation in Pir Panjal Tunnel:

Optical 3 D monitoring: With bi-reflex targets to monitor deformation in tunnel on daily basis

Extensometers: To measure stresses in surrounding rock mass

Radial Pressure Cells: To measure pressure of rockmass on shotcrete lining

Shotcrete Strain meter: To monitor stresses in shotcrete lining

Piezometer: To monitor hydrostatic pressure during tunneling

Page 29: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

29

CONSTRUCTION ACTIVITES

• Open excavation & portal development

• Tunnel mining & primary lining

• Water-proof membrane installation +

drainage system.

• Secondary lining.

• Ventilation, system and safety

installations

• Track laying

Page 30: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

30

QUALITY ASSURANCE

• Laid down responsibilities, procedures and checklists for various activities through:

–CPM, CQM, SH&EM

–PPM, PSM

–Organogram

–QAP

– ITP

Page 31: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

31

QUALITY ASSURANCE (contd…)

• Availability of relevant documentation and defining the manner of execution of various activities

• Maintaining compliance through appropriate monitoring

• Ensuring adequate support facilities for successful & scheduled execution of work.

• Availability of competent/trained personnel to carry out various activities

• Compliance of statutory/regulatory requirements related to safety, environment etc.

Page 32: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

32

Quality Assurance (contd…)

Check Lists and Forms for Process Control During Execution of Works:

• Required Excavation and Support Sheet (RESS)

• ATSS/ Shift Report/Blasting clearance report/ R/Bolt Installation report

• Shotcrete testing by Penetrometer test, Core crushing test, thickness verification etc.

• Geological mapping (Geological face mapping sheet)

• Lining Air Permeability Test

• All Material Testing at Site Lab

Page 33: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

33

ENVIRONMENT ISSUES

• Identified Muck Dumping areas

• Recycling of Excavated Rocks

– aggregate for concrete constn.

• Effluent Settling Tank

– Fit for agriculture discharge

• Ventilation during Construction Stage

– Gas Analyser for air quality monitoring

• Controlled Blasting below Inhabited areas

• Lined Waterproof Tunnel

– No long term impact on water table/ Aquifers

Page 34: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

34

SOCIAL IMPACT • All weather link, Alternate to Jawahar

Tunnel

• Even at Construction stage, given a

boost to

– local construction-industry

– Employment

– Transportation business

• A boost to Local economy of Banihal

Page 35: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

35 Time Line

Page 36: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

36

PIR PANJAL TUNNEL-

EXCAVATION PROGRESS Year Excavation

(mts.)

Remarks

2006 722 Two Faces

2007 1876 Start From 4 Faces

2008 2475

2009 2533

2010 1739 Two Faces after Jan’10

2011 947 High overburden,

Squeezing, Shale

2012 63

Page 37: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India
Page 38: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India
Page 39: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India
Page 40: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

40

Miles to go……

“A thing should be made as simple as possible, but not simpler”. Einstein

Page 41: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

41

THANKS !

Page 42: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

42

ENGAGEMENT OF CONSULTANT

• Investigations for Tunneling Methodology Assessment

• Initial Design

– Usage of NATM

– Usage of Water proof Membrane for Semi Dry Tunnel

– Development of 4-Arc Tunnel X-Section

– Additional Access through ADIT and Shaft

– Portal Location Review

• Real Time Monitoring / Instrumentation and Design Support

Page 43: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

43

INVESTIGATIONS & PLANNING 2003 Geological L-Section Profile Submitted by M/s

RITES based on GSI data.- Used to decide the Bore hole Location.

2003-04 Bore holes by RITES/ MECL- To Confirm Geological Mapping inference

2004 Consultants engaged in Feb. 2004 Geological Surface Mapping along the entire alignment by -

For Detailed Geological Section

2004 Data input for Tendering and a Decision Support System for

ADIT and Shaft decision

– Adit & Shaft Work Awarded in June 2004

2004 Detailed Topographical Survey for Portal

Location

2005 Main Tunnel Construction Work Awarded in

August 2005

Page 44: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

44

Page 45: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

45

Page 46: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

46

Page 47: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

BASIC PRINCIPLES OF NATM

• Rock Mass is the major load bearing member

• Primary Support shall

maintain the integrity & strength of Rock Mass

light, have good and area contact (shotcrete)

strengthen Rock Mass (bolt, grouting)

provide protection to workers (steel rib, mesh)

installed quickly

• Provide always an effective ring closure, if necessary by an invert if rock is not suitable

Page 48: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

BASIC PRINCIPLES OF NATM (Contd.)

• Rounded shape of Cross-Section

• Continuous control of system behaviour

by monitoring

• Inner lining shall be installed only after

balance of stresses („zero“ deformation)

Page 49: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

49

Page 50: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

50 3D Monitoring Targets

Page 51: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

51

Page 52: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

52

Page 53: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

53

EXTENSOMETER

Page 54: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

54

FACE MAPPING

Page 55: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

55

PROBING SHEET

Page 56: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

56

Page 57: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

57

Page 58: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

58

Page 59: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

59

Deformation

Monitoring in Primary

Lining Before start of

Secondary Lining

Page 60: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

60

Page 61: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

61

Page 62: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

62 Charging of Face

Page 63: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

63 Ventilation Duct

Page 64: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

64 Mucking

Page 65: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

65 Wire mesh & Lattice Girder Erection

Page 66: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

66

Face sealing

Face sealing by Shotcrete

Page 67: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

67 Drilling for Forepoling

Page 68: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

68 Rock Bolting

Page 69: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

69

TUNNEL MINING

Activity Cycle Time (hr.) 2 mt.

RC IV

Cycle time (hr.) 1.25

mt. RC V

Drilling & Excavation 1.7 0.9

Charging , Blasting

& Defuming 2.7 1.5

Mucking 1.1 0.8

Wire Mesh & Lattice

Girder 2.4 2.3

Shotcrete 0.9 0.8

Rock Bolting 1.8 1.0

Preparation of new

face 0.3 0.3

Maintenance 1.6 1.1

Forepoling 1.6 1.7

Total 14.1 10.4

Page 70: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

70

Page 71: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

71

Kicker Beam Casting

Page 72: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

72 Geotextile Fixing

Page 73: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

73 PVC Membrane Fixing

Page 74: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

74 Membrane Stitching

Page 75: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

75 Reinforcement for Overt Lining

Page 76: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

76 Reinforcement Cage for Inner Lining

Page 77: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

77 Concrete Lining Gantry

Page 78: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

78

View of Finished Lining Concrete

Page 79: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

79

Profile Checking with Total Station

Page 80: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

80 Core Cutting

Page 81: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

81 Testing of Joints (Membrane)

Page 82: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

82

Sedimentation Tank

Page 83: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

83

Effluent Quality

Test Report

Page 84: Tunnel T80 across Pir Panjal Mountain Range: The Longest Transportation Tunnel In India

84