Tujuh Bukit Project Indonesia Field Response Team Knots.

27
Tujuh Bukit Project Tujuh Bukit Project Indonesia Indonesia Field Response Team Field Response Team Knots Knots

Transcript of Tujuh Bukit Project Indonesia Field Response Team Knots.

Page 1: Tujuh Bukit Project Indonesia Field Response Team Knots.

Tujuh Bukit ProjectTujuh Bukit Project

IndonesiaIndonesia

Field Response TeamField Response Team

KnotsKnots

Page 2: Tujuh Bukit Project Indonesia Field Response Team Knots.

DESIRABLE KNOT ELEMENTS

• Easy to tie

• Easy to identify

• Easy to untie

• Secure under load (not subject to slippage)

• Tied with few abrupt bends

• Strong enough for required job

Page 3: Tujuh Bukit Project Indonesia Field Response Team Knots.

ELEMENTS OF A KNOT I

Bight

Underhand Loop

Loop

Round Turn Overhand

Loop

Page 4: Tujuh Bukit Project Indonesia Field Response Team Knots.

ELEMENTS OF A KNOT II

Working End

Standing Part

Running End

Page 5: Tujuh Bukit Project Indonesia Field Response Team Knots.

KNOT TERMS

• Working end — Used for forming knot

• Standing part — Between working and running ends

• Running end — Used to hoist, pull, belay, etc.

• Bight — Loop that does not cross over itself

• Loop — Side of bight crossed over or under standing part

• Round turn — End of rope continued around top of loop until standing lengths are parallel

Page 6: Tujuh Bukit Project Indonesia Field Response Team Knots.

PRIMARY KNOT APPLICATIONS

• Overhand knot A foundation knot for beginning other knots A safety knot or backup to secure other knots (particularly

those of synthetic rope) to prevent the working end from slipping back through the knot and causing it to fail

• Half hitch Hoisting tools Stabilizing tall objects

Page 7: Tujuh Bukit Project Indonesia Field Response Team Knots.

PRIMARY KNOT APPLICATIONS (cont.)

• Bowline — Various utility and life safety (rope rescue harness) applications

• Clove hitch Attaching ropes to objects Hoisting (with overhand knot)

• Figure-eight — Foundation knot for other knots in family

• Figure-eight follow through — Joining ropes of equal diameters

Page 8: Tujuh Bukit Project Indonesia Field Response Team Knots.

PRIMARY KNOT APPLICATIONS (cont.)

• Figure-eight on a bight — Securing a loop in middle or end of a rope for a safety line, safety harness, litter and rescue equipment, anchor lines

• Double-loop figure-eight — Constructing a rope rescue harness

• Becket bend (sheet bend) Joining ropes of unequal diameter Joining rope to chain

Page 9: Tujuh Bukit Project Indonesia Field Response Team Knots.

HALF HITCH & OVERHAND SAFETY KNOT

1

2

3

Overhand Safety KnotTwo Half Hitches

1

Page 10: Tujuh Bukit Project Indonesia Field Response Team Knots.

BOWLINE1 2

3 4

2

Page 11: Tujuh Bukit Project Indonesia Field Response Team Knots.

BOWLINE KNOT

• Is used to form a loop that will not constrict the object it is placed around

• Is untied easily

• Shares degree of acceptability in both life safety and utility applications

Page 12: Tujuh Bukit Project Indonesia Field Response Team Knots.

CLOVE HITCH OPEN1 2

3 4

3

Page 13: Tujuh Bukit Project Indonesia Field Response Team Knots.

CLOVE HITCH AROUND OBJECT

21 3

4

Page 14: Tujuh Bukit Project Indonesia Field Response Team Knots.

CLOVE HITCH

• Is easily formed of two half hitches

• May be used with overhand safety knot for hoisting tools and equipment

• May be formed anywhere on the rope

• Withstands pull in either direction without slipping, when properly tied

Page 15: Tujuh Bukit Project Indonesia Field Response Team Knots.

BECKET BEND

1 2

3

5

Page 16: Tujuh Bukit Project Indonesia Field Response Team Knots.

BECKET BEND

• Is not likely to slip when the rope is wet

• Is dependable and useful for fire service utility applications

Page 17: Tujuh Bukit Project Indonesia Field Response Team Knots.

FIGURE EIGHT

1 2 3 4

6

Page 18: Tujuh Bukit Project Indonesia Field Response Team Knots.

FIGURE EIGHT FOLLOW THROUGH

1 2 3

7

Page 19: Tujuh Bukit Project Indonesia Field Response Team Knots.

FIGURE EIGHT FOLLOW THROUGH AROUND OBJECT

1 2

3 4

8

Page 20: Tujuh Bukit Project Indonesia Field Response Team Knots.

FIRGURE EIGHT ON A BIGHT1

2

9

Page 21: Tujuh Bukit Project Indonesia Field Response Team Knots.

DOUBLE LOOP FIGURE EIGHT

1 2 3 4

10

Page 22: Tujuh Bukit Project Indonesia Field Response Team Knots.

FIGURE EIGHT KNOT

• Has replaced the bowline since the introduction of synthetic rope

• Is not as likely as the bowline to damage the rope

• Is stronger than the bowline

• Is an easy knot to tie, untie, inspect, and keep neat

Page 23: Tujuh Bukit Project Indonesia Field Response Team Knots.

HOISTING A LADDER

1 3

2

Page 24: Tujuh Bukit Project Indonesia Field Response Team Knots.

HOISTING A LADDER

• Use bowline or figure eight on a bight.

• Place knot through two rungs of ladder about one-third down from top.

• Place loop over top of ladder.

Page 25: Tujuh Bukit Project Indonesia Field Response Team Knots.

HOISTING HOSELINES

Charged LineDry Line

Page 26: Tujuh Bukit Project Indonesia Field Response Team Knots.

HOISTING TOOLS & EQUIPMENTPike Pole

Axe

Portable Fan

Half Hitch

Half Hitch

Half Hitch

CloveHitch

CloveHitch

WorkingEnd

Tag Line

Bowline

TagLine

Page 27: Tujuh Bukit Project Indonesia Field Response Team Knots.

1. Overhand Safety Knot

2. Bowline

3. Clove Hitch Open

4. Clove Hitch Around an Object

5. Becket Bend

6. Figure Eight

7. Figure Eight Follow Through

8. Figure Eight Follow Through around an Object

9. Figure Eight on the Bight

10. Double Loop Figure Eight

Practical Knot Assessment